Skip to Content

Notice

Black Hills Power, Inc.; Notice of Institution of Section 206 Proceeding and Refund Effective Date

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

On July 17, 2014, the Commission issued an order in Docket No. EL14-71-000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e (2012), instituting an investigation into the justness and reasonableness of the formula rate protocols of Black Hills Power, Inc., as joint administrator, under the Joint Open Access Transmission Tariff of Black Hills, Basin Electric Power Cooperative, and Powder River Energy Corporation. Black Hills Power, Inc., 148 FERC ¶ 61,035 (2014).

The refund effective date in Docket No. EL14-71-000, established pursuant to section 206(b) of the FPA, will be the date of publication of this notice in the Federal Register.

Start Signature

Dated: July 17, 2014.

Nathaniel J. Davis, Sr.,

Deputy Secretary.

End Signature End Preamble

[FR Doc. 2014-17298 Filed 7-22-14; 8:45 am]

BILLING CODE 6717-01-P