Skip to Content

Notice

Transcontinental Gas Pipe Line Company, LLC; Notice of Availability of the Environmental Assessment for the Proposed Leidy Southeast Expansion Project

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Leidy Southeast Expansion Project, proposed by Transcontinental Gas Pipe Line Company, LLC (Transco) in the above-referenced docket. Transco requests authorization to construct and operate certain natural gas pipeline facilities in various counties in New Jersey, Pennsylvania, Maryland, Virginia, and North Carolina to expand the natural gas delivery capacity to the northeast region of the United States by up to 525,000 dekatherms per day.

The EA assesses the potential environmental effects of the construction and operation of the Leidy Southeast Expansion Project in accordance with the requirements of the National Environmental Policy Act (NEPA). The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment.

On June 12, 2014, FERC issued a Notice of Schedule for Environmental Review of the Leidy Southeast Expansion Project. That notice identified the EA issuance date as August 8, 2014, with a 90-day Federal Authorization Decision Deadline of November 6, 2014 (now November 9, 2014).

The U.S. Department of Transportation's Pipeline and Hazardous Materials Safety Administration and the U.S. Army Corps of Engineers (COE) participated as cooperating agencies in the preparation of the EA. Cooperating agencies have jurisdiction by law or special expertise with respect to resources potentially affected by the proposal and participate in the NEPA analysis. The COE will use the EA as part of its review to consider the issuance of a Section 404 Clean Water Act permit.

The proposed Leidy Southeast Expansion Project includes the following facilities:

  • About 29.8 miles of new 42-inch-diameter pipeline loop1 in four separate segments in Mercer, Somerset, and Hunterdon Counties, New Jersey, and Monroe and Luzerne Counties, Pennsylvania;
  • Additional compression and modification of existing Compressor Stations 205, 515, 517, and 520 in Mercer County, New Jersey, and Luzerne, Columbia, and Lycoming Counties, Pennsylvania, respectively;
  • Modification of existing compressor stations in North Carolina (1 facility), Virginia (5 facilities), and Maryland (1 facility); and
  • Modification of existing meter and regulating stations, mainline valves, and pig launchers and receivers in North Carolina, Pennsylvania, Virginia, and Maryland.

The FERC staff mailed copies of the EA to Federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; newspapers and libraries in the project area; and parties to this proceeding. In addition, the EA is available for public viewing on the FERC's Web site (www.ferc.gov) using the eLibrary link. A limited number of copies of the EA are available for distribution and public inspection at: Federal Energy Regulatory Commission, Public Reference Room, 888 First Street NE., Room 2A, Washington, DC 20426, (202) 502-8371.

Any person wishing to comment on the EA may do so. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that the Commission has the opportunity to consider your comments prior to making its decision on this project, it is important that we receive your comments in Washington, DC on or before September 10, 2014.

For your convenience, there are three methods you can use to file your comments to the Commission. In all instances, please reference the project docket number (CP13-551-000) with your submission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502-8258 or efiling@ferc.gov.

(1) You can file your comments electronically using the eComment feature on the Commission's Web site (www.ferc.gov) under the link to Documents and Filings. This is an easy method for submitting brief, text-only comments on a project;Start Printed Page 48740

(2) You can also file your comments electronically using the eFiling feature on the Commission's Web site (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on “eRegister.” You must select the type of filing you are making. If you are filing a comment on a particular project, please select “Comment on a Filing”; or

(3) You can file a paper copy of your comments by mailing them to the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 20426.

Any person seeking to become a party to the proceeding must file a motion to intervene pursuant to Rule 214 of the Commission's Rules of Practice and Procedures (18 CFR 385.214).[1] Only intervenors have the right to seek rehearing of the Commission's decision. The Commission grants affected landowners and others with environmental concerns intervenor status upon showing good cause by stating that they have a clear and direct interest in this proceeding which no other party can adequately represent. Simply filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered.

Additional information about the project is available from the Commission's Office of External Affairs, at (866) 208-FERC, or on the FERC Web site (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on “General Search,” and enter the docket number excluding the last three digits in the Docket Number field (i.e., CP13-551). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, contact (202) 502-8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings.

In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to www.ferc.gov/​docs-filing/​esubscription.asp.

Start Signature

Dated: August 11, 2014.

Kimberly D. Bose,

Secretary.

End Signature End Preamble

Footnotes

1.  See the previous discussion on the methods for filing comments.

Back to Citation

[FR Doc. 2014-19468 Filed 8-15-14; 8:45 am]

BILLING CODE 6717-01-P