This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Approval and Promulgation of Implementation Plans; Mississippi; Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Approval and Promulgation of Implementation Plans; Mississippi; Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
112
as of
09/07/2026 at 2:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2015-04140 as it appeared on Public Inspection on
02/27/2015 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2015-04140 (80 FR 11131)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Final rule.
SUMMARY:
The Environmental Protection Agency (EPA) is taking final action to approve in part and disapprove in part, the May 29, 2012, and July 26, 2012, State Implementation Plan (SIP) submissions, provided by the Mississippi Department of Environmental Quality (MDEQ) for inclusion into the Mississippi SIP. This final rulemaking pertains to the Clean Air Act (CAA or the Act) infrastructure requirements for the 2008 8-hour ozone national ambient air quality standards (NAAQS). The CAA requires that each state adopt and submit a SIP for the implementation, maintenance and enforcement of each NAAQS promulgated by EPA, which is commonly referred to as an “infrastructure” SIP. MDEQ certified that the Mississippi SIP contains provisions that ensure the 2008 8-hour ozone NAAQS is implemented, enforced, and maintained in Mississippi (hereafter referred to as an “infrastructure SIP submission”). With the exception of provisions pertaining to prevention of significant deterioration (PSD) permitting, interstate transport, visibility protection requirements and the state board majority requirements respecting significant portion of income, EPA is taking final action to approve Mississippi's infrastructure SIP submissions, provided to EPA on May 29, 2012, and July 26, 2012. EPA is taking final action to disapprove Mississippi's May 29, 2012, and July 26, 2012, SIP submissions with regards to the state board majority requirements respecting significant portion of income. EPA will consider action with regards to the infrastructure elements related to PSD permitting, visibility and interstate transport in a separate action.
DATES:
This rule will be effective April 1, 2015.
ADDRESSES:
EPA has established a docket for this action under Docket Identification No. EPA-R04-OAR-2012-0698. All documents in the docket are listed on the
www.regulations.gov
Web site. Although listed in the index, some information is not publicly available,
i.e.,
Confidential Business Information or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically through
www.regulations.gov
or in hard copy at the Air Regulatory Management Section (formerly the Regulatory Development Section), Air Planning and Implementation Branch (formerly the Air Planning Branch), Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia 30303-8960. EPA requests that if at all possible, you contact the person listed in the
FOR FURTHER INFORMATION CONTACT
section to schedule your inspection. The Regional Office's official hours of business are Monday through Friday, 8:30 a.m. to 4:30 p.m. excluding Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Nacosta C. Ward, Air Regulatory Management Section, Air Planning and Implementation Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia 30303-8960. The telephone number is (404) 562-9140. Ms. Ward can be reached via electronic mail at
ward.nacosta@epa.gov.
SUPPLEMENTARY INFORMATION:
I. Background
Upon promulgation of a new or revised NAAQS, sections 110(a)(1) and (2) of the CAA require states to address basic SIP requirements, including emissions inventories, monitoring, and modeling to assure attainment and maintenance for that new NAAQS. Section 110(a) of the CAA generally requires states to make a SIP submission to meet applicable requirements in order to provide for the implementation, maintenance, and enforcement of a new or revised NAAQS within three years following the promulgation of such NAAQS, or within such shorter period as EPA may prescribe. These SIP submissions are commonly referred to as “infrastructure” SIP submissions. Section 110(a) imposes the obligation upon states to make an infrastructure SIP submission to EPA for a new or revised NAAQS, but the contents of that submission may vary depending upon the facts and circumstances. In particular, the data and analytical tools available at the time the state develops and submits the infrastructure SIP for a new or revised NAAQS affect the content of the submission. The contents of such infrastructure SIP submissions may also vary depending upon what provisions the state's existing SIP already contains. In the case of the 2008 8-hour ozone NAAQS, states typically have met the basic program elements required in section 110(a)(2) through earlier SIP submissions in connection with previous ozone NAAQS.
More specifically, section 110(a)(1) provides the procedural and timing requirements for SIPs. Section 110(a)(2) lists specific elements that states must meet for infrastructure SIP requirements related to a newly established or revised NAAQS. As mentioned above, these requirements include basic structural SIP elements such as modeling, monitoring, and emissions inventories that are designed to assure attainment and maintenance of the NAAQS. The requirements of section 110(a)(2) are summarized below and in EPA's September 13, 2013, memorandum entitled “Guidance on Infrastructure State Implementation Plan (SIP) Elements under Clean Air Act Sections 110(a)(1) and 110(a)(2).” [1]
110(a)(2)(A): Emission Limits and Other Control Measures
110(a)(2)(B): Ambient Air Quality Monitoring/Data System
110(a)(2)(C): Programs for Enforcement of Control Measures and
( printed page 11132)
for Construction or Modification of Stationary Sources [2]
110(a)(2)(D)(i)(I) and (II): Interstate Pollution Transport
110(a)(2)(D)(ii): Interstate Pollution Abatement and International Air Pollution
110(a)(2)(E): Adequate Resources and Authority, Conflict of Interest, and Oversight of Local Governments and Regional Agencies
110(a)(2)(F): Stationary Source Monitoring and Reporting
110(a)(2)(G): Emergency Powers
110(a)(2)(H): SIP revisions
110(a)(2)(I): Plan Revisions for Nonattainment Areas [3]
110(a)(2)(J): Consultation with Government Officials, Public Notification, and Prevention of Significant Deterioration (PSD) and Visibility Protection
110(a)(2)(K): Air Quality Modeling and Submission of Modeling Data
110(a)(2)(L): Permitting fees
110(a)(2)(M): Consultation and Participation by Affected Local Entities
On November 24, 2014, EPA proposed to approve in part and disapprove in part, the May 29, 2012, and July 26, 2012, 2008 8-hour ozone NAAQS infrastructure SIP submissions with the exception of the PSD permitting requirements for major sources of sections 110(a)(2)(C) and (J), the interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II) (prongs 1 through 4), and the visibility requirements of section 110(a)(2)(J), which EPA will address in a separate action. EPA also proposed to disapprove a portion of Mississippi's infrastructure submission for section 110(a)(2)(E)(ii) pertaining to state board majority requirements respecting significant portion of income.
See79 FR 69787. EPA did not receive any comments, adverse or otherwise, on the Agency's November 24, 2014, proposed action. In this rulemaking, EPA is taking final action to approve in part and disapprove in part Mississippi's May 29, 2012, and July 26, 2012, infrastructure submissions as demonstrating that the State meets the applicable requirements of sections 110(a)(1) and (2) of the CAA for the 2008 8-hour ozone NAAQS, as proposed in the Agency's November 24, 2014, rulemaking. EPA will act on portions of Mississippi's submissions not addressed in today's rulemaking in a separate action.
II. Final Action
With the exceptions described below, EPA is taking final action to approve that MDEQ's infrastructure SIP submissions, submitted May 29, 2012, and July 26, 2012, for the 2008 8-hour ozone NAAQS have met the above described infrastructure SIP requirements. EPA is disapproving in part section 110(a)(2)(E)(ii) of Mississippi's infrastructure submissions because the majority of members of boards that approve permits or enforcement orders in Mississippi may still derive a significant portion of income from persons subject to permits or enforcement orders issued by such Mississippi boards, and therefore, its current SIP does not meet the section 128(a)(1) majority requirements respecting significant portion of income. This final approval in part and disapproval in part, however, does not include the PSD permitting requirements for major sources of section 110(a)(2)(C) and (J), the interstate transport requirements of section 110(a)(2)(D)(i)(I) and (II) (prongs 1 through 4), and the visibility requirements of section 110(a)(2)(J), which will be addressed by EPA in a separate action. With the exceptions noted above Mississippi has addressed the elements of the CAA 110(a)(1) and (2) SIP requirements pursuant to section 110 of the CAA to ensure that the 2008 8-hour ozone NAAQS is implemented, enforced, and maintained in Mississippi.
III. Statutory and Executive Order Reviews
Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this action merely approves state law as meeting federal requirements and does not impose additional requirements beyond those imposed by State law. For that reason, this action:
Is not a “significant regulatory action” subject to review by the Office of Management and Budget underExecutive Order 12866 (58 FR 51735, October 4, 1993);
does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501et seq.);
is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601et seq.);
does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and
does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, underExecutive Order 12898 (59 FR 7629, February 16, 1994).
The SIP is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), nor will it impose substantial direct costs on tribal governments or preempt tribal law.
The Congressional Review Act, 5 U.S.C. 801et seq.,
as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the
Federal Register
. A major rule cannot take effect until 60 days after it is published in the
Federal Register
. This action is not a “major rule” as defined by 5 U.S.C. 804(2).
Under section 307(b)(1) of the CAA, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by May 1, 2015. Filing a petition for reconsideration by the Administrator of this final rule does not affect the
( printed page 11133)
finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements.
See
section 307(b)(2).
2. Section 52.1270(e) is amended by adding a new entry “110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards” at the end of the table to read as follows:
110(a)(1) and (2) Infrastructure Requirements for the 2008 8-Hour Ozone National Ambient Air Quality Standards
Mississippi
7/26/2012
3/2/2015 [Insert citation of publication]
With the exception of sections:
110(a)(2)(C) and (J) concerning PSD permitting requirements;
110(a)(2)(D)(i)(I) and (II) (prongs 1 through 4) concerning interstate transport requirements;
110(a)(2)(E)(ii) concerning state board majority requirements respecting significant portion of income; and
110(a)(2)(J) concerning visibility requirements.
3. Section 52.1272 is amended by adding paragraph (b) to read as follows:
(b)
Disapproval.
Submittal from the State of Mississippi, through the Mississippi Department of Environmental Quality (MDEQ) on May 29, 2012, and July 26, 2012, to address the Clean Air Act (CAA) section 110(a)(2)(E)(ii) for the 2008 8-hour Ozone National Ambient Air Quality Standards concerning state board majority requirements respecting significant portion of income. EPA is disapproving MDEQ's submittal with respect to section 128(a)(1) because a majority of board members may still derive a significant portion of income from persons subject to permits or enforcement orders issued by the Mississippi Boards, therefore, its current SIP does not meet the section 128(a)(1) majority requirements respecting significant portion of income for the 2008 8-hour Ozone National Ambient Air Quality Standards.
Footnotes
1.
Two elements identified in section 110(a)(2) are not governed by the three year submission deadline of section 110(a)(1) because SIPs incorporating necessary local nonattainment area controls are not due within three years after promulgation of a new or revised NAAQS, but rather due at the time the nonattainment area plan requirements are due pursuant to other provisions of the CAA for submission of SIP revisions specifically applicable for attainment planning purposes. These requirements are: (1) Submissions required by section 110(a)(2)(C) to the extent that subsection refers to a permit program as required in part D Title I of the CAA; and (2) submissions required by section 110(a)(2)(I) which pertain to the nonattainment planning requirements of part D, Title I of the CAA. Today's proposed rulemaking does not address infrastructure elements related to section 110(a)(2)(I) or the nonattainment planning requirements of 110(a)(2)(C).