Start Preamble Start Printed Page 21302

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Final rule.

SUMMARY:

The Environmental Protection Agency (EPA or the Agency) is publishing a final rule to regulate the disposal of coal combustion residuals (CCR) as solid waste under subtitle D of the Resource Conservation and Recovery Act (RCRA). The available information demonstrates that the risks posed to human health and the environment by certain CCR management units warrant regulatory controls. EPA is finalizing national minimum criteria for existing and new CCR landfills and existing and new CCR surface impoundments and all lateral expansions consisting of location restrictions, design and operating criteria, groundwater monitoring and corrective action, closure requirements and post closure care, and recordkeeping, notification, and internet posting requirements. The rule requires any existing unlined CCR surface impoundment that is contaminating groundwater above a regulated constituent's groundwater protection standard to stop receiving CCR and either retrofit or close, except in limited circumstances. It also requires the closure of any CCR landfill or CCR surface impoundment that cannot meet the applicable performance criteria for location restrictions or structural integrity. Finally, those CCR surface impoundments that do not receive CCR after the effective date of the rule, but still contain water and CCR will be subject to all applicable regulatory requirements, unless the owner or operator of the facility dewaters and installs a final cover system on these inactive units no later than three years from publication of the rule. EPA is deferring its final decision on the Bevill Regulatory Determination because of regulatory and technical uncertainties that cannot be resolved at this time.

DATES:

This final rule is effective on October 14, 2015.

ADDRESSES:

EPA has established three dockets for this regulatory action under Docket ID No. EPA-HQ-RCRA-2009-0640, Docket ID No. EPA-HQ-RCRA-2011-0392, and Docket ID No. EPA-HQ-RCRA-2012-0028. All documents in these dockets are available at http://www.regulations.gov. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form. Publicly available docket materials are available either electronically in http://www.regulations.gov or in hard copy at the OSWER Docket, EPA/DC, WJC West Building, Room 3334, 1301 Constitution Ave. NW., Washington, DC 20460. The Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Public Reading Room is (202) 566-1744, and the telephone number for the OSWER Docket is 202-566-0276.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

For questions on technical issues: Alexander Livnat, Office of Resource Conservation and Recovery, Environmental Protection Agency, 5304P; telephone number: (703) 308-7251; fax number: (703) 605-0595; email address: livnat.alexander@epa.gov, or Steve Souders, Office of Resource Conservation and Recovery, Environmental Protection Agency, 5304P; telephone number: (703) 308-8431; fax number: (703) 605-0595; email address: souders.steve@epa.gov. For questions on the regulatory impact analysis: Richard Benware, Office of Resource Conservation and Recovery, Environmental Protection Agency, 5305P; telephone number: (703) 308-0436; fax number: (703) 308-7904; email address: benware.richard@epa.gov. For questions on the risk assessment: Jason Mills, Office of Resource Conservation and Recovery, Environmental Protection Agency, 5305P; telephone number: (703) 305-9091; fax number: (703) 308-7904; email address: mills.jason@epa.gov.

For more information on this rulemaking please visit http://www.epa.gov/​epawaste/​nonhaz/​industrial/​special/​fossil/​index.htm.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

A. Does this action apply to me?

This rule applies to all coal combustion residuals (CCR) generated by electric utilities and independent power producers that fall within the North American Industry Classification System (NAICS) code 221112 and may affect the following entities: Electric utility facilities and independent power producers that fall under the NAICS code 221112. The industry sector(s) identified above may not be exhaustive; other types of entities not listed could also be affected. The Agency's aim is to provide a guide for readers regarding those entities that potentially could be affected by this action. To determine whether your facility, company, business, organization, etc., is affected by this action, you should refer to the applicability criteria discussed in Unit VI.A. of this document If you have any questions regarding the applicability of this action to a particular entity, consult the person listed in the preceding FOR FURTHER INFORMATION CONTACT section.

B. What actions are not addressed in this rule?

This rule does not address the placement of CCR in coal mines. The U.S. Department of Interior (DOI) and, as necessary, EPA will address the management of CCR in minefills in separate regulatory action(s), consistent with the approach recommended by the National Academy of Sciences, recognizing the expertise of DOI's Office of Surface Mining Reclamation and Enforcement in this area. See Unit VI of this document for further details. This rule does not regulate practices that meet the definition of a beneficial use of CCR. Beneficial uses that occur after the effective date of the rule need to determine if they comply with the criteria contained in the definition of “beneficial use of CCRs.” This rule does not affect past beneficial uses (i.e., uses completed before the effective date of the rule.) See Unit VI of this document for further details on proposed clarifications of beneficial use. Furthermore, CCR from non-utility boilers burning coal are also not addressed in this final rule. EPA will decide on an appropriate action for these wastes through a separate rulemaking effort. See Unit IV of this document for further details. Finally, this rule does not apply to municipal solid waste landfills (MSWLFs) that receive CCR for disposal or use as daily cover.

C. The Contents of This Preamble Are Listed in the Following Outline

I. Executive Summary

II. Statutory Authority

III. Background

IV. Bevill Regulatory Determination Relating to CCR From Electric Utilities and Independent Power Producers

V. Development of the Final Rule—RCRA Subtitle D Regulatory ApproachStart Printed Page 21303

VI. Development of the Final Rule—Technical Requirements

VII. Summary of Major Differences Between the Proposed and Final Rules

VIII. Implementation Timeframes for Minimum National Criteria and Coordination With Steam Electric ELG Rule

IX. Implementation of the Minimum Federal Criteria and State Solid Waste Management Plans

X. Risk Assessment

XI. Summary of Damage Cases

XII. Summary of Regulatory Impact Analysis

XIII. Uniquely Associated Wastes

XIV. Statutory and Executive Order Reviews

I. Executive Summary

This rule establishes nationally applicable minimum criteria for the safe disposal of coal combustion residuals in landfills and surface impoundments. This section summarizes these criteria. Detailed discussions of the criteria and the Agency's rationale for finalizing these requirements are provided in Unit VI of this document.

A. What are coal combustion residuals?

Coal combustion residuals (CCR) are generated from the combustion of coal, including solid fuels classified as anthracite, bituminous, subbituminous, and lignite, for the purpose of generating steam for the purpose of powering a generator to produce electricity or electricity and other thermal energy by electric utilities and independent power producers. CCR includes fly ash, bottom ash, boiler slag, and flue gas desulfurization materials. A description of the types of CCR can be found in the proposed rule (see 75 FR 35137).

CCR is one of the largest industrial waste streams generated in the U.S. In 2012, over 470 coal-fired electric utilities burned over 800 million tons of coal, generating approximately 110 million tons of CCR in 47 states and Puerto Rico. CCR may be generated wet or dry; however, this composition may change after generation. Some CCR is dewatered while other CCR is mixed with water to facilitate transport (i.e., sluiced). CCR can be sent off-site for disposal or beneficial use or disposed in on-site landfills or surface impoundments. In 2012, approximately 40 percent of the CCR generated was beneficially used, with the remaining 60 percent disposed in surface impoundments and landfills. Of that 60 percent, approximately 80 percent was disposed in on-site disposal units. CCR disposal currently occurs at over 310 active on-site landfills, averaging over 120 acres in size with an average depth of over 40 feet, and at over 735 active on-site surface impoundments, averaging over 50 acres in size with an average depth of 20 feet.

B. Background

The Agency first solicited comments on the regulation of CCR in a proposed rule published in the Federal Register on June 21, 2010. This proposal, under the Resource Conservation and Recovery Act (RCRA), addressed the risks from disposal of CCR generated from the combustion of coal at electric utilities and from independent power producers. Two regulatory options were proposed. Under the first option, EPA proposed to list CCR as special waste subject to regulation under subtitle C of RCRA, when destined for disposal in landfills or surface impoundments. Under this option, CCR would require “cradle-to-grave” management and would be subject to requirements for, among other things, composite liners, groundwater monitoring, structural stability requirements, corrective action, closure/post closure care and financial assurance. States would be required to adopt the rule before it went into effect and a permitting program would be established with direct federal oversight. The subtitle C option, as proposed, would also effectively result in the closure of all CCR surface impoundments.

Under the second option, EPA proposed to regulate the disposal of CCR under subtitle D of RCRA by issuing minimum national criteria. Similar to the subtitle C option, this option would require composite liners, groundwater monitoring, structural stability requirements, corrective action, and closure/post closure care. However, consistent with the available statutory authority under subtitle D, EPA proposed this option to be a self-implementing rule with no direct federal oversight, with an effective date six months after publication in the Federal Register. This option required all unlined surface impoundments to either retrofit to a composite liner or close within five years.

After reviewing all the comments and additional data received, EPA is promulgating this final rule to regulate the disposal of CCR as solid waste under subtitle D of RCRA. This rule addresses the risks from structural failures of CCR surface impoundments, groundwater contamination from the improper management of CCR in landfills and surface impoundments and fugitive dust emissions. The rule has also been designed to provide electric utilities and independent power producers generating CCR with a practical approach for implementation of the requirements and has established implementation timelines that take into account, among other things, other upcoming regulatory actions affecting electric utilities and site specific practical realities. In order to ease implementation of the regulatory requirements for CCR units with state programs, EPA is also providing the opportunity for states to secure approval of its CCR program through the State Solid Waste Management Plan (“SWMP”). EPA strongly recommends that states take advantage of this process by revising their SWMPs to address the issuance of the revised federal requirements in this final rule, and to submit revisions of these plans to EPA for review. EPA would then review and approve the revised SWMPs provided they demonstrate that the minimum federal requirements in this final rule will be met. In this way, EPA's approval of a revised SWMP signals EPA's opinion that the state SWMP meets the minimum federal criteria.

C. What types of CCR units are covered by this rule?

The final rule applies to owners and operators of new and existing landfills and new and existing surface impoundments, including all lateral expansions of landfills and surface impoundments that dispose or otherwise engage in solid waste management of CCR generated from the combustion of coal at electric utilities and independent power producers. The requirements of the rule also apply to CCR units located off-site of the electric utilities' or independent power producers' facilities that receive CCR for disposal. In addition, the rule applies to certain inactive CCR surface impoundments (i.e., units not receiving CCR after the effective date of the rule) at active electric utilities' or independent power producers' facilities, regardless of the fuel currently used at the facility to produce electricity (e.g. coal, natural gas, oil), if the CCR unit still contains CCR and liquids.

The requirements do not apply to: (1) CCR landfills that ceased receiving CCR prior to the effective date of the rule; (2) CCR units at facilities that have ceased producing electricity (or electricity and other thermal energy) prior to the effective date of the rule; (3) CCR generated at facilities that are not part of an electric utility or independent power producer, such as manufacturing facilities, universities, and hospitals; (4) fly ash, bottom ash, boiler slag, and flue gas desulfurization materials, generated primarily from the combustion of fuels (including other fossil fuels) other than coal, for the purpose of generating electricity unless the fuel burned Start Printed Page 21304consists of more than fifty percent coal on a total heat input or mass input basis, whichever results in the greater mass feed rate of coal; (5) CCR that is beneficially used; (6) CCR placement at active or abandoned underground or surface coal mines; or (7) municipal solid waste landfills (MSWLF) that receive CCR.

D. What minimum national criteria are being established for CCR landfills and CCR surface impoundments?

This final rule establishes minimum national criteria for CCR landfills, CCR surface impoundments, and all lateral expansions of CCR units including location restrictions, liner design criteria, structural integrity requirements, operating criteria, groundwater monitoring and corrective action requirements, closure and post-closure care requirements, and recordkeeping, notification, and internet posting requirements.

1. Location Restrictions. To ensure there will be no reasonable probability of adverse effects on health or the environment from the disposal of CCR in CCR landfills, CCR surface impoundments, and all lateral expansions of CCR landfills and CCR surface impoundments (together “CCR units”), this final rule establishes five location restrictions. The location criteria include restrictions relating to placement of CCR above the uppermost aquifer, in wetlands, within fault areas, in seismic impact zones, and in unstable areas. All of these location restrictions require the owner or operator of a CCR unit to demonstrate that they meet the specific criteria. As discussed elsewhere in this preamble, the five location restrictions apply to all new CCR landfills, all new and existing CCR surface impoundments, and all lateral expansions of CCR units; however, existing CCR landfills are only subject to the location restriction for unstable areas. Units that do not meet these restrictions can retrofit or make appropriate engineering demonstrations to meet this criteria. This final rule requires owner or operators of existing CCR units that cannot make the required demonstrations to close, while owners or operators of new CCR units and all lateral expansions who fail to make the required demonstrations are prohibited from placing CCR in the CCR unit.

2. Liner Design Criteria. The final rule also establishes liner design criteria to help prevent contaminants in CCR from leaching from the CCR unit and contaminating groundwater. All new CCR landfills, new CCR surface impoundments, and lateral expansions of CCR units must be lined with composite liner, which is a liner system consisting of two components—a geomembrane and a two-foot layer of compacted soil—installed in direct and uniform contact with one another. The final rule allows an owner or operator to construct a new CCR unit with an alternative composite liner, provided the alternative composite liner performs no less effectively than the composite liner. In addition, new landfills are required to operate with a leachate collection and removal system which is designed to remove excess leachate that may accumulate on top of the composite (or alternative composite) liner. Existing CCR landfills are not required to close or retrofit with a composite (or alternative composite) liner and a leachate collection and removal system. These existing CCR units can continue to receive CCR after this rule is in effect; however, the CCR units must meet all applicable groundwater monitoring and corrective action criteria to address any groundwater releases promptly. Existing CCR surface impoundments can also continue to operate as designed. However, if the existing CCR surface impoundment was not constructed with a composite (or alternative composite) liner or with at least two feet of compacted soil with a specified hydraulic conductivity, the rule would require the unit to retrofit or close if the CCR surface impoundment detects concentrations of one or more constituents listed in appendix IV at statistically significant levels above the groundwater protection standard established by the rule.

3. Structural Integrity Requirements. To help prevent the damages associated with structural failures of CCR surface impoundments, the final rule establishes structural integrity criteria for new and existing surface impoundments (and all lateral expansions) as part of the design criteria. While the applicability of the structural integrity requirements to individual CCR surface impoundments vary depending on factors such as dike heights and the potential for loss of life, environmental damage and economic loss if there is a dike failure, the final rule establishes requirements for owner or operators to conduct a number of structural integrity-related assessments regularly. These include: (1) Conducting periodic hazard potential classification assessments to assess the potential adverse incremental consequences that would occur if there was a failure of the CCR surface impoundment; (2) conducting periodic structural stability assessments by a qualified professional engineer to document whether the design, construction, operation and maintenance is consistent with recognized and generally accepted good engineering practices; and (3) conducting periodic safety factor assessments to document whether the CCR unit achieves minimum factors of safety for slope stability. If a CCR unit required to conduct a safety factor assessment fails to demonstrate that the unit achieves the specified factors of safety, the owner or operator must close the unit. In addition, certain CCR surface impoundments are required to develop an emergency action plan which defines the events and circumstances involving the CCR unit that represent an emergency and identifies the actions that will be taken in the event of a safety emergency.

4. Operating Criteria. The operating criteria include air criteria for all CCR units, run-on and run-off controls for CCR landfills, hydrologic and hydraulic capacity requirements for CCR surface impoundments, and periodic inspection requirements for all CCR units. These criteria address the day-to-day operations of CCR units and are established to prevent health and environmental impacts from CCR units. The air criteria address the pollution caused by windblown dust from CCR units, and require owners and operators to minimize CCR from becoming airborne at the facility. The run-on controls for CCR landfills minimize the amount of surface water entering the unit that will help prevent erosion, surface discharges of CCR in solution or suspension, and will mitigate the generation of landfill leachate, while run-off controls help prevent erosion, protect downstream surface water from releases from the unit, and minimize storm water run-off volume and velocity. CCR surface impoundments are subject to hydrologic and hydraulic capacity requirements to ensure the unit can safely handle flood flows, which will help prevent uncontrolled overtopping of the unit or erosion of the materials used to construct the surface impoundment. The final rule also requires periodic inspections of CCR units to identify any appearance of structural weakness or other conditions that are not consistent with recognized and generally accepted good engineering standards.

5. Groundwater Monitoring and Corrective Action. The groundwater monitoring and corrective action criteria require an owner or operator of a CCR unit to install a system of monitoring wells and specify procedures for sampling these wells, in addition to methods for analyzing the groundwater data collected, to detect the presence of Start Printed Page 21305hazardous constituents (e.g., toxic metals) and other monitoring parameters (e.g., pH, total dissolved solids) released from the units. The final rule establishes a groundwater monitoring program consisting of detection monitoring, assessment monitoring and corrective action. Once a groundwater monitoring system and groundwater monitoring program has been established for a CCR unit, the owner or operator must conduct groundwater monitoring and, if the monitoring demonstrates an exceedance of a groundwater protection standard for any of the identified constituents in CCR, must initiate corrective action.

6. Closure and Post-Closure Requirements. The closure and post-closure care criteria require all CCR units to close in accordance with specified standards and to monitor and maintain the units for a period of time after closure, including the groundwater monitoring and corrective action programs. These criteria are essential to ensuring the long-term safety of closed CCR units. Closure of a CCR unit must be completed either by leaving the CCR in place and installing a final cover system or through removal of the CCR and decontamination of the CCR unit. The final rule establishes timeframes to initiate and complete closure activities, and authorize owners or operators to obtain time extensions due to circumstances beyond the facility's control. As discussed elsewhere in this preamble, the rule also establishes alternative closure procedures in situations where an owner or operator is closing a CCR unit, but has no alternative CCR disposal capacity or is permanently closing the coal-fired boiler unit in the foreseeable future. Finally, owners and operators are required to prepare closure and post-closure care plans describing these activities.

7. Record Keeping, Notification, and Internet Posting Requirements. The final rule requires owners or operators of CCR units to record certain information in the facility's operating record. In addition, owners and operators are required to provide notification to States and/or appropriate Tribal authorities when the owner or operator places information in the operating record, as well as to maintain a publicly accessible internet site for this information.

8. Severability. EPA intends that the provisions of this rule be severable. In the event that any individual provision or part of this rule is invalidated, EPA intends that this would not render the entire rule invalid, and that any individual provisions that can continue to operate will be left in place. The following tables provide a summary of the specific technical requirements applicable to existing and new CCR landfills, existing and new CCR surface impoundments, and all lateral expansions of CCR units.

Start Printed Page 21306

Start Printed Page 21307

Start Printed Page 21308

Start Printed Page 21309

E. When must owners or operators of CCR landfills and CCR surface impoundments meet the minimum national criteria?

The rule becomes effective six months after the publication date of this rule. The final rule establishes timeframes for certain technical criteria based on the amount of time determined to be necessary to implement the requirements (e.g., installing the groundwater monitoring wells and establishing the groundwater monitoring program). In establishing these timeframes, EPA accounted for other Agency rulemakings that are anticipated to also affect the owners or operators of CCR units, namely the Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category (78 FR 34432; proposed rule issued June 7, 2013) and the Carbon Pollution Emission Guidelines for Existing Stationary Sources: Electric Utility Generating Units (79 FR 34830; proposed rule issued June 18, 2014). Specifically, EPA developed implementation timeframes that would ensure that owner or operators of CCR units would not be required to make decisions about those CCR units without first understanding the implications that such decisions would have for meeting the requirements of all applicable EPA rules.

F. Deferral of Final Bevill Determination

This rule defers a final Bevill Regulatory Determination with respect to CCR that is disposed in CCR landfills and CCR surface impoundments until additional information is available on a number of key technical and policy questions. This includes information needed to quantify the risks of CCR disposal, and the potential impacts of recent Agency regulations on the chemical composition of CCR. The Agency also needs further information on adequacy of the state programs.

G. Beneficial Use

The final rule retains the Bevill exclusion for CCR that is beneficially used, and provides a definition of beneficial use to distinguish between beneficial use and disposal.

H. Implementation

Because the regulations have been promulgated under sections 1008(a), 4004(a), and 4005(a) of RCRA, the rule does not require permits, does not require states to adopt or implement these requirements, and EPA cannot enforce these requirements. Instead, states or citizens can enforce the requirements of this rule under RCRA's citizen suit authority; the states can also continue to enforce any state regulation under their independent state enforcement authority. (For a more detailed discussion of EPA authorities under RCRA and its relationship to this rule, see 75 FR 35128, June 21, 2010). EPA recognizes the significant role states play in implementing these requirements and EPA strongly encourages states to revise their SWMPs to show how these new criteria will be implemented. EPA would then review and approve the revised plan provided it demonstrates that the minimum federal requirements in this final rule will be met. In this way, EPA's approval of a revised plan signals EPA's opinion that the State's SWMP meets the minimum federal criteria. For a more detailed discussion on the role of the states in implementing this rule, please refer to Unit IX of this document.

I. Characterization of Baseline Affected Entities and CCR Management Practices

This action will affect CCR generated by coal-fired electric utility plants in the NAICS industry code 221112 (i.e., the “Fossil Fuel Electric Power Generation” industry within the NAICS 22 “Utilities” sector code). Based on 2012 electricity generation data published by the Energy Information Administration (EIA), the Regulatory Impact Analysis (RIA) for this action estimated that a total of 478 operational coal-fired electric utility plants in this NAICS code could be affected by this action. These plants are owned by 242 entities consisting of 166 companies, 17 cooperative organizations, 58 state or local governments, and one federal agency. A sub-total of 81 of the 242 owner entities (i.e., 33 percent may be classified as small businesses, small organizations, or small governments). The 478 coal-fired electric utility plants operate a total of 1,045 CCR management units (735 surface impoundments and 310 landfills). These 478 plants generate 110 million tons of CCR, consisting of 201 plants (42 percent) disposing in on-site landfills, 169 (35 percent) disposing in on-site ponds, and 197 (41 percent) disposing in off-site landfills. Because some plants use more than one CCR management method, these plant counts exceed 478 total plants. In addition, 293 of the 478 plants supply CCR for beneficial uses in at least 14 industries. Nineteen of the 293 plants solely supply CCR for beneficial uses. As of 2012, CCR beneficial uses (i.e., industrial applications) involved about 52 million tons annually.

J. Summary of Estimated Regulatory Costs and Benefits

The EPA estimated future regulatory compliance costs and expected future human health and environmental protection benefits can be found in the RIA document which is available from the docket for this action. The estimated costs and benefits for the CCR rule are incremental to the baseline (current) practices by the electric utility industry to manage CCR in accordance with (a) existing state government environmental regulations and (b) utility company CCR management methods.

The RIA estimates the cost of the rule over a 100 year period because of: (1) CCR unit lifespans (40 years to 80 years of age); (2) groundwater migration (estimated time to peak potential exposures of CCR through groundwater migration to drinking water wells is 75 years); and (3) latency periods for onset of illness after exposure to CCR, which can average 20 years.

The table below summarizes the estimated incremental costs and benefits of the rule. The RIA estimates costs to comply with the 12 pollution control requirements associated with the rule, as well as estimated monetized values for 11 expected benefits, and discusses 11 other non-monetized benefits.

EPA Estimated Incremental Costs & Benefits of the CCR Rule

[millions 2013$ over 100-year period of analysis 2015-2114]

3% Discount rate7% Discount rate
A. Annualized Values
A1. Total Costs$735$509
A2. Total monetized benefits$294$236
A3. Net Benefits (A2-A1)($441)($441)
A4. Benefit to Cost Ratio (A3/A1)0.400.46
Start Printed Page 21310
B. Present Value
B1. Total Costs$23,200$7,260
B2. Total monetized benefits$8,710$3,360
B3. Net Benefits (B2-B1)($14,490)($3,900)
B4. Benefit to Cost Ratio (B2/B1)0.380.46

II. Statutory Authority

These regulations are established under the authority of sections 1006(b), 1008(a), 2002(a), 3001, 4004, and 4005(a) of the Solid Waste Disposal Act of 1970, as amended by the Resource Conservation and Recovery Act of 1976 (RCRA), as amended by the Hazardous and Solid Waste Amendments of 1984 (HSWA), 42 U.S.C. 6906(b), 6907(a), 6912(a), 6944 and 6945(a).

RCRA section 1006(b) directs EPA to integrate the provisions of RCRA for purposes of administration and enforcement and to avoid duplication, to the maximum extent practicable, with the appropriate provisions of other EPA statutes. Section 1006(b) conditions EPA's authority to reduce or eliminate RCRA requirements on the Agency's ability to demonstrate that the integration meets RCRA's protectiveness mandate (42 U.S.C. 6005(b)(1)). See Chemical Waste Management v. EPA, 976 F.2d 2, 23, 25 (D.C. Cir. 1992).

RCRA section 1008(a) authorizes EPA to publish “suggested guidelines for solid waste management.” 42 U.S.C. 6907(a). RCRA defines solid waste management as “the systematic administration of activities which provide for the collection, source separation, storage, transportation, transfer, processing, treatment, and disposal of solid waste.” 42 U.S.C. 6903(28).

Pursuant to section 1008(a)(3), the guidelines are to include the minimum criteria to be used by the states to define the solid waste management practices that constitute the open dumping of solid waste or hazardous waste and are prohibited as “open dumping”under section 4005. Only those requirements promulgated under the authority of section 1008(a)(3) are enforceable under section 7002 of RCRA.

RCRA section 4004 generally requires EPA to promulgate regulations containing criteria for determining which facilities shall be classified as sanitary landfills (and therefore not “open dumps”). The statute directs that, “at a minimum, the criteria are to ensure that units are classified as sanitary landfills only if there is no reasonable probability of adverse effects on health or the environment from disposal of solid wastes at such facility.” 42 U.S.C. 6944(a).

RCRA section 4005(a), entitled “Closing or upgrading of existing open dumps” generally establishes the key implementation and enforcement provisions applicable to EPA regulations issued under sections 1008(a) and 4004(a). Specifically, this section prohibits any solid waste management practices or disposal of solid waste that does not comply with EPA regulations issued under RCRA section 1008(a) and 4004(a). 42 U.S.C. 6944(a). See also 42 U.S.C. 6903(14) (definition of “open dump”). This prohibition takes effect “upon promulgation” of any rules issued under section 1008(a)(3) and is enforceable through a citizen suit brought pursuant to section 7002. As a general matter, this means that facilities must be in compliance with any EPA rules issued under this section no later than the effective date of such rules, or be subject to a citizen suit for “open dumping” 42 U.S.C. 6945. RCRA section 4005 also directs that open dumps, i.e., facilities out of compliance with EPA's criteria, must be “closed or upgraded.”

Section 7004 lays out specific requirements relating to public participation in regulatory actions under RCRA. Subsection (b) provides that “[p]ublic participation in the . . . implementation, and enforcement of any regulation under this chapter shall be provided for, encouraged, and assisted by the Administrator.” 42 U.S.C. 6974(b).

A. Regulation of Solid Wastes Under RCRA Subtitle D

Solid wastes that are neither a listed nor characteristic hazardous waste are subject to the requirements of RCRA subtitle D. Subtitle D of RCRA establishes a framework for federal, state, and local government cooperation in controlling the management of non-hazardous solid waste. The federal role is to establish the overall regulatory direction, by providing minimum nationwide standards that will protect human health and the environment, and to provide technical assistance to states for planning and developing their own environmentally sound waste management practices. The actual planning and any direct implementation of solid waste programs under RCRA subtitle D, however, remains a state and local function, and the Act envisions that states will devise programs to deal with state-specific conditions and needs. EPA has no role in the planning and direct implementation of the minimum national criteria or solid waste programs under RCRA subtitle D, and has no authority to enforce the criteria. However, states are not required to adopt solid waste management programs, and thus, Congress developed a statutory structure that creates incentives for states to implement and enforce the federal criteria, but that does not necessarily rely on or require a regulatory entity to oversee or implement them. While Congress developed the statutory structure to create incentives for states to implement and enforce the federal criteria, it does not require them to do so. As a result, subtitle D is also structured to be self-implementing.

RCRA sections 1008(a)(3) and 4004(a) delegate broad authority to EPA to establish regulations governing the management of solid waste. Under section 4004(a) EPA is charged with establishing requirements to ensure that facilities will be classified as sanitary landfills “only if there is no reasonable probability of adverse effects on health or the environment from the disposal of solid waste” at the facility. Or in other words, under section 4004(a) EPA is charged with issuing regulations to address all “reasonable probabilities of adverse effects” (i.e., all reasonably anticipated risks) to health and the environment from the disposal of solid waste. Section 1008(a)(3) expands EPA's authority to address the risks from any of the listed activities. Specifically, EPA is authorized to establish requirements applicable to “storage, transportation, transfer, processing, treatment, and disposal of solid waste.” (42 U.S.C. 6907(a), 6903(28)).Start Printed Page 21311

EPA interprets the standard in section 4004(a) to apply equally to criteria issued under sections 1008(a)(3) and 4004(a); namely that the criteria must ensure that a facility is to be classified as a sanitary landfill, and thus allowed to continue to operate, “only if there is no reasonable probability of adverse effects on health or the environment” from either the disposal or other solid waste management practices at the facility. Thus, under the combined authority conferred by sections 1008(a)(3) and 4004(a), a facility is an “open dump” if it engages in any activity involving the management of solid waste that does not meet the standard in section 4004(a); or in other words, any activity involved with the management of solid waste that presents a reasonable probability of causing adverse effects on health or the environment. EPA also interprets these provisions to authorize the establishment of criteria that define the manner in which facilities upgrade or close, consistent with the standard in section 4004(a), to ensure there will be no reasonable probability of adverse effects on health or the environment.

As discussed previously, Congress created a regulatory structure that limited EPA's role to the creation of national criteria that would operate even in the absence of a regulatory entity to oversee or implement the criteria. Under RCRA section 4005(a), upon promulgation of criteria under section 1008(a)(3), any solid waste management practice or disposal of solid waste that constitutes the “open dumping” of solid waste is prohibited. The federal standards apply directly to the facility (are self-implementing) and facilities are directly responsible for ensuring that their operations comply with these requirements. States are not required to incorporate or implement these requirements under any state permitting program or other state law requirement, and EPA is not authorized to impose such requirements, directly or indirectly on the states. States and citizens may enforce this prohibition (and therefore, the federal criteria) using the authority under RCRA section 7002.[1]

The statute also creates incentives to states to implement the criteria. Chief among the incentives is a greater role in implementation and enforcement of the solid waste program, including to a limited extent the ability to give facilities that are operating within their state additional time to come into compliance with newly promulgated EPA criteria. Specifically, if the facility is located in a state with a plan that was approved under section 4003(b), the state may grant the facility an extension of up to five years from the date the final rule was published in the Federal Register to come into compliance with EPA regulations, provided: (a) The facility is listed in a state inventory of open dumps; and (b) the facility has demonstrated that it has considered other public or private alternatives for solid waste management to comply with the prohibition on open dumping and is unable to utilize such alternative. For facilities that meet these requirements, the state may establish a “schedule for compliance” which specifies a schedule of remedial measures, including an enforceable sequence of actions or operations, leading to compliance with the requirements “within a reasonable time (not to exceed five years from the date of publication of criteria under section [1008] (a)(3) of this title).” 42 U.S.C. 6945(a).

As a consequence of this statutory structure—the requirement to establish national criteria and the absence of any requirement for direct regulatory oversight—to establish the criteria EPA must demonstrate, through factual evidence available in the rulemaking record, that the final rule will achieve the statutory standard (“no reasonable probability of adverse effects on health or the environment”) at all sites subject to the standards based exclusively on the final rule provisions. This means that the standards must account for and be protective of all sites, including those that are highly vulnerable.

III. Background

A. EPA's Proposed Rule

On June 21, 2010 (75 FR 35128), EPA proposed to regulate CCR under RCRA to address the risks from the disposal of CCR generated from the combustion of coal at electric utilities and independent power producers. As described in the proposal, CCR are residuals generated from the combustion of coal and include fly ash, bottom ash, boiler slag (all composed predominantly of silica and aluminosilicates), and flue gas desulfurization (FGD) materials (predominantly Ca-SOX compounds) and can be managed in either wet (surface impoundments) or dry (landfills) disposal systems. EPA noted in the proposed rule that the constituents of most environmental concern in CCR are metals, such as antimony, arsenic, barium, beryllium, cadmium, chromium, lead, mercury, nickel, selenium, silver and thallium. EPA also presented data showing numerous instances where these constituents (especially arsenic) have leached at levels of concern from unlined and inadequately clay-lined landfills and surface impoundments.

In the proposal, EPA revisited its August 1993 and May 2000 Bevill Regulatory Determinations regarding CCR generated at electric utilities and independent power producers. The results from this effort led the Agency to consider two primary options for the management of CCR and thus, propose two alternative regulatory strategies. Under the first option, EPA proposed to reverse its August 1993 and May 2000 Bevill Regulatory Determinations (58 FR 42466 and 65 FR 32214 respectively) regarding CCR and to list these residuals as special wastes subject to regulation under subtitle C of RCRA when they are destined for disposal in landfills or surface impoundments. Under this proposed option, CCR would be regulated from the point of generation to the point of final disposition and would generally be subject to the existing subtitle C regulations at 40 CFR parts 260 through 268, as well as the permitting requirements in 40 CFR part 270, and the state authorization process in 40 CFR parts 271-272. Among other things, the regulatory requirements included waste characterization, location restrictions, liner and, if applicable, leachate collection requirements for land disposal units, fugitive dust controls, groundwater monitoring and corrective action requirements, closure and post-closure care requirements, financial assurance, permitting requirements, and recordkeeping and reporting requirements. This option also imposed requirements on generators and transporters of CCR destined for disposal, including manifesting (if the CCR destined for disposal is sent off-site). However, in light of practical difficulties in implementing certain subtitle C regulatory requirements, EPA also proposed to revise selected requirements under the subtitle C option. Consequently, EPA proposed, pursuant to its authority under section 3004(x) of RCRA, modifications to the CCR landfill and surface impoundment liner and leak detection system requirements, the effective dates for the land disposal restrictions, and the surface impoundment retrofit requirements. EPA also proposed to establish new land disposal prohibitions and treatment standards for both wastewater and non-wastewater forms of CCR. In part, the proposed Start Printed Page 21312modifications to the treatment standards would result in the closure of existing surface impoundments and the prohibition of all new surface impoundments. (See 75 FR 35128 for a complete discussion of this proposed option).

Under the second option, EPA proposed to retain the August 1993 and May 2000 Bevill Regulatory Determinations and to regulate CCR disposal under subtitle D of RCRA by issuing national minimum criteria to ensure the safe disposal of CCR in surface impoundments and landfills. Under this option, CCR would remain classified as a non-hazardous RCRA solid waste. EPA proposed to establish technical requirements, many of which were nearly identical to the technical standards proposed under the subtitle C option. The technical standards included, among other things, locations standards, liner and leachate collection requirements, groundwater monitoring and corrective action standards for releases from the units, operating criteria, such as fugitive dust control, closure and post-closure care requirements, and recordkeeping and reporting requirements. Under this option, EPA did not propose to establish regulatory requirements that would restrict the generation, transportation, storage, or treatment of CCR prior to disposal, nor did EPA propose to establish financial assurance requirements under RCRA.[2] Also, because of subtitle D's limitations, the proposed rule did not require permits; nor could EPA enforce the national minimum criteria. Rather, states or citizens could enforce the national minimum criteria under RCRA's citizen suit authority, and states could continue to enforce any state regulation that applies to CCR under their independent state enforcement authority.

The subtitle D proposed option was designed to be self-implementing, meaning that the requirements were such that facilities could comply with the regulatory requirements without the need to interact with a regulatory authority. EPA sought to enhance the protectiveness of the proposed option by requiring certified demonstrations by an independent registered professional engineer to provide verification that the regulatory requirements were being adhered to. In addition, the option provided for state and public notification of the certifications, as well as required posting of certain information on a Web site maintained by the facility and in the operating record. (See 75 FR 35128 for a complete discussion of this proposed option).[3]

The Agency also described other alternatives considered. For example, one subtitle D option, called “D-prime” was structured so that all existing CCR surface impoundments could continue to receive CCR after the effective date of the rule for the remainder of the unit's useful life, irrespective of their liner type, provided the other provisions of the subtitle D option were met (e.g., groundwater monitoring). (See 75 FR 35128 for a complete discussion of this and other possible regulatory alternatives on which the Agency solicited comment.)

Under both the subtitle C and subtitle D alternatives, EPA proposed establishing dam safety requirements to address the structural integrity of surface impoundments. EPA also proposed not to change the May 2000 Regulatory Determination for beneficially used CCR, which are currently exempt from the hazardous waste regulations under section 3001(b)(3)(A) of RCRA. EPA also did not propose to address the placement of CCR in mines, or non-minefill uses of CCR at coal mine sites.

In addition to proposing these two regulatory options for the management of CCR, EPA identified many issues on which it solicited comment, information, and data. Certain solicitations were very general, such as comments on alternative options for regulating CCR, while other requests for comment were very specific in nature, for example, whether clay liners designed to meet a specified hydraulic conductivity might perform differently in practices than modeled in the risk assessment. (The Agency requested comment on issues throughout the preamble; however specific issues for which EPA solicited comment can be found at 75 FR 35221-34224.)

B. Comments Received on the Proposed Rule

The Agency received over 450,000 comments on the proposed rule. The majority of the commenters focused on which regulatory path the Agency should pursue for regulating CCR, i.e., RCRA's subtitle C or subtitle D. A number of commenters, however, argued that no additional regulation was necessary and that the states were adequately regulating the management of CCR. Generally, environmental groups and individual citizens favored a subtitle C rule arguing that state programs have failed and damage cases are growing in number. State organizations, individual states, and industry groups (electric utilities, recycling firms, trade associations), largely favored a subtitle D rule with a permitting program.

One area that received extensive comment was the re-evaluation of the eight Bevill study factors.[4] Numerous commenters provided detailed analysis related to the study factors and provided their own interpretations of the data (e.g., state programs and damage cases). Other areas that received significant comment included beneficial use and the risk assessment.

Discussion of the specific comments germane to this rulemaking are provided in the relevant sections of this document.

C. Other Actions During Which Comment Was Taken

1. Public Hearings

EPA conducted eight public hearings during the months of August, September, and October in 2010. There were over 1300 individual speakers at the eight public hearings that commented on the proposed rule. Testimony at the public hearings focused generally on whether EPA Start Printed Page 21313should adopt a subtitle C or subtitle D approach for regulating CCR. Many commenters were also concerned with fugitive dust emissions and the affect these emissions had on their health and overall well-being. Other commenters were concerned that adopting a subtitle C rule for CCR would negatively affect the beneficial use of the material. In addition to their testimonies that were entered into the rulemaking record, over 1200 additional documents were submitted in hard copy and entered into the docket (see EPA-HQ-RCRA-2009-0640).

2. Notices of Data Availability

Subsequent to the proposed rule, the Agency published several Notices of Data Availability (NODAs), the first on October 21, 2010, (75 FR 64974); the second on October 12, 2011 (76 FR 63252) and the third on August 2, 2013 (78 FR 46940). Specifically:

  • The first NODA invited comment on the responses EPA received on Information Collection Requests that were sent to electric utilities on their CCR surface impoundments, as well as reports and materials related to the site assessments EPA had conducted on a subset of these impoundments.
  • The second NODA invited comment on a number of topics, including (1) chemical constituent data from coal combustion residuals; (2) facility and waste management unit data; (3) information on additional alleged damage cases; (4) the adequacy of state programs; and (5) beneficial use.
  • The third NODA invited comment on (1) supplemental data for the risk assessment; (2) supplemental data for the RIA; (3) information regarding large-scale fill; and (4) data on the CCR Assessment Program. EPA also sought comment on two technical issues associated with the requirements for CCR management units: closure requirements and regulation of overfills (i.e., CCR management units built directly over pre-existing CCR landfills or CCR surface impoundments).

Specific comments received on each of the three NODAs are discussed in the relevant sections of this rule.

3. Effluent Limitations Guidelines and Standards for the Steam Electric Power Generating Point Source Category Proposed Rule

On June 7, 2013 (78 FR 34432), EPA proposed a regulation that would strengthen the controls on discharges from certain steam electric power plants by revising the technology-based effluent limitation guidelines (ELG) and standards for the steam electric power generating point source category. As part of this proposal, EPA discussed its current thinking on how a final RCRA CCR rule might be aligned and structured to account for any final requirements adopted under the ELG for the Steam Electric Power Generating point source category. Two primary means of integrating the two rules were discussed: (1) Coordinating the design of any final substantive CCR regulatory requirements and (2) coordinating the timing and implementation of the rules to allow facilities to coordinate their compliance planning and implementation and to protect electricity reliability for consumers. EPA stated that consistent with RCRA section 1006(b), effective coordination of any final RCRA requirements with the ELG requirements would be sought in order to minimize the overall complexity of the two regulatory structures, and facilitate implementation of engineering, financial, and permitting activities. EPA solicited comments on how any final CCR final rule might be aligned and structured to account for any final requirements adopted under the ELG for the Steam Electric Power Generation point source category.

D. EPA's CCR Assessment Program

In March 2009, the Agency's CCR Assessment Program (herein referred to as the Assessment Program) was initiated. This effort was in response to the December 22, 2008 dike failure of a coal ash impoundment at the Tennessee Valley Authority (TVA) Kingston Fossil Plant in Harriman, Tennessee where over one billion gallons of coal ash slurry were released, affecting more than 300 acres, including residences and infrastructure. The TVA Kingston impoundment failure ignited a nation-wide concern over the safety of coal ash impoundments; and EPA was tasked with determining whether the potential existed for similar impoundment failures at other coal-fired power plants. In response, EPA developed the Assessment Program to evaluate the structural stability and safety of all coal ash impoundments throughout the country.[5] As of September 2014, 559 impoundments had been assessed at over 230 coal-fired power plants.

The Assessment Program began as a separate effort from the development of this final rule.[6] However, the information and experience developed in carrying out the site assessments during the Assessment Program is directly relevant to many of the issues addressed in this rulemaking, and provide further technical support for many of the technical criteria. Consequently, many of the final technical criteria were developed in direct response to findings from the site assessments. For example, several of the technical criteria contained in the proposed rule were modified to account for the widely accepted engineering methodologies and practices used in conducting the site assessments, as well as current facility practices documented during the assessments. In a few instances, the criteria were supplemented to better align the technical requirements with the Assessment Program. Included among the final criteria that directly rely on the Assessment Program are the provisions relating to structural integrity assessments to address factors of safety, periodic reassessments, hazard potential classifications, and the hydrologic and hydraulic capacity of CCR surface impoundments. These requirements are further discussed in Unit VI of this preamble.

The Assessment Program focused on impoundments meeting four general criteria that were designed to identify the units most likely to present the same risks as the collapsed TVA impoundment: (1) Above ground or diked; (2) of sufficient height to be susceptible to structural failure (i.e., six feet); (3) receiving CCR; and (4) located at operating coal-fired power plants selling power to the electric grid. Also included in the assessments were a number of inactive impoundments, i.e., impoundments not receiving CCR but still containing CCR and/or liquid. The Agency included these inactive units in the assessment reasoning that these units would be as susceptible to structural failure as units currently receiving CCR, given that they still contained CCR and maintained an ability to impound liquid (i.e., the unit had not been breached). The Assessment Program did not evaluate, however, incised (not having above ground berms or dikes) impoundments or landfills (not containing liquid slurried CCR wastes). EPA chose not to assess these units because they did not share the characteristics of Start Printed Page 21314impoundments likely to raise concern for catastrophic releases, and because no known catastrophic structural failures were associated with these types of units.

Prior to initiating the assessments, EPA consulted with two key dam safety organizations, the Association of State Dam Safety Officials (ASDSO) and the Mine Safety and Health Administration (MSHA) to better understand how these federal and state dam inspection programs operated, including how earthen dams and impoundments were assessed.[7] These groups provided the Agency with critical insight and information for inspecting and evaluating CCR impoundments. The Agency also reviewed various technical documents relating to dam safety and conducting impoundment inspections, many of which were recommended by these organizations. They were: (1) U.S. Army Corp of Engineers (USACE) 2008 National Inventory of Dams (NIDS); (2) Federal Emergency Management Agency's (FEMA) Federal Guidelines for Dam Safety—Hazard Potential Classification System for Dams (April 2004); (3) FEMA's Risk Prioritization Tool for Dams User Manual (March 2008); (4) MSHA's Handbook (PH07-01); (5) MSHA's Coal Mine Impoundment Inspection and Plan Review Handbook (October 2007); and (6) MSHA's Engineering and Design Manual: Coal Refuse Disposal Facility (May 2009); (7) ASDSO's “Summary of State Dam Safety Laws and Regulations,” (2000); (8) ASDSO's “Owner Responsible Periodic Inspection Guidance,” (2005); (9) “Guidelines for Inspections of Existing Dams.” New Jersey Department of Environmental Protection—Dam Safety (January 2008).

In developing the criteria that were used to conduct the assessments, a standard rating system was developed to classify the units' suitability for continued safe and reliable operation. EPA modeled its impoundment condition rating criteria on those developed by the State of New Jersey (see reference above).

1. Conducting the Site Assessments

In order to prioritize the assessments, a preliminary hazard potential classification ranking was identified for each impoundment, based on criteria developed by the FEMA and found generally in USACE's NID. EPA elected to evaluate first those impoundments with a high hazard potential classification, which signifies that a failure or mis-operation of the unit would probably result in the loss of human life.

Upon initiation of the Assessment Program, every owner or operator of a CCR impoundment was contacted by the Agency and supplied with information on the objectives of the assessment and how the assessments were to be conducted. Assessments were conducted in rounds, consisting of groups of 12-26 facilities per round.[8] Prior to each site assessment, to ensure uniformity throughout the study, a statement of work and an impoundment field checklist was developed and adhered to during the assessment.

To ensure objectivity, EPA contracted with professional engineers (PEs) in the state where the impoundment was located who were experts in the area of dam safety to perform the site assessments. Each individual assessment was performed by PEs qualified in the areas of geotechnical engineering, hydrology and hydraulics, and overall dam safety. Upon evaluation of a robust set of technical documents addressing dam safety and inspections as well as comprehensive discussions with key dam safety organizations, the Assessment Program developed a comprehensive set of factors that were to be used to evaluate the overall safety of CCR surface impoundments, which concluded that, among other important factors, the static and seismic factors of safety, hydrologic and hydraulic capacity, liquefaction potential analysis and a post-liquefaction stability analysis if the soils of the embankment were identified to be susceptible to liquefaction, and operation and maintenance protocols, e.g. instrumentation monitoring, inspection program, emergency response protocols were critical parameters for assessing the overall safety of CCR surface impoundments.

The individual evaluations or assessments were conducted at each impoundment at each facility using standard, accepted engineering practices, including a visual assessment of the CCR surface impoundment, interviews with site personnel, a review of the history of the CCR surface impoundment, and a review of engineering documentation related to the design, construction, operation, and maintenance of the impoundments, including available technical analyses. At each site visit, additional documentation was collected and reviewed as available, including descriptions, along with supporting information, of: (1) The impoundment, including location, size, age, design and/or alterations to the design, and the amount of residuals currently in the unit; (2) known, measured settlement of the impoundment embankment; (3) known, measured movement of the impoundment embankment; (4) observed erosion of the impoundment embankment; (5) seepage; (6) leakage; (7); observed cracking of the impoundment embankment; (8) deterioration, such as scarps, boils, or sloughs, of the — embankment; (9); seismicity; (10) internal stresses; (11) functioning of foundation drains and relief wells; (12) stability of critical slopes adjacent to the units; and (13) regional and site geological conditions. If available, state and federal inspections reports were also reviewed.[9]

In addition, for each assessment, the following factors were identified, to the extent feasible, for evaluation: (1) The presence and adequacy of spillways; (2) hydrologic and hydraulic capacity of the unit; (3) overall structural adequacy and stability of structures under all credible loading conditions through a review of static, seismic, and liquefaction analyses with determined factors of safety; (4) soil, groundwater, surface water, geology, and geohydrology characteristics associated with the unit, including hydrological data accumulated since the impoundment was constructed or last inspected; (5) a history of the performance of the management unit through analysis of data from monitoring instruments, interviews with facility personnel, and review of available operating records; (6) quality and adequacy of maintenance, surveillance, and methods of unit operations for the protection of public safety; (7) location of schools, hospitals, or other critical infrastructures within five miles down gradient of the impoundment; and (8) whether the impoundment is located within federally designated flood plains. Finally, each impoundment and any associated spillways were evaluated to determine whether the impoundment and the spillways could withstand the loading or overtopping from appropriate inflow design flood events.

Each CCR surface impoundment was classified with a hazard potential classification following the New Jersey Department of Environmental Protection Start Printed Page 21315Bureau of Dam Safety and Flood Control's hazard potential ranking. Each impoundment was classified with a hazard potential classification of either; “high,” “significant,” “low,” or “less-than-low.” The hazard potential classification was a qualitative assessment of the potential adverse incremental consequences of a dam failure.

At the conclusion of each assessment, a report was generated and the impoundment was given a condition rating of either; satisfactory, fair, poor, or unsatisfactory. The condition ratings were based on the availability of information on the unit and evaluation of the previously mentioned factors, including the static, seismic, and liquefaction factors of safety. No impoundments received an “unsatisfactory” rating. Numerous impoundments were, however, rated as “poor,” often for lack of appropriate technical documentation in the aforementioned areas. “Poor” or “fair” ratings were also an indication that additional measures were needed to improve the stability of the unit. Of 559 impoundments assessed, 241 received a condition rating of “satisfactory,” 166 received a condition rating of “fair,” and 152 received a “poor” condition rating.

It is important to note that the condition rating did not necessarily imply that the unit had inadequate structural integrity. On the contrary, in many instances a structurally sound impoundment may have been given a condition rating or “fair” or “poor” based on other factors such as a lack of documented information on the unit or insufficient operations and maintenance protocols. For example, an impoundment could be rated as “poor” if it lacked the appropriate technical documentation and analyses regarding structural or hydrologic and hydraulic analyses. EPA rated numerous units as “poor” based primarily on unavailable technical analyses.

Once the assessment was performed, a draft report was prepared. Draft reports were reviewed by the appropriate state agency, the utility, and by EPA.[10] Once comments were received and incorporated, a final report was issued along with recommendations for additional actions to be taken by the facility (if needed). Facilities then developed action plans and schedules to implement the recommendations. EPA also informed facility owners and operators that in addition to implementing their action plans, they need to adopt an ongoing, routine program to assess each surface impoundment and to take necessary corrective measures to ensure the units' continued structural integrity.

2. Assessment Program Findings

Upon completion of the Assessment Program, a review was undertaken to ascertain the key findings or lessons learned from the effort. These key findings included: (1) The majority of CCR surface impoundments are currently inspected on a periodic basis; (2) most utilities were readily able to supplement outdated or missing information with new or updated evaluations of their impoundments after the on-site portion of EPA's assessment was conducted; (3) in response to the assessment report recommendations, facilities typically willingly conducted remedial actions; (4) interaction with the states and the utilities assured accuracy in the final assessment reports; (5) placing site assessment materials on an internet site assured that the public, states, and utilities had full access to information about the design and operation of CCR impoundments and did not present either homeland security or other confidentiality concerns; (6) static, seismic, and liquefaction analyses did not pose a significant technical or cost burden on facilities since many already routinely conducted these types of evaluations; (7) state regulatory bodies viewed the assessments as a means to further support existing assessment programs; and (8) the use of PEs to certify all final reports ensured that the assessments reflected the PE's best judgments.

3. Assessment Program's Support for the Structural Integrity Requirements of the Rule

As noted, the findings from EPA's Assessment Program provide technical and factual support for many of the final requirements for structural stability in this rule. A more detailed discussion of several of the most significant of these is presented below. Additional discussion of the relevance of these findings is included throughout Unit VI of this document.

a. Periodic Inspections/Assessments

Consistent with the findings from the assessments and with EPA's recommendations to facilities as part of the Assessment Program, this rule requires that all CCR surface impoundments be inspected at intervals not exceeding seven days for any appearances of actual or potential structural weakness and other conditions that are disrupting or have the potential to disrupt the operation or safety of the CCR surface impoundment. Monitoring of instrumentation is also required to be conducted at intervals not exceeding 30 days. The Assessment Program found that virtually all utility companies conduct some sort of periodic inspection or monitoring at CCR surface impoundments, although practices varied among facilities and between states. The Assessment Program also found that while many facilities were conducting regularly scheduled inspections, some did not adequately document the results of these inspections.

In the final rule, CCR surface impoundments exceeding a specified size threshold, i.e., height of five feet or more and capacity of 20 acre-feet or more or a height of 20 feet or more, are required to perform annual inspections as well as two assessments of structural stability quinquennially, (i.e., every five years) that include a structural stability assessment of specified parameters and a factor of safety assessment. Annual inspections are broader in scope than weekly inspections and are conducted to ensure that the design, construction, operation and maintenance of the CCR unit is consistent with recognized and generally accepted good engineering standards. Annual inspections must include a review of available information regarding the status and condition of the unit and a visual inspection to identify signs of distress or malfunction of the unit and appurtenant structures. The annual inspections must be conducted by a qualified professional engineer.

The Assessment Program also reviewed how detailed structural stability reviews and inspections were recommended to be conducted by FEMA, MSHA, and the USACE guidelines and found that such inspections were recommended to take place every three to five years. Review of state dam safety programs demonstrated that similar detailed inspections were also conducted on a three-to-five year cycle. Therefore, in the final rule, EPA is requiring that structural integrity assessments, including the calculation of factors of safety under various loading conditions, be conducted within 18 months of publication of the rule, and be repeated every five years. The five year review timeframe is based on documentation showing that the factual bases for such reviews are only sound for that time Start Printed Page 21316period, and is consistent with federal dam safety guidance, specifically FEMA. FEMA recommends in Federal Guidelines for Dam Safety that dams be formally assessed at a frequency not to exceed five years by a qualified professional engineer. EPA has adopted this timeframe to maintain consistency with FEMA guidance. The inspection and assessment requirements in this rule will ensure that there are consistent and uniform inspection and assessment practices across states and facilities and will ensure that problems related to their stability will be promptly identified and remediated as necessary.

b. Static, Seismic, and Liquefaction Factors of Safety

(1) Static Factors of Safety.

Factor of safety (FOS) means the ratio of the forces tending to resist the failure of a structure, as compared to the forces tending to cause such failure as determined by accepted engineering practice. This analysis is used to determine whether a CCR surface impoundment's dikes are engineered to withstand the specific loading conditions that can be reasonably anticipated to occur during the lifetime of the unit without failure of the dike, if accepted good engineering practices are employed. Static factors of safety refer to the factors of safety (FOS) under static loading conditions that can reasonably be anticipated to occur during the lifetime of the unit. Static loading conditions are unique from other loading conditions (e.g., seismic, liquefaction) in that static loading conditions are those which are in equilibrium, meaning the load is at rest or is applied with constant velocity.

EPA reviewed a series of USACE guidance documents addressing how to determine static FOS. These documents included, but were not limited to, Engineer Manual EM 1110-2-1902 “Slope Stability” (October 2003), and EM 1110-2-1902 “Stability of Earth and Rock-Fill Dams.” The Agency also assessed the recommendations on how to conduct static analysis contained in the Engineering and Design Manual for Coal Refuse Disposal Facilities, originally published by the Mining Enforcement and Safety Administration (MESA) in 1975 and updated for MSHA in May 2009, and in particular Chapter 6, “Geotechnical Exploration, Material Testing, Engineering Analysis and Design.” Based on recommendations from ASDSO, among others, the Agency adopted the USACE guidance to determine static FOS, both in the Assessment Program and in this rulemaking, as these manuals are recognized throughout industry as the standard routinely used in field assessment of structural integrity.

In EPA's Assessment Program all CCR units were assessed to determine their static FOS. Each assessment classified a CCR unit as having sufficient structural stability under static loading conditions if analysis of critical sections of embankments demonstrated FOS that met or exceeded the values defined by USACE for static specific loading conditions. EPA found that most CCR surface impoundments exhibited sufficient calculated factors of safety under static loading conditions. EPA also found that in those CCR units which insufficient factors of safety against failure due to static loading were calculated, the owner or operator was able to implement actions which increased the factors of safety under static loading conditions to acceptable levels. Oftentimes, these implemented actions were of a simple nature, such as installing riprap (rock armoring the slopes) or buttressing the slopes.

Similarly, this rule adopts the static FOS from USACE Engineer Manual EM 1110-2-1902 “Slope Stability,” with the exception of the rapid drawdown loading condition,[11] which was determined not to be relevant to CCR surface impoundments. EPA found the factors of safety identified by EM 1110-2-1902, specifically the Maximum Storage pool, Maximum Surcharge pool, and End-Of-Construction loading conditions, provided consistent, achievable levels of safety in CCR surface impoundment dikes, comprehensively assessed static stability, and provided sufficient consideration of compounding stresses on dikes (e.g., factors of safety values greater than 1.00 to account for unanticipated loadings acting in conjunction or misidentified strength of materials).

(2) Seismic Factor of Safety.

Seismic FOS means the FOS determined using analysis under earthquake conditions for a seismic loading event, based on the U.S. Geological Survey (USGS) seismic hazard maps for seismic events with a specified return period for the location where the CCR surface impoundment is located. The seismic FOS analysis is used to determine whether a dam would remain stable during an earthquake or other seismic event. The Agency relied on guidance from USACE and MSHA to evaluate the appropriate methods to determine if a dam would remain stable during a seismic event. This includes the USACE guidance Engineer Circular 1110-2-6061: Safety of Dams—Policy and Procedures 2204, Engineer Circular 1110-2-6000: Selection of Design Earthquakes and Associated Ground Motions 2008, and Engineer Circular 1110-2-6001: Dynamic Stability of Embankment Dams 2004). EPA also reviewed MSHA's 2009 Engineering and Design Manual for Coal Refuse Disposal Facilities, in particular Chapter 7, “Seismic Design: Stability and Deformation Analyses.” These documents are viewed by ASDSO, FEMA and MSHA as generally accepted guidance on how to conduct seismic stability analyses.

As noted earlier, in performing the assessments, EPA directed its engineering contractors to assess seismic stability of CCR impoundments during and following a seismic event with a 2% probability of exceedance in 50 years (i.e. probable earthquake within approximately 2,500 years) and a horizontal spectral response acceleration for 1.0-second period (5% of Critical Damping). EPA selected this return period for determining the maximum design earthquake (MDE) by first considering the operating life anticipated for CCR surface impoundments. EPA has identified the operating life of CCR surface impoundments to range between 40-80 years. EPA then consulted the United States Geological Survey (USGS) and ASDSO to determine a conservative probability that should be used in the assessments.[12] To reduce the likelihood of a CCR unit failing during a seismic Start Printed Page 21317event, the Agency assessed various return periods and chose a conservative 2500 year return period. The use of this “return” period was chosen because it is conservative, reflects the fact that many CCR impoundments are located in active seismic zones, and the use of a conservative “return” period ensures that if a unit meets the seismic FOS it is unlikely to fail under most seismic events. By evaluating seismic stability under a conservative return period and requiring the unit to maintain structural stability under that design seismic event, the likelihood of a seismic event occurring at the location of the CCR surface impoundment in which the strength of the unit is exceeded and the unit fails is considerably reduced. Additionally, the unit can reasonably be anticipated to withstand seismic events of a more frequent return period (i.e., smaller magnitude).

The Agency assessed CCR impoundments and classified them as having seismic stability if modeling results of critical failure surfaces were calculated to have a FOS greater than 1.0 under the specified seismic loading condition. The Assessment Program found that most CCR impoundments did meet the required seismic FOS. This rule also adopts this seismic stability FOS under the 2% probability of exceedance in 50 years event.

The Assessment Program found that many CCR impoundments had not undergone static or seismic analyses in sufficient detail that an independent professional engineer could assert that they were stable. The assessments gave impoundments a condition rating of “poor” if the utility was unable to provide static and seismic studies of their units conducted in a fashion which represented acceptable professional engineering practice. As the Assessment Program advanced, many utilities independently conducted new or updated static and seismic analyses of CCR surface impoundments in anticipation of their facilities being assessed. By the end of the program, virtually all facilities had conducted or were in the process of conducting static and seismic analyses. While some utilities noted concern over the costs of conducting additional static or seismic stability studies, none found that completing these studies presented any significant engineering challenges.

(3) Liquefaction Factors of Safety

Liquefaction FOS means the factor of safety determined using analysis under liquefaction conditions. Liquefaction is a phenomenon which typically occurs in loose, saturated or partially-saturated soils in which the effective stress of the soils reduces to zero, corresponding to a total loss of shear strength of the soil. The most common occurrence of liquefaction is in loose soils, typically sands. The liquefaction FOS determination in the final rule is used to determine if a CCR unit would remain stable if the soils of the embankment of the CCR unit were to experience liquefaction. EPA relied primarily on one source to evaluate the appropriate methods to determine if a dam would remain stable under liquefaction conditions. This source was “Soil Liquefaction during Earthquakes,” Idriss and Boulanger, Earthquake Engineering Research Institute, 2008.[13] EPA also reviewed several technical resources regarding soil liquefaction, including “Ground Motions and Soil Liquefaction During Earthquakes,” Seed and Idriss, 1982,[14] “Liquefaction Resistance of Soils: Summary report from the 1996 and 1998 NCEER/NSF Workshops on Evaluation of Liquefaction Resistance of Soils,” Youd and Idriss, 2001,[15] and Seismic Design Guidance for Municipal Solid Waste Landfill Facilities, US EPA, Office of Research and Development, 1995.[16] These documents are viewed as generally accepted guidance on how to conduct liquefaction potential analyses and residual strength analyses under post-liquefaction conditions.

As noted earlier, in performing the assessments, EPA assessed the liquefaction potential of soils that compose the embankments of the CCR unit to determine if the soils present in the embankment were of the soil classification and configuration that was susceptible to liquefaction. This determination was based on evidence available through interviews with facility personnel, construction documentation, or representative soil sampling, such as information provided by corings and borings. Identical to the requirements for seismic factor of safety calculation, EPA selected a return period for a seismic event for analysis of liquefaction potential, under a seismic loading which may induce liquefaction in embankments, of a 2% probability of exceedance in 50 years. The discussion of the selection of this return period can be found in the “Seismic Factor of Safety” section above.

The Agency assessed CCR impoundments and classified them as having stability under liquefaction conditions if representative soil sampling, anecdotal evidence from interviews with facility personnel, or construction documentation indicated that there was no susceptibility to liquefaction of the embankment soils or if modeling or analysis in critical failure planes in the embankment expected to be susceptible to liquefaction were calculated to have a FOS greater than 1.00 under post-liquefaction conditions. The Assessment Program found that most CCR surface impoundments did not contain soils in detrimental volumes or configurations in the embankment that would indicate susceptibility to liquefaction. However, the assessment effort found that in embankments with a presence of soils susceptible to liquefaction, most CCR surface impoundments did not meet the required liquefaction FOS.

The Assessment Program found that many CCR surface impoundments had not undergone liquefaction potential analyses or post-liquefaction residual strength analyses in those instances in which liquefaction potential was identified (i.e., soils subject to liquefaction were present). The assessments gave impoundments a condition rating of “poor” if there was no information available to characterize the soils of the embankment, and a condition rating of “poor” or “fair” if post-liquefaction residual strength analysis of soils previously identified as being susceptible to liquefaction had not been available, with the rating dependent on the determined severity of the liquefaction potential in the embankment. Impoundments with calculated liquefaction factors of safety which did not meet or exceed 1.00 were given a condition rating of “poor.”

As the Assessment Program advanced, many utilities independently conducted new or updated liquefaction potential analyses or residual strength analyses of CCR surface impoundments in anticipation of their facilities being assessed. By the end of the program, virtually all facilities had conducted or were in the process of conducting liquefaction potential analyses or residual strength analyses. While some utilities noted concern over the costs of Start Printed Page 21318conducting additional liquefaction potential or residual strength studies, none found that completing these studies presented any significant engineering challenges.

Based on its experience in the Assessment Program and subsequent review of numerous technical resources, EPA determined that a post-liquefaction residual strength factor of safety in the embankment of 1.00 is not sufficient. Liquefaction potential analysis and post-liquefaction residual strength analysis involves a larger degree of uncertainties, e.g., liquefiable stratum configuration, in assumptions and analysis which must be accounted for with a factor of safety above 1.00. The final rule therefore requires CCR surface impoundments which are constructed of soils determined to be susceptible to liquefaction to meet or exceed a liquefaction factor of safety of 1.20. EPA has determined that 1.20 is an appropriate liquefaction factor of safety based on several technical guidances and memos, including Federal Guidelines for Dam Safety: Earthquake Analyses and Design of Dams, Document 65, FEMA May 2005, which states that “post-liquefaction factors of safety are generally required to be a minimum of 1.2 to 1.3.” [17 18 19 20 21]

c. Impoundment Height and Relationship to Regulatory Requirements

During the Assessment Program, the Agency reviewed the stability issues related to various heights of impoundments. The Assessment Program concluded that impoundments with heights less than five feet or those retaining less than 20 acre feet were unlikely to cause significant environmental or economic loss should they undergo a catastrophic failure. The Agency's review of MSHA and FEMA guidance also noted that “small” units were unlikely to cause significant losses should they fail. Based on the Agency's experience and FEMA and MSHA's guidance, the Agency has concluded that there is a substantial benefit in having impoundments which exceed a specified size threshold, i.e., height of five feet or more and capacity of 20 acre-feet or more or a height of 20 feet or more determine their static, seismic, and liquefaction FOS on a regular basis. The analyses and experience gained in conducting the Assessment Program indicates that a catastrophic failure of a CCR surface impoundment is unlikely to occur so long as the factors of safety are maintained or exceeded throughout the unit's operating life. This conclusion is also consistent with relevant guidance and regulations which do not require such evaluations for units below a certain size threshold.

d. Hazard Potential Ratings

Each impoundment assessed in the Assessment Program was given a Hazard Potential Classification rating of either Less-than-Low, Low, Significant, and High. Previous classifications were reviewed and amended as necessary to reflect guidance developed for the Assessment Program. The hazard potential ratings refer to the potential for loss of life or damage if there is a dam failure. The ratings do not refer to the condition or structural stability of the dam. Four hazard potential classifications were used in assessing the impoundments in the Assessment Program:

High Hazard Potential—Dams assigned the high hazard potential classification are those where failure or mis-operation will probably cause loss of human life.

Significant Hazard Potential—Dams assigned the significant hazard potential classification are those dams where failure or mis-operation results in no probable loss of human life, but can cause economic loss, environment damage, disruption of lifeline facilities, or impact other concerns. Significant hazard potential classification dams are often located in predominantly rural or agricultural areas, but could be located in areas with population and significant infrastructure.

Low Hazard Potential—Dams assigned the low hazard potential classification are those where failure or mis-operation results in no probable loss of human life and low economic and/or environmental losses. Losses are principally limited to the owner's property.

Less Than Low Hazard Potential—Dams which do not pose high, significant, or low hazard potential.

There is a substantial benefit in having owners or operators of all CCR impoundments determine the hazard potential classification of their units. The Assessment Program found that many CCR surface impoundments had not been given a hazard potential classification and consequently, their potential threat to human health and the environment if a failure were to occur was not clearly identified, nor had response plans been developed to respond to any catastrophic failure. Moreover, these classifications should be updated over time, particularly to account for changes such as population growth, construction of key infrastructure, or changes to the impoundment's size or operation. The Assessment Program also found that some states do not classify CCR impoundments as “dams” and therefore those units may not be required to determine their hazard potential classification or otherwise evaluate the potential effects of a catastrophic failure. Consistent with the guidance from ASDSO, FEMA, and the state of New Jersey, this rule requires that all diked CCR impoundments determine their hazard potential classification according to the definitions set out in this regulation. For those units with a hazard potential classification of significant or high, the owner or operator of such impoundments is also required to develop an Emergency Action Plan to address the higher potential impacts of a potential failure.

e. Condition Ratings

While the rule does require facilities to evaluate the same engineering factors that went into developing these ratings, the rule does not require that each impoundment be given a condition rating. After evaluation of the use of these ratings, the Agency determined that the rating may have relied too heavily on subjective factors. For that reason, this rule requires that the qualified professional engineer certify, based on quantitative determinations, that an impoundment meets the requirements for FOS and hydraulic and hydrologic capacity. This approach is less subjective and allows the professional engineer to make quantifiable certifications.

IV. Bevill Regulatory Determination Relating to CCR From Electric Utilities and Independent Power Producers

As discussed in the preceding sections, in the proposed rule EPA reopened its August 1993 and May 2000 Regulatory Determinations regarding CCR generated at electric utilities and independent power producers, to re-evaluate whether regulation of CCR under RCRA subtitle C is necessary in light of subsequent information. EPA explained that this was based on several Start Printed Page 21319relatively recent developments, such as a newly completed quantitative risk assessment that concluded that the disposal of CCR in unlined waste management units posed substantial risks, with upper end risk estimates ranging from 10−2-10−4. Citing to the recent structural failures of surface impoundments, the proposed rule also noted that these wastes have caused greater damage to human health and the environment than EPA originally estimated. Finally, EPA explained that recently collected information regarding the existing state regulatory programs had called into question whether those programs, in the absence of national minimum standards specific to these wastes, had sufficiently improved to address the gaps originally identified in the May 2000 Regulatory Determination. EPA ultimately concluded that federal regulation of this material was necessary, but did not reach any conclusion as to whether regulation under subtitle D would be sufficient or whether regulation under subtitle C would be necessary to adequately address the risks.

Of the over 450,000 comments received on the proposed rule, the vast majority focused on whether the Bevill exemption should be retained, and the corresponding question of whether CCR regulations should be established under RCRA subtitle C or subtitle D. In terms of the sheer numbers, the majority of commenters supported a decision to revoke the Bevill exemption and to regulate CCR under a subtitle C rule. These commenters, largely individual members of the public and environmental groups, generally argued that the Bevill exemption should be revoked because state programs have failed to adequately regulate the disposal of CCR and because the risks associated with the management of these wastes are significant. In support of both points, these commenters pointed to the fact that the number of damage cases that have been discovered has increased substantially since the original 2000 Regulatory Determination, and have continued to grow since publication of the proposed rule in 2010.

By contrast, state organizations, individual states, and industry groups (electric utilities, recycling firms, trade associations), largely favored a subtitle D rule. Overall, these commenters raised concern about the costs of the subtitle C regime, arguing that the subtitle C requirements were more stringent than necessary to address the risks from CCR disposal. Commenters also raised concern that regulation of these wastes under subtitle C would negatively affect the beneficial use of these materials, arguing that the stigma associated with regulating the disposal of CCR as a hazardous waste would “cripple” the current beneficial reuse market. Many of these commenters also argued that EPA lacks the legal authority to regulate these wastes under subtitle C on a variety of grounds, including claims that EPA entirely lacks the authority to revisit its Bevill Regulatory Determination, and that EPA had failed to comply with statutory procedures in doing so.

A. Deferral of a Final Decision on the Bevill Regulatory Determination for CCR Destined for Disposal

In determining whether the Bevill exemption should be retained for CCR, EPA must evaluate and weigh eight factors that were enumerated in section 8002(n) of RCRA. 42 U.S.C. 6921(b)(3)(C). The eight factors are: (1) The source and volumes of CCR generated per year; (2) present disposal and utilization practices; (3) potential danger, if any, to human health or the environment from the disposal and reuse of CCR; (4) documented cases in which danger to human health or the environment from surface run-off or leachate has been proved; (5) alternatives to current disposal methods; (6) the cost of such alternative disposal methods; (7) the impact of those alternatives on the use of coal and other natural resources; and (8) the current and potential utilization of CCR. 42 U.S.C. 6982(n).

EPA addressed each of these study factors in the 1988 and 1999 Reports to Congress, and in reaching our decisions in the August 1993 and the May 2000 Regulatory Determinations to maintain the Bevill exemption for CCR. 58 FR 42466 (August 9, 1993); 65 FR 32214 (May 22, 2000). Consequently, in considering whether to reverse these Regulatory Determinations for CCR destined for disposal, EPA reexamined the RCRA section 8002(n) study factors against all of the available data, which included both the data that formed the basis for the May 2000 Regulatory Determination and the most recent data available. (See 75 FR 35150-35156.)

As discussed at length in the proposed rule, three of these factors weighed the most heavily in the Agency's decision to reconsider its previous Regulatory Determinations. (See 75 FR 35133 and 35156-35158.) The first of these related to the extent of the risks posed by the current management of these wastes. Since the 2000 Regulatory Determination, EPA had completed a quantitative risk assessment that estimated significant risks to human health and the environment. EPA's 2010 CCR risk assessment estimated the cancer risk from arsenic that leaches into groundwater from CCR managed in units without composite liners to exceed EPA's typical risk thresholds of 10−4 to 10−6. For example, depending on various assumptions about disposal practices (e.g., whether CCR is co-disposed with coal refuse), groundwater interception and arsenic speciation, the 90th percentile risks from unlined surface impoundments ranged from 2 × 10−3 to 1 × 10−4. The risks from clay lined surface impoundments ranged from 7 × 10−2 to 4 × 10−5. Similarly, estimated risks from unlined landfills ranged from 5 × 10−4 to 3 × 10−6, and from 2 × 10−4 to 5 × 10−9 for clay-lined landfills. EPA's risk assessment also estimated Hazard Quotients (HQs) [22] above 1 for other metals, including selenium and lead in unlined and clay-lined units. However, a number of technical questions were raised regarding this quantitative risk assessment that called into question the accuracy of these risk estimates.

A second and equally significant consideration related to how effectively state regulatory programs address the risks associated with the improper management of these wastes. The existing reports on state regulatory programs had called into question whether the trend in improving state regulatory regimes that EPA identified in May 2000 had materialized to the degree anticipated in the Regulatory Determination. EPA noted concern about the lack of substantial details regarding the full extent of state regulatory authority over the disposal of these materials, and the manner in which states have, in practice, implemented this oversight.

The final consideration, which is tightly related to the first two, was the recent information documenting continued instances involving the contamination of ground or surface water from the management of these wastes. Since the 2000 Regulatory Determination EPA had gathered or received information on 67 “proven or potential” cases involving damage to (i.e., contamination of) ground and surface water, and to human health and the environment from improper management of CCR in landfills and surface impoundments. These also included cases involving the structural failure of surface impoundments and the catastrophic release of CCR.Start Printed Page 21320

For each of these key areas, EPA identified a number of issues on which the absence of critical information prevented the Agency from reaching an initial decision on whether to revise the Bevill Determination. Some of these issues or uncertainties have been resolved during the development of the final rule, either as a result of information received from commenters or through additional information and analyses EPA obtained or developed, which were held out for comment in subsequent NODAs. See 75 FR 35128 (October 21, 2010) and 78 FR 46940 (August 2, 2013). However, as discussed in more detail below, critical information necessary to make a final Regulatory Determination is still lacking in two of these three areas. This information bears directly on the extent and magnitude of the risks over the course of the next several years, and the degree to which those risks can be managed sufficiently under each of the two regulatory structures available to the Agency. In the absence of this information, EPA is unable to reach a conclusion on the issue that is central to a Bevill Determination: Whether the risks presented by management of CCR waste streams can only be adequately mitigated through regulation under RCRA subtitle C. As a consequence, EPA is deferring a final Regulatory Determination for these wastes.[23]

Nevertheless, the record is clear that current management of these wastes can present, and in many cases has presented, significant risks to human health and the environment. Although EPA cannot reach conclusions as to the full extent or magnitude of those risks over the long term, the current level of risk clearly warrants the issuance of federal standards to ensure consistent management practices and a national minimum level of safety.

In the following sections, EPA describes the information that was obtained over the course of the rulemaking relating to each area of concern, and the extent to which the new information addressed the issue.

1. Risks Posed by Current Management of CCR and Potential Danger to Human Health From the Disposal of CCR

In the proposed rule, EPA specifically noted that several uncertainties remained in the Agency's quantitative risk analysis of the current management of CCR. Chief among these uncertainties was the evolving character and composition of CCR due to electric utility upgrades and retrofits of multi-pollutant controls needed to comply with the emerging Clean Air Act (CAA) requirements, which could present new or otherwise unforeseen contaminant issues (e.g., addition of calcium bromide to coal prior to combustion increasing mercury capture; use of selective catalytic reduction for post-NOX controls forming hexavalent chromium). As EPA explained, changes to fly ash and other types of CCR is expected to occur as a result of increased use and application of advanced air pollution control technologies in coal-fired power plants. These technologies include flue gas desulfurization (FGD) systems for SO2 control, selective catalytic reduction (SCR) systems for NOX control, and activated carbon injection (ACI) systems for mercury control. These technologies are being installed or are expected to be installed in response to federal regulations, state regulations, legal consent decrees, and voluntary actions taken by industry to adopt more stringent air pollution controls. Use of these more advanced air pollution control technologies reduces air emissions of metals and other pollutants in the flue gas of a coal-fired power plant by capturing and transferring the pollutants to the fly ash and other air pollution control residues. Previous EPA studies of whether increased pollutant content would increase the risks correspondingly were inconclusive. For example, EPA evaluated the environmental fate of metals that are captured in CCR through use of enhanced air pollution controls, by characterizing the leaching behavior of 73 air pollution control residues, using the Leaching Environmental Assessment Framework (LEAF) methodology. Materials were tested over the pH conditions and liquid/solid ratios expected during management via land disposal or beneficial use. Leachate concentrations for most metals were highly variable over a range of coal type, facility configurations, and air pollution control residues. In addition, the data showed significantly different leaching behavior for similar residue types and facility configurations. Overall, the variability in leaching of the metals in the CCR was greater than the variability in totals concentrations by several orders of magnitude, suggesting that total pollutant content may not be predictive of leaching behavior, and consequently the risks.[24]

The Agency received no data from commenters that would aid in resolving this uncertainty. To try to establish some parameters around the uncertainty, EPA attempted to develop estimates of the extent to which this issue could meaningfully affect the risks.

As an initial step, EPA focused on mercury pollution controls, as mercury levels in these wastes was an issue of particular concern in the public comments. It has been established that mercury pollution controls can affect both the mercury content and the general leaching behavior of ash (US EPA 2006, 2008, 2009). Using the limited data available, EPA attempted to evaluate the extent to which mercury controlled wastes could ultimately affect the overall risk associated with disposal of CCR.

EPA conducted a sensitivity analysis that filtered the full 2014 risk assessment results for the subset of fly ash samples generated by facilities that have currently installed ACI systems. The samples were collected from five different facilities that were either installing or evaluating an ACI system for increasing mercury capture. At each facility, samples were collected both before and after the installation of an ACI system. Ultimately the results were inconclusive, likely because of the small sample size, and EPA can draw no conclusions about the exact effects of ACI systems on the risks from CCR disposal. Nevertheless, the analysis provided some useful information. Capturing and transferring pollutants from air emission to the fly ash and other air pollution control residues would normally be expected to increase the risks associated with disposal of these wastes. EPA's analyses, however, showed only a marginal difference in risks for ash generated with or without the use of an ACI system, and in some instances the risks decreased slightly with the addition of activated carbon. The significance of these results should not be overstated—the observed decreases were not consistent and were thought to be an artifact of the relatively small number of model iterations. It is also important to remember that these results provide no information about the potential effects from the installation of Start Printed Page 21321FGD systems for SO2 control, or SCR systems for NOX control, any of which could also significantly affect the characteristics of the wastes. But these results also suggest that EPA should be cautious about assuming that the risks will necessarily increase as a result of the imposition of additional air pollution controls.

Other uncertainties in the risk assessment developed for the proposal related to the extent to which some sampled data with high concentrations of constituents used in the risk assessment accurately reflect coal ash leaching from landfills or surface impoundments. For example, as explained in the proposed rule, some data reflected pore water taken in the upper section of a surface impoundment where coal refuse was placed. There were acid generating conditions and high concentrations of arsenic, but the data demonstrated that the underlying coal ash neutralized the acid conditions and greatly reduced the arsenic which leached from the bottom of the impoundment. EPA also noted that much of the pore water samples and leachate data were several years old, and questions had been raised whether these data accurately reflected current management practices. Finally, EPA noted that recent research indicated that traditional leach procedures (e.g., Toxicity Characteristic Leaching Procedure (TCLP) and Synthetic Precipitation Leaching Procedure (SPLP)) may underestimate the actual leach rates of toxic constituents from CCR under different field conditions.

First, regarding the question of appropriate pH conditions in CCR units, and the resulting leachate concentrations in impoundments where coal refuse was placed, EPA obtained data during the development of this rule directly relevant to this issue. A survey conducted by the Electric Power Research Institute (EPRI) in 1995 had shown that 34 percent of unlined landfills and 68 percent of unlined surface impoundments actively managed CCR with coal refuse. However, more recent data collected by EPA as part of the Clean Water Act ELG rulemaking in 2009-2010 indicates that this management practice has declined significantly to approximately five percent of current units.

EPA also obtained sufficient data to resolve concerns about the accuracy of the concentrations in pore water and leachate used in the risk assessment. EPA received a substantial amount of data on CCR chemical constituents from commenters, which included total concentrations, pore water, and leaching test results for various types of CCR, i.e., bottom ash, FGD gypsum, FGD sludge, fly ash cenospheres, boiler slag, and combined waste streams. This included data from several EPRI reports, which provided field leachate results for bottom ash, fly ash, and FGD solids from a number of landfills and surface impoundments. EPA also received leachate data from the Alaska Department of Environmental Conservation, the Michigan Department of Natural Resources and Environment (MI DNRE), and from the Maryland Department of the Environment on total metals, TCLP, and SPLP results for bottom ash and fly ash. Included among these data were TCLP results for 102 CCR samples and 12 FGD gypsum samples, and two landfill leachate samples, as well as several laboratory reports on CCR leachate from 2008 through 2010. EPA also received several reports from the University of North Dakota Energy & Environmental Research Center, with leaching test results for 58 fly ash, five FGD, and four FGD gypsum samples using various leaching methods other than TCLP, and TCLP mercury results for 15 fly ash samples, as well as leaching test results for five fly ash and two bottom ash samples using 18-hr, 30-day, and 60-day leach methods, plus bulk and trace element data for five fly ash samples, two bottom ash samples, and one slag sample. (See 76 FR 63252, October 12, 2011.)

In addition to the data submitted by commenters, EPA's Office of Research and Development (ORD), in collaboration with Vanderbilt University (VU), developed additional CCR leaching data using a revised methodology, the Leaching Environmental Assessment Framework, or LEAF, consisting of four methods that evaluate leaching potential for various waste forms at different plausible pH values and liquid-solid ratios, in order to more accurately simulate leaching potential over a variety of field conditions. The LEAF methods went through validation working with 20 different laboratories, different waste matrices, and documented in two EPA reports finding good agreement between the labs for the four methods.[25] In addition, EPA compiled decades of data for ten different case studies to compare field and laboratory leach data.[26] These data also showed LEAF methods to be a good predictor of field leachate behavior using geochemical speciation modeling for factors such as oxidation that are difficult to account for in the lab. When considered along with the methods validation, the field-to-lab leachate data comparison provides additional confidence that LEAF methods can more accurately predict environmental release over a range of materials, waste form, pH, liquid-solid ratio, and other parameters influencing leaching behavior such as calcium depletion for a material.

In updating the risk assessment for the final rule, EPA relied on surface impoundment pore water data and impoundment wastewater data, including the data submitted by commenters. For landfills, EPA only used LEAF data to characterize the leachate for the range of materials resulting from various air pollution control technologies. The CCR data documented in three EPA reports [27] and summarized in Thorneloe et al, 2010 [28] Start Printed Page 21322provides a robust characterization of air pollution control residues from coal-fired power plants and indicates that leaching rates can vary by several orders of magnitude, depending on pH levels and the amount of liquid that comes into contact with the CCR solids (i.e., the liquid to solid ratio).

The 2014 risk assessment incorporates these new data, and accounts for both the pH of the waste in field conditions, as well as the liquid-to-solid ratio of the leachate and CCR, which effectively addresses the concerns raised in the proposed rule that TCLP and SPLP methods could underestimate leachate concentrations.

A further area of uncertainty related to one of the primary inputs into the risk assessment. As noted in the proposed rule, the Agency's risk estimates were based on the existing cancer slope factor of 1.5 mg/kg/d−1 for arsenic in EPA's Integrated Risk Information System (IRIS). However, EPA noted that was in the process of revaluating the arsenic cancer slope factor in light of recent recommendations from the National Research Council (NRC) of the National Academy of Sciences (NAS) in “Critical Aspects Arsenic in Drinking Water, 2001 Update.” In the proposal, EPA estimated that using this NRC data analysis would increase the individual risk estimates by approximately 17 times.

EPA is currently evaluating the arsenic cancer slope factor in light of more recent NRC recommendations, regarding the approach and the science for estimating cancer and non-cancer risk in “Critical Aspects of EPA's IRIS Assessment of Inorganic Arsenic, (NRC 2013).” EPA is in the process of implementing these recommendations, but to date has been unable to finalize its IRIS reassessment. Nor did EPA receive any other information during the development of this final rule that would help to resolve this uncertainty.

A final source of uncertainty in the risk assessment developed for the proposed rule related to the potential impact from the interception of contaminated groundwater plumes by surface water bodies that exist between a waste management unit and a down-gradient drinking water well. It is common for coal-fired utilities to be located near water bodies, which are used as a source of cooling water and waste conveyancing. Releases from surface impoundments located in close proximity to water bodies can be intercepted, which can significantly affect the contaminants that reach drinking water wells. For example, surface impoundments are commonly placed next to rivers, which can intercept the leachate plume and prevent contamination of drinking water wells on the other side of the river. Also, in such circumstances the direction of groundwater flow on both sides of the river may be towards the river; thus, the drinking water well on the opposite side of a river may not be impacted.

Over the course of the rulemaking, EPA was able to obtain sufficient data to model the impact from interception of contamination by surface water bodies. The risk assessment developed for the final rule accounts for the interception of the groundwater contamination plume by surface water bodies, and the resulting decrease in constituent mass to downstream drinking water sources. As a consequence of this modeling, the median risks for surface impoundments and landfills were substantially lower than both the high-end and median risks modeled in the 2010 risk assessment, i.e., by approximately an order of magnitude.

2. Adequacy of Existing State Regulatory Oversight

The assessment of state regulatory programs in the proposed rule was based largely on two reports: A joint U.S. Department of Energy (DOE) and EPA study completed in 2006, “Coal Combustion Waste Management at Landfills and Surface Impoundments, 1994-2004,” and a 2009 survey conducted by the Association of State and Territorial Solid Waste Management Officials (ASTSWMO). EPA's preliminary conclusion was that while states seem to be regulating landfills to a greater extent than in 2000, significant gaps in state programs appeared to remain, particularly with respect to the oversight of surface impoundments.

In reaching this conclusion EPA noted the following findings from the DOE/EPA study: only 19 percent (three out of 19) of the surveyed surface impoundment permits included requirements addressing groundwater protection standards (i.e., contaminant concentrations that cannot be exceeded) or closure/post-closure care, and only 12 percent (two out of 12) of surveyed units were required to obtain bonding or financial assurance. The EPA/DOE report also concluded that approximately 30 percent of the net disposable CCR generated was potentially exempt from all state solid waste permitting requirements (EPA/DOE Report at pp 45-46). For example, at the time of the report, Alabama did not regulate CCR disposal under any state waste authority and nor had a dam safety program. Texas (the largest coal ash producer) did not require permits for waste managed on-site, which is defined as waste managed at any site owned by the generator, up to 50 miles away from the generating facility. Finally, the report found that a number of states only regulated surface impoundments under CWA authorities, and consequently primarily addressed the risks from effluent discharges to navigable waters, but did not require liners or groundwater monitoring.

The more recent 2009 ASTSWMO survey reached similar conclusions. With respect to liner requirements, 36 percent of surveyed states did not have minimum liner requirements for CCR landfills, while 67 percent did not have CCR liner requirements for surface impoundments. Similarly, 19 percent of states surveyed did not have minimum groundwater monitoring requirements for landfills and 61percent did not have groundwater monitoring requirements for surface impoundments. The 2009 ASTSWMO survey also indicated that only 36 percent of states regulated the structural stability of surface impoundments.

In the proposal, EPA identified several issues that complicated its preliminary assessment and prevented the Agency from reaching overall conclusions as to the adequacy of state regulatory programs. First, EPA raised concern about the absence of any real details in the two reports regarding how states, in practice, oversee the disposal or other solid waste management of CCR. For example, even though the disposal units might not be regulated under the state solid waste provisions, some states may use performance based standards or implement requirements to control CCR landfills and surface impoundments under other state programs. Second, EPA noted that most of the more recent data primarily focused on the requirements applicable to new management units, which only represented approximately 10 percent of currently operating units. EPA had little, if any, information that described the extent to which states and utilities had implemented requirements, such as groundwater monitoring, on the many existing landfills and surface impoundments that receive CCR. Moreover, the information in the record for the proposal with respect to these older units was fifteen years old. EPA assumed it to be unlikely that states would have required existing units to install liners, but suggested states may have been more likely to have imposed groundwater monitoring for such units over the last 15 years.Start Printed Page 21323

EPA also identified several issues that would be relevant to the Agency's evaluation of the overall adequacy of state regulatory programs. Specifically, EPA explained that it would consider how state regulatory programs have, in practice, evaluated and imposed requirements to address: (1) Leachate collection; (2) groundwater monitoring; (3) whether a unit must be lined and the type of liner needed; (4) the effectiveness of existing management units as opposed to new management units; (5) whether the state requires routine analysis of CCR; (6) whether financial responsibility requirements are in place for the management of CCR; (7) the extent of permit requirements, including under what authorities these disposal units are permitted, the types of controls that are included in permits, and the extent of oversight provided by the states, (8) whether state programs include criteria for siting new units; (9) the extent of requirements for corrective action, post-closure monitoring and maintenance; (10) the state's pattern of active enforcement and public involvement; and (11) whether or not these facilities have insurance against catastrophic failures.

EPA received a substantial amount of information on state programs from commenters. Extensive comments were submitted by a coalition of environmental groups, outlining the alleged gaps in state regulatory programs applicable to the management of CCR. These comments contained a comprehensive analysis of 37 state programs based on the findings of the DOE/EPA 2006 report as well as on an independent compilation of state program requirements. According to these commenters' analysis, only four states (representing approximately four percent of the CCR generated in the U.S. in 2005) required groundwater monitoring in all new and existing landfills, and only six states (representing approximately 19 percent of the CCR generated in 2005) required groundwater monitoring in all new and existing surface impoundments; only five states (representing approximately seven percent of the CCR generated in 2005) required composite liners for all new landfills; and only four states (representing approximately 19 percent of the CCR generated) required composite liners for all new surface impoundments. The commenters' analysis discounted any state law that included any provision that granted permit writers discretion to modify the requirement on a case-by-case basis, and/or to grant waivers and exemptions based on the waste's toxicity, onsite location, and management practice.

EPA also received comments from ASTSWMO, the Environmental Council of the States (ECOS), and 36 individual states. In its comments, ASTSWMO submitted a report with revisions of the aggregated statistics in its 2009 report, which they claim demonstrated that state CCR programs were more robust than described in the proposed rule. These commenters generally agreed with EPA's conclusion that state requirements for key CCR requirements are typically more robust for landfills than for surface impoundments. ASTSWMO's comments included the following examples: 71 percent of the surveyed states required a liner for landfills, compared to 65 percent that required that surface impoundments be lined; 87 percent of surveyed states required groundwater monitoring at landfills, compared to 67 percent of states that required groundwater monitoring at surface impoundments; and while 83 percent of surveyed states required structural stability monitoring at landfills, only 64 percent of surveyed states required it at surface impoundments. The sole exception related to permit requirements, where the report claimed that 91 percent of the surveyed states required a permit of some type for surface impoundments, as compared to 86 percent of states that required a permit for landfills. In addition, ASTSWMO claimed that all 42 surveyed states had the authority to require remediation. The report also alleged that in 43 of 44 states, states had the authority to require surface impoundments to implement repair and maintenance efforts during operation. ASTSWMO also claimed that 43 out of 44 states required that steps be taken to protect human health and the environment, and that 41 of 43 states also had authority to require closure.

According to this revised survey, state requirements also vary with respect to whether they applied to all waste units, or only to new units or lateral expansions. ASTSWMO stated that in 34 percent of the surveyed states, liner requirements applied equally to new and existing landfills, and to both existing and new surface impoundments in 46 percent of the surveyed states. Similarly, ASTSWMO stated that groundwater monitoring was required for both existing and new landfills in 82 percent of the surveyed states, and to both existing and new surface impoundments in 74 percent of the surveyed states.

Nineteen states and state organizations also directly responded to the environmental groups' report by submitting comments on their programs, although only four of these states were among the leading CCR generators: Kentucky, North Dakota, Ohio, and Michigan. These states identified specific instances where the assertions made by the environmental groups were factually incorrect or omitted relevant information. In response to both the proposed rule and the NODA (76 FR 63252, October 12, 2011) most states provided only summaries of their regulatory programs rather than detailed descriptions.

As EPA explained in the proposed rule, there are significant limitations to the kind of aggregated survey statistics presented in ASTSWMO's comments. Such statistics fail to provide the information necessary to meaningfully address the question of how, in practice, state programs regulate the relevant risks presented by the management or disposal of CCR, which was the issue that EPA explained was necessary to resolve. For example, even assuming that 91 percent of the surveyed states actually do require a permit of some type for surface impoundments, this provides no information on the nature or extent of the specific requirements in the permit. As noted in the proposal, most CCR surface impoundments are regulated under a NPDES permit, and while the risks from effluent discharges to navigable waters are addressed, these units are not subject to the provisions designed to protect groundwater, such as liners or groundwater monitoring. Nor does it address the extent of the requirement; for example, although Texas generally requires landfills to be permitted and to monitor groundwater, the majority of CCR units are exempt from these requirements because all industrial wastes managed on-site (i.e., any site owned by the generator, up to 50-miles away from the generator's facility) are exempt. Finally, since the ASTSWMO survey does not identify the individual surveyed states but merely presents aggregated statistics, this information cannot be correlated with the amount of CCR generated, which significantly limits its value; for example, information demonstrating the strength of the regulatory program in a state responsible for two percent of the net CCR generated nationally is less significant than similar information on a state responsible for 25 percent of the net CCR generated.

In addition to the information provided by commenters, EPA independently reviewed state statutes and regulations, with a more detailed focus on the 16 states responsible for approximately 74 percent of the CCR generated in 2009. It is clear from this Start Printed Page 21324review, as well as from information submitted by the commenters, that the degree of state regulatory oversight of these wastes and the overall protectiveness of the particular state programs varies widely.

Overall, the information from commenters and from EPA's own review of state programs generally confirms EPA's original conclusion that significant gaps remain in many state programs. Some programs provide minimal or no regulatory oversight of CCR units. For example, Arizona, New Mexico, and Utah have no regulations applicable to CCR units or entirely exempt CCR from state regulations governing solid waste. Similarly, Mississippi, Montana, and Texas (the largest coal-ash producer) exempt the on-site disposal of CCR (as “non-hazardous industrial solid waste”) from some or all key requirements, such as permits or groundwater monitoring.[29] Such exemptions would cover most of the disposal of CCR within the state, as the majority of utilities dispose of their CCR on-site. Other states, such as Florida, Indiana, Ohio and Pennsylvania, exempt CCR landfills or “monofills” from many requirements. For example, Indiana regulations consider surface impoundments that are dredged at least annually to be “storage units” that are exempt from solid waste regulations, including from corrective action requirements. Many of these states are among the leading generators of CCR wastes. In total, EPA estimates that approximately 20 percent of the net disposable CCR is entirely exempt from state regulatory oversight.

State programs that entirely exempt CCR management from regulatory oversight, however, are the exception. Most states do regulate the management of CCR to varying degrees, although the particular requirements can vary significantly. Still, some general conclusions can be drawn.

Most CCR surface impoundments are permitted exclusively under NPDES or other surface water pollution prevention programs. In these states, requirements to protect groundwater, such as liners or groundwater monitoring systems, are frequently less robust than the corresponding requirements applicable to CCR landfills.

Many state programs require that new disposal units be lined and groundwater monitoring systems installed, although many exempt existing waste units from the liner and groundwater monitoring requirements. Consequently, for newer units, the facts are less alarming: 89 percent of the 114 CCR surface impoundments constructed between 1994 and 2010 have liners, and 70 percent have composite liners. Similarly, 37 of 45 CCR surface impoundments EPA surveyed had installed groundwater monitoring systems. By contrast, 79 percent of the landfills constructed during this timeframe had installed liners, but only 58 percent were composite-lined. However the majority of the older (pre-1994) waste units still lack liners; 63 percent of older landfills have no liners and 63 percent and 24 percent of older surface impoundments have either no liners or clay liners, respectively.

Information on the extent of groundwater monitoring at older units was either unavailable, or was too unreliable to support any conclusions as to the overall number or percentage of older units with groundwater monitoring systems in most states. ASTSWMO's comments in response to the October 2011 NODA identified eight states [30] that required groundwater monitoring at existing facilities, but only a few of these states addressed this issue in their comments. EPA has some anecdotal evidence on the status of groundwater monitoring in six states, including four states that are among the leading CCR generators. In the wake of the Kingston TVA spill, groundwater monitoring wells were installed at 12 of Illinois's existing surface impoundments, almost doubling the number of monitored surface impoundments in the state. However, 55 additional surface impoundments, both active and inactive, still lack groundwater monitoring systems. In Ohio, 44 CCR units, out of a total of 57 CCR units in the state (42 surface impoundments and 15 landfills) still lack groundwater monitoring, even though all of the surface impoundments were permitted decades ago under Ohio's NPDES program. Ohio acknowledged in their comments that the extent of groundwater risks in the state is poorly documented, as 40 out of 44 unlined CCR units do not have a groundwater monitoring system. In sum, the available information is limited, but at least some of that information indicates that significant gaps remain with respect to the implementation of groundwater monitoring requirements under some state regulatory programs.

Of the states that require groundwater monitoring, most appear to require monitoring wells to be placed around the waste unit boundary, although the distance from the unit boundary varies from 50 feet to 150 meters. However, some state programs also authorize a buffer zone or a “zone of discharge,” which allows the facility to defer remediation of groundwater contamination for some period of time, usually until the contaminant plume has migrated to the facility site boundary. Florida, Illinois, North Dakota, and Tennessee are among that states with such a regulatory provision. For example, under Florida regulations, primary and secondary maximum contaminant levels (MCLs) do not apply even beyond the “zone of discharge,” absent a specific order by state regulatory authorities.

Most state programs allow the state regulatory authority to grant variances or exemptions for some or all of the requirements based on site-specific factors. For example, all of the following states require groundwater monitoring at CCR surface impoundments, but also authorize the regulatory authority to exempt or waive those requirements: Alabama, Florida, Georgia, Illinois, Indiana, Kentucky, North Carolina, North Dakota, Pennsylvania, and West Virginia. Contrary to the analysis presented by the environmental groups' comments, the mere fact that state law grants a permit authority the discretion to tailor requirements to account for a facility's site specific conditions does not support a conclusion that the regulatory program is necessarily inadequate. In fact, EPA noted in the proposal that one of the strengths of the subtitle C program was that, as a result of the permit process, requirements could be tailored to account for site specific conditions. Nor does the existence of a waiver process provide any evidence of actual practices; in their comments, a few states acknowledged that state law allowed for variances, but asserted that none had been requested.

To complicate matters further, several states explained that while state law does not mandate certain requirements, state regulatory authorities have, in practice, begun to require them in more recent permits. For example, several states, including Ohio, Texas, Michigan, Florida, and Kentucky, noted that recent practice was to require older disposal units to retrofit or close where they failed to meet relevant standards. Similarly, it appears that in the 16 leading CCR-generating states, 94 percent of new landfills have installed liners (either composite or clay), although only 19 percent of these state programs actually mandate CCR landfills to install a liner. And although only six percent of these state programs require installation of a liner in a new surface impoundment, 75 percent of Start Printed Page 21325new CCR surface impoundments in these states are lined.

All of this information suggests that, at least in some cases, the concerns raised in the proposal regarding the protectiveness of state programs remain warranted. But it also is clear it would be impossible to accurately evaluate whether, in practice, state programs are protective without reviewing individual permit decisions and permit requirements. Such an evaluation would necessarily involve not only a review of the specific permit requirements, but also the site conditions and other factual bases supporting the decision to impose the particular requirements. Unfortunately, this information was not provided by commenters or found in any source currently available to the Agency.

3. Documented Cases in Which Danger to Human Health or the Environment From Surface Run-off or Leachate Has Been Proved

In the proposed rule, EPA described the information it had compiled on specific cases where CCR mismanagement had caused harm to human health or the environment since the 2000 Regulatory Determination. Specifically, EPA explained that it had identified 27 proven damage cases: 17 cases of damage to groundwater, and ten cases of damage to surface water, seven of which are ecological damage cases. Sixteen of the 17 proven damage cases to groundwater involved disposal in unlined units; for the one additional unit, it is unknown whether the unit was lined. EPA also identified 40 potential damage cases to groundwater and surface water. The Agency noted that these numbers likely underestimated the number of damage cases and its expectation that additional cases of damage would be found if a more comprehensive evaluation was conducted, particularly since much of this waste has been (and continues to be) managed in unlined disposal units. EPA also noted its concern that several of the new damage cases involved activities that differ from prior damage cases, including the catastrophic release of waste due to the structural failure of CCR surface impoundments, such as the dam failures that occurred in Martins Creek, Pennsylvania and Kingston, Tennessee, as well as the large-scale placement, akin to disposal, of CCR, under the guise of “beneficial use.”

EPA noted as well that it had received new reports from industry and environmental and citizen groups regarding damage cases. Industry provided information to demonstrate that many of EPA's listed proven damage cases did not meet EPA's criteria for a damage case to be considered “a proven damage case,” that had been developed for purposes of the Bevill Regulatory Determinations. Environmental and citizen groups, on the other hand, had submitted reports alleging the existence of more recent damage cases beyond those EPA had previously documented.

EPA raised questions concerning the following areas associated with the damage cases; first, whether the damage cases discovered to date accurately reflected the true number of damage cases associated with the mismanagement of CCR. Second, EPA highlighted concern regarding the accuracy of the available information on damage cases, as in certain instances, much of the information was largely anecdotal. EPA therefore specifically solicited comments from state regulatory authorities and the facilities involved with the incidents, in the hope of obtaining direct evidence of the facts in each case and to obtain a better understanding of the nature of the damage caused by past and current management practices. For the same reason, on October 12, 2011, EPA published a NODA, soliciting comment on the extensive reports received during the original comment period on the proposed rule. (See 76 FR 63252.)

As discussed in more detail in Unit XI of this document, EPA received a significant number of comments on this topic, both during the original comment period on the proposal, and in response to the NODA. EPA received information on additional damage cases from a number of citizen groups, including the report from Environmental Integrity Project and Earthjustice titled, “Out of Control: Mounting Damages From Coal Ash Waste Sites,” which presented information on 31 alleged CCR damage cases that were not included or were not recognized as damage cases in EPA's July 2007 report. EPA also received an August 26, 2010 report by the Environmental Integrity Project, Earthjustice, and the Sierra Club titled “In Harm's Way: Lack of Federal Coal Ash Regulations Endangers Americans and Their Environment,” which presented an additional 39 alleged CCR damage cases.[31] EPA also received information on ten additional damage cases from state officials in Michigan and Wisconsin.

EPRI submitted two draft reports titled “Evaluation of Coal Combustion Product Damage Cases: Volume 1: Data Summary and Conclusions” (finalized in July 2010), and “Evaluation of Coal Combustion Product Damage Cases: Volume 2: Case Summaries” (finalized in September 2010). In these reports, EPRI provided information that, they claimed, showed that many of EPA's previously identified “proven” damage cases did not meet EPA's criteria for a damage case to be considered “proven.” In response to the 2010 NODA, USWAG submitted a report that reviewed the 70 additional damage cases submitted by citizen groups as part of their comments on the proposed rule. These reports focused primarily on the degree to which the contamination had been contained “on-site” or had migrated off-site of the facility.

In Unit XI of this document, EPA discusses at length all of the comments received and its subsequent analysis of the information obtained throughout the rulemaking. In sum, after analyzing all of the information submitted in response to this rulemaking, EPA has confirmed a total of 157 cases, both proven and potential, in which CCR mismanagement has caused damage to human health and the environment. Although EPA expects that additional damage cases will be discovered in response to the installation of the groundwater monitoring systems required by the final rule, overall EPA has a significantly better understanding of the extent and nature of the damage caused by CCR mismanagement than when the proposed rule was issued. EPA has sufficient confidence in the veracity of the information collected to rely on it in making decisions in this rule.

4. Conclusions

EPA explained in the proposed rule that the decision on whether to retain the Bevill exemption is inherently discretionary, in that it ultimately requires the Agency to make a policy judgment as to the appropriate balance among the eight statutory factors. Chief among the several principles that EPA stated would guide its decision was that any action must protect human health and the environment. To this end, EPA singled out three key areas of analyses that bear directly on that guiding principle: the extent of the risks posed by mismanagement of CCR; the adequacy of state programs to ensure proper management of CCR; and the extent and nature of damage cases.

The first of these largely related to the 2010 quantitative risk assessment of the potential for contamination to Start Printed Page 21326groundwater. During the rulemaking, EPA received information that allowed the Agency to resolve two of the four primary uncertainties identified in the proposal. The risk assessment has been revised with updated pore water concentration data and with LEAF leachate data, and accounts for the potential reduction of contaminants reaching drinking water sources due to interception of contamination by surface water bodies. However, two sources of uncertainty remain: the potential effect of pollution control technologies on the CCR characteristics, and the appropriate IRIS value for arsenic.

EPA's risk assessment evaluated current management practices, and generally did not attempt to account for or evaluate the potential for future changes in the wastes. While EPA has great confidence in the assessment, its ability to definitively resolve this question is therefore limited, given the very real potential for significant changes in CCR characteristics and constituents in the near future, due to the required installation of pollution control technologies. Changes in the CCR characteristics are particularly significant, as the risk assessment concluded that one of the parameters most likely to affect the agency's risk estimates was the characteristic of the wastes.

With respect to the second area, EPA is unable to reach any definitive conclusions as to whether state regulatory programs are so deficient that the level of federal oversight under subtitle C is necessary. Specifically, EPA cannot determine from the available information how states, in practice, have implemented regulatory requirements. At this point, only limited conclusions are possible.

Clear deficiencies exist in some state regulatory programs, and questions remain with respect to others. And many of these concerns exist with respect to programs in states responsible for the majority of CCR generation and disposal. However, most state programs, although they vary considerably, are not clearly deficient on their face. But it is equally clear that exclusive reliance on the regulatory programs as written, without any examination of how states have implemented those requirements in practice, would not support sweeping conclusions about the overall adequacy of state programs. It is critical to ensure that any decision accurately accounts for how the states have exercised their judgment in implementing those requirements, before concluding that state programs cannot adequately oversee the management of CCR without the degree of federal involvement mandated by subtitle C. Notwithstanding EPA's inability to draw conclusions on the overall adequacy of state programs, the high degree of variation across state programs strongly supports the need for federal requirements to establish a consistent national standard of groundwater and human health protection.

In contrast to the other two areas identified in the proposed rule, while some uncertainty remains with respect to the damage cases—namely, whether the 157 identified to date represent the total number of damage cases caused by CCR mismanagement, and whether some of the “potential” damage cases should be classified as “proven” damage cases—at this point, EPA has concluded that the available information provides a sufficient evidentiary base on which decisions can be made. In the absence of the necessary information on two of the three critical areas, however, EPA cannot reach any final conclusions regarding the appropriate balance among the eight statutory factors. Consequently, EPA is also not reaching any final conclusions as to whether a damage case is best categorized as “proven” or “potential.” Such a finding is relevant only to the Bevill Regulatory Determination.

However, as discussed in more detail in Unit XI of this document, the damage cases provide extremely valuable evidence that is directly relevant to the question of whether and how to regulate CCR waste. For example, the damage cases provide “real world” evidence against which to compare EPA's risk modeling estimates, such as evidence regarding the frequency with which particular constituents leach into groundwater. They also provide direct evidence regarding specific waste management practices at electric utilities, along with the potential consequences of those practices. Finally, both the specifics of the damage cases and the fact that they continue to occur provide strong evidence of the need for this rule under subtitle D while EPA obtains the information that will allow the Agency to make a final Regulatory Determination for these wastes.

Thus, even though EPA is not able to reach a final conclusion on the Regulatory Determination for these wastes, the totality of the information in the rulemaking record clearly demonstrates that the risks associated with the current management and disposal of CCR remain substantial. EPA's risk assessment concluded that the cancer risks from unlined surface impoundments ranged from 3 × 10−4 for trivalent arsenic to 4 × 10−5 for pentavalent arsenic. Non-cancer risks from these same units also significantly exceeded EPA's level of concern, with estimates ranging from an HQ of 2 for thallium, to HQs [32] of 4 for molybdenum and 8 for trivalent arsenic. The risks associated with unlined landfills were also estimated to be significant, with cancer risks of 2 × 10−5 for trivalent arsenic. It is important to note that these risk numbers are based on national disposal practices. Risks at an individual site may be even higher based on individual site conditions, waste characteristics, and management practices. EPA's risk assessment identified the potential for higher risks based on different waste pH values and management practices. Multiple constituents presented higher risks when considered in waste management units that co-dispose both ash and coal refuse at more acidic pHs or FGD wastes at more basic pHs. For example, the modeled cancer risks for the co-disposal of ash and coal refuse (pH 1.7-8.2) ranged between 10−3 for trivalent arsenic to 4 × 10−4 for pentavalent arsenic. Non-cancer risks were similarly high, ranging between and an HQ of 13 for cobalt, and HQs of 14 for pentavalent arsenic to 26 for trivalent arsenic, based on the ingestion of contaminated drinking water. Although this management practice is declining, recent information indicates that approximately five percent of facilities continue to co-dispose of ash and coal refuse in surface impoundments.

Moreover, EPA's risk estimates are consistent with the continued damage cases compiled through this rulemaking. As further discussed in Unit XI of this document, EPA has confirmed that 157 cases of proven or potential contamination of groundwater have occurred in states across the nation since the initial Regulatory Determination. These damage cases were primarily associated with unlined units and were most frequently associated with releases of arsenic. While new units are typically constructed with composite liners, which under EPA's current risk assessment adequately mitigate the risks, older units still comprise the overwhelming majority of currently operating units. EPA's data show that approximately 63 percent of currently operating surface impoundments and landfills are unlined, and thus more prone to leach contaminants into groundwater. Analysis of the information from the damage cases also demonstrates that unlined surface Start Printed Page 21327impoundments typically operate for 20 years before they begin to leak. Most of the currently operating surface impoundments are between 20 and 40 years old.

The age of the units also has implications for their structural stability and the potential for catastrophic releases. Of the approximately 735 CCR surface impoundments currently operating in the United States, a certain percentage have a great potential for loss of human life and environmental damage in the event of catastrophic failure. Based on the information collected from EPA's Assessment Program, 318 surface impoundments have either a high or significant hazard potential rating, at least 13 of which were not designed by a professional engineer. Of the total universe of surface impoundments, approximately 186 of these units were not designed by a professional engineer. Surface impoundments are generally designed to last the typical operating life of coal-fired boilers, on the order of 40 years. However, many impoundments are aging; based on the subset of units for which age data were available, approximately 195 active surface impoundments exceed 40 years of age; 56 units are older than 50 years, and 340 are between 26 and 40 years old. In recent years, problems have continued to arise from these units, which appear to be related to the aging infrastructure, and the fact that many units may be nearing the end of their useful lives. For example, as a result of the administrative consent order issued after the December 2008 spill, TVA conducted testing which showed that another dike at TVA's Kingston, Tennessee plant had significant safety deficiencies. Collectively, these facts indicate a high likelihood that in the absence of any regulatory action, such units will leak in the near future, or are currently leaking, undetected, since groundwater monitoring is not installed at many of these older units. Moreover, damage cases continue to occur; in response to EPA's CERCLA 104(e) information request letter, a total of 35 units at 25 facilities reported historical releases. These range from minor spills to a spill of 0.5 million cubic yards of water and fly ash. And as recently as February 2014, CCR slurry was released into the Dan River from an inactive surface impoundment in North Carolina.

All of which demonstrates a compelling need for a uniform system of requirements to address these risks without waiting for the information and analyses necessary to complete a final Regulatory Determination. EPA will continue to monitor these critical areas, and will provide the public with an additional opportunity to comment on any proposed Regulatory Determination, prior to issuing a final Regulatory Determination.

B. Final Regulatory Determination Regarding Beneficial Use

EPA generally proposed to retain the May 2000 Regulatory Determination that beneficially used CCR did not warrant federal regulation under subtitle C of RCRA. As EPA stated in the May 2000 Regulatory Determination, “In the [Report to Congress], we were not able to identify damage cases associated with these types of beneficial uses, nor do we now believe that these uses of coal combustion wastes present a significant risk to human health and the environment. While some commenters disagreed with our findings, no data or other support for the commenters' position was provided, nor was any information provided to show risk or damage associated with agricultural use. Therefore, we conclude that none of the beneficial uses of coal combustion wastes listed above pose risks of concern.” (See 65 FR 32230.) EPA noted that since the original Regulatory Determination, the Agency had found no data or other information to indicate that existing efforts of states, EPA, and other federal agencies had been inadequate to address the environmental issues associated with the beneficial use of CCR that were originally identified in the Regulatory Determination. EPA explained that it had proposed this approach in recognition that some uses of CCR, such as encapsulated uses in concrete, and use as an ingredient in the manufacture of wallboard, provide benefits and raise minimal health or environmental concerns. Consequently, EPA preliminarily concluded that encapsulated uses of CCR, which are common in many consumer products, did not merit regulation based on the available information.

However, EPA noted that the issues were more difficult with respect to unencapsulated uses of CCR and specifically solicited comment on whether such uses should continue to be included as “beneficial use” under the Bevill exemption. EPA explained that unencapsulated uses have raised concerns and therefore merited closer attention. For example, the placement of unencapsulated CCR on the land, such as in road embankments or in agricultural uses, presented a set of issues similar to those that caused the Agency to propose to regulate CCR destined for disposal. But the Agency also acknowledged that the amounts and, in some cases, the manner in which CCR is used—i.e., subject to engineering specifications and material requirements rather than landfilling techniques—are potentially very different from land disposal.

EPA is retaining the original 2000 Regulatory Determination for CCR that is beneficially used. EPA has made this determination based on consideration of the available information and the RCRA section 8002(n) study factors. {{

1. Source and Volume of CCR Generated Each Year

The American Coal Ash Association (ACAA) conducts a voluntary, annual survey of the coal-fired electric utility industry to track the quantities of CCR generated and beneficially used. According to the latest survey, the electric utility industry generated nearly 110 million tons of CCR in 2012. Approximately 39 million tons of these CCR was identified by ACAA as beneficially used in either encapsulated or unencapsulated products. An additional 12.8 million tons were placed in mine-fill operations, while the remaining 57.8 million tons were disposed of in landfills and surface impoundments (ACAA, 2013).[33]

2. Present Utilization Practices

Based on the beneficial use rates reported by ACAA, approximately 50 percent of the CCR beneficially used on an annual basis falls into two categories: (1) Fly ash used as a direct substitute for Portland cement during the production of concrete (referred to as “fly ash concrete”); and (2) FGD gypsum used as a replacement for mined gypsum in wallboard (referred to as “FGD gypsum wallboard”). Specifically, the 2012 ACAA survey indicates that the largest encapsulated beneficial uses of CCR, by more than a factor of two, are fly ash used in “concrete/concrete products/grout” (12.6 million tons) and FGD gypsum used in “gypsum panel products” (7.6 million tons).

3. Potential Danger, if Any, to Human Health or the Environment From the Reuse of CCR

The risks associated with the disposal of CCR stems from the specific nature of that activity; that is, the disposal of CCR in (often unlined) landfills or surface impoundments, with thousands, if not millions, of tons placed in a single Start Printed Page 21328concentrated location. And in the case of surface impoundments, the CCR is managed with water, under a hydraulic head, which promotes rapid leaching of contaminants into neighboring groundwater. The beneficial uses identified as excluded under the Bevill exemption for the most part present a significantly different risk profile.

a. Encapsulated Beneficial Uses

An encapsulated beneficial use is one that binds the CCR into a solid matrix that minimizes mobilization into the surrounding environment. Examples of encapsulated uses include, but are not limited to: (1) Filler or lightweight aggregate in concrete; (2) a replacement for, or raw material used in production of, cementitious components in concrete or bricks; (3) filler in plastics, rubber, and similar products; and (4) raw material in wallboard production.

Since publication of the proposal, EPA has developed a methodology for evaluating encapsulated beneficial uses. A copy of the methodology can be found at http://www2.epa.gov/​coalash/​methodology-evaluating-encapsulated-beneficial-uses-coal-combustion-residuals. EPA applied this methodology to the two largest CCR uses—the use of fly ash as a replacement for Portland cement in concrete, and the use of FGD gypsum as a replacement for mined gypsum in wallboard. A complete copy of the evaluation can be found at http://www.epa.gov/​wastes/​conserve/​imr/​ccps/​pdfs/​ccr_​bu_​eval.pdf.

The evaluation considered products that meet relevant physical and performance standards, that conform to standard design specifications, and that incorporate fly ash and FGD gypsum from pollution control devices currently used in the United States. Based on the findings of the evaluation, the Agency concluded that environmental releases of constituents of potential concern from CCR fly ash concrete and FGD gypsum wallboard during use by the consumer are comparable to or lower than those from analogous non-CCR products, or are at or below relevant regulatory and health-based benchmarks for human and ecological receptors.

b. Unencapsulated Uses

EPA acknowledged in the proposal that unencapsulated uses generally presented more difficult issues than encapsulated uses. CCR can leach toxic metals at levels of concern, so depending on the characteristics of the CCR, the amount of material placed, how it is placed, and the site conditions, there is a potential for environmental concern. However, EPA cannot extrapolate from the risk assessments conducted to evaluate the management practices associated with CCR landfills and CCR surface impoundments, because the exposure patterns are too dissimilar: The amounts and manner involved with beneficial use are very different than the thousands, if not millions of tons of CCR that are mounded in a single concentrated location in a landfill. And the potential exposures are entirely unlike surface impoundments, where CCR is managed with water under a hydraulic head, which promotes more rapid leaching of contaminants. By contrast “beneficial uses,” even unencapsulated uses, are typically subject to engineering specifications, and for certain uses, federal oversight, and material requirements. For example, fly ash used as a stabilized base course in highway construction is subject to both regulatory standards under the U.S. Department of Transportation (DOT) and the Federal Highway Administration (FHWA), and engineering specifications, such as the ASTM C 593 test for compaction, the ASTM D 560 freezing and thawing test, and a seven day compressive strength above 2760 kPa (400 psi). (See 75 FR 35163-35165 for additional examples.)

In 1999, EPA conducted a risk assessment of certain agricultural uses of CCR, since this practice was considered the most likely to raise human health or environmental concerns.[34] EPA estimated the risks associated with such uses to be within the range of 1 × 10−6. These results as well as EPA's conclusion that the use of CCR in agricultural settings was the most likely use to raise concerns, caused EPA to conclude that none of the beneficial uses identified in the 2000 Regulatory Determination warranted federal regulation, because “we were not able to identify damage cases associated with these types of beneficial uses, nor do we now believe that these uses of coal combustion wastes present a significant risk to human health or the environment.” (65 FR 32230, May 22, 2000.)

EPA also noted that beneficially using secondary materials conserves natural resources, and can serve as an important alternative to disposal.

4. Documented Cases in Which Damage to Human Health or the Environment From Surface Run-off or Leachate Has Been Proved

To date, EPA has seen no evidence of damages from the encapsulated beneficial uses of CCR that EPA identified in the proposal. For example, there is wide acceptance of the use of CCR in encapsulated uses, such as wallboard, concrete, and bricks because the CCR is bound into products. However, as of the date of the proposed rule, seven proven damage cases associated with unencapsulated uses have occurred, in which large quantities of unencapsulated CCR were used indiscriminately to re-grade the landscape or to fill old quarries or gravel pits. The proposed rule discussed two of these cases. (See 75 FR 35147.) The first case was in Gambrills, Maryland and involved the disposal of fly ash and bottom ash (beginning in 1995) in two sand and gravel quarries. EPA considers this site a proven damage case, because groundwater samples from residential drinking wells near the site include heavy metals and sulfates at or above groundwater quality standards, and the state of Maryland is overseeing remediation. The second case is the Battlefield Golf Course in Chesapeake, Virginia where 1.5 million yards of fly ash were used as fill and to contour a golf course. Groundwater contamination above MCLs has been found at the edges and corners of the golf course, but not in residential wells. An EPA study in April 2010, established that residential wells near the site were not impacted by the fly ash and, therefore, EPA does not consider this site to be a proven damage case. However, due to the onsite groundwater contamination, EPA considers this site to be a potential damage case.

During the development of this final rule, EPA obtained information on a comparable situation in which large quantities of unencapsulated CCR were placed on the land in a manner that presented significant concerns. The AES coal-fired power plant in Puerto Rico lacked capacity to dispose of their CCR on-site, and off-site landfills in Puerto Rico were prohibited from accepting CCR. In lieu of transporting their CCR off of the island for disposal, AES created an aggregate (“AGREMAX”) with the CCR generated at their facility, and used the aggregate as fill in housing developments and in road projects. Over two million tons of this material was used between 2004 and 2012.

Currently, there is insufficient information to determine whether groundwater has been contaminated as Start Printed Page 21329a result of this practice, and thus, EPA cannot classify this as either a proven or potential “damage case.” Nevertheless, the available facts illustrate several of the significant concerns associated with unencapsulated uses. Specifically, the AGREMAX was applied without appropriate engineering controls and in volumes that far exceeded the amounts necessary for the engineering use of the materials. Inspections of some of the sites where the material had been placed showed use in residential areas, and to environmentally vulnerable areas, including areas close to wetlands and surface waters and over shallow, sole-source drinking water aquifers. In addition, some sites appeared to have been abandoned.

Consistent with the proposed rule, EPA does not consider the practices described in this section to be beneficial use, but rather waste management that would be subject to the requirements of the final rule.

5. Alternatives to Current Disposal Methods, the Costs of Such Alternatives, and the Impact of Such Alternatives on the Use of Coal and Other Natural Resources

The beneficial use of CCR is a primary alternative to current disposal methods. And as EPA has repeatedly concluded, it is a method that, when performed correctly, can offer significant environmental benefits, including greenhouse gas (GHG) reduction, energy conservation, reduction in land disposal (along with the corresponding avoidance of potential CCR disposal impacts), and reduction in the need to mine and process virgin materials and the associated environmental impacts.

a. Greenhouse Gas and Energy Benefits

The beneficial use of CCR reduces energy consumption and GHG emissions in a number of ways. Three of the most widely recognized beneficial applications of CCR are the use of coal fly ash as a substitute for Portland cement in the manufacture of concrete, the use of FGD gypsum as a substitute for mined gypsum in the manufacture of wallboard, and the use of CCR as a substitute for sand, gravel, and other materials in structural fill. Reducing the amount of cement, mined gypsum, and virgin fill produced by substituting CCR leads to large supply chain-wide reductions in energy use and GHG emissions. Specifically, the RIA estimates three-year rolling average of 53,054,246 million British thermal units (MMBtu) per year in energy savings and 11,571,116 tons per year in GHG (i.e., carbon dioxide and methane) emissions reductions in 2015. This estimate is likely to underestimate the total benefits that can be achieved from all beneficial uses. Furthermore, the use of fly ash generally makes concrete stronger and more durable. This results in a longer lasting material, thereby marginally reducing the need for future cement manufacturing and corresponding avoided emissions and energy use.

b. Benefits From Reducing the Need To Mine and Process Virgin Materials

CCR can be substituted for many virgin materials that would otherwise have to be mined and processed for use. These virgin materials include limestone to make cement, and Portland cement to make concrete; mined gypsum to make wallboard, and aggregate, such as stone and gravel for uses in concrete and road bed. Using virgin materials for these applications requires mining and processing, which can impair wildlife habitats and disturb otherwise undeveloped land. It is beneficial to use secondary materials—provided it is done in an environmentally sound manner—that would otherwise be disposed of, rather than to mine and process virgin materials, while simultaneously reducing waste and environmental footprints. Reducing mining, processing and transport of virgin materials also conserves energy, avoids GHG emissions, and reduces impacts on communities.

c. Benefits From Reducing the Disposal of CCR

Beneficially using CCR instead of disposing of it in landfills and surface impoundments also reduces the need for additional landfill space and any risks associated with their disposal. In particular, the United States disposed of over 57.8 million tons of CCR in landfills and surface impoundments in 2012, which is equivalent to the space required of 20,222 quarter-acre home sites under eight feet of CCR.

As discussed in the final rule RIA, the current beneficial use of CCR as a replacement for industrial raw materials (e.g., Portland cement, virgin stone aggregate, lime, gypsum) provides substantial annual life cycle environmental benefits for these industrial applications. Specifically, the three-year rolling average of environmental benefits estimated for 2015 includes: (1) 53,054,246 MMBtu per year in energy savings; (2) 1,661,900 million gallons per year in water savings; (3) 11,571,116 tons per year in GHG (i.e., carbon dioxide and methane) emissions reductions; (4) 45,770 tons of criteria air pollutant (i.e., NOX, SOX, particulate matter, and CO) emissions reductions; and (5) 3,207 pounds of toxic air pollutant (i.e., mercury and lead) emissions reductions. All together, the beneficial use of CCR in 2015 is estimated to provide over $2.3 billion in annual national environmental benefits. In addition, since EPA estimates annual baseline disposal costs of approximately $2.4 billion for the just over 50 percent of tons disposed each year, current beneficial use and minefilling also result in annual material and disposal cost savings of approximately $2 billion annually.

6. Current and Potential Utilization of CCR

In 2012, nearly 36 percent (39 million tons) of CCR were beneficially used (excluding minefill operations) and nearly 12 percent (12.8 million tons) were placed in minefills. (This compares to 23 percent of CCR that were beneficially used, excluding minefilling, at the time of the May 2000 Regulatory Determination, and represents a significant increase.)

7. Conclusions

On balance, after considering all of the available information, EPA has concluded that the most appropriate approach toward beneficial use is to retain the May 2000 Regulatory Determination that regulation under subtitle C of the beneficial use of CCR is not warranted. EPA has also determined that regulation under subtitle D is generally not necessary for these beneficial uses.

As discussed in the preceding section, the most important of the section 8002(n) factors are those relating to the potential risks to human health and the environment. See e.g., Horsehead Resource Development Co. v. EPA, 16 F.3d 1246, 1258 (D.C. Cir, 1994) (Upholding EPA's interpretation that wastes resulting from the combustion of mixtures of Bevill-exempt and non-exempt wastes could only retain Bevill-exempt status so long as the combustion waste remained of low toxicity); EDF v. EPA, 852 F.2d 1316, 1328-1329 (D.C. Cir. 1988) (Overturning EPA rule that included as Bevill exempt, wastes that were not of low toxicity). EPA is adopting this Regulatory Determination in recognition that many uses of CCR, such as encapsulated uses in concrete, and use as an ingredient in the manufacture of wallboard, provide environmental benefits and raise minimal health or environmental concerns. To date, the information available does not demonstrate the existence of any risks associated with encapsulated uses of CCR that merit Start Printed Page 21330regulation under either subtitle C or subtitle D of RCRA.

While there can be some risks associated with unencapsulated uses—for example, the placement of unencapsulated CCR on the land, such as in large scale fill operations or in agricultural uses, depending on the specific site conditions—in general the amounts and, in some cases, the manner in which they are used are very different than land disposal. For example, agricultural uses involve the placement of inches rather than tons of CCR, and placement of CCR in a thin layer rather than mounded in a single concentrated location. In addition, these uses are subject to engineering specifications and materials requirements, which will limit the ultimate amount of material placed on the land.

EPA recognizes that several proven damage cases involving the large-scale placement, akin to disposal, of CCR have occurred under the guise of “beneficial use”— the “beneficial” use being the filling up of old quarries or gravel pits, or the re-grading of landscape with large quantities of CCR. EPA did not consider this type of use as a “beneficial” use in its May 2000 Regulatory Determination, and still does not consider this type of use to be covered by the exclusion. Therefore, the final rule explicitly removes these types of uses from the category of beneficial use, and from this Regulatory Determination. As discussed in the next section of this preamble, EPA has adopted criteria in the final rule to ensure that inappropriate uses that effectively are disposal will be regulated as disposal. The final rule expressly defines the placement of CCR in sand and gravel pits or quarries as disposal in a landfill. In addition, the final rule provides that the use of large volumes of CCR in restructuring landscape that does not meet specific criteria will constitute disposal.

While EPA has not definitively concluded that all unencapsulated beneficial uses are “safe,” based on the current record for this rulemaking, EPA is unable to point to evidence demonstrating that the unencapsulated uses subject to this Determination warrant federal regulation. While the absence of demonstrated harm in this instance is not proof of safety, neither is the lack of information proof of risk.[35]

In this regard, EPA notes that many states have developed beneficial use programs that allow the use of CCR, provided they are demonstrated to be non-hazardous materials; and many require a site specific assessment before authorizing placement on the land of large amounts of unencapsulated CCR. For example, Wisconsin's Department of Natural Resources has developed a regulation (NR 538 Wis. Adm. Code), which includes a five-category system to allow for the beneficial use of industrial by-products, including coal ash, provided they meet the specified criteria. In addition, the ASTSWMO 2006 Beneficial Use Survey Report states that a total of 34 of the 40 reporting states, or 85 percent, indicated they had either formal or informal decision-making processes or beneficial use programs relating to the use of solid wastes. (http://www.astswmo.org/​Files/​Policies_​and_​Publications/​Solid_​Waste/​2007BUSurveyReport11-30-07.pdf) [36] Because EPA has not identified significant risks associated with the beneficial uses covered by this Regulatory Determination, the adequacy of these state programs does not factor into EPA's Determination. Nevertheless, to the extent that that these materials do have the potential to pose risk at an individual site, the fact that many states exercise regulatory oversight of these materials provides an additional level of assurance.

Finally, EPA does not wish to inhibit or eliminate the measurable environmental and economic benefits derived from the use of this valuable material given the current lack of evidence affirmatively demonstrating an environmental or health risk. Consequently, EPA is confident that the combination of the final rule, EPA guidance, current industrial standards and practices, and in many cases, state regulatory oversight is sufficient to address concerns associated with the beneficial uses to which this Determination applies.

V. Development of the Final Rule—RCRA Subtitle D Regulatory Approach

As previously discussed in Unit II of this document, the authority to develop and promulgate the national minimum criteria governing the disposal of CCR in landfills and surface impoundments is found under the provisions of sections 1008(a), 4004, and 4005(a) of RCRA (i.e., subtitle D of RCRA). These authorities, however, do not provide EPA with the ability to issue permits, require states to issue permits, approve state programs to operate in lieu of the federal program, or to enforce any of the requirements addressing the disposal of CCR. Consequently, EPA designed the proposed RCRA subtitle D option to ensure that the requirements will effectively protect human health and the environment within those limitations. The final rule establishes self-implementing requirements—primarily performance standards—that owners or operators of regulated units can implement without any interaction with regulatory officials.

In developing the subtitle D option for the proposal, EPA considered a number of existing programs as relevant models. EPA drew most heavily on the existing 40 CFR part 258 program applicable to MSWLFs. While this program does not address CCR disposal in surface impoundments, it provided EPA with a general regulatory framework that addressed all aspects of disposal in certain land-based units. Given the Agency's expansive history and experience with these requirements, EPA concluded that the part 258 criteria with certain modifications for other land-based disposal units (i.e., surface impoundments) represented a reasonable balance between ensuring the protection of human health and the environment from the risk of CCR disposal and the absence of any regulatory oversight. (See 75 FR 35192-35195.)

EPA also considered that many of the technical requirements developed to specifically address the risks from the disposal of CCR as part of the subtitle C alternative would be equally justified under a RCRA subtitle D regulatory regime. The factual record—i.e., the risk analysis and the damage cases—supporting such requirements was the same, irrespective of the statutory authority under which the Agency was operating. Thus, several of the provisions under RCRA subtitle D either corresponded to the proposal under RCRA subtitle C, or were modeled after the existing subtitle C requirements; for example, EPA proposed the same MSHA-based structural stability standards for surface impoundments under the subtitle C and subtitle D options. However, because there is no corresponding guaranteed permit mechanism under the RCRA subtitle D requirements, EPA also considered the 40 CFR part 265 interim status requirements for hazardous waste facilities, which were designed to operate in the absence of a permit. These requirements were particularly Start Printed Page 21331relevant in developing the requirements for surface impoundments since such units are not regulated under 40 CFR part 258. Beyond their self-implementing design, these requirements provided a useful model because, based on decades of experience in implementing these requirements, EPA had assurance that these requirements were protective for a variety of waste, under a wide variety of site conditions.

In an effort to ensure that the proposed RCRA subtitle D requirements would achieve the statutory standard of “no reasonable probability of adverse effects on health and the environment” in the absence of guaranteed regulatory oversight, EPA also proposed to require facilities to obtain third party certifications and to provide enhanced state and public notifications of actions taken to comply with the regulatory requirements. Specifically, EPA proposed that certain technical demonstrations made by the owner or operator be certified by an independent registered professional engineer or hydrologist, in order to provide verification and otherwise ensure that the provisions of the rule were properly applied. EPA also provided a regulatory definition of the term, “independent registered professional engineer or hydrologist,” to identify the minimum qualifications necessary to make these certifications. While EPA acknowledged that relying upon a third party certification was not the same as relying upon a state or federal regulatory authority and was not expected to provide the same level of independence as a state permit program, the availability of meaningful third party (i.e., independent) verification provided critical support that the rule would achieve the statutory standard, as it would provide at least some degree of control over a facility's discretion in implementing the rule.

As part of the notification requirements, EPA further proposed that all owners and operators create and maintain an operating record and publically accessible Web site, containing comprehensive documentation of compliance with the rule. EPA also proposed that owners or operators provide notification to the state and the public of third party certifications as well as other information documenting actions taken to comply with the technical criteria of the rule.

A. The Self-Implementing Approach

While the vast majority of state and industry commenters supported regulating the management of CCR under subtitle D of RCRA, a very limited number of commenters favored the proposed self-implementing option. Most commenters argued that if the Agency were to adopt the proposed subtitle D approach it would most certainly result in parallel and redundant regulatory programs for CCR in many states, creating an unworkable situation for industry, as well as the state. Some commenters argued that under this dual regulatory approach, an owner or operator of a CCR unit could conceivably be in non-compliance with both a federal requirement and an independently administered state regulatory requirement, subjecting the owner or operator to both a citizen suit enforcement action in federal court for the alleged violation and to a wholly separate enforcement action in state court for violation of the parallel state requirement. Commenters argued that this regulatory construct made no sense and would waste federal and state judicial resources and company resources, as well as possibly resulting in inconsistent federal and state court determinations with respect to an identical regulatory requirement. It also could result in duplicative federal and state penalties for essentially the same regulatory infraction.

Commenters further argued that the prescriptive one-size-fits-all approach was overly stringent and inflexible and had the potential to greatly disrupt implementation of a state's regulatory programs, which have been tailored to provide for site specific conditions and situations. Moreover, commenters argued that because of the many state regulatory programs addressing CCR disposal, there would be many instances where state requirements could be in conflict with, in addition to, or separate from the federal requirements and it was unclear how these differences would be resolved.

Many commenters simply argued that a permitting program similar to that for MSWLFs was the only viable approach for the regulation of CCR. A significant number of commenters, however, proposed various alternative approaches for regulating CCR disposal under subtitle D of RCRA. One option would have EPA allow qualified state programs to directly administer the subtitle D requirements for CCR when the state regulatory program meets or exceeds the federal requirements, thereby minimizing duplicative regulations and avoiding the self-implementing “one size fits all” approach contained in EPA's proposal. This option, commenters reasoned, could be implemented utilizing a process developed by the Agency for evaluating whether the state's CCR regulations were equivalent to the federal minimum criteria (much like EPA does now in the case of MSWLFs under 40 CFR part 258). Another suggested approach involved EPA clarifying that a state can be more restrictive than the federal rule, and that where a state has a subtitle D regulatory program that is more restrictive, the state program and permitting process would take precedence over any self-implementation aspects of a final rule. (The proposed rule had simply stated that an owner or operator must comply with any other applicable federal, state, tribal or local laws or other requirements.) Commenters also proposed a third option, similar to the 40 CFR part 258 program, recognizing that EPA cannot approve state programs in this rule. Specifically, 40 CFR part 258 provides a definition for “Director of an approved state” that means they are the chief administrative officer of a state agency responsible for implementing the state permit program that is deemed to be adequate by EPA under regulations published pursuant to sections 2002 and 4005 of RCRA. The commenters suggested that the final rule adopt a similar approach by defining a “state permit program” and allowing a state permit program that met the definition to approve compliance with a specified regulatory requirement, e.g., landfill design. The commenter suggested the following definition: “state permit program means a permit program implemented by a state agency that adopts and implements the minimum requirements for the disposal of coal combustion residuals outlined in this final rule.” The commenter claimed that such an approach should not affect enforcement through citizen suits under RCRA section 7002 or by EPA under RCRA section 7003. Taking such an approach, commenters reasoned, would allow states to utilize their own enforcement authority and not rely upon the citizen suit authority under RCRA section 7002. Furthermore, allowing states to consider alternative approaches to the technical standards may give states an incentive to adopt the minimum requirements of the final federal rule into their state permit programs.

As noted, many commenters suggested that EPA rely on the same combination of RCRA statutory authorities, i.e., RCRA sections 4010(c) and 4005(c), to establish controls for CCR units that it employed in promulgating federally enforceable subtitle D rules for MSWLFs and for non-MSWLFs that receive household Start Printed Page 21332hazardous waste and small quantity generator waste under 40 CFR parts 257 and 258. RCRA sections 4010(c) and 4005(c), the commenters reasoned, provides EPA that authority because non-hazardous waste CCR disposal facilities have the potential to receive household wastes or conditionally exempt small quantity generator waste, whether or not such waste is actually received at the CCR disposal facility. Commenters contended that the combination of these two provisions could enable EPA to promulgate non-hazardous waste rules for CCR that could be directly administered through state permitting programs and backed up by direct EPA enforcement powers in those states that fail to adequately implement the federal rules. Such an approach, commenters concluded provides the Agency with the enforcement authority it desires under a subtitle D regulatory program, while enabling states to have a prominent role in the administration of any subtitle D rules, and preventing the duplication of potentially conflicting federal and state controls.

Finally, some commenters encouraged EPA to request from Congress the statutory authority necessary to propose non-hazardous regulations under subtitle D that could be implemented by the states and provide federal enforceability (similar to RCRA's part 258 requirements for MSWLFs). Commenters argued that states should be allowed to enforce compliance through a traditional permitting system, and that solid waste operating permits are critical to ensuring coal ash disposal facilities design, construct, operate and close their waste facilities safely. Commenters argued that permits are important because they can dictate the use of specific operating practices and control technologies that may be essential for minimizing releases. Permits also provide an important enforcement vehicle, as well as a process by which the public can be informed and participate in the siting, operation and closure of the waste disposal unit.

While the Agency appreciates commenters' attempts to craft alternative approaches to address the limitations in the proposed self-implementing subtitle D option, EPA has not “chosen” to design standards under subtitle D that are self-implementing. The sections of RCRA that are currently applicable to CCR—sections 1008(a), 4004(a), and 4005(a)—only authorize the Agency to establish minimum national criteria that apply to “facilities.”

As previously discussed, these provisions do not authorize EPA to require that facilities obtain a permit from EPA or a state. The fact that section 4004(a) does not contain any provision that either expressly requires a permit to manage waste, such as in section 3005, or that requires states to adopt a permit program, such as in section 4004(c)(1), provides strong evidence that Congress did not authorize EPA to impose such a requirement on facilities managing solid waste. Compare 42 U.S.C. 6925(a), 6944(a), and 6945(c)(1). This is further confirmed by the fact that Congress thought it necessary to expressly add provisions to require state permit programs in 4010(c) and 4005(c). And the fact that the HSWA provisions are limited to two specifically enumerated types of units provides further evidence that Congress intended to authorize EPA to require permits only for these units.

The restriction that the criteria apply only to “facilities” also means that EPA cannot establish any requirements on states or state programs, either directly or indirectly. This means, for example, that EPA cannot adopt a regulation that restricts certain provisions to those “state permit programs” that meet EPA requirements, as one commenter suggested, since this would indirectly regulate state programs—leaving aside that EPA never proposed anything of the sort. This also means that EPA cannot require a facility to obtain state approval, as this not only presupposes the existence of a state permit program, but also that the state will approve the facility action on the basis of EPA's criteria. EPA cannot condition a facility's compliance on actions beyond its control.

However, these provisions restrict EPA's authority only. The legislation is clear that these are minimum requirements only, and without preemptive effect; states may therefore impose more stringent requirements, including the requirement that CCR facilities obtain a permit. This is also wholly consistent with longstanding EPA interpretations. See 44 FR 53438, 53439 (September 13, 1979) (“the standards established in the criteria constitute minimum requirements. These criteria do not preempt other state and federal requirements. Nothing in the Act precludes the imposition of additional obligations under authority of other laws on parties engaged in solid waste disposal.”); see also 44 FR 45066 (July 31, 1979) (“EPA establishes only ‘minimum’ requirements under this portion of the Act which should not prevent States from developing broader programs or stricter standards under authority of State law.”). States may also incorporate the federal requirements into state law—whether through revisions to existing legislation or regulation, or through incorporating them into any permits issued to CCR facilities. Such an approach would also resolve commenters' concerns about the potential for “parallel and redundant regulatory programs.”

While subtitle C and 4005(c) provide for state oversight on rule implementation and allow approved state requirements to operate in lieu of federal criteria, the Agency lacks the authority to do so under the subsections of RCRA currently applicable to CCR. The provisions applicable to solid waste—sections 1008(a)(3), 4003, 4004(a) and 4005(a)—establish a regulatory structure that differs in key respects from those established under subtitle C and for MSWLFs under section 4005(c). Under subtitle C and section 4005(c), Congress required EPA to establish federal criteria that will serve as national minimum standards, which is comparable to the authority under section 4004(a). But subtitle C and section 4005(c) also include detailed provisions governing both the state implementation of those requirements and the relationship between the federal requirements and the state programs that implement them. No comparable provisions appear in either section 4004(a) or section 4003, which governs the approval of state SWMPs. And the consequences of these omissions are significant.

Subtitle C of RCRA contains several provisions that establish the relationship between the federal program and state requirements; these include provisions authorizing EPA to approve state programs and to retain a direct role in the implementation of the federal minimum requirements, whether through continued oversight of state implementation or direct implementation of the regulations. See, 42 U.S.C. 6926, 6928(a)(2), and 6929. For purposes of this issue, the most critical of these is the explicit direction in section 3006 that authorized state programs “operate in lieu of the Federal program.” 42 U.S.C. 6926(b), (c)(1). See also 42 U.S.C. 6929 (prohibiting the adoption of less stringent state requirements than those in EPA regulations, and authorizing states to establish more stringent requirements).

The provisions for MSWLFs under section 4005(c) are less detailed, but establish a similar regulatory structure. Section 4005(c)(1) expressly directs the states to “adopt and implement a permit program or other system of prior approval and conditions,” for covered Start Printed Page 21333facilities in order to implement federal requirements established for such facilities. 42 U.S.C. 6945(c)(1). The statute directs EPA to determine the adequacy of such programs, and directs EPA to enforce the federal requirements in states that have not adopted an adequate program. 42 U.S.C. 6945(c)(1)(C), (2). While less detailed than the provisions under subtitle C, section 4005(c) establishes a system that is equally predicated on mandated implementation by a state regulatory authority of the federal requirements, rather than the potential coexistence of two separate regulatory systems.

The absence of any similar provisions in the “solid waste” provisions of subtitle D demonstrates that Congress intended to create a different regulatory structure. EPA's role under sections 1008(a)(3) and 4004(a) is to establish minimum criteria to determine which facilities “shall be classified as sanitary landfills and which shall be classified as open dumps,” and to encourage states to use the criteria as a part of their solid waste management planning. Under this regulatory structure, Congress intended that the federal requirements apply directly to facilities and operate independent of state involvement, unless the state chooses to do otherwise. The ability to approve state SWMPs under section 4003 does not alter this relationship. Indeed, the fact that Congress thought it necessary to revise section 4005 to include the specific provisions in subsection (c) confirms that Congress did not believe such authority already existed under sections 4003 and 4004.

Approval of a state's SWMP pursuant to section 4003 qualifies the state to receive federal funds (no longer available) and authorizes the state to issue compliance schedules; but unlike under section 3006 or 4005(c), an authorized plan does not affect the federal minimum standards themselves, or authorize states to do so. Section 4003 contains nothing that explicitly or implicitly authorizes state requirements to operate “in lieu of” the federal requirement as a consequence of EPA approval of the state plan. The closest analogue is that states with an approved plan may establish a “timetable or schedule” to bring existing open dumps into compliance with the federal requirements; but notably, Congress only authorized the state to modify the timeframes by which such facilities must be in compliance, not the substantive requirements themselves. 42 U.S.C. 6945(a).

The combination of this regulatory structure and the need to demonstrate that the final rule achieves section 4004(a)'s protectiveness standard based on the record at the time the rule is promulgated also effectively limits EPA's ability to establish the kind of regulatory provisions commenters have requested (i.e., establish an alternative that allows a state permit program to approve a less stringent technical requirement based on site specific conditions). Because as discussed in Unit IV of this document, EPA is currently unable to reach a conclusion regarding the adequacy of state programs, EPA cannot demonstrate that such an alternative would meet the section 4004(a) standard. And in the absence of a mandatory mechanism for subsequent public involvement and review, which would create decisions with their own record, subject to judicial review in their own right, the lack of such information is dispositive.

With respect to the proposal to rely on RCRA sections 4010(c) and 4005(c) authorities, EPA also disagrees that this is a viable option. As the comment appears to acknowledge, construing sections 4010(c) and 4005(c) to apply to CCR units on the basis that they could potentially receive conditionally-exempt small quantity generator waste is inconsistent with EPA's longstanding interpretation of those sections. EPA directly addressed this issue nearly 20 years ago in the preamble for EPA's final rules at 40 CFR part 257, subpart B. In that discussion which we summarize in the next several paragraphs, EPA explained that the proposed rule was written to provide that only those non-municipal non-hazardous waste disposal units which meet the requirements in §§ 257.5 through 257.30 “may receive” CESQG waste, as required by RCRA section 4010(c). Any non-municipal non-hazardous waste disposal unit that did not meet the proposed requirements may not receive CESQG hazardous wastes. The proposal was written to apply to non-municipal non-hazardous waste disposal units that receive CESQG waste for storage, treatment, or disposal, including such units as surface impoundments, landfills, land application units and waste piles. The regulatory definition of the term “disposal” cover all placement of wastes on the land. See 40 CFR 257.2.

EPA further noted that several commenters addressed the Agency's interpretation of the statutory language “may receive.” One commenter supported the Agency's decision to limit the proposed regulatory requirements to only those non-municipal non-hazardous waste disposal units that receive CESQG wastes. Another commenter, however, stated that a closer reading of section 4010(c) reveals that Congress was not only concerned about modifying the criteria for “facilities that may receive hazardous household wastes or hazardous wastes from small quantity generators . . .” but also for “facilities potentially receiving such wastes.” According to the commenter, the “may receive” clause of the first sentence in section 4010(c) merely refers to whether a facility may legally receive CESQG waste for disposal. The “potentially receiving such wastes” clause of the third sentence of Section 4010(c) refers to the actual potential for such facilities to receive CESQG wastes. The potential for CESQG waste to be disposed of at many types of industrial D landfills is high even with the proposed prohibition under § 261.5. It is the “potentially receiving” clause that specifically commands the Agency to promulgate provisions for all industrial facilities that could potentially receive CESQG wastes.

EPA disagreed with the commenter's interpretation of the statutory language in RCRA section 4010(c). More specifically, for a number of reasons, the Agency did not believe that the statutory language cited by the commenter evidenced congressional intent that the revised criteria promulgated in the rule should address disposal of solid waste in all industrial disposal facilities. First, EPA believed that the commenter erred by focusing only on the “facilities potentially receiving” language in the last sentence of section 4010(c). If one reviews this language together with the statutory language in RCRA section 4010(a), it is clear that Congress did not intend for the revised criteria being promulgated in this rule to apply to all industrial landfills.

RCRA section 4010(a) required EPA to conduct a study of the then existing guidelines and criteria issued under RCRA sections 1008 and 4004 which were applicable to “solid waste management and disposal facilities, including, but not limited to landfills and surface impoundments.” 42 U.S.C. 6949a(a). This statutory language does indeed suggest that EPA was to study a wide range of solid waste disposal facilities, including industrial landfills. (As the commenter stated, because the information on industrial disposal facilities was quite limited, EPA's report to Congress did focus on municipal landfills.)

However, the statutory language in section 4010(c) directing EPA to promulgate a rule revising the criteria in 40 CFR part 257 limits the rule's applicability only to those facilities which may receive hazardous Start Printed Page 21334household waste or small quantity generator waste. 42 U.S.C. 6949a(c). If Congress had intended the revised criteria under section 4010(c) to apply to all solid waste disposal facilities, including industrial landfills and surface impoundments, it clearly could have done so by enacting language similar to that already used in section 4010(a).

Secondly, the legislative history of RCRA section 4010 suggests that Congress expressly rejected a provision that would have required rules to be promulgated under section 4010(c) to apply to the entire universe of RCRA subtitle D solid waste disposal facilities. Indeed, the House version of section 4010 would have required EPA to promulgate revised guidelines and criteria such that they would be applicable to all “solid waste management and disposal facilities, including, but not limited to landfills and surface impoundments. . . .” H.R. 2867, section 30, 98th Cong., 1st Sess. (as introduced in the Senate on November 9, 1983). However, the Conference Committee instead adopted a Senate amendment which limited the scope of the revised criteria to those facilities that may receive hazardous household waste or small quantity generator waste. H. Rept. No. 98-1133, 98th Cong., 2d Sess., at 116-117.

Another indication that RCRA section 4010(c) was not intended to cover the entire universe of solid waste disposal facilities is the fact that subsequent to the enactment of section 4010(c) (as part of the Hazardous and Solid Waste Amendments in 1984), a number of bills were introduced in Congress which would have either authorized or required EPA to issue additional regulations that would address all disposal facilities receiving industrial waste as opposed to addressing those which may receive CESQG waste as stated in section 4010(c). See, e.g., H.R. 3735, “Waste Materials Management Act of 1989,” section 324 (would have required EPA to promulgate standards for the management of industrial solid waste) (Luken Bill); S. 1113, “Waste Minimization and Control Act of 1989,” section 204 (would have required EPA to promulgate requirements for facilities that manage different types of industrial waste) (Baucus Bill). Neither of these provisions (although neither was enacted) would have been necessary if RCRA section 4010(c) required EPA to promulgate revised criteria for all types of industrial disposal facilities. (See 61 FR 34252, 34254-55 (July 1, 1996).)

The commenter on the proposed CCR rule makes essentially the same argument based on the same language in 4010(c) that EPA rejected in the 1996 rule. The commenter provided no legal analysis that contravenes the basis for EPA's interpretation of subtitle D. EPA thus declines to reopen or reconsider this interpretative question. EPA also notes that in any case, information in its record for this rulemaking indicates that CCR landfills or surface impoundments do not actually or potentially receive CESQG wastes.

Nevertheless, EPA recognizes that this regulatory structure gives rise to legitimate concerns about the potential for duplicative or conflicting state and federal regulatory systems. EPA has adopted measures to address these concerns within the confines of the regulatory structure that Congress established in subtitle D. First, EPA has made every effort to ensure that the final rule does not establish any requirements that truly conflict with existing state programs. To clarify, this does not mean that the requirements are necessarily the same, but rather that it is possible to comply with both federal and state requirements simultaneously. Or in other words, compliance with the more stringent standard—whether federal or state—will ensure compliance with the less stringent. Based on the comments received, EPA is aware of no example of a situation in which truly conflicting requirements will exist. Second, as discussed, these regulations do not constrain or direct state action. States can impose more stringent or different requirements, such as requiring a permit. Nor does the regulation require the state to enforce the federal requirements; even with promulgation of the final rule, the decision to bring an action under section 7002 remains entirely within the state's discretion. Third, as discussed in greater detail in Unit IX of this document, EPA has developed a number of measures to clarify the relationship between an individual state program, or particular requirements, and the federal criteria. Specifically, for those states that choose to submit a revised SWMP that incorporates the federal criteria, EPA intends to rely on the existing processes in 40 CFR part 256 relating to approval of SWMPs. EPA expects that approval of a state SWMP, while it cannot prevent a citizen group from filing a lawsuit, will carry substantial weight in any court proceeding charged with determining whether compliance with state requirements constitutes compliance with the federal criteria.

B. Enforceability of the Subtitle D Approach

Numerous commenters raised concern that reliance on a RCRA citizen suit as the basic enforcement mechanism to address non-compliance with the CCR requirements presents environmental justice concerns. Commenters argued that as a practical matter, this self-implementing approach would result in unenforced regulations affecting neighborhoods where environmental, legal, and technical services are unavailable or difficult to obtain. Commenters stated that it would be highly unreasonable for EPA to place the burden of enforcement of the CCR regulations on citizens, arguing that it is EPA's duty to make sure federal regulations protecting human health and the environment are enforced fairly and effectively, and that enforcement by citizen suits puts an unacceptable burden on low income populations located near these facilities. Commenters contended that environmental justice communities were the least likely to mount a serious challenge to the industry because low income people are often less well-educated, have less access to computers and internet technology, are less knowledgeable of how to access and interpret environmental data, and are the least likely to have the resources for a time consuming legal battle. Commenters argued that given the high number of damage cases in this industry, it was clear that the industry cannot police itself and neither can state governments. For these reasons, commenters asserted that the regulations and the enforcement must come from the federal level.

Conversely, other commenters were encouraged by the opportunity to enforce the rule through citizen suits, stating that it would result in very effective regulation since citizens have shown no reluctance to challenge companies that they believe are not responsibly following environmental regulations. Similarly, other commenters noted that other incentives existed to comply with the regulations, including the possibility of state and third party litigation (for both regulatory compliance and actual damages), and the requirements of investors, lenders, and insurers to demonstrate compliance with environmental requirements, i.e., investors and lenders typically condition capital investments and loans on environmental compliance. Commenters also noted that incentives to comply were created by environmental insurance policies, which “invariably exclude damage claims arising from non-compliance from covered events” as well as typical corporate policies that call for Start Printed Page 21335environmental compliance as a standard operating procedure.

Other commenters focused on the role of the professional engineer in the self-implementing framework, arguing that EPA is requiring the certifying professional to inappropriately take on a quasi-regulatory and enforcement role which places the certifying professional at great risk of being subject to nuisance lawsuits from project opponents, creating a scenario where some professionals may decline to be involved in such reviews. Still other commenters argued with EPA's basic premise that the RCRA subtitle D program lacks federal enforceability. Commenters contended that EPA's concerns about the lack of direct federal enforcement authority failed to recognize the significant enforcement opportunities available under existing law, namely the “imminent and substantial endangerment authority” under RCRA section 7003 to take action against any CCR unit that posed a risk to human health and the environment, as well as, the imminent and substantial endangerment authorities under CERCLA, as well as other federal authorities, including the federal Clean Water Act, to address circumstances where a CCR unit posed a threat.

EPA acknowledges that the lack of federal enforcement under Subtitle D presents challenges. However, as discussed above, issuing minimum national standards under the authority that is currently applicable to CCR (i.e., subtitle D) is significantly more protective than the current federal standards in part 257 that apply to these wastes. It is more consistent with EPA's obligations under RCRA to put in place the additional protections that, based on the information currently available, are needed to protect health and the environment. As part of those requirements, EPA has developed a number of provisions designed to facilitate citizens to enforce the rule pursuant to RCRA section 7002. Chief among these is the requirement to publicly post monitoring data, along with critical documentation of facility operations, so that the public will have access to the information to monitor activities at CCR disposal facilities. Moreover, as noted elsewhere, a state seeking EPA's approval for a State SWMP would be required to conduct a public comment process to avail itself of the benefits of an EPA's approval.

EPA also agrees that the Agency retains the authority to bring an action under RCRA section 7003, as well as other statutes, when the facts support the necessary findings. However, an action under section 7003 does not enforce the requirements of this rule. Certainly, EPA believes that the failure to comply with the requirements of the rule increases the probability that an imminent and substantial endangerment may arise, but the fact that a facility has not complied with one or more of the requirements of this rule does not per se establish that a section 7003 order is warranted.

The Agency also acknowledges that the self-implementing frameworks could potentially place certifying professionals at risk for lawsuits; several of the performance standards in the proposed rule were adopted from part 258, which were designed to operate in the context of an approved state program, under the oversight of a state regulatory authority, rather than a purely private entity. In part due to this concern, the Agency has re-evaluated the performance standards throughout the final rule, and has revised them where necessary to ensure that the requirements are sufficiently objective and technically precise that a qualified professional engineer will be able to certify that they have been met.

C. Reliance on Certification by Independent Qualified Professional Engineers

As previously discussed, the majority of commenters were highly skeptical of a regulatory approach that substituted state oversight with an owner or operator hiring a consultant or professional, i.e., an independent registered professional engineer or hydrologist, to certify compliance with a federal regulatory requirement and posting that information on an internet site. More specifically, commenters were concerned that relying almost entirely on professional certifications for ensuring regulatory compliance did not seem like a reliable way to provide for protection of human health and or the environment.

As explained in Unit IV.A of this document, EPA is issuing national minimum criteria under subtitle D to put in place the technical requirements the Agency has determined are necessary to protect human health and the environment from the disposal of CCR in surface impoundments and landfills, while the Agency completes its Bevill Determination. EPA is relying on the certification in this context to partially compensate for one of the more significant limitations under the authorities currently applicable to CCR: The lack of any guaranteed regulatory oversight mechanism. However, EPA disagrees that the rules rely “almost entirely” on professional engineers to protect human health and the environment. The final rule relies on multiple mechanisms to ensure that the regulated community properly implements requirements in this rule. As one part of this multi-mechanism approach, owners or operators must obtain certifications by qualified individuals verifying that the technical provisions of the rule have been properly applied and met. However, a more significant component supporting EPA's determination that the technical requirements will achieve the level of protection required under section 4004(a) is the performance standards that the rules lay out. These standards impose specific technical requirements, and, even where they provide flexibility, will operate to significantly constrain the facility's activities and discretion. The certifications required by the rule supplement these technical requirements, and while they are important, they are not the sole mechanism ensuring regulatory compliance.

The rule also contains a number of provisions requiring the owner or operator to document their compliance with the rule's technical requirements, and to post those documents on a publically available Web site in a timely and transparent manner. The rule also requires owners or operators to notify State Directors of numerous actions, including that certified demonstrations have been completed. This transparency will facilitate citizen and state oversight and overall enforcement of the requirements. Finally, the rule establishes specific timeframes by which these actions must occur, including timeframes by which facilities must document compliance with the various technical requirements in the rule. Timeframes have been established for: (1) Technical compliance demonstrations made by the owner or operator; (2) certifications made by a qualified professional engineer verifying the technical accuracy and veracity of the compliance demonstration; (3) notifications made to the State Director; (4) submittals (e.g., data, reports and other documentation) to the operating record; and (5) postings to the owner or operator's publicly accessible internet site. Further details pertaining to all of these requirements can be found in the Recordkeeping, Notification, and Posting of Information to the Internet section of the regulations published in this rule.

1. Changes to the Definition of Independent Registered Professional Engineer or Hydrologist

EPA proposed to define “independent registered professional engineer or Start Printed Page 21336hydrologist” to mean a scientist or engineer who is not an employee of the owner or operator of a CCR landfill or CCR surface impoundment, who has received a baccalaureate or post-graduate degree in the natural sciences or engineering, and who has sufficient training and experience in groundwater hydrology and related fields as may be demonstrated by state registration, professional certifications, or completion of accredited university programs that enable that individual to make sound professional judgment regarding the technical information for which a certification under this subpart is necessary.

Many comments were received on the definition. Some commenters agreed with the proposed definition, but most commenters argued that significant changes were needed. These changes included removing the requirement that the engineer be “independent,” adding the word “qualified,” and limiting the ability to make certifications to “licensed” professional engineers. Still other commenters felt that EPA should broaden the qualifications beyond a professional engineer or hydrologist, to include geologists, hydrogeologists, groundwater scientists or “other qualified environmental professionals” among the individuals able to certify regulatory demonstrations.

By far the issue receiving the most comment was whether the Agency should require a professional engineer to be “independent.” Commenters disagreed with EPA that the certification must be made by an independent registered professional engineer (i.e., not an employee of the owner or operator of the CCR unit). Commenters argued that most utilities employ a number of professional engineers that typically possess the most relevant experience and knowledge about the unit, and that company-employed engineers and hydrologists were in a much better technical position to certify technical provisions of the rule were being met. Furthermore, commenters asserted that these professionals would be subject to the same state registration and licensing requirements as those not employed by the facility and would have an equally strong incentive to maintain their licenses in good standing as those that are independent of the utility. These commenters also pointed to several EPA rulemakings in which EPA allowed “qualified” professional engineers to make the kind of certifications contemplated by this rulemaking, without requiring that they be “independent.” Commenters also contended that state licensing and registration programs help to ensure that all professionals exercise proper judgment or “independence” regarding the operation of CCR landfills and CCR surface impoundments. Similarly, commenters claimed that a professional engineer without the required expertise would refuse to make any certifications for which they were not qualified. Some commenters suggested that EPA provide some criteria requiring demonstrated experience and training. Commenters also took issue with the fact that the definition focused entirely on groundwater hydrology and failed to include training or experience in other areas that would also be necessary to effectively certify specific technical criteria of the rule (e.g., structural integrity, composite liner design).

The definition EPA proposed for “independent registered professional engineer or hydrologist,” focused on three components that were intended to define the minimum qualifications necessary to independently verify that a specific technical standard was met and to provide sufficient objectivity to reduce the opportunity for abuse. These components were: (1) The individual was a scientist or engineer by academic training or education; (2) the individual was not an employee of the owner or operator of the CCR unit; and (3) the individual had sufficient training in groundwater hydrology or related fields. The proposed definition did not require the individual to be a licensed professional engineer or hydrologist; instead the Agency prohibited the individual providing the certification from being an employee of the owner or operator of the CCR unit, reasoning that this requirement would provide some degree of independent verification of facility practices.[37] The Agency stated that the availability of meaningful independent verification was critical to EPA's ability to conclude that the performance standards laid out in the proposed rule would meet the RCRA section 4004 protectiveness standard.

In the course of developing this final rule, the Agency concluded that it needed to better define the connection between the technical requirements of the rule and the technical qualifications an individual must possess to certify the demonstrations being made by the owner or operator of the CCR unit. In doing so, the Agency looked for direction in the following rules, the “Resource Conservation and Recovery Act (RCRA) Burden Reduction Initiative” (71 FR 16826, April 4, 2006) and the “Oil Pollution Prevention and Response; Non-Transportation-Related Onshore and Offshore Facilities rule (67 FR 47042, July 17, 2002). In both of these actions, the Agency had come to similar conclusions. First, that professional engineers, whether independent or employees of a facility, being professionals, will uphold the integrity of their profession and only certify documents that meet the prescribed regulatory requirements; and that the integrity of both the professional engineer and the professional oversight of boards licensing professional engineers are sufficient to prevent any abuses. (For an example see: 67 FR 47084, July 17, 2002.) And second, that in-house professional engineers may be the persons most familiar with the design and operation of the facility and that a restriction on in-house professional certifications might place an undue and unnecessary financial burden on owners or operators of facilities by forcing them to hire an outside engineer.

Reviewing these other regulatory actions and the Agency's rationale for making its decisions, has led the Agency to a similar conclusion with regard to this rule—that it is unnecessary to require the individual making certifications under this rule to be “independent.” Thus the final rule does not prohibit an employee of the facility from making the certification, provided they are a professional engineer that is licensed by a state licensing board. The personal liability of the professional engineer provides strong support for both the requirement that certifications must be performed by licensed professional engineers, and for removing the requirement that the engineer be “independent.”

While other commenters argued that the word “independent” should be retained because an independent review and certification avoids any potential of conflict of interest, the Agency is convinced that an employee of a facility, who is a qualified professional engineer and who has been licensed by a state licensing board would be no more likely to be biased than a qualified professional engineer who is not an employee of the owner or operator. Moreover, it is not clear that an in-house engineer faces a greater economic temptation than an independent Start Printed Page 21337engineer seeking to cultivate an ongoing relationship with a client. EPA has concluded that the programs established by state licensing boards provide sufficient guarantees that a professional engineer, regardless of whether he/she is “independent” of the facility, will give a fair technical review.

As an additional protection, the Agency has re-evaluated the performance standards throughout the final rule to ensure that the requirements are sufficiently objective and technically precise that a qualified professional engineer will be able to certify that they have been met.

The Agency agrees with concerns that a professional engineer may not be qualified to address all the varied aspects of CCR landfill and CCR surface impoundment design, and has amended the definition to clarify and strengthen the qualifications of the individual authorized to certify the technical demonstrations under the rule. In the proposed rule, the Agency did not require an independent registered professional engineer to be licensed, only that they be an engineer or hydrologist who had received a baccalaureate or post graduate degree in the natural sciences with training and experience in groundwater hydrology or a related field. While the term “independent registered professional engineer or hydrologist” conveyed to some commenters that the individual was in fact “licensed,” the definition in the proposal did not require it. Furthermore, as noted by commenters, the proposed definition focused primarily on hydrogeology expertise and did not include training and experience qualifications necessary to accurately certify some of the requirements being promulgated in the rule, e.g., landfill and surface impoundment design and construction, structural stability assessments, analysis of unstable areas. In reviewing this proposed requirement, the Agency has determined that specifying exact qualifications and or experience for the professional engineer is neither necessary nor practical, given the range of technical specifications that will require certification. EPA has therefore adopted a more succinct requirement focused on the professional engineer's qualifications to perform the task or certification.

In making this change, the Agency was again strongly influenced by the “Resource Conservation and Recovery Act (RCRA) Burden Reduction Initiative” rule. (See 71 FR 16826, April 4, 2006.) In that rule, EPA amended the majority of RCRA provisions requiring the certification of an “independent, qualified, registered, professional engineer” to substitute the phrase, a “qualified professional engineer,” reasoning that a requirement for a qualified professional engineer maintains the most important components of any certification requirement: (1) That the engineer be qualified to perform the task based on training and experience; and (2) that she or he be a professional engineer licensed to practice engineering under the title Professional Engineer which requires following a code of ethics with the potential of losing his/her license for negligence (see 71 FR 16868.)

In the “Burden Reduction Rule” the Agency concluded that a professional engineer is able to give fair and technical review because of the oversight programs established by the state licensing boards that will subject the professional engineer to penalties, including the loss of license and potential fines if certifications are provided when the facts do not warrant it. In fact, this personal liability of the professional engineer is one of the primary reasons that commenters to the “Burden Reduction Rule” supported the idea that RCRA certifications should only be done by licensed professional engineers (See 71 FR 16868.) Upon further analysis and reflection, the Agency sees no reason to deviate from the position EPA held in that rule. Despite some concerns raised by commenters that problems could occur if an owner or operator hires an engineering firm that is small, inexperienced, or operating outside of their past professional practice, the Agency continues to believe that with the protections afforded by the specific performance standards in this rule and the standards and ethics to which a qualified professional engineer is subject, situations in which an unqualified or un-licensed engineer certifies a technical demonstration will be avoided. Furthermore, it is important to reiterate that state licensing boards can investigate complaints of negligence or incompetence on the part of professional engineers, and may impose fines and other disciplinary actions, such as cease-and-desist orders or license revocation. (See 71 FR 16868.) In light of the third party oversight provided by the state licensing boards in combination with the numerous recordkeeping and recording requirements established in this rule, the Agency is confident that abuses of the certification requirements will be minimal and that human health and the environment will be protected.

The Agency wants to make it clear that qualified professional engineers can utilize a qualified team of professionals in performing the analyses that underlie these certifications. In most instances, EPA expects that the basis for certification by a qualified professional engineer will be the result of a team of professionals (e.g., geologists, hydrologists, scientists and engineers) who have collectively worked together in order to provide the data and analyses necessary for the professional engineer to certify the specific demonstration.

The Agency is convinced that the change to the certification requirements to allow the use of in-house expertise will not compromise environmental safety. Professional engineers employed by a facility are more familiar with the facility's particular situation and are in a position to provide more on-site review and oversight of the activity being certified. To this end, the Agency is also requiring that the qualified professional engineer be licensed in the state in which the CCR unit is located. The Agency has made this decision for a number of reasons, but primarily because state licensing boards can provide the necessary oversight on the actions of the professional engineer and investigate complaints of negligence or incompetence as well as impose fines and other disciplinary actions such as cease-and-desist orders or license revocation. Oversight may not be as rigorous if the professional engineer is operating under a license issued from another state.

Finally, the Agency disagrees with comments that professional geologists or geoscientists should be added to the list of those professionals that have expertise and authority to certify compliance with certain RCRA subtitle D regulatory requirements. In developing this final rule, the Agency has re-considered the qualifications necessary to certify compliance with the technical requirements of the rule and is limiting compliance certifications to qualified professional engineers only. While some environmental professionals, e.g., hydrologists, geologists may be qualified to make certain certifications, EPA is not convinced that hydrologists or geologists licensed by a state are held to the same standards as a professional engineer licensed by a state licensing board. For example, it is unclear that hydrologists or geologists are subject to the rigorous testing required by professional engineers or that state licensing boards can investigate complaints of negligence or incompetence. Further, professional engineers have licensing boards in all 50 states, a standard not achieved by other Start Printed Page 21338professional disciplines. Consequently, hydrologists, geologists, or other professionals may only perform analyses that underlie the certification, but it is the responsibility of a qualified professional engineer to make the actual certification.

D. State and Public Notifications of Certifications

To address concerns about the absence of adequate regulatory oversight under subtitle D, EPA proposed to require state and public notifications of the third party certifications, as well as other information documenting the decisions made or actions taken by the owner or operator to comply with the technical criteria in the rule. As stated in the proposal and reiterated here, the Agency cannot conclude that the regulations promulgated in this rule will ensure there is no reasonable probability of adverse effects on health or the environment unless there is a mechanism for states and citizens, as the entities responsible for enforcing the rule, to effectively monitor or oversee its implementation. Mandated documentation and transparency of the owner or operator's actions to comply with the rule provides this mechanism, and will help to minimize the potential for abuse. The proposal specified that the documentation of how the various technical standards had been met were to be placed in the facility's operating record, along with notification to the appropriate state authority. Additionally, EPA proposed to require the owner or operator to maintain a Web site available to the public that would also provide access to this documentation. EPA proposed that owners or operators post notices and relevant information on the internet site with a link clearly identified as being a link to notifications, reports, and demonstrations required under the regulations. While EPA recognized that the internet is currently the most widely accessible means for gathering and disseminating information, the Agency also solicited comments regarding alternative methods to provide notifications to the public and the states. The Agency also solicited comment on whether to require the establishment of a publicly accessible internet site to provide regulatory information to the public and the states, including whether there could be homeland security implications associated with internet posting of information, and whether the posting would duplicate information that is already available to the public through the state.

In response to most of these proposals, the Agency received little comment. Significant comment, however, was received on the publicly accessible internet site. Commenters argued that absent specific statutory authorization, it was inappropriate for EPA to delegate a regulatory oversight function to the regulated community by requiring the creation of a Web site and posting of regulatory compliance information. Commenters identified at least three substantial problems associated with “outsourcing information management responsibilities” to CCR facilities. First, commenters argued that EPA lacked the authority to impose such a requirement. Specifically, the commenters alleged that no statute authorizes EPA to demand that private parties act as an information clearinghouse for information pertaining to EPA's regulatory functions, either generally or in the specific context of CCR. To the contrary, the commenters argued, public information access statutes, such as the Freedom of Information Act are predicated on an assumption that information held by the government is presumptively public, while information held by a private entity presumptively is not.

Second, some commenters were concerned that facilities would not post information the facility deems to be confidential (e.g., the structural stability of ash pond impoundments) and by attempting to outsource the information management role to industry, EPA effectively allows industry to make the initial determination as to confidentiality and places the burden on citizens and EPA to take action to compel disclosure.

Third, commenters were concerned that citizen groups would not accept an electric utility's self-reported information, regardless of the amount of effort the facility exerts to ensure the accuracy of the information, without a regulatory agency acting as the intermediary or providing some degree of oversight (e.g., EPA's Toxic Release Inventory, EPA's Biennial Report of hazardous waste facilities). By requiring citizen groups to obtain their information from industry instead of a regulator, the commenters argued that EPA is inviting conflict as to the adequacy of data and the sufficiency of the utilities' responses to citizen groups' requests for clarification or additional information. The fact that the industry has provided information to a federal agency, subject to criminal penalties for providing false information, provides a useful public assurance of the integrity of the information.

Other commenters stated that the proposed requirement to maintain a Web site was excessive, and generated a regulatory burden upon companies that serves no useful function. Commenters urged that the same purpose could be served simply through making the certification of the registered professional engineer available on the Web site. Other commenters argued that internet posting of information on a surface impoundment's construction raised homeland security issues. These commenters alleged that the information “can be extremely sensitive and may contain information that could be used by certain individuals with an intent to destroy a dam (e.g., engineering information on the structure's foundation, detailed information on physical and engineering properties, the basis for the structure hazard classification, slope stability information, etc.).”

Finally, some commenters offered an alternative to the requirement to establish and maintain a publicly accessible internet site. Under this alternative the information would be included in the owner or operator's operating record only, and persons with “legitimate interests in reviewing these data” could make a written request to the owner or operator or the permitting authority to obtain the information. The commenters alleged that this would also allow the owner, operator, and federal and state authorities to know the names and identities of all organizations requesting information on the facility, which would help protect against the misuse of these data.

EPA disagrees that RCRA section 4004(a) does not authorize EPA to require facilities to disclose all of the information required under these final rule provisions. Section 4004(a) delegates broad authority to EPA to establish criteria governing facilities' management of solid waste, requiring only that such criteria ensure that there will be no reasonable probability of adverse effects on health or the environment from the disposal of solid waste. The statute imposes no limits on the actions EPA may require facilities to perform to achieve that level of protection. Moreover, unlike other statutes, e.g., the Toxic Substances Control Act, or the Federal Insecticide, Rodenticide and Fungicide Act, RCRA contains neither provisions that grant facilities the right to withhold regulatory compliance information from the public, nor provisions that establish any reasonable expectation that such information will be kept confidential. To the contrary, section 7004 explicitly provides that “[p]ublic participation in Start Printed Page 21339the . . . implementation, and enforcement of any regulation under this chapter shall be provided for, encouraged, and assisted by the Administrator.” 42 U.S.C. 6974(b). And in fact, this kind of information would routinely be publically available under the permitting process for hazardous waste facilities. Accordingly, RCRA provides more than ample authority to support these requirements.

As repeatedly discussed throughout this preamble, under section 4004(a) EPA must be able to demonstrate, based on the record available at the time the rule is promulgated that the final rule provisions will achieve the statutory standard. EPA explained in the proposal that a key component of EPA's support for determining that the rule achieves the statutory standard is the existence of a mechanism for states and citizens to monitor the situation, such as when groundwater monitoring shows evidence of potential contamination, so that they can determine when intervention is appropriate. The existence of effective oversight measures provides critical support for the statutory finding, particularly with respect to some of the more flexible alternatives EPA has adopted in certain of the technical standards in response to commenters' requests for greater flexibility. These “transparency” requirements serve as a key component by ensuring that the entities primarily responsible for enforcing the requirements have access to the information necessary to determine whether enforcement is warranted. Unlike a federal or state regulatory authority, private citizens cannot access a private facility to conduct inspections. While EPA encourages states to adopt and implement a CCR regulatory program, and seek EPA's approval of it via a state SWMP, EPA cannot require it. The final rule therefore must establish oversight mechanisms that will function effectively even in the absence of a state regulatory authority.

Such notifications will also reduce the incentives for owners or operators to abuse the rule's self-implementing requirements, and can improve compliance. Indeed, the public disclosure of information is an increasingly common and important regulatory tool, as evidenced by the 2010 guidance issued by the Office of Management and Budget (OMB), with principles to assist agencies in using information disclosure to achieve regulatory objectives.

Thus, even if the commenters were correct that there exists a general “presumption” that information held by private entities need not be made publically available, that presumption can be, and has been, effectively rebutted by the facts at hand.

None of the alternatives offered by the commenters would fulfill these same objectives. For example, simply making the certification of the qualified professional engineer available on the Web site without the underlying support information fails to provide the same incentives because no one could evaluate the accuracy of that certification. This alternative could also present the same concerns raised in comments on other sections of the rule, i.e., that such a requirement could place the engineer at great risk of being subject to lawsuits. Requiring persons with “legitimate interests in reviewing these data” to request the data from the owner or operator also fails to provide an effective guarantee, as facilities that have failed to comply will have a strong incentive to withhold information documenting their non-compliance, however “legitimate” the request. And as noted, the absence of a guaranteed state permitting program means that requiring citizens to request information from such entities is also not a viable alternative. Given the absence of a guaranteed regulatory authority, EPA also disagrees that posting such information on a company internet site is necessarily duplicative, particularly in those states that have no regulatory program for controlling CCR. In addition, state requirements, whether pursuant to permits or other regulatory mechanisms, may not necessarily correspond to the requirements of this rule.

EPA acknowledges that parties may be suspicious of information self-reported by regulated entities. However, it is important to remember that facilities that provide information in compliance with these regulation remain subject to the penalties for providing false information under 18 U.S.C. 1001, even though the information will not be submitted to EPA. For example, the Tenth Circuit has held that federal jurisdiction lies under 18 U.S.C. 1001 when a defendant has submitted false information to a state delegated to enforce a federal environmental statute. United States v. Wright, 988 F.2d 1036 (10th Cir. 1993) (defendant submitted false monitoring reports required by the Safe Drinking Water Act to Oklahoma officials). This is consistent with rulings in other areas that the false statement need not be made directly to the federal government. United States v. Uni Oil Co., 646 F.2d 946, 954-55 (9th Cir. 1981); see also United States v. Patullo, 709 F.2d 1178, 1180 (7th Cir. 1983); United States v. Ross, 77 F.3d 1525, 1544 (7th Cir. 1996) (“This court has repeatedly found the submission of a fraudulent statement to a private (or non-federal government) entity to be within the jurisdiction of a federal agency where the agency has given funding to the entity and fraudulent statements cause the entity to utilize the funds improperly.”). As commenters recognized, the potential for criminal penalties under 18 U.S.C. 1001 provides a significant guarantee, as well as a strong incentive for compliance.

EPA also disagrees with the comments raising concern about the homeland security implications of posting information on a CCR surface impoundment's construction, as it relates to structural stability. Much of the information relevant to an impoundment's structural stability is currently available through Google Earth or through EPA's Web site. For example, EPA's Web site currently provides access to all of the information from the responses to EPA's original 104(e) information requires and the information obtained through the CCR Assessment Program. This information can be accessed at the following pages: http://www.epa.gov/​osw/​nonhaz/​industrial/​special/​fossil/​surveys/​index.htm, http://www.epa.gov/​osw/​nonhaz/​industrial/​special/​fossil/​surveys2/​index.htm, and http://www.epa.gov/​osw/​nonhaz/​industrial/​special/​fossil/​ccrs-fs/​index.htm . Moreover, the Department of Homeland Security has cleared both the internet posting of all of the information currently on EPA's Web site, as well as, in general, information on the design, hydraulic parameters, volume of contained liquids and solids, and hazard rating of all major CCR surface impoundments across the U.S.

VI. Development of the Final Rule—Technical Requirements

A. Applicability

EPA proposed general provisions to identify those solid waste disposal units subject to the proposed RCRA subpart D requirements (i.e., CCR landfills and CCR surface impoundments as defined under proposed § 257.40(b)). The applicability section also identified three of the existing subpart A criteria that would continue to apply to these facilities: § 257.3-1 Floodplains, § 257.3-2 Endangered Species, and § 257.3-3 Surface Water. Consistent with RCRA section 4004(c), EPA specified an effective date of 180 days after publication of the final rule.

The Agency received numerous comments on this part of the rule. In Start Printed Page 21340general, commenters were concerned with three specific areas. First, commenters requested additional clarification as to the specific sources of CCR that would be subject to the requirements of the rule, i.e., CCR generated by the electric utilities and independent power producers. Second, commenters requested clarification on the applicability of the proposed regulations to MSWLFs disposing of CCR and third, the definition and status of “uniquely associated wastes.” Uniquely associated wastes are addressed in Unit XIII of this preamble. EPA also received numerous comments regarding the proposal to apply the rule to “inactive” CCR surface impoundments that had not completed closure prior to the effective date of the rule.

EPA is finalizing minimum national criteria that apply to owners and operators of new and existing CCR landfills and CCR surface impoundments, including any lateral expansions of these units that dispose, or otherwise conduct solid waste management of CCR generated from the combustion of coal at electric utilities and independent power producers. The rule applies only to CCR units at “active” electric utilities and independent power producers, i.e., those that generate electricity, regardless of the fuel currently used to produce electricity. However, disposal units at facilities that are “closed”—i.e., the entire facility has been permanently taken out of service and no longer produces electricity—are outside of the scope of this rule.

Unless otherwise provided, the rule applies to CCR units located both on-site and off-site of the electric utility or independent power producer.

1. CCR Generated by Non-Utility Boilers

The requirements of this rule do not apply to wastes, including fly ash, bottom ash, boiler slag, and FGD materials generated at facilities that are not part of the electric power sector or an independent power producer and that use coal as the fuel in non-utility boilers, such as manufacturing facilities, universities, and hospitals. Industries that primarily burn coal to generate power for their own purposes (i.e., non-utilities), also known as combined heat and power (CHP) plants, are primarily engaged in business activities, such as agriculture, mining, manufacturing, transportation, and education. The electricity that they generate is mainly for their own use, but any excess may be sold in the wholesale market. According to the Energy Information Administration (EIA), CHPs produced less than one percent of the total electricity generated from coal combustion in 2013 and, similarly, burned less than one percent of the total coal consumed for electricity generation or less than 5 million tons (http://www.eia.gov/​electricity/​data.cfm).

EPA never proposed to include these wastes in the rule because EPA lacked critical data from these facilities that would allow us to address key Bevill criteria (see 75 FR 35165). These other industries, and the manufacturing industries in particular, generate other types of wastes which are likely to be mixed or co-managed with the CCR at least at some facilities. As a result, the chemical compositions of the co-managed wastes are likely to be fundamentally different from the chemical composition of CCR generated by electric utilities or independent power producers. In addition, EPA noted that insufficient information was available on non-utility boilers burning coal to determine whether a regulatory flexibility analysis would be required under the Regulatory Flexibility Act, and to conduct one if it is necessary. Without such data, we were unable to fully assess CCR wastes from non-utility operations and indicated that we would decide on an appropriate course of action for these wastes after completing this rulemaking (see 75 FR 35129).

Several commenters stated that EPA's decision to propose limiting the scope of the rule only to CCR generated by the electric power sector (electric utilities and independent power producers) was arbitrary. These commenters claimed that CCR generated by the electric power sector and CCR generated by non-utilities are generally comparable in physical and chemical composition and are typically managed similarly. As a result, these commenters suggested that EPA amend the applicability of the rule to subject all facilities that generate CCR to the same disposal requirements. EPA also received comments maintaining that important differences exist between CCR generated by electric power sector facilities and non-utility facilities, and that supported EPA's proposed decision to exclude CCR generated by non-utilities from the rule. Differences identified by the commenters included waste management issues (e.g., mixing and subsequent co-management of non-utility CCR and other industrial wastes generated by non-utilities), CCR generation rates, CCR management unit design, and CCR management unit operation. In response to our request for additional information, a few commenters provided either waste characterization data for non-utility CCR or information on alleged damage cases involving non-utility CCR.

Based on the proposed rule, EPA cannot include these facilities in this final rule, even if the Agency had concluded that it had received the necessary information from commenters. EPA specifically stated its intention to exclude them, and clearly stated that it had not assessed the operations. (See 75 FR 35166.) The Agency provided no indication of any intention to include such facilities, and did not solicit comment on such an option. Moreover, under the Administrative Procedure Act, the public must be given the opportunity to comment on not only the information that would support such an action, but also EPA's evaluation of that information, and the reasoning behind the Agency's decision. And with respect to this subset of facilities, no such opportunity has been presented. EPA will consider the information provided by commenters at a future point, and will determine whether the information is sufficient to address key Bevill criteria and to decide on the appropriate regulatory scheme for disposal of CCR generated by non-utilities. Accordingly, this rule does not apply to owners and operators of landfills and surface impoundments in which CCR are disposed that were generated by non-utility boilers burning coal.

2. CCR Generated Primarily From the Combustion of Fuels Other Than Coal

These requirements also do not apply to fly ash, bottom ash, boiler slag, and flue gas desulfurization materials, generated primarily from the combustion of fuels (including other fossil fuels) other than coal, for the purpose of generating electricity unless the coal comprises more than fifty percent (50%) of the fuel burned on a total heat input or mass input basis, whichever results in the greater mass feed rate of coal (see § 266.112). Fuel mixtures that contain less than 50% coal are not considered to be CCR, but other fossil fuel wastes. Other fossil fuels that are typically co-combusted with coal are oil and natural gas. In the May 22, 2000 Regulatory Determination, EPA determined that it is not appropriate to establish national regulations applicable to oil combustion wastes (OCW) because: (1) We found in most cases that OCW, whether managed alone or co-managed, are rarely characteristically hazardous; (2) we have not identified any beneficial uses that are likely to present significant risks to human health or the environment; (3) we identified no significant ecological risks posed by Start Printed Page 21341land disposal of OCW; (4) we identified only one documented damage case involving OCW in combination with coal combustion wastes, and it did not affect human receptors; and (5) except for two unlined surface impoundments, we have not identified any significant risks to human health and the environment associated with any waste management practices. Similarly, EPA determined that regulating natural gas combustion wastes is not warranted because the burning of natural gas produces virtually no solid waste. Therefore, the Agency has determined that regulations for wastes generated primarily from the combustion of fuels (including other fossil fuels) other than coal are not warranted unless the fuel mixture consists primarily of coal.

3. Placement of CCR in Minefilling Operations

Consistent with the approach in the proposed rule, this rule does not apply to CCR placed in active or abandoned underground or surface coal mines. The U. S. Department of Interior (DOI) and EPA will address the management of CCR in minefills in a separate regulatory action(s). EPA will work with the OSM to develop effective federal regulations to ensure that the placement of coal combustion residuals in minefill operations is adequately controlled. In doing so, EPA and OSM will consider the recommendations of the National Research Council (NRC), which, at the direction of Congress, studied the health, safety, and environmental risks associated with the placement of CCR in active and abandoned coal mines in all major U.S. coal basins. The NRC published its findings on March 1, 2006, in a report entitled “Managing Coal Combustion Residues (CCR) in Mines,” which is available at http://books.nap.edu/​openbook.php?​isbn=​0309100496.

The report concluded that the “placement of CCR in mines as part of coal mine reclamation may be an appropriate option for the disposal of this material. In such situations, however, an integrated process of CCR characterization, site characterization, management and engineering design of placement activities, and design and implementation of monitoring is required to reduce the risk of contamination moving from the mine site to the ambient environment.” The NRC report recommended that enforceable federal standards be established for the disposal of CCR in minefills to ensure that states have specific authority and that states implement adequate safeguards. The NRC Committee on Mine Placement of Coal Combustion Wastes also stated that OSM and its SMCRA state partners should take the lead in developing new national standards for CCR use in mines because the framework is in place to deal with mine-related issues. Consistent with the recommendations of the National Academy of Sciences, EPA anticipates that the U.S. Department of the Interior (DOI) will take the lead in developing these regulations. EPA will work closely with DOI throughout that process.

4. Municipal Solid Waste Landfills

The issue receiving the majority of comment in this section focused on the applicability of the rule to MSWLFs accepting CCR. The vast majority of commenters on this issue requested that EPA clarify that permitted MSWLFs, receiving CCR as daily cover or for disposal were not covered by the rule.

While most CCR is currently disposed of at electric utility owned CCR landfills or surface impoundments, there is no prohibition against disposing of CCR in state-permitted MSWLFs. However, many commenters interpreted the proposed CCR subtitle D regulations to apply to a state permitted MSWLF disposing of CCR, which as a consequence would be subject to the additional burden of posting documentation to a Web site, having a professional engineer review certification, etc. (See 75 FR 35210, where the preamble states that under a subtitle D regulation, regulated CCR wastes shipped off-site for disposal would have to be sent to facilities that meet the standards above.) Commenters argued that since MSWLFs were never mentioned in the proposed rule, that it should be made clear that the rule did not apply to these facilities. Commenters further contended that since the requirements for CCR landfills were directly modeled from the MSWLF requirements found at 40 CFR part 258, disposal in MSWLFs would be protective of human health and the environment. Commenters also contended that a benefit of MSWLFs would be their ability to provide additional capacity for the disposal of CCR as utilities seek to close, upgrade, or develop their own compliant CCR disposal sites.

EPA recognizes that there are MSWLFs that either accept CCR for disposal, use CCR for as daily cover, or both. Since the proposed and final RCRA subtitle D standards for CCR landfills are modeled after the standards for MSWLFs found at 40 CFR part 258, EPA has concluded that disposal of CCR in MSWLFs is as protective as disposal in a CCR landfill and that permitted MSWLFs are not subject to the requirements of this rule. Like the MSWLF requirements, the CCR technical criteria require new units to have composite liners or their equivalent, and all units are subject to location restrictions, run-on and run-off controls, fugitive dust controls, groundwater monitoring and corrective action, closure and post-closure care requirements.[38]

While the MSWLF fugitive dust criteria (air criteria) are not as specific as those in this rule, § 258.4(a) states that owners or operators of all MSWLFs must ensure that the units not violate any applicable requirements developed under a State Implementation Plan (SIP) approved or promulgated by the Administrator pursuant to section 110 of the Clean Air Act, as amended. It is expected that states will impose additional requirements to address fugitive dusts, of the sort codified in Illinois' 415 ILCS 5/9(a)(2012) [39] and enforced by the state (see People of the State of Illinois v. KCBX Terminals Company, Injunction no. 2013CH24788 in the Circuit Court of Cook County, Illinois. Moreover, if used as a daily cover, § 258.21 requires that the alternative cover (i.e., CCR) control disease, vectors, odors, blowing litter, and scavenging without presenting a threat to human health and the environment.

The Agency is not requiring MSWLFs that receive CCR for disposal or for use as daily cover to modify their groundwater monitoring programs to comply with the rule; however the Agency expects that State Directors will require MSWLFs to modify their MSWLF permits to address the addition of CCR to the unit as it relates to groundwater monitoring and corrective action. Section 258.54(a)(2) allows for the Director of an approved state to establish an alternative list of inorganic indicator parameters for a MSWLF unit if the alternative parameters provide a reliable indication of inorganic releases Start Printed Page 21342from the MSWLF unit to the groundwater (i.e., as would be the case if CCR was disposed in the MSWLF unit). In determining alternative parameters, the Director shall consider, among other things: (1) The types, quantities, and concentrations in wastes managed at the MSWLF unit; (2) the mobility, stability, and persistence of waste constituents or their reaction products in the unsaturated zone beneath the MSWLF unit; and (3) the detectability of indicator parameters, waste constituents, and reaction products in the groundwater. In situations where the MSWLF unit is receiving CCR for disposal and/or daily cover, EPA expects the controlled management of CCR in these units. Specifically, EPA expects State Directors to utilize the provisions in § 258.54(a)(2) to revise the detection monitoring constituents to include those constituents being promulgated in this rule under § 257.90. These detection monitoring constituents or inorganic indicator parameters are: boron, calcium, chloride, fluoride, pH, sulfate and total dissolved solids (TDS). These inorganic indicator parameters are known to be leading indicators of releases of contaminants associated with CCR and the Agency strongly recommends that State Directors add these constituents to the list of indicator parameters to be monitored during detection monitoring of groundwater if and when a MSWLF decides to accept CCR.

The Agency has concluded that CCR can readily be handled in permitted MSWLFs provided that they are evaluated for waste compatibility and placement as required under the part 258 requirements. Furthermore, consistent with the recordkeeping requirements in § 258.29, the Agency further expects State Directors to encourage MSWLF units receiving CCR after the effective date of this rule to do so pursuant to a “CCR acceptance plan” that is maintained in the facility operating record. This plan would assure that the MSWLF facility is aware of the physical and chemical characteristics of the waste received (i.e., CCR) and handles it with the additional precautions necessary to avoid dust, maintain structural integrity, and avoid compromising the gas and leachate collection systems of the landfill so that human health and the environment are protected. While the Agency sees no need to impose duplicative requirements for MSWLFs that receive CCR for disposal or daily cover; development of these acceptance plans as well as a revised list of groundwater detection monitoring constituents will help ensure that CCR is being managed in the most protective manner consistent with the Part 258 requirements.

5. Inactive CCR Surface Impoundments

The final rule also applies to “inactive” CCR surface impoundments at any active electric utilities or independent power producers, regardless of the fuel currently being used to produce electricity; i.e., surface impoundments at any active electric utility or independent power producer that have ceased receiving CCR or otherwise actively managing CCR. While it is true that EPA exempted inactive units from the part 258 requirements in 1990, the original subtitle D regulations at 40 CFR part 257 (which are currently applicable to CCR wastes) applied to “all solid waste disposal facilities and practices” except for eleven specifically enumerated exemptions (none of which are relevant). 40 CFR 257.1(c). See also, 40 CFR 257.1(a)(1)-(2). And as discussed in greater detail below, subtitle D of RCRA does not limit EPA's authority to active units—that is, units that receive or otherwise manage wastes after the effective date of the regulations. EPA has documented several damage cases that have occurred due to inactive CCR surface impoundments, including the release of CCR and wastewater from an inactive CCR surface impoundment into the Dan River which occurred since publication of the CCR proposed rule. As discussed in the proposal, the risks associated with inactive CCR surface impoundments do not differ significantly from the risks associated with active CCR surface impoundments; much of the risk from these units is driven by the hydraulic head imposed by impounded units. These conditions remain present in both active and inactive units, which continue to impound liquid along with CCR. For all these reasons, the Agency has concluded that inactive CCR surface impoundments require regulatory oversight.

The sole exception is for “inactive” CCR surface impoundments that have completed dewatering and capping operations (in accordance with the capping requirements finalized in this rule) within three years of the publication of this rule. EPA considers these units to be analogous to inactive CCR landfills, which are not subject to the final rule. As noted, EPA's risk assessment shows that the highest risks are associated with CCR surface impoundments due to the hydraulic head imposed by impounded water. Dewatered CCR surface impoundments will no longer be subjected to hydraulic head so the risk of releases, including the risk that the unit will leach into the groundwater, would be no greater than those from CCR landfills. Similarly, the requirements of this rule do not apply to inactive CCR landfills—which are CCR landfills that do not accept waste after the effective date of the regulations. The Agency is not aware of any damage cases associated with inactive CCR landfills, and as noted, the risks of release from such units are significantly lower than CCR surface impoundments or active CCR landfills. In the absence of this type of evidence, and consistent with the proposal, the Agency has decided not to cover these units in this final rule.

Under both the subtitle C and subtitle D options, EPA proposed to regulate “inactive” CCR surface impoundments that had not completed closure prior to the effective date of the rule. EPA proposed that if any inactive CCR surface impoundment had not met the interim status closure requirements (i.e., dewatered and capped) by the effective date of the rule, the unit would be subject to all of the requirements applicable to CCR surface impoundments. Under the subtitle C option, those requirements would have included compliance with the interim status and permitting regulations. Under subtitle D, such units would have been required to comply with all of the criteria applicable to CCR surface impoundments that continued to receive wastes, including groundwater monitoring, corrective action, and closure.

EPA acknowledged that this represented a departure from the Agency's long-standing implementation of the regulatory program under subtitle C. While the statutory definition of “disposal” has been broadly interpreted to include passive leaking, historically EPA has construed the definition of “disposal” more narrowly for the purposes of implementing the subtitle C regulatory requirements. For examples see 43 FR 58984 (Dec. 18, 1978); and 45 FR 33074 (May 1980). Although in some situations, post-placement management has been considered to be disposal triggering RCRA subtitle C regulatory requirements, e.g., dredging of impoundments or management of leachate, EPA has generally interpreted the statute to require a permit only if a facility treats, stores, or actively disposes of the waste after the effective date of its designation as a hazardous waste. EPA explained that relying on a broader interpretation was appropriate in this instance given that the Start Printed Page 21343substantial risks associated with currently operating CCR surface impoundments, i.e., the potential for leachate and other releases to contaminate groundwater and the potential for catastrophic releases from structural failures, were not measurably different than the risks associated with “inactive” CCR surface impoundments that continued to impound liquid, even though the facility had ceased to place additional wastes in the unit. EPA noted as well that the risks are primarily driven by the older existing units, which are generally unlined.

In the section of the preamble discussing the subtitle D option, EPA did not expressly highlight the application of the rule to inactive CCR surface impoundments, but generally explained that EPA's approach to developing the proposed subtitle D requirements for surface impoundments (which are not addressed by the part 258 regulations that served as the model for the proposed landfill requirements) was to seek to be consistent with the technical requirements developed under the subtitle C option. (See 75 FR 35193.) (“In addition, EPA considered that many of the technical requirements that EPA developed to specifically address the risks from the disposal of CCR as part of the subtitle C alternative would be equally justified under a RCRA subtitle D regime . . . The factual record—i.e., the risk analysis and the damage cases—supporting such requirements is the same, irrespective of the statutory authority under which the Agency is operating . . . Thus several of the provisions EPA is proposing under RCRA subtitle D either correspond to the provisions EPA is proposing to establish for RCRA subtitle C requirement. These provisions include the following regulatory provisions specific to CCR that EPA is proposing to establish: Scope and applicability (i.e., who will be subject to the rule criteria/requirements) . . .”) (emphasis added).

EPA received numerous comments on this aspect of the proposal. On the whole, the comments were focused on EPA's legal authority under subtitle C to regulate inactive and closed units, as well as inactive and closed facilities. One group of commenters, however, specifically criticized the proposed subtitle D regulation on the grounds that it failed to address the risks from inactive CCR surface impoundments. The majority of commenters, however, argued that RCRA does not authorize EPA to regulate inactive or closed surface impoundments. These commenters focused on two primary arguments: first, that RCRA's definition of “disposal” cannot be interpreted to include “passive migration” based on the plain language of the statute, and second, that such an interpretation conflicted with court decisions in several circuits, holding that under CERCLA “disposal” does not include passive leaking or the migration of contaminants.

In support of their first argument, commenters argued that the plain language of RCRA demonstrates that the requirements are “prospective in nature” and thus cannot be interpreted to apply to past activities, i.e., the past disposals in inactive CCR units. They also argued that the absence of the word “leaching” from the definition of “disposal” clearly indicates that Congress did not intend to cover passive leaking or migration from CCR units. The commenters also selectively quoted portions of past EPA statements, claiming that these demonstrated that EPA had conclusively interpreted RCRA to preclude jurisdiction over inactive units and facilities. In particular, they pointed to EPA's decision in 1980 not to require permits for closed or inactive facilities.

Commenters cited several cases to support their second claim. These include Carson Harbor Vill. v. Unocal Corp., 270 F.3d 863 (9th Cir. 2001); United States v. 150 Acres of Land, 204 F.3d 698, 706 (2000); ABB Industrial Systems v. Prime Technology, 120 F.3d 351, 358 (2d Cir. 1997); United States v. CMDG Realty Co., 96 F.3d 706, 711 (3rd Cir. 1996); Joslyn Mfg. Co. v. Koppers Co., 40 F.3d 750, 762 (5th Cir. 1994); Delaney v. Town of Carmel, 55 F. Supp. 2d 237, 256 (S.D.N.Y. 1999); see also Interfaith Cmty. Org. v. Honey-Well Intl Inc., 263 F. Supp. 2d 796, 846 n.10 (D.N.J. 2003). The commenters acknowledged that these cases were all decided under CERCLA, but claim that the cases are all equally dispositive with respect to RCRA's definition of disposal because CERCLA specifically incorporates by reference RCRA`s statutory definition of disposal.

As an initial matter, it is important to correct certain misunderstandings contained throughout a number of the comments. First, EPA did propose to include inactive units under the subtitle D alternative. EPA clearly signaled its intent to cover the same universe of units and facilities covered under the subtitle C proposal. EPA did not include a corresponding discussion in its explanation of the subtitle D alternative because application of the criteria to inactive units did not represent such a significant departure from EPA's past practice or interpretation. As discussed in more detail below, the original subtitle D regulations applied to all existing disposal units. See 40 CFR 257.1(a)(1)-(2), (c) and 43 FR 4942-4943, 4944.

Second, several commenters criticized EPA's purported proposal to cover both “closed” and “inactive” surface impoundments, using the terms interchangeably. These same commenters also refer to both “inactive facilities” and “inactive units.” These are all different concepts, and EPA clearly distinguished between them.

EPA proposed to regulate only “inactive” surface impoundments that had not completed closure of the surface impoundment before the effective date. “Inactive” surface impoundments are those that contain both CCR and water, but no longer receive additional wastes. By contrast, a “closed” surface impoundment would no longer contain water, although it may continue to contain CCR (or other wastes), and would be capped or otherwise maintained. There is little difference between the potential risks of an active and inactive surface impoundment; both can leak into groundwater, and both are subject to structural failures that release the wastes into the environment, including catastrophic failures leading to massive releases that threaten both human health and the environment. This is clearly demonstrated by the recent spill in the Dan River in North Carolina, which occurred as the result of a structural failure at an inactive surface impoundment. Similarly, as demonstrated by the discovery of additional damage cases upon the recent installation of groundwater monitoring systems at existing CCR surface impoundments in Michigan and Illinois, many existing CCR surface impoundments are currently leaking, albeit currently undetected. These are the risks the disposal rule specifically seeks to address, and there is no logical basis for distinguishing between units that present the same risks.

EPA did not propose to require “closed” surface impoundments to “reclose.” Nor did EPA intend, as the same commenters claim, that “literally hundreds of previously closed . . . surface impoundments—many of which were properly closed decades ago under state solid waste programs, have changed owners, and now have structures built on top of them—would be considered active CCR units.” Accordingly, the final rule does not impose any requirements on any CCR surface impoundments that have in fact “closed” before the rule's effective date—i.e., those that no longer contain water and can no longer impound liquid.Start Printed Page 21344

Further, EPA never proposed that the rule would apply to inactive facilities. The proposal was clear that the regulations would apply to active facilities—i.e., those that continue to generate electricity for distribution to the public, and those that continue to manage CCR. Consistent with that proposal, the final rule applies only to inactive surface impoundments at active electric utilities, i.e., facilities that are actively generating electricity irrespective of the fuel used.

Finally, some comments focused on issues that were specific to the plain language of subtitle C provisions. While most of the issues the commenters raised relate equally to EPA's authority under both subtitles C and D, because the final rule establishes standards under subtitle D of RCRA, EPA has not addressed comments that are purely relevant or applicable to the extent of EPA's authority under subtitle C.

a. Plain Language of RCRA and EPA's Past Interpretations

Under both subtitle C and subtitle D, EPA's authority to regulate “inactive” units primarily stems from the agency's authority to regulate “disposal.” The term is defined once in RCRA and applies to both subtitles C and D. Moreover, the definition explicitly includes “leaking” and “placing of any solid waste . . . into or on any land so that such [waste] or any constituent thereof may enter the environment . . . or be discharged into any waters, including groundwaters.” 42 U.S.C. 6903(3).

Commenters focused on the past statements that EPA cited in the proposal in acknowledging that the Agency was proposing to revise its interpretation for this rulemaking. In general, the comments misconstrue the significance of these past statements. The cited passages merely explain that the permitting requirements in subtitle C were written to be “prospective in nature” and as a consequence, EPA has chosen to interpret “disposal” more narrowly in that context. Thus EPA's historic interpretation under subtitle C was not based on an interpretation that the plain language of RCRA's definition of “disposal” precluded reaching inactive units, but on a determination that a narrower interpretation would be reasonable in light of specific language in sections 3004 and 3005, and the practical consequences of applying these requirements to inactive facilities.[40]

None of EPA's past statements included any interpretation that “leaking” does not include leaking from an inactive disposal unit, or that the statutory definition of “disposal” cannot be interpreted to apply to the current consequences of past disposals. To the contrary, EPA was clear in the original 1978 proposed hazardous waste regulations that leaking from inactive disposal units constitutes “disposal” under RCRA.

Neither RCRA nor its legislative history discusses whether section 3004 standards for owners and operators of hazardous waste treatment, storage, or disposal facilities apply or were intended to apply to inactive facilities, i.e., those facilities which have ceased receiving, treating, storing, and disposing of wastes prior to the effective date of the subtitle C regulations. “This is an important issue, however, because some, and perhaps most, inactive facilities may still be “disposing of waste” within the meaning of that term in Section 1004(3) of RCRA. `Disposal' includes: the discharge, dumping, spilling, leaking, . . . of any solid waste or hazardous waste into or on any land or water so that such solid waste or hazardous waste or any constituent thereof may enter the environment or be emitted into the air or discharged into any waters, including groundwaters. Many inactive facilities may well be leaking solid or hazardous waste into groundwater and thus be “disposing” under RCRA.” 43 FR 58984 (emphasis added).

Note as well that EPA declined to impose requirements on “inactive facilities” not “inactive units at active facilities,” which are the entities covered in this final CCR rule. Further, the complications discussed in 1978 were specific to inactive or closed facilities: the concern that the present owner of the land on which an inactive site was located might have no connection (other than present ownership of the land) with the prior disposal activities. Id. These considerations are not relevant to inactive CCR surface impoundments at active electric utilities.

EPA further clarified this position in the 1980 final hazardous waste rule, explaining that, while the Agency did not generally intend to regulate those portions of facilities that had closed before the effective date, there were exceptions to this, and that in individual cases, inactive portions of a facility—or in other words, inactive units, might be regulated.

[O]wners and operators which continue to operate after the effective date of the regulations must ensure that portions of facilities closed before the effective date of these rules do not interfere with the monitoring or control of active portions. This requirement regulates the facility which operates under the RCRA regulations, although it may require the owner or operator before he receives a permit, or, as a permit condition, to take certain measures on portions of his facility closed before the effective date of these regulations.

45 FR 33068. (See also 45 FR 33170.)

In other words, EPA was clear that its jurisdiction under RCRA extended to these portions of the facility but that the Agency had made a policy choice not to exert its regulatory jurisdiction as a general matter over inactive facilities, choosing instead to rely on section 7003 and CERCLA to address the risks and require clean-up of these sites. EPA has adopted a substantially similar approach here, requiring the current owner or operator of an active facility to address the risks associated with an inactive portion of the facility that could potentially interfere with the monitoring or control of the actively operating portion of the facility through leaking contaminants or other releases.

Similarly, in the 1980 final rules, EPA expressly declined to revise the regulatory definition of disposal to exclude accidental or unintentional releases. EPA noted that “[r]egardless of whether a discharge of hazardous waste is intentional or not, the human health and environmental effects are the same. Thus intentional and unintentional discharges are included in the definition of `disposal.' ” (See 45 FR 33068.) While EPA revised other provisions to clarify that a permit would not be required for accidental discharges, EPA was clear that such activities are properly considered to be “disposal.”

By contrast, EPA's past implementation of subtitle D, following from the legislative history and the statutory language, consistently applied regulatory requirements equally to all facilities, without distinguishing between active and inactive or new and existing facilities.

Congress was clear that subtitle D was intended to specifically address the problem of abandoned leaking “open dumps” scattered across the country, “where frequently the use of the site for waste disposal is neither authorized nor supervised.” H. Rep. No. 94-1491, p 37, 94th Cong., 2d Sess (1976). For example, the report described the consequences when “the City of Texarcana Arkansas/Texas, abandoned its six open dumps, in 1968” to support the need to require open dumps to upgrade or close. Start Printed Page 21345Similarly, in describing the need for the legislation, the House report stated:

Disposal of solid wastes, including hazardous wastes, can have adverse environmental impacts in several ways. The following paragraphs discuss five different types of such impacts.

(i) Perhaps the most pernicious effect is the contamination of groundwater by leachate from land disposal of waste. About half of the U.S. domestic water supply is from underground water, and thus is potentially subject to contamination. Such contamination is particularly vexing because often it is discovered after the damage is done and because the contamination is very long lasting. Thus leachate from a landfill or dump may not show up for years, maybe not even until after the landfill is closed.

Id. at 89 (emphasis added).

Consequently, subtitle D of RCRA provides clear authority to address inactive or abandoned disposal sites. The relevant provisions of RCRA subtitle D do not distinguish between “active” and “inactive” disposal units. Nor do any of the relevant provisions tie jurisdiction to the receipt or disposal of waste after a specific date.

RCRA section 1004(14) defines an “open dump” as “any facility or site where solid waste is disposed of which is not a sanitary landfill which meets the criteria promulgated under section [4004] of this chapter and which is not a facility for disposal of hazardous waste.” 42 U.S.C. 6903(14) (emphasis added). Section 4004(a) delegates broad authority to EPA to determine the facilities that will be considered “open dumps,” without any requirement that the units or facilities be in operation. “[T]he Administrator shall promulgate regulations containing criteria for determining which facilities shall be classified as sanitary landfills and which shall be classified open dumps within the meaning of this chapter.” 42 U.S.C. 6944(a). Section 4005(a), which is titled, “Closing or upgrading of existing open dumps,” is also not limited in scope: “Upon promulgation of criteria under [1008(a)(3)] of this title, any solid waste management practice of disposal of solid waste or hazardous waste which constitutes the open dumping of solid or hazardous waste is prohibited, . . .” 42 U.S.C. 6945(a) (emphasis added). See also, section 4003(a)(3), requiring state plans to provide for the closing or upgrading of “all existing open dumps”). 42 U.S.C. 6943(a)(3) (emphasis added).

Consistent with the statutory provisions, EPA's current subtitle D regulations at 40 CFR part 257 apply to “all solid waste disposal facilities and practices” whether active or inactive, and did not differentiate between new and existing facilities.[41] 40 CFR 257.1(c). See also, 40 CFR 257.1(a)(1)-(2). EPA was clear in both the proposed and final rules that the rules applied to all existing facilities: “These criteria for the classification of disposal facilities apply to all “solid waste” and “disposal” facilities, which are defined in the Act [in] (section 1004).” 43 FR 4942-4943, 4944. The final rule was equally clear: “These criteria apply to the full range of facilities and practices for “disposal” of “solid waste,” as those terms are defined in the Act.” 44 FR 53440. (See also 44 FR 53438.) The final rule describes eight categories of materials or activities that are excluded; inactive facilities or units are not among them. This stands in stark contrast to the hazardous waste regulations, which, as discussed, specifically exempted inactive facilities from the permitting and associated regulatory requirements.

b. Case Law on the Definition of Disposal

EPA also disagrees with the commenters' second claim that regulating inactive surface impoundments would be inconsistent with case law in six circuits. The commenters are correct that some courts have held that the subsequent passive migration of contamination left on-site is insufficient to support liability against a third party that merely owned the property under CERCLA. But the commenters misconstrue this case law and fundamentally overstate its significance to the issue at hand. Of greater significance, however, is that federal courts have almost universally reached different conclusions under RCRA, holding that the statutory definition of disposal does include the passive migration of contamination from previously disposed of wastes.

As an initial matter, the issue decided by the courts in the cited CERCLA cases was narrower than the commenters allege; these cases generally focused on whether current or past owners of land contaminated by the activities of other owners were liable for passive migration that occurred during their ownership of the land. This is very different than the situation at hand, in which regulatory requirements are being imposed to address the existing and future contamination caused by the past and current activities of the current owner.

In addition, these decisions were largely predicated on language that is unique to CERCLA, rather than on a definitive reading of RCRA's definition of disposal. See, e.g., United States v. CMDG Realty Co., supra at 712-717. For example, in CMDG Realty, the court found that passive migration was not disposal because Congress had clearly distinguished between “releases,” and “disposal,” defining the two terms differently and imposing liability on different parties for the two activities. Id. Accord, Carson Harbor Village, supra, at 880-885; ABB Industrial Systems v. Prime Technology, supra at 358.

Moreover, even under CERCLA courts have not universally reached the same conclusions on whether “passive migration” can be considered “disposal.” See, e.g., Nurad, Inc. v. William E. Hooper & Sons Co., 966 F.2d 837, 844-46 (4th Cir. 1992) (concluding that because the definition of disposal includes “leaking,” prior owners are liable if they acquired a site with leaking barrels or underground storage tanks even though the prior owner's actions are purely passive); ABB Industrial Systems, Id., n.3 (expressly declining to decide whether passive migration could ever be considered “disposal”).

But in any event, courts have consistently interpreted RCRA to apply to passive migration. Two cases under RCRA are the most directly analogous to the current situation as they address the extent of EPA's authority to regulate based on the statutory definition of “disposal”: In re Consolidated Land Disposal Regulation Litigation, 938 F.2d 1386 (D.C. Cir. 1991), and United States v. Power Engineering Co., 10 F. Supp. 2d 1145 (D. Colo. 1998), aff'd 191 F.3d 1224 (10th Cir. 1999). In both cases, the court considered whether EPA could impose or enforce regulatory requirements to address passive migration under the interpretation that this constituted “disposal” under RCRA. And in both cases the court agreed that RCRA's definition encompassed such activities.

The issue in Consolidated Land Disposal was whether EPA could require closed hazardous waste facilities to obtain a “post-closure” permit. 938 F.2d at 1388-1389. EPA had relied on the definition of disposal to support the regulation, concluding that a facility “at which hazardous wastes have been disposed by placement in or on the land” remains subject to both permitting and regulation because “such hazardous wastes or constituents may continue `leaking' or `may enter the environment or be emitted . . . or discharged . . .' ” into the environment.” Id. Similar to the commenters' current arguments, the petitioners argued that under § 3005, a permit can only be required for “on-Start Printed Page 21346going activities”—the treatment, storage, or disposal of waste at such facilities—not for the facility itself post-closure. The petitioners argued that linguistically, “disposal . . . is not a continuing activity but occurs anew each time waste is placed into or on land.” The D.C. Circuit summarily rejected the petitioners' interpretation, holding that this “may be one way in which the word is used in ordinary language, but is not necessarily how it is used in the statute; the equation of “disposal” with “leaking,” which is a continuous phenomenon rather than a discrete event, is enough to blunt the sting of the petitioners' point.” Id. This case is essentially dispositive of the issue, given the similarities between the requirement for a post-closure permit and the final requirements applicable to inactive CCR surface impoundments. Electric utilities retain ownership and control over these existing CCR units, just as hazardous waste facilities retain ownership and control over the closed units subject to post-closure permitting. In both situations, EPA requirements are designed to address both the existing and future risks of further “releases” or “leaking” from these units—i.e., further disposal, as that term is defined in section 1004.

Similarly, in Power Engineering the court considered whether under section 3008 of RCRA, EPA could bring an action to compel the operator of a metal refinishing plant to comply with the state's RCRA regulations relating to financial assurance.[42] 10 F. Supp.2d at 1159. The defendants argued that since they were not currently disposing of waste, they were operating in compliance with state regulations and were exempt from financial assurance requirements. The court disagreed. It held that the use of the word “leaking” in the definition of “disposal” indicated that the leaching of hazardous waste into the groundwater constitutes the continuing disposal of hazardous waste. Id. at 1159-60 (“Because the definition of “disposal” includes the word “leaking,” disposal occurs not only when a solid waste or a hazardous waste is first deposited onto ground or into water, but also when such wastes migrate from their initial disposal location.”).

Courts in several circuits have also considered whether the passive migration of previously dumped waste constitutes a current or ongoing violation of RCRA, i.e., illegal “disposal,” under the citizen suit provisions of section 7002(a)(1)(A). Most have concluded that it does. See, Scarlett & Associates v. Briarcliff Center Partners, 2009 WL 3151089 (N.D. Ga 2009) (deciding to “follow the majority rule” and holding that “the continued presence of migrating waste constitutes a continuing violation under the RCRA”); Marrero Hernandez v. Esso Standard Oil Co., 597 F. Supp. 2d 272, 283 (D.P.R. 2009) (holding that unremedied, migrating contamination is not a wholly past violation); Cameron v. Peach County, GA, No. 5:02-CV-41-1 (CAR), 2004 WL 5520003 (M.D. Ga. 2004) (holding that the continued presence of illegal contamination that remains remedial constitutes a continuing violation, even though the acts of unlawful disposal occurred in the past); California v. M&P Investments, 308 F. Supp. 2d 1137, 1146-1147 (E.D. CA 2003) (Allowing RCRA 7002 claim of continuing violation to proceed on evidence that wastes “continue to exist unremediated” as a result of improper discharge that had ceased over 20 years prior to filing of suit); Aurora National Bank v. TriStar Marketing, 990 F. Supp. 1020, 1025 (N.D. Ill. 1998) (“Although subsection (a)(1)(A) does not permit a citizen suit for wholly past violations of the statute, the continued presence of illegally dumped materials generally constitutes a `continuing violation' of the RCRA, which is cognizable under § 6972(a)(1)(A).”) (internal citation omitted); City of Toledo v. Beazer Materials & Servs., Inc., 833 F. Supp. 646, 656 (N.D. Ohio 1993) (“[T]he disposal of wastes can constitute a continuing violation so long as no proper disposal procedures are put into effect or as long as the waste has not been cleaned up and the environmental effects remain remediable.”); Gache v. Town of Harrison, 813 F. Supp. 1037, 1041-42 (S.D.N.Y. 1993) (“The environmental harms do not stem from the act of dumping when waste materials slide off the dump truck but rather after they land and begin to seep into the ground, contaminating soil and water. So long as wastes remain in the landfill threatening to leach into the surrounding soil and water, a continuing violation sure may exist.”); Acme Printing Ink Co. v. Menard, Inc., 812 F. Supp. 1498, 1512 (E.D. Wisc. 1992) (“RCRA includes in its broad definition of `disposal' the continuous leaking of hazardous substances. . . . Accordingly, leaking of hazardous substances may constitute a continuous or intermittent violation of RCRA.”); Fallowfield Dev. Corp. v. Strunk, No. 89-8644, 1990 WL 52745 (E.D. Pa. 1990) (“If a person disposes of hazardous waste on a parcel of property, the hazardous waste remains in that property insidiously infecting the soil and groundwater aquifers. In other words, the violation continues until the proper disposal procedures are put into effect or the hazardous waste is cleaned up.”). It is particularly notable that these cases were all decided under subsection (A); in contrast to subsection (B), section 7002(a)(1)(A) does not include any reference to liability for past actions or for prior owners. Compare, 42 U.S.C. 6972(a)(1)(A) and (B). In reaching their holdings, therefore, the courts necessarily relied [solely] on the reach of the statutory definition of “disposal,” which is at the heart of EPA's authority to regulate inactive CCR surface impoundments.

Courts have also addressed the limits of RCRA's definition of “disposal” is in the context of an EPA action under RCRA section 7003. Section 7003 authorizes EPA to obtain injunctive relief for actions, including disposal that “may present an imminent and substantial endangerment to health or the environment.” 42 U.S.C. 6973(a). Several courts have evaluated whether an inactive disposal site, where no affirmative acts of disposal are occurring, constitute an “imminent and substantial endangerment” under this provision. Once again, most courts accept a definition of disposal that encompasses leaking or contaminant migration from previously discarded wastes. See United States v. Price, 523 F. Supp. 1055, 1071 (D.N.J. 1981), aff'd United States v. Price, 688 F.2d 204 (3rd Cir. 1982) (“There is no doubt, however, that [section 70003] authorizes the cleanup of a site, even a dormant one, if that action is necessary to abate a present threat to the public health or the environment.”) citing S. Rep. No. 96-848, 96th Cong., 2d Sess., at 11 (1980); H. R. Rep. 96-1016 (Part I), 96th Cong., 2nd Sess., at 21 reprinted in [1980] U.S. Code Cong. & Ad. News, 6119, 6124; United States v. Waste Indus., 734 F.2d 159 (4th Cir. 1984) (Rejecting district court interpretation that disposal only includes “active human conduct” based on the inclusion of “leaking” in the definition of disposal, and interpreting the “movement of the waste after it has been placed in a state of repose [to be] encompassed in the broad definition of disposal”); United States v. Diamond Shamrock Corp., 12 Envtl. L. Rep. 20819, 20821 (N.D. Ohio May 29, 1981) (noting that “a disposal clearly requires no active human conduct”); United States v. Conservation Chemical Co., Start Printed Page 21347619 F. Supp. 162, 200 (D. Mo. 1985) (“ `disposal' occurs. . .when [wastes] migrate from their initial location”). See also S. Rep. 98-284, p 58 (98th Cong. 1st Sess.) (“The Environmental Protection Agency and the Department of Justice have used the equitable authority and [sic] granted in section 7003 to seek court orders directing those persons whose past or present acts have contributed to or are contributing to the existence of an imminent and substantial endangerment to abate such conditions. This has been an intended use of the section 7003 since 1976. . . . An [sic] evidenced by the definition of `disposal' in section 1004(3), which includes the leaking of hazardous wastes, section 7003 has always provided the authority to require the abatement of present conditions of endangerment resulting from past disposal practices, whether intentional or unintentional.”).

While EPA continues to maintain that the statutory definition of disposal does in fact authorize regulation of inactive CCR surface impoundments, this is not the sole basis for that authority. Under section 1008(a)(3), EPA is authorized to establish criteria governing solid waste management, which includes the “storage” of solid waste. 42 U.S.C. 6904(28) and 6908(a)(3). RCRA's definition of “storage” is limited to hazardous waste; under subtitle D, therefore, the definition Congress intended was the dictionary definition, which incontrovertibly covers the activities associated with continuing to maintain CCR in inactive surface impoundments. For example, Merriam Webster defines “storage” as “the state of being kept in a place when not being used” and “the act of putting something that is not being used in a place where it is available, where it can be kept safely, etc.”

Finally, consistent with the proposed rule and the final Regulatory Determination in Unit IV.B of this document, the final rule does not apply to CCR that is beneficially used.

6. Beneficial Use

The proposed rule generally distinguished between the disposal of CCR and the beneficial use of CCR. Disposal activities would be subject to regulation under one of two alternative regulatory schemes. But under either alternative, beneficial use would remain Bevill exempt and would not be subject to regulation. The proposal identified specific criteria that would be used to distinguish between legitimate beneficial uses of CCR and the disposal of CCR. These criteria were largely drawn from the approach contained in the May 2000 Bevill Regulatory Determination. The criteria were:

—The material used must provide a functional benefit. For example, CCR in concrete increases the durability of concrete—and is more effective in combating degradation from salt water; synthetic gypsum serves exactly the same function in wallboard as mined gypsum, and meets all commercial specifications; CCR as a soil amendment adjusts the pH of soil to promote plant growth.

—The material substitutes for the use of a virgin material, conserving natural resources that would otherwise need to be obtained through practices, such as extraction. For example, the use of FGD gypsum in the manufacture of wallboard (drywall) decreases the need to mine natural gypsum, thereby conserving the natural resource and conserving energy that otherwise would be needed to mine natural gypsum; the use of fly ash in lieu of Portland cement reduces the need for cement. CCR used in road bed replace quarried aggregate or other industrial materials.

—Where relevant product specifications or regulatory standards are available, the materials meet those specifications, and where such specifications or standards have not been established, they are not being used in excess quantities. For example, when CCR is used as a commercial product, the amount of CCR used is controlled by product specifications, or the demands of the user. Fly ash used as a stabilized base course in highway construction is part of many engineering considerations, such as the ASTM C 593 test for compaction, the ASTM D 560 freezing and thawing test, and a seven day compressive strength above 2760 kPa (400 psi). If excessive volumes of CCR are used—i.e., greater than were necessary for a specific project,—that could be grounds for a determination that the use is not beneficial, but rather is being disposed of. 75 FR 35162-35163.

EPA explained that in the case of agricultural uses, CCR would be expected to meet appropriate standards, constituent levels, prescribed total loads, application rates, etc. EPA has developed specific standards governing agricultural application of biosolids. While the management scenarios differ between biosludge application and the use of CCR as soil amendments, EPA stated that the Agency would consider application of CCR for agriculture uses not to be a legitimate beneficial use if they occurred at constituent levels or loading rates greater than EPA's biosolids regulations allow. (75 FR 35162-35163, June 21, 2010)

EPA proposed to codify these criteria in the term, “beneficial use of coal combustion products (CCPs).” This definition stated that the beneficial use of CCPs was the use of CCPs that provides a functional benefit; replaces the use of an alternative material, conserving natural resources that would otherwise need to be obtained through practices such as extraction; and meets relevant product specifications and regulatory standards (where these are available). CCPs that are used in excess quantities (e.g., the field-applications of FGD gypsum in amounts that exceed scientifically-supported quantities required for enhancing soil properties and/or crop yields), placed as fill in sand and gravel pits, or used in large scale fill projects, such as restructuring the landscape, are excluded from this definition. (75 FR 35129-35130, June 21, 2010).

Commenters generally supported the criteria in the proposal but raised concern that the criteria lacked specificity; some commenters stated that the criteria were those that states already considered in doing their beneficial use determination. Commenters also suggested the use of a “no toxics” provision and others suggested that the criteria include a requirement that “environmental benefits” be achieved. A more general comment raised by several commenters was that the proposed criteria failed to establish any standard that ensured protection of human health and the environment. Finally, one commenter raised concern that EPA's approach to beneficial use, and particularly to large scale fill operations, inappropriately assumed that these operations constituted the disposal of solid waste, which, the commenter claimed was inconsistent with a series of judicial decisions.

There are generally three critical issues in determining whether a material is regulated under RCRA subtitle D: whether the material is a “solid waste,” whether the activity constitutes “disposal,” and whether regulation of the disposal is warranted. Although there can be some overlap between these issues in that the same facts may be relevant to each of them, understanding the distinction between them is critical to understanding the final approach to the beneficial use of CCR adopted in this rulemaking.

In order to be subject to RCRA, the material must be a solid waste. The statute defines a solid waste as “any garbage, refuse . . . and other discarded material. . . .” 42 U.S.C. 6903(27). As EPA noted in the proposed rule, for some beneficial uses, CCR is a raw Start Printed Page 21348material used as an ingredient in a manufacturing process that have never been “discarded,” and thus, would not be considered solid wastes under the existing RCRA regulations. For example, synthetic gypsum is a product of the FGD process at coal-fired power plants. In this case, the utility designs and operates its air pollution control devices to produce an optimal product, including the oxidation of the FGD to produce synthetic gypsum. In this example, after its production, the utility treats FGD as a valuable input into a production process, i.e., as a product, rather than as something that is intended to be discarded. Wallboard plants are sited in close proximity to power plants for access to raw material, with a considerable investment involved. Thus, FGD gypsum used for wallboard manufacture is a product rather than a waste or discarded material. This use and similar uses of CCR that meet product specifications would not be regulated under the final rule.

However, this does not describe the majority of CCR, which are unambiguously wastes; after generation in the boiler, they are placed into landfills or surface impoundments. While they may subsequently be dredged from these units and reused, placement in a landfill or surface impoundment presents prima facie evidence of discard. At the time the material is placed into the unit, the utility is not treating the material as a valuable product or otherwise seeking to protect the material for use. Although the material may subsequently be reused if a buyer is found, the material is originally placed in the unit with the intent to let it remain in place if no buyer is found. The waste designation does not change merely because a material in a surface impoundment or landfill may in the future be beneficially reused.

For those materials that are “wastes” the second issue becomes relevant: whether the activities involved with the material constitutes “disposal” or “solid waste management.” The statute distinguishes between these activities and “use;” several activities are listed in the definitions of “disposal” and “solid waste management” and “use” is not among them. See 42 U.S.C. 6903(3) and (28). In general, commenters agreed that the three criteria in the proposal, and discussed above, would identify those activities that were properly considered to be legitimate beneficial uses rather than disposal. As several commenters noted, many state beneficial use programs rely on similar (or identical) criteria. And for encapsulated uses, EPA agrees that these three criteria are sufficient to distinguish between the activities that will be regulated as disposal under this final rule and those that will be considered beneficial use. Accordingly, EPA has adopted them in the final definition of “beneficial use.”

But as EPA acknowledged in the proposal, the issues are more difficult with regard to unencapsulated uses. Because these uses involve the direct placement of CCR on the land, they are clearly more analogous to activities that have consistently been considered to be “disposal.” RCRA defines disposal to specifically include the “placing of any solid waste or hazardous waste into or on any land or water so that such solid waste or hazardous waste or any constituent thereof may enter the environment . . .” 42 U.S.C. 6903(3). The issue is further complicated by the fact that there can be risks associated with placement of unencapsulated CCR on the land. As described in the proposal, CCR can leach toxic metals at levels of concern. The major risks associated with the placement of unencapsulated CCR on the land for beneficial use involved using large volumes of CCR to restructure the landscape, such as occurred at the Battlefield golf course, and placement in quarries and sand and gravel pits, such as occurred at the Gambrills, Maryland site. EPA acknowledged in the proposal that these types of operations would be subject to regulation as disposal, and so were not directly on point. However, because these damage cases involved the placement of unencapsulated CCR on the land, they raised questions regarding the safety of other uses of unencapsulated CCR that involved direct placement on the land. In addition, previous risk analyses do not address many of the use applications currently being implemented, and have not addressed the improved leachate characterization methods. EPA also noted that some scientific literature indicates that the uncontrolled (i.e., excessive) application of CCR can lead to the potentially toxic accumulation of metals.[43]

As noted, several commenters raised concern that EPA's beneficial use criteria did not include any standard that ensured protection of human health and the environment. EPA agrees that a criterion that accounted for the potential risks of the land placement of unencapsulated CCR would be an appropriate element to include in differentiating between disposal and beneficial use. RCRA's definition of disposal includes some elements related to risk: specifically, the definition includes as a relevant concept that the waste or any constituent of concern “may enter the environment.” In this regard it is also relevant that not all disposal activities are regulated by EPA under subtitle D; rather, EPA only regulates those that present risks that exceed the Agency's acceptable risk levels.

Building off of these concepts, the Agency has developed an additional criterion to address both the question of whether the activity is appropriately considered to be “disposal,” and the question of whether that “disposal” warrants regulation. Because uses that fail to meet the beneficial use criteria will be considered disposal and would therefore be considered disposal subject to the final regulation, this fourth criterion was designed to exclude uses likely to present the same risks as the management practices regulated under other sections of the final rule. Thus, the final criterion directly correlates to the practices and the risks that the disposal regulations are designed to address: the risks associated with the placement of large quantities of CCR in a single concentrated location, such as a CCR landfill, as documented in the 2014 risk assessment and the damage cases.

As discussed in more detail below, to be considered a “beneficial use,” prior to initiating an activity that involves placing unencapsulated CCR on the land in amounts greater than 12,400 tons, in non-roadway applications, the user must demonstrate that environmental releases to groundwater, surface water, soil and air are comparable to or lower than those from analogous products made without CCR, or that environmental releases to groundwater, surface water, soil and air will be at or below relevant regulatory and health-based benchmarks for human and ecological receptors during use.

EPA acknowledges that there may be risks associated with uses that are below this threshold, depending on the characteristics of the CCR, the amount of material and the manner in which it is placed, and (perhaps most important) the site conditions. Consequently, all unencapsulated uses, including use in road construction and agriculture, should be conducted with care, according to appropriate management Start Printed Page 21349practices, and with appropriate characterization of the material and the site where the material will be placed. However, as discussed in the previous section, because the amounts and, in some cases, the manner in which the CCR are used are very different from the land disposal modeled in the risk assessment, EPA cannot extrapolate from the risk assessment to reach conclusions regarding the risks these uses may pose. And in the absence of such information, EPA cannot establish criteria to regulate these uses.

a. Final Definition of the Term “Beneficial Use of CCR”

The final beneficial use criteria are as follows: (1) The CCR must provide a functional benefit; (2) The CCR must substitute for the use of a virgin material, conserving natural resources that would otherwise need to be obtained through practices such as extraction; (3) the use of CCR must meet relevant product specifications, regulatory standards, or design standards when available, and when such standards are not available, CCR are not used in excess quantities; and (4) when unencapsulated use of CCR involves placement on the land of 12,400 tons or more in non-roadway applications, the user must demonstrate and keep records, and provide such documentation upon request, that environmental releases to groundwater, surface water, soil and air are comparable to or lower than those from analogous products made without CCR, or that environmental releases to groundwater, surface water, soil and air will be at or below relevant regulatory and health-based benchmarks for human and ecological receptors during use. Any use that fails to comply with all of the relevant criteria will be considered to be disposal of CCR, subject to all of the requirements in the disposal regulations, and the user will be considered to be the owner or operator of a CCR disposal unit. Encapsulated uses need only comply with the first three criteria. Unencapsulated uses involving placement on the land of 12,400 tons or more in non-roadway applications that fail to meet all of the beneficial use criteria are considered a CCR unit. As previously noted, the first three criteria were discussed in the proposal and commenters generally supported these criteria, which establish flexible performance standards. As discussed above, the Agency has developed an additional criterion in response to comments, which generally reflects the issues discussed in the proposal. This additional criterion is designed to address the environmental and human health concerns associated with large-scale, unencapsulated uses that have features similar to landfills. These four criteria are discussed in greater detail in the sections below. Any user of CCR that, at a later time, believes that there could be a health or environmental issue associated with their beneficial use should work with their state agency to address any potential issue.

As noted above, encapsulated uses of CCR must only comply with the first three criteria. Encapsulated beneficial uses are those that bind the CCR into a solid matrix that minimizes their mobilization into the surrounding environment. Examples of encapsulated uses include, but are not limited to: (1) Filler or lightweight aggregate in concrete; (2) a replacement for, or raw material used in production of, cementitious components in concrete or bricks; (3) filler in plastics, rubber, and similar products; and (4) raw material in wallboard production.

Compliance with the first three criteria suffices because, as discussed in Unit IV of this document, the available information demonstrates that encapsulated uses of CCR raise minimal health or environmental concerns. The Agency did not receive any data to contradict this assessment during any of the comment periods. In addition, since publication of the proposal, the Agency conducted a study of FGD gypsum in wallboard and fly ash concrete, which further supports this conclusion. This study “Coal Combustion Residual Beneficial Use Evaluation: Fly Ash Concrete and FGD Gypsum Wallboard” (February 2014) concluded that “environmental releases of constituents of potential concern (COPCs) from CCR fly ash concrete and FGD gypsum wallboard during use by the consumer are comparable to or lower than those from analogous non-CCR products, or are at or below relevant regulatory and health-based benchmarks for human and ecological receptors.”

Criteria 1: CCR must provide a functional benefit. This criterion is designed to ensure that the material performs a genuine function in the product or use; while it need not improve product performance when compared to the material for which it is substituting, CCR must genuinely be a necessary component of the product. In other words, there must be a legitimate reason for using CCR in the product other than the fact that it is an alternative to disposal of the material, e.g., the material fulfils material specifications. For example, CCR provides a functional benefit when used as a replacement for cement in concrete because the CCR increases the durability of the concrete and is also more effective against degradation from salt water. FGD gypsum serves the same function in the production of wallboard as mined gypsum, and meets all product specification. Additionally, CCR can be used to adjust the pH of soils thereby increasing and promoting plant growth.

One commenter noted that many states already consider whether the material provides a functional benefit when making beneficial use determinations under their regulatory programs. The Agency agrees that this is an important criterion in determining whether a use is a “beneficial use.” To the extent that a state regulatory program has determined that a particular use provides a functional benefit, this may serve as evidence that this criterion has been met.

Criteria 2: CCR must substitute for the use of a virgin material, conserving natural resources that would otherwise need to be obtained through practices, such as extraction. This criterion is intended to ensure that the use is truly “beneficial” from an environmental perspective. Examples of CCR used as a substitute for a virgin material include FGD gypsum for mined gypsum and the use of fly ash in lieu of Portland cement thereby reducing the need for cement. The use of FGD gypsum in the manufacture of wallboard reduces the need to use virgin gypsum, thereby conserving natural resources (virgin gypsum) while conserving valuable energy that would be needed to mine the virgin gypsum. Similarly, the use of CCR fly ash in lieu of Portland cement reduces the overall need for cement. CCR used in a road bed application substitutes for the use of quarried natural materials that provide structural support for the road surface.

One commenter again highlighted that many states consider this criterion in their current state beneficial use programs. The Agency agrees that this second criterion is appropriate, and that conserving natural resources is an important function that should be encouraged. Here as well, potential users of CCR materials may choose to rely on a state determination to provide evidence that this criterion has been met.

Criteria 3: The use of CCR must meet relevant product specifications, regulatory standards, or design standards, when available, and where such specifications or standards have not been established, CCR may not be used in excess quantities. This criterion was intended to address both the legitimacy of the use and the potential environmental and human health Start Printed Page 21350consequences associated with the use of excess quantities of CCR, particularly unencapsulated CCR. If excessive volumes of CCR are used—i.e., greater than necessary for a specific project—that calls into question whether the purpose of the application was in fact a sham to avoid compliance with the disposal regulations. In addition, the record demonstrates that the risks from use of CCR are more likely to be associated with large volumes, particularly for unencapsulated uses.

The Agency has modified this criterion slightly from the proposed rule. The proposed rule merely referenced “relevant product specifications or regulatory standards” and EPA was concerned that this was too narrow, and might not incorporate all of the relevant technical information currently available that provides guidance on what constitutes an excess amount. Consequently, in the final definition the Agency has added the phrase “design standards.” Design standards are different from product specifications, because they include things other than “products.” An example of a “design standard” would be technical guidance specifying that six inches of CCR is to be used in constructing a road.

EPA received several comments on this provision, several of which criticized the sole reliance on engineering performance standards. For example, one commenter questioned how the Agency would quantify acceptable amounts for each use if no specifications or standards were in place. One commenter stated that the Agency needs to rely on more than the existence of engineering performance standards or comparisons to typical application rates of mined materials as coal combustion wastes are unique materials and comparisons to typical rates of application of natural gypsum or other soil amendments are inappropriate. Another commenter suggested a provision that would require users to follow a plan to only use what is necessary to reach the desired effect, in lieu of product specifications.

EPA purposely did not attempt to establish product specifications for each potential beneficial use application. The potential products are too varied, and in many instances EPA lacks the necessary expertise (e.g., to develop manufacturing specifications for individual products.). Nor is such an approach necessary. When CCR substitutes for other materials, the amount used is typically controlled by product specifications, particularly for encapsulated uses. Product specifications currently exist for many, if not most, of the significant uses of CCR and can be found in a variety of sources. For example, as previously described, fly ash used as a stabilized base course in highway construction is subject to both regulatory standards under DOT/FHWA, and engineering specifications, such as the ASTM C 593 test for compaction, the ASTM D 560 freezing and thawing test, and a seven-day compressive strength above 2760 kPa (400 psi).

Similarly, in an agricultural setting, EPA expects all appropriate standards, constituent levels, prescribed total loads, and application rates to be met. For example, EPA has developed specific standards governing the agricultural application of biosolids. While the management scenarios differ between biosludge application and the use of CCR as soil amendments, EPA would consider application of CCR for agriculture uses not to be a legitimate beneficial use if they occurred at constituent levels or loading rates greater than EPA's biosolids regulations. Several commenters also noted that agronomic rates currently exist for certain items such as peanuts, cotton, tomatoes, corn and soybeans.[44] EPA would generally consider application of CCR above these rates, or any other rate that has been scientifically justified, to constitute disposal rather than beneficial use.

Many other sources of technical reports and documents exist for other uses. ASTM Standard E2277-03 provides standard guidance and a methodology for using CCR in a structural fill and includes a consideration of engineering properties and behaviors, testing procedures, and design considerations relevant to constructing a structural fill project using CCR. Industry guidance, such as USWAG's “Engineering and Environmental Guidance on the Beneficial Use of Coal Combustion Products in Engineered Structural Fill Projects” may also provide information relevant to this issue. Further, some states, such as Wisconsin and Virginia, have developed environmental guidance for evaluating the suitability of a site prior to construction of a CCR structural fill.

While many of these documents do not establish binding requirements, nor is EPA seeking to make them binding on users, they provide evidence of the design and construction practices, including the amounts that are typically used throughout the industry, and provide a basis on which to evaluate whether excessive quantities have been used in a particular application. These types of documents are also relevant in making judgments on the larger question—whether the activity is legitimate reuse or merely sham disposal. In essence, product specifications serve the same function as the requirement suggested by a commenter for a plan to only use what is necessary to reach the desired effect.

Commenters were also concerned that the proposed standards, and particularly this criterion, did not include any provision that would ensure that CCR reuse was protective of human health and the environment. One commenter stated that product specifications and engineering standards do not speak to environmental risk or consumer exposure. This same commenter was concerned that the proposed criteria used circular logic by stating that excess materials were not to be used in cases where specifications or standards have not been established. Another commenter criticized this criterion because it did not include threshold levels that protect public health from the range of toxicants routinely found in coal ash.

EPA generally disagrees that the requirement to ensure that excessive volumes have not been used is unrelated to environmental and safety concerns. Minimizing the amount of material used in a product or released to the environment decreases potential exposures to the material. EPA agrees, however, that an additional criterion that more directly addresses the potential health and environmental risks is appropriate for unencapsulated uses, which present the greater potential for exposures of concern. As discussed in more detail below, the Agency has added a criterion to specifically require users of unencapsulated CCR to demonstrate that environmental and health related standards have been met. The criterion is a general performance standard that is equally applicable to all sites and uses and will account for a wide variety of potential exposures. By contrast, in order to establish toxicant “threshold levels,” EPA would need to develop risk assessments that account for the wide variety of potential uses and exposures. This is neither practical nor feasible, given the site specific nature of the potential risks and the myriad of potential uses. In addition, EPA disagrees that this is necessary, as the performance standard laid out in the fourth criterion will appropriately address the risks documented in the current record for these uses. Start Printed Page 21351Furthermore, as the Agency has previously stated in the May 2000 Regulatory Determination and the 2010 proposal, leaving the Bevill determination in place for beneficial use does not conflict with EPA's view that certain beneficial uses, e.g., use in road construction and agriculture, should be conducted with care, according to appropriate management practices, and with appropriate characterization of the material and the site where the materials will be placed. EPA has concluded that the potential risks of these uses do not warrant federal regulation, but can be addressed, if necessary, in other ways.

State programs exist and have the expertise to address beneficial use applications. In addition, the Agency is currently developing a framework to address the risks associated with the beneficial use of unencapsulated materials. This framework is expected to be finalized in 2015; the framework will be available to assist in the implementation of issues associated with the unencapsulated uses of CCR. The Agency has also been working with the U.S. Department of Agriculture to address the risks associated with the agricultural use of CCR. In conclusion, the Agency believes that sufficient tools are available (or will soon be available) to address the site-specific risks associated with the beneficial use of CCR.

Criteria 4: When unencapsulated use of CCR involving placement on the land of 12,400 tons or more in non-roadway applications, the user must demonstrate and keep records, and provide such documentation upon request, that environmental releases to groundwater, surface water, soil and air are comparable to or lower than those from analogous products made without CCR, or that environmental releases to groundwater, surface water, soil and air will be at or below relevant regulatory and health-based benchmarks for human and ecological receptors during use. The Agency has established an environmental criterion to protect human health and the environment in response to numerous comments received on the proposal raising concern that additional provisions were necessary to ensure that unencapsulated uses of CCR needed to be conducted in an environmentally protective manner. The Agency discussed in the proposed rule the ways in which the use of CCR in an unencapsulated manner could affect groundwater, surface water, air and be associated with dust emissions. This fourth “environmental” criterion requires potential users to addresses potential risks from all of these pathways in order to avoid compliance with the final disposal requirements. Existing sources of guidance and standards (e.g., ASTM E2277-03 and USWAG's “Engineering and Environmental Guidance on the Beneficial Use of Coal Combustion Products in Engineered Structural Fill Projects,” to name just two that are currently available), are available and may provide useful assistance for determining if the use of CCR are comparable to or lower than those from analogous products made without CCR, or that environmental releases to groundwater, surface water, soil and air will be at or below relevant regulatory and health-based benchmarks for human and ecological receptors during use. Information (e.g., modeling results, proposed designs, risk assessments, etc.) that have been proposed or developed to comply with state standards that explicitly address the environmental impacts of unencapsulated uses may also be relevant to this determination.

i. Source of the 12,400 Ton Threshold and Fill Operations.

As discussed earlier in this section, the fourth criterion was designed to address whether the activity is appropriately considered to be “disposal” and whether that “disposal” warrants regulation. Thus, the final criterion correlates to the practices and the risks at issue: The placement of large quantities of CCR in a single concentrated location, as documented by the 2014 risk assessment and the damage cases.

In the proposed rule, EPA explained that the risks of greatest concern from unencapsulated beneficial uses were associated with the placement of CCR in quarries and sand and gravel pits, and with large scale fill operations used to re-grade the landscape. EPA generally proposed to define these operations as “disposal” rather than “beneficial use.” As discussed below, EPA has retained that approach with respect to the placement in sand and gravel pits and quarries; consequently the fourth criterion need not account for these uses. By contrast, EPA has not definitively concluded that “large scale fill operations,” per se, constitute the disposal of CCR. This is because EPA agrees with commenters that, if constructed correctly, large scale fill operations can meet all of the criteria for a beneficial use. But EPA also agrees that these applications can present risks to human health and the environment, and therefore has drafted the fourth criterion to specifically address the risks presented by these operations. The fourth criterion is thus tied to the Agency's general approach to large scale fill.

The Agency acknowledged in the proposal that additional guidance was warranted on what would constitute a large scale fill operation, and received numerous comments on this issue in response to the proposal. EPA requested comments again on the topic of large scale fills in a Notice of Data Availability (NODA). 78 FR 46940 (August 2, 2013). The NODA discussed the fact that many commenters on the proposed CCR rule stated that EPA should have developed a size criterion to define large scale fill operations. One commenter suggested 5,000 cubic yards as a size criterion for a CCR landfill, but did not provide a basis for this. Other commenters suggested size criteria but for different reasons than defining disposal criteria; for example, Wisconsin has a standard where all CCR used for unconfined and confined “fill projects exceeding 5,000 cubic yards require concurrence by the State prior to commencement of the project.” Similarly, West Virginia stated that “unencapsulated use of CCR as structural fills not exceeding 10,000 cubic yards are approvable on a case-by-case basis.”

In the NODA, EPA identified three different types of data sets that could provide information relevant to developing appropriate criteria or to otherwise defining what constitutes a “large scale” fill operation. EPA solicited comment on the adequacy of the data sets and whether EPA should consider them for the purpose of creating criteria or a definition. The three data sets were: (1) The size of the structural fills that have resulted in damage cases; (2) the distribution of landfill sizes, derived either from an EPA Office of Water's questionnaire or from the landfill size distribution used in the proposed rule; and (3) the size distribution for large scale fills that have been constructed in North Carolina. Many commenters argued that it was entirely inappropriate for EPA to specify in the rule when a project constitutes beneficial use simply by volume or amount of structural fill necessary to construct a stable base for a building. Commenters argued that a large scale fill operation, if designed appropriately, constituted a legitimate beneficial use. In fact, industry commenters universally claimed that they were not aware of any damage cases or adverse environmental impacts associated with structural fills that had adhered to industry guidance (e.g., ASTM standard E2277-03 for structural fills and the USWAG Engineering and Environmental Guidance on the Beneficial Use of CCPs Start Printed Page 21352in Engineered Structural Fill Projects), and argued that the history of well-designed and implemented engineered structural fills demonstrate that CCR can serve as a valuable resource in avoiding disturbing native ground to secure borrow soils where fill materials are needed to establish a final grade for a project site that meets the need of the proposed final use. To this end, the commenters also acknowledged that site characterization and characterization of the CCR are fundamental to the construction of fills across the U.S. Similarly, other commenters stated that size should not be the only criterion used to define large scale fill operations and highlighted that the site conditions, including such features as the hydraulic conductivity of the area, should also be an important criterion to consider. Still other commenters stated that CCR landfills cannot include large scale fill CCR beneficial use projects because such operations do not involve disposal of a solid waste. Rather, industry commenters argue that the determination as to what is disposal as opposed to beneficial use should be a determination that rests solely with state agencies. These commenters suggested that the determination as to whether a particular fill project constituted disposal, rather than beneficial use should be based on a series of factors, and not simply a size-cut-off. Finally, other commenters argued that the Agency incorrectly presumed that only large scale fill operations could cause environmental damage, and suggested that rather than regulating large scale fill operations solely on the basis of the volume or the amount of CCR involved, the information available to EPA from damage cases and monitoring data suggests that an additional, if not primary criteria for regulating fill operations, including those involved in highway construction, should include the prevention of CCR coming into contact with water. Focusing on the risks of concern—that large scale fills were effectively operating as landfills—the Agency reviewed the database of landfills used in the 2014 risk assessment and has established a threshold limit that corresponds to the smallest size landfill in the risk assessment database. EPA selected this threshold as the trigger for requiring an affirmative demonstration by the user that there will be no releases of concern as a consequence of the land application, because the available evidence in the record (i.e., the 2014 risk assessment) demonstrates that at these volumes the potential risks are of such significance to warrant regulation. Based on this evidence, the burden then shifts to the potential user to demonstrate that these potential risks do not exist at the particular site or have been adequately mitigated. Under this approach, unencapsulated beneficial use applications greater than or equal to 12,400 tons can still be conducted without becoming subject to the disposal regulations by using engineering principles, such as a liner system, and demonstrating that environmental releases to groundwater, surface water, soil and air are comparable to or lower than those from analogous products made without CCR, or that environmental releases to groundwater, surface water, soil and air will be at or below relevant regulatory and health-based benchmarks for human and ecological receptors. EPA agrees that the volume of CCR involved should not be the sole basis for determining whether an operation constitutes disposal. As such, the Agency is requiring the use of the fourth criterion in order to address any potential risks associated with unencapsulated uses of CCR that are in excess of 12,400 tons. Users will be required to make an affirmative demonstration relating to the potential environmental releases and the potential risks of the application (in addition to requiring compliance with the other three criteria). Specifically, users will be required to demonstrate that environmental releases to groundwater, surface water, soil and air are comparable to or lower than those from analogous products made without CCR, or that environmental releases to groundwater, surface water, soil and air will be at or below relevant regulatory and health-based benchmarks for human and ecological receptors during use. EPA expects such determinations to take into account a wide variety of factors, including the hydraulic conductivity of the area, proximity of the material to water, and the likelihood of contact with water. EPA also expects that such determinations would take into account, as many commenters acknowledged to be appropriate and necessary, the need for site characterization and characterization of the CCR. The fourth criterion was adopted in part, to address commenters' concern that the EPA should include a criterion that prevents the placement of CCR in water sources. These are legitimate concerns; existing damage cases show that the placement of CCR in sand and gravel pits was almost always associated with CCR being placed in contact with water. The fourth criterion will require the user to demonstrate that environmental releases to groundwater, surface water, soil and air are comparable to or lower than those from analogous products made without CCR, or that environmental releases to groundwater, surface water, soil and air will be at or below relevant regulatory and health-based benchmarks for human and ecological receptors during use. As a consequence of this requirement, EPA expects that significant changes may need to be made in order to proceed with a proposed use; for example, conducting the required assessment, may demonstrate that the only way to achieve the performance standard is to install engineering features, such a liner, as part of the proposed project.

Application of unencapsulated CCR to the land in volumes less than the 12,400 tons will not require an affirmative demonstration to be considered a beneficial use. While the Agency has sufficient information to document that unencapsulated uses can present a hazard, based on the current rulemaking record, EPA lacks the information necessary to demonstrate that unencapsulated uses in smaller amounts are likely to present a risk.[45] In other words, the evidence relating to these uses is not sufficient to shift the burden to the potential user to affirmatively demonstrate the safety of the proposed use. Nevertheless, the Agency expects potential users of unencapsulated CCR below this threshold to work with the states to determine the potential risks of the proposed use at the site and to adopt the appropriate controls necessary to address the risks. In this regard, EPA notes that the composition and leaching behavior of CCR being beneficially used may change over time due to upgrades in air pollution controls devices at coal-fired power plants. Further, initial determinations for existing beneficial use (BU) applications may have relied on single-point pH test methods (e.g., TCLP, SPLP) that, depending on actual field conditions in which the applications are occurring, can under- or over-estimate leachate concentrations. Scientific advancements Start Printed Page 21353in leach test protocols have found that the degree of leaching can vary by several orders of magnitude. Accordingly, states overseeing CCR BU programs are encouraged to closely evaluate existing BU applications in light of ongoing scientific advances in tools and technologies to ensure these applications remain protective of human health and the environment. In addition, the Agency is working to provide assistance to states and potential users; this includes the release of the Agency's Industrial Waste Evaluation Model (IWEM), and the development of a framework for systematically assessing unencapsulated BU applications to aid in assessing whether there are environmental risks associated with site specific structural fills.

ii. Exclusion of Roadway Applications from the 4th Criterion. In the 2010 proposal, the Agency stated that the placement of unencapsulated CCR on the land, such as in road embankments, presented concerns, but that the amount and the manner in which they are used—subject to engineering specifications and material requirements rather than landfilling techniques—are very different from land disposal. The Agency highlighted the 2005 guidance that was developed by EPA, FHWA, DOE, ACAA, and USWAG, addressing the appropriate methodologies and engineering requirements for the use of coal ash in highway construction. Lastly, the Agency noted the difference in terms of volume; the difference between the amounts of CCR that could be disposed of in a landfill vs. the amount of CCR used in the construction of a roadbase (typically on the order of six to twelve inches thick).

EPA received a number of comments requesting that the definition of a CCR landfill exclude CCR used in highway and road construction projects and similar beneficial use projects authorized by an appropriate state agency. These commenters reasoned that the “arbitrary cutoff' discussed in the NODA would inappropriately capture such uses.

The Agency has excluded roadways and associated embankments from the fourth criterion because the methods of application are sufficiently different from CCR landfills that EPA cannot extrapolate from the available risk information to determine whether these activities present similar risks. Roadways are subject to engineering specifications that generally specify CCR to be placed in a thin layer (e.g., six to 12 inches) under a road. The placement under the surface of the road limits the degree to which rainwater can influence the leaching of the CCR.

There are also significant differences between the manner in which roadways and landfills can potentially impact groundwater. These include the nature of mixing in the media, the leaching patterns, and how input infiltration rates are generated. First, CCR landfills are typically a homogenously mixed system, and as a result, there are no spatial variations of the chemical and physical properties of the media (for example, bulk density, hydraulic conductivity and contaminant concentration). By contrast, roadways are generally constructed of several layers with different material properties (heterogeneity). This difference affects the hydraulic conductivity of a mass of CCR in a landfill, as compared to CCR placed in an embankment. Any potential leaching will tend to spread over the length of the embankment, as opposed to the leaching in a downward motion that would occur in a homogenously filled landfill.

Finally, (and perhaps most critically) the construction of roads and associated embankments are supervised and approved by State and/or Federal Department of Transportation (DOT) engineers who ensure compliance with engineering specifications

While EPA is exempting roadbed applications of 12,400 tons or larger from the fourth criterion, EPA is mindful of situations where large quantities of CCR have been used without appropriate engineering controls or where placement on the land has apparently far exceeded those necessary for the engineering use of the materials. One such situation occurred in Puerto Rico with CCR generated by the AES Coal Fired Power Plant in Guayama. As discussed in Unit IV.B of this document, CCR and an aggregate created from them (“AGREMAX”) were being used as fill in housing developments and in road projects. Over two million tons of this material was used between 2004 and 2012. When made aware of the situation, EPA raised concerns over the use of CCR and AGREMAX based on the fact that the Environmental Quality Board had not imposed engineering controls, specified appropriate uses, or otherwise limited the use of AGREMAX by the end users. Inspections of some of the sites where the material had been placed showed use in residential areas, areas close to wetlands and surface waters and/or over shallow sole source drinking water aquifers. In addition, in some cases the volumes appeared to be in excess of what was necessary for engineering uses and some sites appeared to be abandoned. This kind of situation will be directly addressed by the new beneficial use criteria promulgated in the final rule. To qualify as a beneficial use, the use of AGREMAX would need to meet all four of the criteria—that is, it must provide a functional benefit, substitute for a virgin material, meet product specifications, and in this case, the user would be required to make the environmental demonstration for the non-roadbed applications.

iii. Kinds of unencapsulated uses of CCR required to comply with the fourth criterion.

Unencapsulated uses of CCR are numerous and range, in total use, from hundreds of thousands of tons to millions of tons per year. These applications include, as examples, the following: (1) Flowable fill; (2) structural fills; (3) soil modification/stabilization; (4) waste stabilization/solidification; (5) use in agriculture as a soil amendment; and (6) aggregate.

Many of these unencapsulated uses, other than structural fills, are not generally expected to be used in amounts that would require an environmental demonstration under the fourth criterion. And for several of these applications, which can be structurally very different from landfills, EPA expects that even if these applications are used in amounts greater than 12,400 tons, potential users will be easily able to meet the performance standard. For example, the use of CCR for soil modification or stabilization, agriculture, waste stabilization/solidification, aggregate or flowable fill applications, is generally not similar to the mounding that occurs in a landfill situation. These differences can have a tremendous bearing on the leaching potential of the CCR materials.

Structural fills, however, can be larger applications and so may be required to demonstrate compliance with the environmental standards in the fourth criterion more frequently. In addition, because structural fills can be similar to the landfills regulated in the final disposal rule, some proposed applications may need to install engineering features to meet the performance standard.

iv. Demonstration that “environmental releases to groundwater, surface water, soil and air are comparable to or lower than those from analogous products made without CCR, or that environmental releases to groundwater, surface water, soil and air will be at or below relevant regulatory and health-based benchmarks for human and ecological receptors during use.” Start Printed Page 21354

The environmental fourth criterion requires a potential use of CCR to compare analogous products or to perform an environmental assessment evaluating whether releases to the environment are at or below relevant regulatory and health-based benchmarks for human and ecological receptors during use. A demonstration should consider the development of a conceptual model to assist in the determination of whether the environmental criteria contained in the definition of the term “beneficial use of CCR” can be demonstrated. Numerous potential pathways exist and these should be evaluated as necessary depending on the potential application of the CCR. Potential exposure pathways include exposure to groundwater, surface water, air, and soils. Generation of dust, leaching to groundwater and surface water, inhalation of mercury, and plant uptake are areas that need to be evaluated. A complete evaluation of the types of releases, the types of exposure and the receptors that may be potentially affected by a potential application will need to be conducted. A screening comparison will need to be performed comparing the concentrations of individual constituents of potential concern to the following benchmarks: human soil ingestion, ecological soil, tap water ingestion, fish ingestion, surface water, sediment, and inhalation. As an example, a user could compare a mercury concentration to a human health screening benchmark with an inhalation value of 300 ng/m3. Existing documents that can be used to gain an understanding of conceptual models, pathways and regulatory limits include: Risk Assessment Guidance for Superfund, Exposure Factors Handbook, Volumes I, II and III, Risk Assessment Guidance for Superfund Volume I: Human Health Evaluation Manual Part A, Industrial Waste Management Model (IWEM) Technical Backgrounds Document, Exposure Factors Handbook, Human and Ecological Risk Assessment of Coal Combustion Wastes. In addition, although it is not directly applicable, a potential user of unencapsulated CCR may find it useful to consult the previously mentioned “Coal Combustion Residual Beneficial Use Evaluation: Fly Ash Concrete and FGD Gypsum Wallboard” and the “Methodology for Evaluating Encapsulated Beneficial Uses of Coal Combustion Residuals” to assist in the determination of whether the unencapsulated CCR is comparable to or lower than those from analogous products made without CCR, or that environmental releases to groundwater, surface water, soil and air will be at or below relevant regulatory and health-based benchmarks for human and ecological receptors during use.

After the effective date of the final rule, any potential user of CCR that makes the demonstration in the fourth criterion must keep records and provide such documentation upon request.

b. Placement in Sand and Gravel Pits and Quarries

EPA proposed that, without exception, unencapsulated CCR placed in sand and gravel pits, and quarries should not constitute beneficial use, but disposal. The Agency highlighted a number of damage cases that involved the filling of old, unlined quarries or gravel pits with large quantities of unencapsulated CCR, under the guise of “beneficial use.” Because of the damage cases and the concern that in such instances, sand and gravel pits and quarries were essentially operating as landfills, EPA proposed to define the placement of CCR in sand and gravel pits or quarries as land disposal that would be subject to regulation under either of the proposed regulatory options. The proposal specifically defined a CCR landfill as a disposal facility or part of a facility where CCR are placed in or on land and which is not a land treatment facility, a surface impoundment, an underground injection well, a salt dome formation, a salt bed formation, an underground mine, a cave, or a corrective action management unit. For purposes of this part, landfills also include piles, sand and gravel pits, quarries, and/or large scale fill operations. Sites that are excavated so that more coal ash can be used as fill are also considered CCR landfills.

Commenters stated that there were numerous examples of harm caused by the unencapsulated “reuse” in sand and gravel pits and quarries, which demonstrate that these unencapsulated uses were merely disposal in disguise, and must be regulated stringently under Subtitle C of RCRA to prevent the risks they pose of contaminating groundwater, surface water, and ecological systems with heavy metals and other harmful pollutants. In particular, they argue that “There have already been at least 13 damage cases caused by the disposal of coal ash in sand and gravel pits or former quarries that led to contamination of water sources and/or ecological damages.” Some commenters also agreed that placement in sand and gravel pits and quarries should not be considered beneficial use. For example, one commenter agreed that CCR placement in sand and gravel pits and quarries is “disposal” and not beneficial use while another commenter wrote that it concurs that large-scale fills in quarries in poorly engineered applications can cause negative impacts. Other commenters highlighted that damage cases related to sand and gravel pits and quarries were old practices that no longer take place. These commenters argued that while sand and gravel quarries have been used to dispose of CCR, it is not correct to assume that with proper engineering and environmental standards that CCR cannot be used beneficially to reclaim quarries for uses such as recreational areas, commercial or industrial uses, or to aesthetically improve the characteristics of the land.

EPA is finalizing its proposal that placement of CCR in sand and gravel pits constitutes disposal, rather than beneficial use. The final definition of a CCR landfill explicitly includes placement of CCR in sand and gravel pits and quarries. EPA has adopted this approach because the practice has resulted in numerous damage cases as a result of the highly permeable strata typically present at such sites. Moreover, while the commenters may be correct that “with proper engineering measures, placement in sand and gravel pits and quarries can be conducted safely”, they submitted no data to support this contention. The only engineering features the available information demonstrate would be protective are those that have been determined to be necessary for CCR landfills—i.e., composite liners and groundwater monitoring. And in the absence of these features, any future placement in sand and gravel pits and quarries could not meet the performance standard in the fourth criterion: i.e., that environmental releases to groundwater, surface water, soil and air will be at or below relevant regulatory and health-based benchmarks for human and ecological receptors during use.

B. Definitions

EPA proposed definitions for a number of key terms used in the proposed subtitle D rule that the Agency determined were necessary for the proper interpretation of the proposed requirements, e.g., coal combustion residuals, existing CCR landfill. (See 75 FR 35196-97, June 21, 2010.) In addition, EPA also proposed definitions for terms that were specific to certain regulatory requirements, e.g., seismic impact zone.Start Printed Page 21355

EPA is finalizing many of the regulatory definitions that were proposed, some with modifications. Several definitions that were proposed have been removed because they are no longer relevant to this rulemaking and a number of new definitions have been added. Specifically, definitions that have been removed from the final rule include: natural water table, probable maximum precipitation, surface water, systemic toxicants and upstream toe. New definitions are discussed in the technical section of the rule for which they apply. The majority of the regulatory definitions contained in the proposed rule have been retained in the final rule, as proposed or with minor clarifying changes. These definitions are codified in § 257.53 and include the following: acre foot, active life, aquifer, area capacity curves, areas susceptible to mass movement, coal combustion residuals (CCR), displacement, facility, factor of safety, fault, freeboard, groundwater, hazard potential classification, high hazard potential surface impoundment, significant hazard potential surface impoundment, low hazard potential surface impoundment, holocene, hydraulic conductivity, karst terrain, lithified earth material, maximum horizontal acceleration in lithified earth material, new CCR landfill, new CCR surface impoundment, operator, owner, poor foundation conditions, recognized and generally accepted good engineering practices, representative sample, run-off, run-on, sand and gravel pit or quarry, seismic impact zone, state, structural components, unstable area, uppermost aquifer, and waste boundary.

Several definitions received a significant number of comments and upon further evaluation by EPA have been modified to better explain their meaning or intent. This includes the definitions for the following terms: CCR landfill or landfill, CCR surface impoundment or impoundment, existing CCR landfill and existing CCR surface impoundment. These comments, along with the revisions made in response are discussed in more detail below. In addition, EPA has revised a number of definitions, or added new definitions, to be consistent with revisions made in the corresponding technical requirements. These are discussed in the various sections of the preamble that address the specific technical requirement. For example, as discussed in Unit V of this document, EPA has revised the definition of “independent registered professional engineer or hydrologist” to “qualified professional engineer” to address the concerns raised in comments.

1. Definition of CCR Landfill

EPA proposed to define a CCR landfill as a disposal facility or part of a facility where CCR is placed in or on land and which is not a land treatment facility, a surface impoundment, an underground injection well, a salt dome formation, a salt bed formation, an underground mine, a cave, or a corrective action management unit. For purposes of this subpart, landfills also include piles, sand and gravel pits, quarries, and/or large scale fill operations. Sites that are excavated so that more coal ash can be used as fill are also considered CCR landfills. (See 75 FR 35239.) The Agency received a significant number of comments on the proposed definition. These comments focused almost exclusively on the inclusion of “large-scale fill operations” and “piles” within the definition of CCR landfill. Regarding large-scale fills, commenters argued that one of the fundamental problems with the proposed definition was that it assumed all CCR placed in large scale fill operations constituted “disposal” of CCR (and that these operations therefore constitute CCR landfills) rather than beneficial use. Commenters further argued that CCR is often used in engineered fills, such as road base and road embankments and that these legitimate beneficial use operations should not be subject to the CCR landfill regulations.

Commenters also argued that “piles” should be omitted from the definition of a CCR landfill for a variety of reasons. Several commenters argued that including the word “pile” was overly broad and insufficiently prescriptive and would inappropriately capture on-going or short-term CCR management activities that did not constitute disposal, such as storage for beneficial use. These commenters also raised concern that including “piles” in the definition of CCR landfill without further clarification or specificity, i.e., when used as part of a beneficial use operation, would negatively affect beneficial use activities. Other commenters raised concern that the term “piles” was too vague, and suggested that whether piles were treated as CCR landfills should be determined by the size of the piles, or the intent for which such piles exist. These commenters suggested the Agency should exclude small piles of CCR that are staged and/or consolidated prior to transport or placement for disposal. These commenters argued that subjecting all CCR piles to all of the landfill requirements was “illogical and inappropriate.”

Certain commenters argued that piles should not be regulated under this rule because they do not present a significant risk to the environment, as evidenced by a lack of damage cases. Alternately, other commenters suggested that if EPA were to regulate piles, the Agency should consider a regulatory strategy other than regulation as a CCR landfill. One alternative regulatory strategy suggested was to include an option establishing a limit (e.g., 180 days) on the amount of time that the CCR could be allowed to be maintained in a pile without regulation as a CCR landfill. Another option suggested was to develop a set of reasonable design and operating standards consistent with the uses and risks posed by piles. Such design standards could include the requirement for a low permeability underlayment or base such as asphalt, concrete or a high density polyethylene (HDPE) liner. Operating standards could include such provisions as labeling, and the requirement to remove at least 90 percent of the contents every 90 days, with a full cleanout annually.

EPA believes the suggested option to establish a time limit would be difficult to oversee and verify. States and citizens would have no way to determine when CCR is placed in a pile and when the CCR was subsequently removed. Therefore, EPA is rejecting this suggested option. The suggested option to develop appropriate design and operating standards is essentially the approach EPA has adopted, as discussed in more detail below. However, the final design and operating standards differ according to the management practices, and include measures to control fugitive dust, and for certain practices, require the installation of a composite liner and leachate collection system.

EPA discussed its final approach to large-scale fill operations in Unit V of this document; the definition of a CCR landfill has been revised to be consistent with the approach described in that section. As explained at length, EPA has adopted a final approach that distinguishes between beneficial use and the “disposal” of CCR. Activities that meet the definition of beneficial use are not subject to these regulations. Activities that do not meet all of the criteria in the definition of a beneficial use—and in particular, such activities that involve the placement of unencapsulated CCR on the land—are considered disposal and are subject to the requirements of this final rule. Consistent with this approach the final definition of a CCR landfill has been revised to clarify that it includes “the Start Printed Page 21356use of CCR that does not meet the definition of a beneficial use of CCR.” Waste piles, including those used to temporarily store or manage CCR on-site prior to disposal in a CCR landfill or subsequent beneficial use, have been retained within the definition of a CCR landfill. In making this determination the Agency was strongly influenced by the similarities in the potential risks posed by both waste piles and CCR landfills to human health, groundwater resources, or the air if improperly managed. Both CCR piles and CCR landfills are subject to external factors such as rain and wind, which can adversely affect human health and the environment. For example, uncontrolled run-on and run-off can result in ponding of water in and around the unit resulting in increased leachate which has the potential to affect groundwater. Similarly, absent dust control measures, such as the conditioning of CCR, both CCR landfills and CCR piles have the potential to generate significant amount of fugitive dust. Indeed, CCR piles are generally more susceptible to the creation of fugitive dusts. And contrary to the commenters' contention about the absence of damage cases, the single most frequent issue presented during the public hearings was the allegation by individual citizens of damage caused by fugitive dusts from neighboring CCR facilities. Moreover, the same pollution control measures, such as liners, leachate collection systems, and groundwater monitoring, will address the potential adverse effects from both of these units. As such, the Agency sees no reason to treat piles and landfills differently.

EPA also disagrees that the inclusion of CCR piles would capture on-going or short-term CCR management activities that do not constitute disposal. Irrespective of whether the facility is using the pile as “temporary storage” or ultimately intends to direct the CCR to beneficial use, by placing the CCR on the land with no containment or other method of preventing environmental exposures, the facility is engaging in an activity that clearly falls within the statutory definition of disposal. See 42 U.S.C. 6903(3)(“placing of solid waste . . . on any land, so that such solid waste . . . or any constituent thereof may enter the environment.”) Moreover, even where the facility intends the pile to be “temporary,” some amount of CCR inevitably remains in place. And if this was not the case, under section 1008(a)(3), EPA is authorized to establish criteria governing all aspects of solid waste management—which explicitly is defined to include “storage” as well as all of the other activities identified by the commenters—to ensure the protection of human health and the environment. See 42 U.S.C. 6903(28).

Nevertheless, EPA agrees that not every activity that involves the management of CCR must occur in a unit that meets all of the technical requirements of a CCR landfill (e.g., groundwater monitoring). The key concern EPA is seeking to address with the inclusion of piles is the uncontrolled exposure from the extended, repeated, or indefinite placement of large amounts of unconsolidated CCR directly on the land. To the extent those exposures are controlled, whether through the use of tanks or some other kind of containment measures, the practice is neither considered to be a “pile” nor disposal in a landfill.

To clarify this, and in response to the concern that the term “piles” was too vague, EPA has adopted a definition of the term “CCR pile” to identify those “piles” that are subject to the disposal requirements in this regulation. The final regulation specifies that a CCR pile means any non-containerized accumulation of solid, non-flowing CCR that is placed on the land. This definition mirrors the existing definition of “waste pile or pile” from the part 257 regulations, (i.e., the regulations that currently apply to CCR facilities), as well as the definition in part 260. The use of the phrase “non-containerized” is not intended to require that all activities occur within tanks or containment structures, but merely that specific measures have been adopted to control exposures to human health and the environment. This could include placement of the CCR on an impervious base such as asphalt, concrete, or a geomembrane; leachate and run-off collection; and walls or wind barriers. CCR managed in such a fashion would not be CCR piles and, therefore, not CCR landfills subject to this regulation. To further clarify how this relates to EPA's overall approach to beneficial use it is important to distinguish between CCR that is actually being used beneficially and CCR that may someday be used beneficially. CCR that is currently being used beneficially—for example, fly ash that has been transferred to a cement manufacturer and that is stored off-site in a “temporary pile,” and that complies with all of the criteria in the definition to be considered a beneficial use including the fourth criterion relating to the placement of large quantities of unconsolidated CCR on the land—would not be subject to the regulations applicable to CCR disposal. Accordingly, the final regulation specifies that practices that meet the definition of beneficial use of CCR are not subject to the `disposal” requirements of the rule.

By contrast, CCR located on-site that may someday be used beneficially but is not yet beneficially used remains subject to the disposal rule. Given that landfills and surface impoundments can be periodically dredged to provide material for beneficial use, any other approach would be impracticable, and would exclude from regulation many of the greatest sources of risk. An example of a “pile” that is not yet beneficially used is unconsolidated CCR placed on the land, that have been designated by the CCR facility to be transferred to another location for subsequent beneficial use (e.g., use as road bed) in the near future.

Several commenters also suggested that the definition of a CCR landfill should explicitly exclude the use of CCR at surface coal mining and reclamation operations, to reflect the Agency's intention not to cover such activities. The Agency agrees and has revised the definition to explicitly provide that the term CCR landfill does not include the use of CCR at coal mining and reclamation operations.

Consequently, the Agency is finalizing a definition of “CCR landfill or landfill” that can be found in § 257.73. On a related matter, the definition of CCR landfill or landfill contains the terms “sand and gravel pits or quarries.” EPA proposed a “sand and gravel pit and/or quarry” to mean an excavation for the commercial extraction of aggregate for use in construction projects. The Agency received comments on the definition of sand and gravel pit and/or quarry suggesting that the term “commercial extraction” was too narrow. Specifically commenters were concerned it would exclude non-commercial extraction, such as gravel pits operated by municipalities, and exclude metallic mineral mines, nonmetallic mining for other than sand and gravel, and coal mines. EPA agrees that the use of the term “commercial extraction” renders the proposed definition too narrow, as there is no basis for distinguishing between commercial and non-commercial extraction, either because of the risks these activities pose, or any other consideration relevant to this rulemaking. EPA is, therefore, revising “sand and gravel pit and/or quarry” to mean an excavation for the extraction of aggregate, minerals, or metals. The term sand and gravel pit and/or quarry does not include subsurface or surface coal mines.Start Printed Page 21357

2. Definition of CCR Surface Impoundment

EPA proposed to define a CCR surface impoundment to mean a facility or part of a facility which is a natural topographic depression, man-made excavation, or diked area formed primarily of earthen materials (although it may be lined with man-made materials) which is designed to hold an accumulation of CCR containing free liquids, and which is not an injection well. Examples of CCR surface impoundments are holding, storage, settling, and aeration pits, ponds and lagoons. CCR surface impoundments are used to receive CCR that have been sluiced (flushed or mixed with water to facilitate movement), or wastes from wet air pollution control devices, often in addition to other solid wastes.

The Agency received many comments on the proposed definition of CCR surface impoundment. The majority of commenters argued that the definition was overly broad and would inappropriately capture surface impoundments that are not designed to hold an accumulation of CCR. Commenters were concerned that the proposed definition could be interpreted to include downstream secondary and tertiary surface impoundments, such as polishing, cooling, wastewater and holding ponds that receive only de minimis amounts of CCR. Commenters reasoned that these types of units in no practical or technical sense could be described as units “used to receive CCR that has been sluiced.”

Other commenters raised concern that the definition did not differentiate between temporary and permanent surface impoundments. Commenters stated that many facilities rely on short-term processing and storage before moving CCR off-site for beneficial use or permanent disposal and that these units should not be required to comply with all of the technical criteria required for more permanent disposal impoundments.

Upon further evaluation of the comments, the Agency has amended the definition of CCR surface impoundment to clarify the types of units that are covered by the rule. After reviewing the comments, EPA reviewed the risk assessment and the damage cases to determine the characteristics of the surface impoundments that are the source of the risks the rule seeks to address. Specifically, these are units that contain a large amount of CCR managed with water, under a hydraulic head that promotes the rapid leaching of contaminants. These risks do not differ materially according to the management activity (i.e., whether it was “treatment,” “storage” or “disposal”) that occurred in the unit, or whether the facility someday intended to divert the CCR to beneficial use. However, EPA agrees with commenters that units containing only truly “de minimis” levels of CCR are unlikely to present the significant risks this rule is intended to address.

EPA has therefore revised the definition to provide that a CCR surface impoundment as defined in this rule must meet three criteria: (1) The unit is a natural topographic depression, man-made excavation or diked area; (2) the unit is designed to hold an accumulation of CCR and liquid; and (3) the unit treats, stores or disposes of CCR. These criteria correspond to the units that are the source of the significant risks covered by this rule, and are consistent with the proposed rule. EPA agrees with commenters that relying solely on the criterion from the proposed rule that the unit be designed to accumulate CCR could inadvertently capture units that present significantly lower risks, such as process water or cooling water ponds, because, although they will accumulate any trace amounts of CCR that are present, they will not contain the significant quantities that give rise to the risks modeled in EPA's assessment. By contrast, units that are designed to hold an accumulation of CCR and in which treatment, storage, or disposal occurs will contain substantial amounts of CCR and consequently are a potentially significant source of contaminants. However, EPA disagrees that impoundments used for “short-term processing and storage” should not be required to comply with all of the technical criteria applicable to CCR surface impoundments. By “short-term,” the commenters mean that some portion of the CCR is removed from the unit; however, in EPA's experience these units are never completely dredged free of CCR. But however much is present at any given time, over the lifetime of these “temporary” units, large quantities of CCR impounded with water under a hydraulic head will be managed for extended periods of time. This gives rise to the conditions that both promote the leaching of contaminants from the CCR and are responsible for the static and dynamic loadings that create the potential for structural instability. These units therefore pose the same risks of releases due to structural instability and of leachate contaminating ground or surface water as the units in which CCR are “permanently” disposed.

The final definition makes extremely clear the impoundments that are covered by the rule, so an owner or operator will be able to easily discern whether a particular unit is a CCR surface impoundment. CCR surface impoundments do not include units generally referred to as cooling water ponds, process water ponds, wastewater treatment ponds, storm water holding ponds, or aeration ponds. These units are not designed to hold an accumulation of CCR, and in fact, do not generally contain significant amounts of CCR. Treatment, storage, or disposal of accumulated CCR also does not occur in these units. Conversely, a constructed primary settling pond that receives sluiced CCR directly from the electric utility would meet the definition of a CCR surface impoundment because it meets all three criteria of the definition: It is a man-made excavation and it is designed to hold an accumulation of CCR (i.e., directly sluiced CCR). It also engages in the treatment of CCR through its settling operation. The CCR may be subsequently dredged for disposal or beneficial use elsewhere, or it may be permanently disposed within the unit. Similarly, secondary or tertiary impoundments that receive wet CCR or liquid with significant amounts of CCR from a preceding impoundment (i.e., from a primary impoundment in the case of a secondary impoundment, or from a secondary impoundment in the case of a tertiary impoundment), even if they are ultimately dredged for land disposal elsewhere are also considered CCR surface impoundments and are covered by the rule. To illustrate further, consider a diked area in which wet CCR is accumulated for future transport to a CCR landfill or beneficial use. The unit is accumulating CCR, while allowing for the evaporation or removal of liquid (no free liquids) to facilitate transport to a CCR landfill or for beneficial use. In this instance, the unit again meets all three definition criteria, it is a diked area (i.e., there is an embankment), it is accumulating CCR for ultimate disposal or beneficial use; and it is removing any free liquids, (i.e., treatment). As such, this unit would meet the definition of CCR surface impoundment. In all of these examples significant quantities of CCR are impounded with water under a hydraulic head that will be managed for extended periods of time. This gives rise to the conditions that both promote the leaching of contaminants from the CCR and are responsible for the static and dynamic loadings that create the potential for structural instability. These units therefore all pose the same risks of Start Printed Page 21358releases due to structural instability and of leachate contaminating ground or surface water.

3. Definition of Existing CCR Landfill

EPA proposed to define an existing CCR landfill to mean a CCR landfill which was in operation on, or for which construction commenced prior to the effective date of the final rule. The proposed definition specified that a CCR landfill has commenced construction if the owner or operator has obtained the federal, state, and local approvals or permits necessary to begin physical construction; and either: (1) A continuous on-site, physical construction program has begun; or (2) the owner or operator has entered into contractual obligations—which cannot be cancelled or modified without substantial loss—for physical construction of the CCR landfill to be completed within a reasonable time.

In response to the proposed definition, the Agency received several comments arguing that the use of the phrase “was in operation on, or for which construction commenced prior to” would lead to confusion. Commenters contended that most units defined as CCR landfills at some point in time “were in operation” and had “commenced construction” prior to the effective date of the regulation. Commenters claimed that this definition would unnecessarily capture thousands of closed structural fill projects, including residential properties, commercial properties used by small businesses, and many recreational facilities. Furthermore, commenters doubted that EPA intended for the rule to cover all of these units and urged the Agency to clarify that closed units are excluded from the definition of existing CCR landfill.

Other commenters argued that the proposed definition of existing CCR landfill should be modified to include lateral expansions of operation units where such an expansion is within the site footprint of an area already approved and permitted by the state for the landfill. Commenters contended that while the proposed definition included undeveloped areas within the footprint of an approved permitted site, it also required that the construction be initiated at the site or that some type of binding contractual obligation be present. Commenters contended that the existence of a contractual obligation unfairly subjects undeveloped, yet approved permitted areas to design and operating standards for new CCR landfills based merely on the existence of a contract to commence construction. Commenters argued that such a distinction was arbitrary and capricious and provided no practical benefit. Other commenters questioned the usefulness of requiring a contractual obligation at all. As written, the commenters argued, that the definition was vague, unenforceable, and thus, not protective of human health and the environment. Commenters reasoned that there was no definitive or generally accepted meaning for the term “substantial loss” or the term “reasonable time” and an owner or operator, sensing that these proposed rules may be passed, could sign a contract now with minimum predetermined cancellation or modification penalties and a contract term of say five years or even longer to avoid the new unit requirements, i.e., a composite liner.

The commenters are correct that EPA did not intend to cover inactive landfills under this rule. The Agency agrees that, as drafted, the proposed definition could cause confusion. EPA therefore deleted the phrase “was in operation on the effective date of the rule” and has substituted the phrase “that receives CCR both before and after [the effective date of the rule].” EPA also agrees that the phrase “commenced construction prior to the effective date of the rule” could similarly cause confusion. Therefore, the Agency has made a similar revision, by adding the phrase “and receives CCR on or after [the effective date of the rule]” after the phrase “for which construction commenced prior to [the effective date of the rule].” These revisions will clarify which units are covered by the technical requirement of the rule and alleviate any confusion. EPA is also making conforming modifications to the definition of existing CCR surface impoundment.

EPA disagrees that lateral expansions should be considered to be “existing” based solely on the fact that such an expansion is within the site footprint of an area already approved and permitted by the state. EPA has frequently distinguished between the types of requirements applicable to new and existing units, reasoning that in many instances, risk mitigation measures would be adequate such that existing units need not wholly retrofit to meet the new “state of the art.” For new units, however, the balance is generally struck in favor of requiring a greater degree of risk prevention, rather than relying solely on risk mitigation measures. In determining whether a unit is “new” or “existing,” EPA has historically considered that the equities lie in favor of considering a unit to be “existing” when there has been an irretrievable commitment of resources on the part of the facility. That has not occurred merely because permits have been obtained. While admittedly resources have been committed, at this stage modifications to the design and construction of the unit are still feasible. Specifically, the critical differences between the requirements applicable to new and existing CCR landfills are the type of liner that must be installed and the location restrictions that apply. Compliance with these requirements can be addressed through modifications to the design and construction of the unit, and are therefore readily feasible until construction has begun.

EPA agrees with those commenters who were concerned that the phrase, “the owner or operator has entered into contractual obligations—which cannot be cancelled or modified without substantial loss—for physical construction of the CCR landfill to be completed within a reasonable time,” is vague and potentially subject to abuse. While this phrase has been included in other EPA regulations, those regulations operate within a regulatory program overseen by a regulatory authority. No similar guarantee exists under these regulations. EPA could not discover a definitive or generally accepted meaning for the terms “substantial loss” or “reasonable time,” or develop sufficiently objective and determinate criteria for these concepts. Consequently, the Agency has decided to remove this provision from the definition of existing CCR landfill. EPA is retaining the two most important elements of the definition that will effectively determine whether the facility has irretrievably committed resources such that it would not reasonable to require compliance with all of the requirements applicable to new units. Accordingly, a unit will be considered to be existing if, first, the owner or operator has obtained the federal, state, and local approvals or permits necessary to begin physical construction; and second, that a continuous on-site, physical construction program has begun (i.e., groundbreaking has occurred). Therefore, EPA is finalizing the definition of existing CCR landfill that can be found in § 257.53.

4. Definition of Existing CCR Surface Impoundment

EPA proposed to define an existing CCR surface impoundment to mean a surface impoundment which was in operation on, or for which construction commenced prior to the effective date of the final rule. The proposal also specified that a CCR surface impoundment has commenced Start Printed Page 21359construction if the owner or operator has obtained the federal, state, and local approvals or permits necessary to begin physical construction; and either: (1) A continuous on-site, physical construction program has begun; or (2) the owner or operator has entered into contractual obligations—which cannot be cancelled or modified without substantial loss—for physical construction of the CCR landfill to be completed within a reasonable time.

EPA received many of the same comments on the definition of an existing CCR surface impoundment that were received on an existing CCR landfill. This included comments requesting clarification that the term did not include impoundments that had ceased receiving CCR before the effective date of the rule. Commenters also suggested that EPA modify the definition to include the phrase that the surface impoundment “was in operation and had not yet ceased receiving CCR prior to the effective date of the rule” to make clear that the definition did not encompass units that are no longer receiving CCR on the effective date of the rule, even though the unit may not have completed final closure prior to the rule's effective date. Commenters reasoned that units no longer receiving CCR on the effective date of the rule are not “in operation” and therefore should not be subject to the standards applicable to active units. Commenters also requested that EPA clarify that the definition of “existing CCR surface impoundment” include units that were in operation on the effective date of the rule and that periodically dredged out during the operating life of the impoundment. Commenters contended that while this may seem self-evident, EPA needed to clarify that these impoundments would not be characterized as “new CCR surface impoundments.”

The Agency is generally conforming the definition of an existing CCR surface impoundment to the revised definition of an existing CCR landfill. Although inactive CCR surface impoundments are covered by the final rule (unlike inactive CCR landfills), EPA decided it would provide greater clarity to establish a section specific to inactive CCR surface impoundments rather than merely including such units within the definition of an existing CCR surface impoundment. As discussed in greater detail in Unit VI.A of this document, under § 257.100, any CCR surface impoundment that continues to impound CCR and water after the effective date of the rule, must either (1) breach, dewater, and place a cover on the unit within three years or (2) must comply with all of the requirements applicable to existing CCR surface impoundments. Without the need to account for inactive CCR surface impoundments within the definition, the definitions of “existing” landfills and surface impoundments should be the same.

Thus, the Agency has removed the term “in operation” from the definition and has instead focused on when the surface impoundment received or will receive CCR. EPA has also deleted the provision that would have allowed a unit to be considered to be “existing” based on the existence of a contract. Accordingly, for purposes of this rule, a CCR surface impoundment will be considered to be “existing” if the unit received CCR both before and after the effective date of the rule. For example, if a CCR surface impoundment received CCR prior to the effective date and was in the process of dredging on the effective date with the intent of receiving additional CCR after the effective date, the unit would still be considered to be an “existing” rather than a new unit. Conversely, if a unit received CCR prior to the effective date and was no longer receiving CCR, this unit would be considered “inactive,” and would only be subject to the technical criteria applicable to “existing” CCR surface impoundments if they had not completed closure within three years. Similarly, if a CCR surface impoundment had commenced construction prior to the effective date with the intention of receiving CCR on or after the effective date of the rule, the unit would be considered an “existing” unit only if the physical construction program had begun (e.g., groundbreaking had occurred) with the appropriate federal, state and local approvals or permits in place. But if prior to the effective date of the rule, the permits had been obtained but the physical construction of the unit had not begun (e.g., groundbreaking had not occurred), the unit would be considered “new” and would be subject to all the applicable technical criteria for new CCR surface impoundments. Therefore, the Agency is finalizing the definition of existing CCR surface impoundment that can be found in § 257.53.

C. Location Restrictions and Individual Location Requirements

In the proposed rule, EPA stated that any RCRA subtitle D regulation would need to ensure that CCR landfills, CCR surface impoundments and all lateral expansions were appropriately sited to ensure that no reasonable probability of adverse effects on health or the environment from the disposal of CCR would occur. Under the subtitle D option, EPA proposed location restrictions for CCR units which included requirements relating to the placement of CCR in five general locations: (1) Above the natural water table; (2) wetlands; (3) fault areas; (4) seismic impact zones; and (5) unstable areas. The proposed requirements relied in large measure, on the record EPA developed to support the 40 CFR part 258 requirements for MSWLFs and on EPA's Guide for Industrial Waste Management (EPA530-R-03-001, February 2003). EPA also chose to add one additional location restriction that would ban the placement of CCR units within two feet of the upper limit of the natural water table. This proposed requirement was originally included in the proposed rule, Standards for the Management of Cement Kiln Dust (64 FR 45631, August 20, 1999) because of the potential damage to groundwater caused by the management of cement kiln dust at sites located below the natural water table. While the proposed cement kiln dust rule has not yet been finalized, EPA extended this reasoning to CCR by applying the same location restriction to CCR units. The proposed applicability of these location requirements varied depending on whether the unit was an existing or new CCR landfill, an existing or new CCR surface impoundment, or a lateral expansion of such units. For example, for existing CCR landfills, the Agency proposed that only the location requirement for unstable areas would apply. By contrast, the proposed rule applied all of the location restrictions to new CCR landfills and all CCR surface impoundments, both existing and new—an approach consistent with RCRA subtitle C and Congressional distinctions between the risks presented by landfills and surface impoundments. (See 75 FR 35198-35199.) This meant that owners or operators would need to close existing CCR surface impoundments located less than two feet above the natural water table, or for existing CCR units in sensitive but not prohibited locations, make a technical demonstration that the unit met the requirements of a performance standard that serves as the alternative to the location restriction, retrofit the unit so that it could meet the performance standard, or close. For those CCR units that need to close (i.e., owners or operators that could not make the necessary technical demonstrations), EPA proposed that the unit must close within five years of the effective date of the rule. If closure could not occur within the five year timeframe, the Start Printed Page 21360Agency proposed allowing for a case-by-case extension for up to two more years if the facility demonstrated that there was no alternative disposal capacity and no immediate threat to health or the environment.

EPA proposed not to impose all of the location requirements on existing CCR landfills based on the conclusion that CCR landfills pose less risk and are structurally less vulnerable than existing CCR surface impoundments. EPA also raised concern that a significant number of these CCR landfills could be located in areas subject to these requirements, (particularly wetlands), which could cause disposal capacity shortfalls in certain regions of the U.S., if existing CCR landfills in these locations were required to close. Disposal capacity shortfalls can pose significant environmental and public health concerns based on the potential for significant disruption of solid waste management state-wide from the closure of these units. EPA concluded that these risks would be greater than the potential risks from allowing existing CCR landfills to remain in these locations, given that these units would be subject to all of the design and operating requirements of the rule. To ensure the accuracy of its preliminary conclusions, the Agency requested commenters to provide any available information regarding the number of existing CCR landfills located in these sensitive areas. The Agency also sought information regarding the extent to which CCR landfill capacity would be affected by applying all of the location restrictions to existing CCR landfills, the extent to which facilities could comply with the proposed performance standards, and the costs that would be incurred to retrofit existing CCR landfills to meet these standards.

The Agency received numerous comments in response to the Agency's request for additional information regarding the extent to which landfill capacity would be affected by applying all the proposed subtitle D location restrictions to existing CCR landfills. Commenters generally agreed with the Agency that applying the other location restrictions to existing CCR landfills would cause a significant decrease in disposal capacity across the country, although they did not provide any data or information which would support this concern. Commenters noted, however, that if existing CCR landfills located in these areas were to close, it would greatly complicate operations at many utilities. Affected facilities would need to find additional disposal capacity, which would require utilities to procure new real estate on which to site a new CCR landfill (which may be a significant distance from a power plant), obtain a new disposal permit for the CCR landfill (which can take an extended period of time), and potentially transport significant volumes of CCR great distances to newly-permitted facilities. Commenters argued that there was simply no environmental basis for causing this level of disruption to utility CCR disposal practices.

EPA received no data or information in response to the Agency's request for the costs associated with retrofitting a CCR surface impoundment or CCR landfill to meet the demonstrations for existing units. Similarly, the Agency received little to no information in response to EPA's request for additional information on the location of these facilities. Some commenters acknowledged that specific states were located in some of these restricted areas but did not provide specific information on specific units.

Overwhelmingly, the issue receiving the most comment was EPA's intention to subject existing CCR surface impoundments to all of the new location criteria. Commenters contended that subjecting existing units to all of the location criteria was a radical departure from the location restriction provisions of the existing MSWLF rules on which the subtitle D option is based (i.e., existing MSWLFs are only subject to the floodplains and unstable areas restrictions) without any justification for regulating CCR surface impoundments more stringently than existing CCR landfills. Commenters argued that EPA must demonstrate that there are increased risks posed by each CCR surface impoundments based on its location; otherwise, they claimed, there was no justification for EPA to subject CCR surface impoundments to more stringent location restrictions. Some commenters suggested that a more reasonable approach would be to limit the restrictions for existing CCR surface impoundments to unstable areas, consistent with the approach proposed for existing CCR landfills. Finally, commenters raised concern about the inconsistency between the preamble language and the corresponding regulatory text. Specifically, the preamble stated EPA's intention to apply all of the location criteria to all CCR surface impoundments (existing and new) while the proposed regulatory language applied all location criteria only to new CCR surface impoundments and lateral expansions.

1. Applicability of the Location Criteria to Existing CCR Surface Impoundments

EPA acknowledges the discrepancies between the preamble language and the regulatory text regarding the proposed regulatory language for the location restrictions as it applies to existing CCR surface impoundments. In the proposed rule, the regulatory language should have included, “all surface impoundments” as opposed to only “new surface impoundments.”

EPA disagrees that in order to justify national minimum standards applicable to existing CCR surface impoundments, the Agency must demonstrate an adverse impact to human health and the environment from each individual unit, based on the specific risks posed at each location. As an initial matter, it is well established that an agency may regulate a class of similarly situated entities through rulemaking, rather than on the basis of an individualized assessment of every entity that will be subject to the rule. And indeed, Congress specifically directed EPA to proceed by rulemaking to establish minimum national standards under RCRA sections 1008(a) and 4004(a). Moreover, section 4004(a) does not require a demonstration of actual impacts, merely that these units present an unacceptable risk of harm. Thus, it is sufficient for EPA to establish a factual record demonstrating that the specific location restrictions in the final rule are necessary for CCR units (landfills and surface impoundments), as a class, to ensure that there will be no reasonable probability of adverse effects on health or the environment. As discussed in greater detail in the next section and in Unit X of the preamble, the factual record supports the need for all of the location standards for existing CCR surface impoundments imposed by this rule.

The Agency also rejects the suggestion that EPA establish the same location restrictions for both existing CCR landfills and CCR surface impoundments. As laid out in the proposal and elsewhere in this final rule in greater detail, the risks associated with CCR surface impoundments are substantially higher than the risks associated with CCR landfills, by approximately an order of magnitude. Surface impoundments are utilized by 45 percent of coal-fired power plants and in 2000 accounted for disposal of one-third of all CCR generated.[46] Unlike landfills, CCR surface impoundments Start Printed Page 21361contain slurried residuals that remain in contact with ponded waters until closure. In a statewide investigation of impacts to groundwater quality from CCR disposal sites, the Wisconsin Department of Natural Resources reported that closed sites which originally contained sluiced coal-combustion residuals displayed extremely elevated mean arsenic levels (as high as 364 µg/l).[47] The highest contaminant concentrations in the study were associated with sluiced CCR residuals. In addition, releases of toxic contaminants to surface water and groundwater from mostly unlined CCR surface impoundments and ponds are a relevant factor in 34 of 40 cases of proven damage to the environment (as well as in several cases of “potential” damage to the environment) from mismanagement of CCR.[48] In many of these cases, effluent discharges from the surface impoundments caused significant ecological damage to aquatic life in nearby streams and wetlands. In one case, in 2002, the structural stability of a CCR surface impoundment was directly compromised by sinkhole development, leading to the release of 2.25 million gallons of CCR slurry. In another, an unusually weak foundation of ash and silt beneath a CCR surface impoundment (i.e., man-made unstable ground) was identified as one of several likely factors contributing to the dike failure that in 2008 resulted in the largest CCR spill in United States history.

Unlike RCRA subtitle C, subtitle D does not explicitly authorize EPA to establish different standards for existing and new units, and Congress specifically intended subtitle D to address the risks from existing, abandoned “open dumps.” In the proposed rule preamble, EPA explained the rationale for applying these provisions to existing CCR surface impoundments, and the commenters have submitted nothing to rebut that rationale. Thus, EPA maintains its determination that application of the location standards to existing CCR surface impoundments is necessary to achieve the standard in section 4004(a). Absent these location restrictions, the risk of impacts to human health and the environment from releases from CCR units, including from the rapid and catastrophic destruction of CCR surface impoundments, sited in these sensitive areas would exceed acceptable levels. Given that the risks associated with CCR surface impoundments are substantially higher than the risks posed by CCR landfills, this is the appropriate regulatory course for existing CCR surface impoundments.

In this rule, EPA is finalizing location restrictions that will ensure that CCR units are appropriately sited, that the structure of the CCR unit will not be adversely impacted by conditions at the site, and that overall there will be “no reasonable probability of harm to human health or the environment” due to the location of the CCR unit. EPA is finalizing different sets of location restrictions depending on whether the unit is a CCR landfill or CCR surface impoundment and whether it is an existing or new unit. Lateral expansions fall within the definitions of new units and are treated accordingly. These standards provide minimum national siting and performance criteria for all CCR units. The location restrictions under § 257.60 through § 257.64 include: (1) Placement above the uppermost aquifer; (2) wetlands; (3) fault areas; (4) seismic impact zones; and (5) unstable areas. Each of these locations is generally recognized as having the potential to impact the structure of any disposal unit negatively and as such, increase the risks to human health or the environment through structural failures or leaching of contaminants into the groundwater. Under the final rule and as proposed, new CCR landfills, existing and new CCR surface impoundments, and all lateral expansions will be required to comply with all of the location restrictions. Existing CCR landfills however, will be subject to only two of the location restrictions—floodplains, and unstable areas. As noted in the proposed rule, and restated here, existing landfills and surface impoundments are already subject to the location standards in subpart A of 40 CFR part 257 for floodplains, endangered species and surface waters. The final rule does not change this requirement, and so facilities should already be in compliance. The Agency is finalizing, as proposed, the unstable area location restriction for existing CCR landfills because the record clearly shows that failure of CCR units in these areas (e.g., due to instabilities in Karst terrains) have and in all likelihood would continue, in the absence of the restrictions in the final rule, to result in damage caused by the release of CCR constituents, affecting both groundwater and surface waters. As the Agency stated in the proposed rule, the impacts resulting from the failure of CCR units from location instability are of far more concern than any disposal capacity concerns resulting from the closure of existing CCR units in unstable areas.

Conversely, and also consistent with the proposed rule, EPA is not applying the following location restrictions to existing CCR landfills: The requirement to construct a unit with a base located no less than 1.52 meters (five feet) above the upper limit of the uppermost aquifer, as well as the siting restrictions applicable to wetlands, fault areas, and seismic impact areas. Existing CCR landfills pose lower risks and are structurally less vulnerable than existing CCR surface impoundments. In addition, disposal capacity shortfalls, which could result if existing CCR landfills in these locations were required to close, raise greater environmental and public health concerns than the potential failure of the CCR landfills in these locales.

2. Placement Above the Uppermost Aquifer

Under § 257.60(a) EPA is requiring new CCR landfills, existing and new CCR surface impoundments and all lateral expansions to be constructed with a base that is located no less than 1.52 meters (five feet) above the uppermost aquifer, or to demonstrate that there will not be an intermittent, recurring, or sustained hydraulic connection between any portion of the base of the CCR unit and the uppermost aquifer due to normal fluctuations in groundwater elevations (including groundwater elevations during the wet season). Existing surface impoundments that fail to achieve this standard must close. New CCR landfills, new CCR surface impoundments and all lateral expansions of existing and new CCR landfills and CCR surface impoundments cannot be constructed unless they meet one of these two standards. In response to comment, the Agency has modified the criteria in two ways. First, EPA has replaced “a base that is located a minimum of two feet above the upper limit of the natural water table” with “a base no less than 1.52 meters (five feet) above the uppermost aquifer.” EPA received comment explaining that fluctuations in groundwater levels in many geological settings can exceed ten feet over the course of the year, and alleging that the proposed two foot minimum buffer between the base of the unit and the top of the water table would therefore be insufficiently protective. The Start Printed Page 21362commenter recommended that the minimum vertical separation be at least three to five feet from the base of the liner components. After additional research, EPA is finalizing a minimum buffer of five feet instead of two feet. EPA's research confirmed the commenter's claims. In addition, EPA determined that several states consider five feet between the base of the surface impoundment and the top of the uppermost aquifer to be the minimum distance that is protective of human health and the environment. These are California, Michigan, Nebraska, New York, West Virginia, and Wisconsin. The Agency has concluded from geographic and climatic spacing of these states that the hydrogeologic conditions within them encompass the range of conditions found in the United States. Therefore, EPA is finalizing a minimum buffer of five feet instead of two feet.

EPA is also clarifying the definition of the natural water table. As some commenters noted, there are many factors (hydrologic and geologic settings, nearby pumping, etc.) that influence the location of the groundwater table making it difficult to determine the “natural” level. In addition, as noted, local site-specific hydrogeologic conditions within the aquifer may cause the natural groundwater table to exceed five feet and vary as much as ten feet. To account for the possibility of such large seasonal fluctuations, EPA is revising the definition of “uppermost aquifer” to specify that the measurement of the upper limit of the aquifer must be made at a point nearest to the natural ground surface to which the aquifer rises during the wet season. This definition of “uppermost aquifer” will encompass large seasonal variations, and is a more appropriate parameter than “seasonal high groundwater table” as suggested by several commenters and the proposed “natural water table” because it is more clearly defined.

In § 257.60(a) the term uppermost aquifer has the same definition as under the general provisions of § 257.40: The geologic formation nearest the natural ground surface that is an aquifer, as well as lower aquifers that are hydraulically interconnected with this aquifer within the facility's property boundary. This definition includes a shallow, deep, perched, confined or unconfined aquifer, provided it yields usable water. Although EPA originally proposed that all CCR surface impoundments be located “. . . . above the upper limit of the natural water table”, the Agency is amending this requirement and replacing “water table” with “uppermost aquifer” to make it consistent with the way natural underground water sources are described elsewhere in the rule. EPA made a second revision to the criteria that were originally proposed. As an alternative to requiring that the CCR units described in this section be constructed with a base that is located no less than five feet above the uppermost aquifer, owners and operators may instead demonstrate that there will not be an intermittent, recurring, or sustained hydraulic connection between any portion of the base of the CCR unit and the uppermost aquifer due to normal fluctuations in groundwater elevations (including groundwater elevations during the wet season).

This alternative standard was developed in response to concerns from commenters that a single depth to the aquifer failed to account for the wide variations in the level of water table fluctuations in different regions of the country. For example, arid regions of the country, such as Arizona, under normal conditions generally do not experience the same degree of fluctuations in groundwater elevations as more temperate regions, such as Minnesota. Accordingly, EPA developed an alternative performance standard focused on the conditions identified in the damage cases and the risk assessment that this location criterion was designed to prevent: Specifically, where the groundwater elevation is high enough to intersect the base of the waste management unit. In such situations, this hydraulic connection can enhance the transport of contaminants of concern from the CCR unit into groundwater. By requiring owners and operators to ensure that these conditions do not occur, the alternative standard to allow owners and operators to account for situations where there are relatively small variations in groundwater levels and a buffer of five feet is not necessary. This will also ensure that a CCR unit need not address situations where an infrequent, unexpected event (e.g., hurricane) could cause a brief, temporary condition where the uppermost aquifer rises to less than the prescribed five feet but which would not in and of itself constitute a long-term threat to the aquifer. However, where normal fluctuations in groundwater elevation (including, but not limited to, seasonal or temporal variations, groundwater withdrawal, mounding effects,[49] etc.) will result in the failure of the unit to meet the performance standard (i.e., no intermittent, recurring, or sustained hydraulic connection between the base of the CCR unit and the uppermost aquifer), the unit must close.

In some recent damage cases, placement of large volumes of CCR into highly permeable strata in the disposal area promoted CCR-water interactions. For example, from 1995 to 2006 in Anne Arundel County, Maryland 4.6 million tons of CCR were placed directly in two sand and gravel quarries without a geomembrane liner or leachate collection system. Rainwater infiltration into exposed CCR coupled with groundwater-CCR interactions and the transmissivity characteristics of local strata contributed to rapid migration of heavy metals, including antimony, arsenic, cadmium, nickel, and thallium to residential drinking water wells located near the mine pits and significant deterioration of water quality as a result of placement of CCR. Similarly, from 1980 to 1997 in Lansing, Michigan, around 0.5 million tons of coal ash was dumped for disposal into a gravel pit with an elevated water table. A remedial investigation has established that groundwater mounding has immersed the CCR into the upper aquifer resulting in on-site exceedances of groundwater quality protection standards for sulfate, manganese, lead, selenium, lithium, and boron. Placement of CCR into un-engineered, unlined units in permeable strata has plainly led to adverse impacts to groundwater. The phrase “normal fluctuations” has been used to clarify that EPA does not intend for the facility to account for extraordinary or highly aberrant conditions (e.g., one-in-a million or “freak” events). Normal fluctuation can include those resulting from natural as well as anthropogenic sources. Natural sources that could affect groundwater levels include, but are not limited to precipitation, run-off, and high river levels. Anthropogenic sources that could affect groundwater levels include groundwater withdrawal, pumping, well(s) abandonment, and groundwater mounding. In satisfying this location restriction, it may be necessary for a professional engineer to model these effects before he can make the necessary certifications.[50] EPA also Start Printed Page 21363notes that this modeling may include the same considerations already evaluated under some state programs.[51] EPA expects that owners and operators will have sufficient information to determine whether their CCR unit meets either performance standard. Most, if not all, of this information would be information a facility would typically have as part of normal operations (e.g., the depth of the CCR unit itself), or that will be developed as part of implementing other rule requirements. For example, through the groundwater monitoring system required under §§ 257.90-257.98, the facility can obtain water level measurements in a sufficient number of locations (e.g., monitoring wells, piezometers) to use in determining whether they satisfy either performance standard. Similarly, under § 257.91 a thorough characterization of the geology and hydrogeology of the site must be conducted. Finally, EPA notes that available technology and guidance are available for using existing groundwater monitoring wells, like those required under this final rule, to measure groundwater levels.[52]

3. Wetlands

In § 257.61 of this rule, EPA is finalizing the regulatory text essentially as proposed. Specifically, EPA is adopting a prohibition on locating all CCR surface impoundments and new CCR landfills, as well as lateral expansions of existing CCR units, in wetlands as defined in 40 CFR 232.2, absent specific demonstrations made by the owner or operator that ensure the CCR unit will not degrade sensitive wetland ecosystems. These provisions place the burden of proof for these demonstrations directly on the owner or operator (the discharger). The owner or operator must make the results of these demonstrations available in the facility record. Failure to make any of the demonstrations will bar siting of the CCR unit in a wetland.

In 2003, disposal of CCR in natural or man-made aquatic basins accounted for nearly one-third of all CCR land disposal. Historically, aquatic disposal of CCR has been attractive economically to facilities because of its lower overall cost relative to dry management and the ease of handling of residuals. During aquatic disposal, CCR is commonly piped as a slurried mixture to surface impoundments designed to retain the solids in contact with water for the life of the unit. Particulate solids from the waste stream gravitationally settle while clarified waters ultimately discharge into nearby streams and wetlands.

The term `wetlands' refers to those areas inundated or saturated by surface or groundwater at a frequency and over a duration sufficient to support a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands include marshes, swamps, bogs and similar areas that are commonly located between open water and dry land. Under the CWA, wetlands are considered 'special aquatic sites' deserving of special protection because of their ecologic significance. Wetlands are very important, fragile ecosystems that must be protected, and EPA has long identified wetlands protection as a high priority.

Undisturbed, natural wetlands provide many benefits to society by improving water quality, providing essential breeding, rearing, and feeding grounds for fish and wildlife, reducing shoreline erosion, and absorbing flooding waters and pollution. Wetlands are also commercial source areas of products for human use such as timber, fish, and shellfish. Recreational hunters harvest wetland-dependent waterfowl. Wetland environments, however, may be adversely impacted by releases of wastes from co-located industrial facilities. Wetland ecosystems can be degraded by accidental discharges that can change the habitat value for fish and wildlife by obstructing surface water circulation patterns, altering substrate elevation, dewatering, or permanent flooding.

In support of the provisions finalized in this rule, EPA is citing several damage cases, including 30 cases of “proven” damage to the environment that involve aquatic disposal of CCR, 14 of which involve impacts to wetlands from release of CCR. For example, at the Hyco Reservoir in Roxboro, North Carolina from 1966 to 1990 the lake received contaminated effluent from coal ash disposal basins that were authorized by National Pollutant Discharge Elimination System (NPDES) permits under the CWA. High levels of the trace element selenium bioaccumulated in aquatic food chains (phytoplankton), poisoning invertebrates and fish in the lake, particularly species of sport fish (bluegill, largemouth bass), causing reproductive failure and severe declines in fish populations in the late 1970's and early 1980's. Consequently, from 1988-2001 the North Carolina Department of Health and Human Services (NCDHHS) issued a consumption restriction advisory for selenium contamination in fish from the reservoir. In 1990, a dry ash handling system was implemented resulting in lower selenium discharge and reduced mean selenium concentration in reservoir waters. As of 2005, concentrations of selenium in fish tissues remained above a toxic threshold even with reduced influx of selenium, due to migration of the element from contaminated sediments to benthic food chains. The total monetized value of damage can be divided among ecologic factors (e.g., major impacts on fish), recreational factors (e.g., fishing trips not taken), depreciated real estate values, aesthetic factors, and human health damages (e.g., losses due to stress and anxiety from knowing ecosystem is poisoned) and is estimated at $877 million.[53]

Although this consideration is not relevant for purposes of establishing the minimum national criteria under RCRA sections 1008(a) and 4004(a), the rulemaking record demonstrates that the monetary cost of environmental damage from releases of CCR at surface impoundments could be considerable. A report on the environmental damage caused by releases of CCR at 22 sites estimates the total cost of poisoned fish and wildlife at the surface impoundment sites at $2.32 billion. At twelve of these sites the releases were legally permitted under the CWA. Five of the 22 cases were caused by structural failures, two resulted from an unpermitted discharge, and one was from a landfill.[54] Effluent contaminated with coal combustion residues is directly linked with high loadings of toxic metals in the discharge areas of aquatic basins, where some metals (primarily arsenic, cadmium, chromium, copper, lead, and selenium) have accumulated in aquatic food chains.[55] In a research overview (literature synthesis) on the environmental effects of disposal of CCR, Rowe et al. (2002) listed adverse biological responses, including histopathological, behavioral, and physiological (reproductive, energetic, and endocrinological) effects, that have been observed in some vertebrates and invertebrates following exposure to and bioaccumulation of CCR-related contaminants.

Under the criteria finalized in this rule, in order to locate a CCR unit or Start Printed Page 21364lateral expansion in a wetland, the owner or operator must: (1) Successfully rebut the presumption that an alternative site (i.e., one that does not involve a wetland) is reasonably available for the CCR unit or lateral expansion; (2) show that the construction or operation of the unit will not cause or contribute to violations of any applicable state water quality standard, violate any applicable toxic effluent standard or prohibition, jeopardize the continued existence of endangered or threatened species or critical habitats, or violate any requirement for protection of a marine sanctuary; (3) show that the CCR unit or lateral expansion will not cause or contribute to significant degradation of wetlands; and (4) demonstrate that steps have been taken to attempt to achieve no net loss of wetlands.

In addition to these requirements, other federal laws may be applicable in siting a CCR unit in a wetland. These include: Sections 401, 402, and 404 of the CWA; the Rivers and Harbors Act of 1989; the National Environmental Policy Act; the Migratory Bird Conservation Act; the Fish and Wildlife Coordination Act; the Coastal Zone Management Act; the Wild and Scenic Rivers Act; and the National Historic Preservation Act. In addition, the use of a wetlands location for a CCR unit may require a permit from the U.S. Army Corps of Engineers. To the extent these are applicable, compliance with these RCRA criteria does not alleviate the need to comply with these other federal requirements, and the owner or operator of the facility remains responsible for ensuring compliance with all applicable federal and state requirements.

The rule adopts a regulatory presumption that a less damaging alternative to locating a disposal unit in a wetland exists, unless the owner or operator can demonstrate otherwise. Thus, when proposing to locate a new facility or lateral expansion in a wetland, owners and operators must be able to demonstrate that alternative sites are not available and that the impact to wetlands is unavoidable. If this presumption is not clearly rebutted, then the CCR unit may not be sited in a wetland location. Such an analysis necessarily includes a review of reasonable alternatives to locating or laterally expanding CCR units in wetlands. As part of the evaluation of reasonable (that is, available and feasible) alternatives the owner or operator must show, and a qualified professional engineer must verify, that operation or construction of the CCR unit will not: (1) Violate any applicable state water quality standards; (2) cause or contribute to the violation of any applicable toxic effluent standard or prohibition; (3) cause or contribute to violation of any requirement for the protection of a marine sanctuary; and jeopardize the continued existence of endangered or threatened species or critical habitats.

When evaluating the impacts of a CCR unit on a wetland, the owner or operator must ensure that the unit cannot cause or contribute to significant wetland degradation. Therefore, the owner or operator and the qualified professional engineer must: (1) Verify the integrity of the CCR unit, and its ability to protect ecological resources by addressing the erosion, stability, and migration potential of native wetland soils, and dredged and fill materials used to support the unit; (2) verify that the design and operation of the CCR unit minimizes impacts on fish, wildlife, and other aquatic resources and their habitat(s) from any release of coal combustion residuals; (3) evaluate the effects of catastrophic release of CCR to the wetland and the resulting impacts on the environment; and (4) verify that ecological resources in the wetland are sufficiently protected, including consideration of the volume and chemistry of the CCR managed in the unit; and any additional factors, as necessary.

When a wetland functions properly, it provides water quality protection, fish and wildlife habitat, natural floodwater storage, and reduction in the erosive potential of surface water. A degraded wetland is less able to effectively perform these functions. For this reason, wetland degradation is as big a problem as outright wetland loss, though often more difficult to identify and quantify. Any change in hydrology can significantly alter the soil chemistry and plant and animal communities. The common hydrologic alterations that can lead to significant degradation in wetland areas include: (1) Deposition of fill material, including CCR; (2) drainage for development; (3) dredging and stream channelization for development; (4) diking and damming to form ponds or impoundments; (5) diversion of CCR-bearing waters or other flows to or from wetlands; (6) addition of impervious surfaces in the watershed, thereby increasing water and CCR-bearing run-off into wetlands. These activities can mobilize CCR-bearing sediment; and once the sediment is discharged into the environment, toxic metals in CCR can become available to organisms within the wetland. Consequently, while the mere presence of one or more of these activities does not necessarily demonstrate that the CCR unit causes or contributes to significant degradation, the fact that they may do so means these activities need to be carefully evaluated.

In determining what constitutes “significant” degradation, it is important to understand that although wetlands are capable of absorbing pollutants from the surface water, there is a limit to their capacity to do so. For the purposes of this rule, the primary pollutants of concern are CCR-bearing sediment and toxic metals. Although the risk assessment did not assess the exposure and hazard to wetlands, these can originate from uncontrolled run-off from the facility, fugitive dust from uncovered CCR landfills and piles, and uncontrolled discharge from CCR units (landfills, waste piles, surface impoundments). A clear example of biologically significant degradation in wetlands is when these toxic metals accumulate in benthic and aquatic food chains as a result of uncontrolled runoff. Another is obrution (smothering) of benthic organisms from discharge(s) of CCR to surface water, thereby jeopardizing the continued existence of organisms or critical habitats within the wetland. EPA notes that there are other requirements established under this rule that can also be relevant in this context, as they have the potential to reduce the likelihood that facility operations will cause or contribute to significant wetland degradation. EPA anticipates that as the facility begins to implement all of the requirements under this rule, the facility will consider how modifications to facility operations to address one requirement can affect compliance with other requirements.

After consideration of these factors, if an existing CCR unit cannot meet all of the requirements in paragraphs (1)-(3) (i.e., if it causes or contributes to significant degradation, or if no reasonable alternative to locating a new CCR unit in wetlands is available), the facility can comply with the location criterion by compensatory steps that must be taken to achieve no net loss of wetlands (as defined by acreage and function). Owners or operators must first take measures to avoid impacts to wetlands. If potential impacts cannot be avoided, all reasonable steps are to be taken to minimize such impacts to the extent feasible. Appropriate measures (for example, engineered containment systems to control discharge of leachate or surface water run-off to wetlands) will likely be site-specific and should be incorporated into the design and operation of the CCR unit. Any remaining unavoidable impacts must be offset, or compensated for through all appropriate and feasible compensatory mitigation actions. This compensatory Start Printed Page 21365mitigation may take the form of restoration (re-establishment or rehabilitation of a wetland), establishment (creation of a man-made wetland where one did not previously exist), enhancement (improving one or more wetland functions), and preservation (permanent protection of important wetlands through implementation of appropriate legal and physical mechanisms). The functions and values of a wetland will vary based on any number of site specific characteristics, including location, wetland type, hydrology, degradation, and whether it is natural or constructed to treat waste. Strictly limited to the application of the wetlands location requirements under this rule, any assessment of the nature and extent of mitigation required under the CCR rule shall consider these kinds of characteristics, including wetlands designed for the treatment of CCR. The Agency recognizes that the function and value of a particular man-made wetland constructed to perform a wastewater treatment function may present a unique situation that may affect both the determination of whether the wetland is significantly degraded, and the nature and extent of any required compensatory mitigation. This discussion refers only to the wetlands-related requirements of this rule and does not affect any requirements or obligations under the Federal Water Pollution Control Act (33 U.S.C. 1251, et seq.) and its implementing regulations.

Although EPA is not finalizing an outright ban on siting of existing or new CCR units in wetlands, the Agency continues to believe that discharges to wetlands of pollutants that can be reasonably avoided should be avoided. Therefore, the amount and quality of compensatory mitigation may not substitute for avoiding and minimizing impacts. For purposes of this rule, EPA assumes CCR units that are designed to avoid discharge of CCR into wetlands have less adverse impact to the aquatic environment than CCR units that ultimately discharge such residuals in wetlands.

4. Fault Areas

In § 257.62 of this rule, EPA is banning the location of new CCR landfills, existing and new CCR surface impoundments, and all new lateral expansions within 60 meters (200 feet) of a fault that has had displacement in Holocene time, unless the owner or operator demonstrates that an alternative setback distance of less than 60 meters (200 feet) will prevent damage to the structural integrity of the unit. For existing surface impoundments, the demonstration is required only if the unit is located closer than 60 meters (200 feet) to an active Holocene fault. If a demonstration cannot be made, the existing surface impoundment must close. These requirements have been adopted with only minor changes from the proposal, and will minimize the risks associated with CCR units located in fault areas.

Stresses produced during earthquake motion can cause serious damage to landfill integrity via seismically induced ground failure and associated rupture of liner systems and subsequent damage to leachate collection systems. Or if the unit is unlined, seismic motion could disrupt landfill caps and foundation soils that impede migration of percolating water. Potential damage to CCR units resulting from structures located across a fault include surface breakage, cracks and fissures between fill and confining slopes, slope failure via landslides, liquefaction-induced lateral spreading and settlement of the pile, disruption of surface water and drainage control systems, and rupture of leachate collection systems. In impoundments, for example, interior dike failure and leakage, and rupture of multilayer liner systems would also be of concern. Failure of the leachate collection system may prevent removal of generated leachate, allowing it to pond on the liner. If the liner system is ruptured, this may create a pathway for leachate to migrate into and contaminate the uppermost aquifer. In addition to the potential damage to leachate collection and liner systems, the integrity of the landfill slopes could also be impaired by fault rupture, potentially exposing coal combustion residuals to surface run-off.

The best protection is to avoid locating new CCR landfills and all CCR surface impoundments across faults and fault zones subject to displacement. For new units or lateral expansions there is no need to construct units in these areas. For existing surface impoundments, the Agency has been unable to find any way to retrofit or engineer the unit to be protective. A setback distance of 60 meters (200 feet) from the outermost damage zone of a Holocene fault will provide an adequate margin of safety to protect the facility from displacements due to surface faulting and any associated damage because 60 meters typically covers the zone of deformation where the ground may be bent or warped as a consequence of fault movement. By including this as a siting requirement for new units the risk of rupture of the unit, including any liner and leachate collection systems, due to surface faulting will be minimized.

Observations of engineered landfill response during earthquake motion come primarily from California where field data have been reported from MSWLFs (including some meeting the current part 258 standards) affected by strong shaking from six major nearby earthquakes. In these large magnitude events (M ≥ 6.7), bedrock peak horizontal ground accelerations, an index of the intensity of earthquake motion, endured by the landfills were in excess of 0.3g. Engineered dry MSWLFs in California are reported to have performed well after strong earthquake motion (no documented incidence of an earthquake-induced release of contaminants harmful to human health or to the environment). Minor cracking of cover soils and breaking of vertical wells and headers were among the most common types of damage reported at MSWLFs subject to strong ground shaking. In the 1994 Northridge earthquake, only one landfill compliant with RCRA Part 258 standards experienced tears in a liner (a geomembrane liquid barrier): One tear 23 meters in length. However, there is little data on seismic stability and performance from industrial solid waste landfills with geosynthetic liners or units with water-saturated CCR waste. The Agency, therefore, remains concerned over the potential instability of engineered disposal units, and particularly CCR surface impoundments, under seismic loadings. Accordingly, EPA is prohibiting new CCR landfills, CCR surface impoundments, and any new extensions from sites located within an active fault zone, unless the owner or operator makes a demonstration, certified by a qualified professional engineer, that an alternative setback distance of less than 60 meters will prevent damage to the structural integrity of the unit.

EPA is clarifying its definition of fault to incorporate updated technical information.[56] Although a fault can be thought of as a simple planar surface across which there has been measurable displacement of one side relative to the other, field-based observations show fault architecture to often be complex. In the geologic literature faults developed in the upper crust are characterized as zones of brittle deformation composed of linked fault segments, with each segment composed of one or more subparallel, curved, or anastomosing fault cores nested within Start Printed Page 21366a damage zone. Some fault zones may contain broad deformational features such as pressure ridges and sags rather than clearly defined fault scarps or shear zones.[57] Fault cores are regions of high strain slip that have accommodated most of the displacement and are marked by mylonites, cataclastites, and gouge, whereas the damage zone is characterized by low strain structures mechanically related to the growth of the fault zone such as small faults, fractures, veins and folds. To avoid displacement that would damage unit integrity, it is best to restrict new CCR landfills and surface impoundments, and all new extensions, to locations no less than 60 meters from the outermost damage zone created by an active fault. Fault zones can range from one meter to several kilometers in width.

For purposes of this section, a fault is considered active if it has moved during Holocene time. Holocene time is defined as the geological epoch which began at the end of the Pleistocene, at 11,700 years BP (before present), and continues to the present. In the field, evidence for Holocene activity may be hard to obtain. Therefore, the Agency cautions that faults which show no evidence for Holocene activity may not necessarily be inactive.

To investigate active faults, EPA expects owners and operators of CCR units to follow standard engineering and geologic practices. Technical considerations include: (1) A geologic reconnaissance of the site to determine the location of active faults. Such a reconnaissance would include utilizing the seismic analysis maps and tools (Quaternary fault maps, earthquake probability maps) of the United States Geological Survey (USGS) Earthquake Hazards Program (http://earthquake.usgs.gov/​hazards/​apps/​); and (2) a site fault characterization within 1000 meters of a site to determine whether it is within 60 meters of an active fault. Such characterizations would include subsurface exploration, including drilling or trenching, to locate any fault zones and evidence of faulting, trenching perpendicular to any faults or lineaments found within 60 meters of the site, and determination of the age of any displacements. Based on this information, the qualified professional engineer would prepare a report that delineates the location of any active (Holocene) fault, including any damage zones, and the associated 60 meter setback. To take advantage of an alternative setback distance of less than 60 meters, the owner or operator must make a demonstration, certified by a qualified professional engineer, that the CCR landfill, surface impoundment, or lateral expansion has a foundation or base capable of providing support for the structure, and capable of withstanding hydraulic pressure gradients to prevent failure due to settlement, compression, or uplift, and all effects of ground motions resulting from at least the maximum surface acceleration expected from a probable earthquake.

5. Seismic Impact Zones

In § 257.63, EPA is adopting the provisions applicable to seismic impact zones, as proposed. The rule prohibits new CCR landfills, existing and new CCR surface impoundments and all lateral extensions from being located in seismic impact zones unless the owner or operator makes a demonstration, certified by a qualified professional engineer, that all containment structures, including liners, leachate collection systems, and surface water control systems, are designed to resist the maximum horizontal acceleration in lithified earth material from a probable earthquake. A Seismic impact zone means an area having a 2% or greater probability that the maximum expected horizontal acceleration, expressed as a percentage of the earth's gravitational pull (g), will exceed 0.10 g in 50 years. Seismic zones, which represent areas of the United States with the greatest seismic risk, are mapped by the U.S. Geological Survey and readily available for all the U.S. (http://earthquake.usgs.gov/​hazards/​apps/​).

Maximum Horizontal Acceleration in lithified earth material means the maximum expected horizontal acceleration at the ground surface as depicted on a seismic hazard map, with a 98% or greater probability that the acceleration will not be exceeded in 50 years, or the maximum expected horizontal acceleration based on a site-specific seismic risk assessment. This requirement translates to a 10% probability of exceeding the maximum horizontal acceleration in 250 years.

For units located in seismic impact zones, as part of any demonstration, owners and operators should include: (1) A determination of the expected peak ground acceleration from a maximum strength earthquake that could occur in the area; (2) a determination of the site-specific seismic hazards such as soil settlement; and (3) a facility design that is capable of withstanding the peak ground acceleration. Seismic designs broadly should include a response analysis to quantify the demands of earthquake motion on facility structures (i.e., landfills, surface impoundments, liners, covers, leachate collection systems, surface water handling systems), liquefaction analyses of both waste and foundation soils to evaluate stability under seismic loading, and a slope stability and deformation analyses. Design modifications to accommodate seismic risks should include use of conservative design factors, use of ductile materials, built-in redundancy for critical system components, and other measures capable of mitigating the potential for seismic upset.[58]

Following trends in earthquake engineering, seismic design criteria for new CCR landfills, new CCR surface impoundment and all lateral expansions should be based on a “withstand without discharge” standard.[59] EPA interprets the performance standard in this criterion (“designed to resist the maximum horizontal acceleration in lithified earth material from a probable earthquake”) to require any new CCR unit located in a seismic impact zone to be designed to withstand seismic motion from a credible earthquake without damage to the foundation or to the structures that control leachate, surface drainage, or erosion. In other words, the CCR unit must be able to withstand an expected earthquake without discharging waste or contaminants. The owner or operator must make a demonstration, certified by a qualified professional engineer, that the CCR unit has a foundation or base capable of providing support for the structure, and capable of withstanding hydraulic pressure gradients to prevent failure due to settlement, compression, or uplift and all effects of ground motions resulting from at least the maximum surface acceleration expected from a probable earthquake. In practice, the Agency recognizes that the CCR unit may sustain some limited damage during an earthquake, but ultimately, the CCR unit design must remain Start Printed Page 21367capable of preventing harmful release of CCR, leachate, and contaminants both during and after the seismic event.

6. Unstable Areas

EPA laid out its rationale for these requirements in the proposal at 75 FR 35201. No significant comments were received on either this rationale or the specific regulatory provisions. Consequently, EPA is adopting the regulatory text as proposed. Specifically, under § 257.64(a) new and existing CCR landfills, new and existing CCR surface impoundments and all lateral expansions are prohibited from sites classified as unstable areas unless the owner or operator makes a demonstration, certified by a qualified professional engineer, that engineering measures have been incorporated into the CCR unit's design to ensure that the structural components will not be disrupted. EPA considers a structural component to include any component used in the construction and operation of CCR landfill or CCR surface impoundment that is necessary to ensure the integrity of the unit and to ensure that the contents will not be released to the environment, including liners, leachate collection system, embankments, spillways, outlets, final covers, inflow design flood controls systems. Liners and leachate collection systems require a firm, secure foundation to maintain their integrity, and may be disrupted as a result of uneven settlement induced by hydrocompaction. Similarly, sudden differential movement resulting from CCR placement and the consequent exceedance of the weight-bearing strength of subsurface materials in unstable areas can destroy liners and damage the unit's structural integrity, resulting in catastrophic release of CCR. It is essential for the owner or operator of any CCR unit to extensively evaluate the adequacy of the subsurface foundation support for the structural components of the unit. Therefore, the Agency is making this demonstration mandatory for all CCR units; existing CCR units for which a demonstration cannot be made must be closed.

EPA has adopted the following definitions without material change from the proposal: Unstable area means a location that is susceptible to natural or human-induced events or forces capable of impairing the integrity of some or all of the structural components responsible for preventing releases from a CCR unit. Natural unstable areas include those areas that have poor soils for foundations, areas susceptible to mass movements, and karst terrains. Structural components mean liners, leachate collection systems, final covers, run-on/run-off systems, and any other component used in the construction and operation of a CCR unit. Poor foundation conditions means those areas where features exist which may result in inadequate foundation support for the structural components of a CCR unit. Areas susceptible to mass movement means those areas of influence (i.e., areas characterized as having an active or substantial possibility of mass movement) where the movement of earth material at, beneath, or adjacent to the CCR unit, because of natural or man-induced events, results in the downslope transport of soil and rock material by means of gravitational influence. Areas of mass movement include, but are not limited to, landslides, avalanches, debris slides and flows, solifluction, block sliding, and rock fall. Karst terrain means an area where karst topography, with its characteristic erosional surface and subterranean features, is developed as the result of dissolution of limestone, dolomite, or other soluble rock. Characteristic physiographic features present in karst terrains include, but are not limited to, dolines (sinkholes), vertical shafts, sinking streams, caves, seeps, large springs, and blind valleys.

The owner or operator must consider at a minimum, the following factors when determining whether an area is unstable: (1) On-site or local soil conditions that may result in significant differential settling; (2) on-site or local geologic or geomorphologic features; and (3) on-site or local human-made features or events (both surface and subsurface). To evaluate subsurface conditions for purposes of § 257.64(c)(3), EPA considers it essential that the owner or operator conduct a geotechnical site investigation, certified by a qualified professional engineer, to identify any potential thick layers of soil that are soft and compressible (e.g., loess, unconsolidated clays, wetland soils), which could cause a significant amount of post-construction differential settlement of foundation soils, adjacent embankments, and slopes unless improved. In addition, it is essential that the investigation identify on-site or local soil conditions that are conducive to downslope movement of soil, rock, and/or debris (alone or mixed with water) under the influence of gravity. Local topography, surface and subsurface soils, surface slope angles, surface drainage and run-off patterns, seepage patterns, rock mass orientations, joint patterns, fissures, and any other landscape factors that could influence downslope movement should be identified. Anthropogenic activities that could induce instability include mining, cut and fill activities during construction, excessive drawdown of groundwater, which may cause excessive settlement or bearing capacity failure of foundation soils, and use of an old landfill as the foundation for a new landfill without verification of complete settlement of the underlying wastes.

In designing a new CCR unit located in an unstable area, recognized and generally accepted good engineering practices dictate that a stability assessment should be conducted to prevent a destabilizing event from damaging the structural integrity of the component systems. For CCR units this involves three components: (1) An evaluation of subsurface conditions, (2) an analysis of slope stability, and (3) an examination of related design needs. In addition to explaining site constraints, identifying any soft soils, and recommending any appropriate ground improvement techniques, the assessment report should include a description of: The site, site geology; and investigative methodology; the results from all site investigations including subsurface exploration, field and laboratory tests, and test results; the subsurface profile, recommended foundation types, depths, and bearing capacities; the water content, grain-size distribution, shear strength, plasticity, and liquefaction potential of foundation soils and subsoils; and other foundation consolidation and settlement issues relevant to site development.

In addition to assessing the ability of soils and rocks to serve as a foundation, it is essential that the report also include a stability assessment of excavated sideslopes, aboveground embankments or dikes, and retaining structures. The slope stability analyses are performed as part of an evaluation of the design configuration under all potential hydraulic and loading conditions, including conditions that may exist during construction of a lateral or vertical expansion. As part of any demonstration, owners and operators should make an assessment, certified by a qualified professional engineer, that finalized site embankments and slopes are able to maintain a stable condition. In addition to evaluating the potential for post-construction differential settlement, the stability assessment should also consider seepage-induced saturation and softening of soils, particularly at CCR surface impoundments and CCR landfill sites that manage effluent.

Engineering considerations for CCR landfills and lateral expansions located in unstable areas are expected to be Start Printed Page 21368similar to those for MSWLFs, which can be found in EPA's 1993 Technical Manual on Solid Waste Disposal Facility Criteria (EPA530-R-93-017). For surface impoundments the relevant design criteria are found in the Agency's 1991 Technical Resource Document on Design, Construction and Operation of Hazardous and Non-Hazardous Waste Surface Impoundments (EPA/530/SW-91/054). Any stability assessment should consider the following: (1) The adequacy of the subsurface exploration program; (2) the liquefaction potential of the embankment, slopes and foundation soils; (3) the expected behavior of the embankment slopes, and foundation soils when they are subjected to seismic activity; (4) the potential for seepage-induced failure; and (5) the potential for differential settlement.

For facilities in areas of karst, to support the demonstration required under the regulations, the owner or operator would need to evaluate the subsurface conditions to ensure that the unit is located away from the influence of potential sinkholes. For areas where the solution-weathered limestone is close to the surface (e.g., Florida) recognized and generally accepted good engineering practices dictate that there must be no conduits beneath the CCR unit that allow piping of groundwater into the karst aquifer, or shallow caves that could cause sudden collapse of the unit foundation. Where unconsolidated sediments cover underlying limestone, piping is commonly marked by paleosinks where sands and clays from the overburden have filled solution cavities in the underlying limestone.[60] Local hydraulic gradients in paleosinks typically point downward. EPA generally expects the potential for sinkhole development to be minimal at locations in karst areas where there are no paleosinks, or historical record of sinkhole development, and where there are no local hydraulic gradients that point downward.

In making a demonstration, it is important for owners and operators of CCR landfills and surface impoundments in karst areas to adequately characterize subsurface conditions. Karst hydrogeology is complex, since contaminant flows can occur along paths and networks that are discreet and tortuous, and groundwater monitoring wells must be capable of detecting any contaminants released from the CCR unit into the karst aquifer. Therefore, the owner or operator will need to ensure, with verification by a qualified professional engineer, that monitoring wells installed in accordance with § 257.91 will intercept these pathways. Verification will usually necessitate the use of tracers to track groundwater flow towards offsite seeps or springs from the uppermost aquifer beneath the facility.

Any engineered solution employed to mitigate weak ground strength in karst areas must be able to prevent the kind of foundation collapse and settlement that could lead to sudden release to the environment of CCR with its toxic constituents and associated leachate. Solution cavities present at the site should be filled with grout or other suitable stiff material to avoid further crumbling and erosion. Where necessary, CCR unit foundations could be reinforced with engineered ground supports such as concrete footings that bridge voids. Larger caverns could be filled with concrete to underpin the CCR unit foundation by transferring load to the cavern floor. However, such engineered solutions are complex and costly, and the best protection is not to site CCR landfills and surface impoundments in karst areas. Nevertheless, this rule does not ban the location of CCR landfills, surface impoundments, or lateral extensions in karst areas.

7. Closure of Existing CCR Landfills and Existing CCR Surface Impoundments

The final provisions of § 257.60 require owners or operators of an existing CCR surface impoundment to demonstrate that the unit meets the minimum requirements for placement above the uppermost aquifer (i.e., constructed with a base located no less than 1.52 meters (five feet) above the upper limit of the uppermost aquifer) no later than 42 months after the date of publication of this rule in the Federal Register.

Owners and operators of existing CCR surface impoundments subject to §§ 257.61-257.64 of this rule and existing CCR landfills subject to § 257.64, must complete demonstrations by the date corresponding to 42 months from publication of this rule. The Agency is setting the compliance deadline at 42 months to allow owners and operators time to complete the requisite studies (e.g., to adequately characterize seasonal variations in the elevation of the top of the uppermost aquifer) and to complete any engineering measures necessary to allow the CCR unit to meet the performance standards. If closure is warranted, it must be initiated no later than 48 months from publication of this rule. Closure and post-closure care must be done in accordance with §§ 257.100-103; which allow certain regulatory flexibilities provided specific conditions are met.

D. Design Criteria—Liner Design

EPA proposed that existing CCR landfills without a composite liner could continue to operate and receive CCR without violating the open dumping prohibition. Conversely, EPA proposed that existing CCR surface impoundments would be required to retrofit with a composite liner system, as defined in the proposed rule, within five years of the effective date of the rule or to close. EPA also proposed that all new CCR units must be constructed with a composite liner and leachate collection and removal system.

In the proposal, EPA defined a composite liner to mean a liner system consisting of two components; the upper component consisting of a minimum 30-mil flexible membrane liner (FML), and the lower component consisting of at least a two-foot layer of compacted soil with a hydraulic conductivity of no more than 1 × 10−7 cm/sec.[61] FML components consisting of high density polyethylene (HDPE) were required to be at least 60-mil thick; and the FML component was required to be installed in direct and uniform contact with the compacted soil component.

EPA solicited comment on a number of issues, including: (1) Whether EPA should allow facilities to use an alternative design for new CCR units; (2) whether clay liners designed to meet a 1 × 10−7 cm/sec hydraulic conductivity might perform differently in practice than modeled in the risk assessment, including a request for specific data on the hydraulic conductivity of clay liners associated with CCR units; and (3) whether the effectiveness of such additives as organosilanes, would allow the use of these additives in lieu of composite liners. (See 75 FR 35203 and 35222.) [62] With respect to the last two issues, the Agency received little comment. However, in response to the use of alternative liner designs in lieu of a composite liner (as defined in the rule), significant comment was received. Commenters advocated for a number of alternative composite liner designs, with a majority recommending that a Start Printed Page 21369geosynthetic clay liner (GCL) be allowed as an alternative to the lower component of the composite liner. Other commenters stated that GCLs alone should be allowed as an alternative to the proposed composite liner. Still others argued that alternative liner designs, such as an FML/FML [63] provided a level of performance similar to the proposed composite liner system and should be allowed. Conversely, there were also comments opposing the use of any alternative liners, claiming that alternatives have not been proven to be effective.

EPA also received significant comment on the actual design of the composite liner system proposed by the Agency as it pertained to CCR surface impoundments (see 75 FR 35202-35203).[64] Commenters argued that the proposed requirement for a leachate collection and removal system in a CCR surface impoundment was illogical since it would have to be constructed between the lower component (two feet of compacted soil) and upper component (flexible membrane liner) and the proposed rule specifically states that the flexible membrane liner component must be installed in direct and uniform contact with the compacted soil component. Commenters reasoned that the inclusion of a leachate collection and removal system between the upper and lower components precluded direct and uniform contact between the two components and that placing a leachate collection and removal system between the lower and upper components of a composite liner would compromise the integrity of the composite liner. With regard to this last point, the Agency has reviewed the requirements for a proposed composite liner system as it would pertain to CCR surface impoundments and agrees that the leachate collection and removal system requirements proposed for CCR surface impoundments would be counterproductive; EPA proposed this requirement in error. The integrity of the composite liner system is indeed dependent upon the direct and uniform contact of the upper GM component with the lower soil component. The proposed requirement for CCR surface impoundments to construct a leachate collection system between the FML and soil components would prevent the direct and uniform contact of the upper and lower components and, therefore, compromise the integrity of the composite liner. For this reason, EPA is not requiring a leachate collection and removal system for new surface impoundments or any lateral expansion of a CCR surface impoundment.

While EPA agrees with those commenters arguing that new CCR units should only be installed with a composite liner system of some kind, the Agency has concluded that not all alternative designs for a composite liner system should necessarily be rejected as insufficiently protective. Many commenters provided strong and compelling evidence that the specific composite liner system described in the proposed rule was not always feasible or necessary to protect groundwater resources and that alternate composite liner designs could be equally protective, and may be a necessity in many areas of the country where soil with the appropriate hydraulic conductivity may not be available (e.g., Alaska).[65]

In re-evaluating the proposed requirement for a composite liner system, EPA was influenced by a number of factors.[66] First, the data provided by commenters showing the performance of a GM/GCL design. Second, EPA's own studies showing that a GM/GCL liner can be constructed to achieve hydraulic efficiencies in the range of 99 to 99.9% which meets or exceeds the hydraulic performance of a GM/compacted clay liner (CCL) design.[67] In addition, these high efficiencies demonstrate that the GCL component of a GM/GCL composite liner is at least as effective in impeding leakage through holes in the GM component of the composite liner system as a CCL with a hydraulic conductivity no more than 1 × 10−7 cm/sec.[68] In fact, EPA has developed guidance for the selection and installation of various types of liners including a GM/GCL.[69] And third, EPA was influenced by the many comments arguing that a “one-size-fits all” approach to liner design stifles design innovation and regulatory flexibility in addressing site specific factors such as geologic or climatic conditions. These commenters reasoned that if EPA established some type of performance standard for composite liners, it would mitigate the negative impacts of a “one-size fits all” regulatory framework.

1. Development of Composite Liner Design Criteria

In this final rule EPA is requiring all new CCR units to be designed and constructed with a composite liner as specified in § 257.70. EPA is also providing the owner or operator with an option to install an alternative composite liner provided it meets the required performance standard and it is certified by a qualified professional engineer. EPA has concluded, consistent with many of the comments received and its own analysis, that an alternative composite liner for new CCR units is warranted if it can be shown to be equivalent to the performance of a composite liner and affords the same protections to groundwater resources as a composite liner. The Agency is promulgating this alternative option to provide flexibility in designing and constructing a protective composite liner system that addresses site specific conditions and situations. The Agency acknowledges that it was overly prescriptive by requiring one particular type of liner rather than relying on a performance standard to define the lower component of the composite liner. The overwhelming amount of data supporting the effectiveness of a GC/GCL liner has convinced the Agency that the final rule should allow for some flexibility in composite liner designs. As such, the Agency is allowing new CCR units to be designed and constructed Start Printed Page 21370with an alternative composite liner, as described below, provided the lower component of the composite liner meets a specified performance standard that ensures it functions in a manner equivalent to the composite liner system defined in the rule.

Composite liner systems installed in either a CCR landfill or CCR surface impoundment provide an effective hydraulic barrier by combining the complementary properties of the two different liner components. The geomembrane provides a highly impermeable layer that can maximize leachate collection and removal in a CCR landfill or minimize infiltration of leachate in a CCR surface impoundment, while the soil component (e.g., CCL) serves as a backup in the event of any leakage/infiltration from the geomembrane occurs. Data indicate that alternatives to the lower component of the composite liner system (e.g., GCLs) are available and can perform at a level equivalent to a compacted soil liner, based on a comparison of their flow rates with two feet of compacted soil with a hydraulic conductivity of no more than 1 × 10−7 cm/sec.

2. Liner Designs That Would Not Meet the Requirements of a Composite Liner or Alternative Liner

Contrary to the arguments made by several commenters, EPA has concluded that a composite liner consisting of two 30-mil GMs (GM/GM) will not provide an equivalent degree of protection as a composite liner consisting of a GM and two feet of compacted soil, or an alternative composite liner such as a GM/GCL. While GMs have the advantages of extremely low rates of water permeation, the disadvantages of a composite liner consisting of two GMs include leakage through occasional GM imperfections and punctures, potential for slippage along the interface between the GMs, and GM embrittlement over time. Furthermore, a critical component of a composite liner is the compacted soil or GCL component beneath the GM layer that will impede the flow of liquid that may leak through a hole or defect in the GM. This added protection cannot be achieved using two GMs for the composite liner. Additionally, the potential exists for liquid transport through the GMs through holes caused by punctures, tears, flawed seams, etc. If a puncture occurs, the puncture could compromise both GMs and create a conduit for liquid flow to underlying permeable soil. Moreover, a liner system consisting of two GMs in contact with each other poses the risk of creating a slip plane that may compromise the stability of the disposal unit (although EPA acknowledges that using textured GMs would reduce or eliminate this particular risk). These data are documented in EPA research.[70]

Consistent with the previous determination, EPA has also determined that the double liner system set forth in Florida regulations (see Florida Rules 62-701.400(3)(c), F.A.C) also does not meet the level of performance achieved by EPA's composite liner system or the alternative liner system. While this double liner system provides the advantage of a leak detection system between the two GMLs, the lower composite liner, consisting of a 60-mil HDPE over six inches of soil with a saturated hydraulic conductivity of less than or equal to 1 × 10−5 cm/sec, is not equivalent to a GM over two feet of compacted soil with a hydraulic conductivity of less than or equal to 1 × 10−7 cm/sec. To be hydraulically equivalent, soil with a hydraulic conductivity of 1 × 10−5 cm/sec would need to be on the order of 100 times thicker than soil with a hydraulic conductivity of less than or equal to 1 × 10−7 cm/sec. Similarly, a lower composite liner consisting of a 60-mil HDPE over a GCL with a hydraulic conductivity not greater than 1 × 10−7 cm/sec would require a GCL thickness of 24 inches to be equivalent to a GM over two feet of compacted soil with a hydraulic conductivity of less than or equal to 1 × 10−7 cm/sec.

EPA has also examined the performance of GCLs approved for use as alternatives to composite liners in MSWLFs.[71] The EPA report titled “Assessment and Recommendations for Improving the Performance of Waste Containment Systems,” [72] concluded that if a CCL or GCL is used alone, liquid migration can occur over the entire area of the liner that is subject to a hydraulic head. The report also concluded that in a composite liner, leakage will only occur at the location of the geomembrane penetration (e.g., hole, tear), and will be much slower than flow through an orifice due to the hydraulic impedance provided by the CCL or GCL alone. The report also evaluated, among other characteristics, the hydraulic efficiencies of a GM/GCL composite liner system for 28 cells at seven landfills. Liner hydraulic efficiencies were reported between 97% and 100%. However, potential stability problems were reported with GCLs constructed on slopes greater than 10 H:1 V (5.7°), and GCLs may not be appropriate for the disposal of liquid wastes or sludges. The Agency is also concerned that GCLs, being much thinner than the two feet of compacted soil required for composite liners, may allow for the flow of liquids through the GCL at a faster rate than through two feet of compacted soil. Taking all of this information into account, the Agency remains unconvinced that a GCL alone is a viable alternative to a composite liner.

3. Design Requirements

a. Existing CCR Landfills

As proposed, the final rule allows existing CCR landfills as defined in § 257.54, to continue to operate without retrofitting with a composite liner and leachate collection and removal system. As previously discussed, given the volume of the material currently managed in CCR landfills, the potential for disruption in CCR disposal capacity if existing CCR landfills were required to retrofit would be significant. Significant disruptions in the state-wide solid waste management (and possibly power generation) are associated with significant risks to public health and the environment in their own right. EPA has concluded that these risks are greater than the risks associated with allowing unlined CCR landfills to continue to operate. Further, existing CCR landfills will be required to comply with the extensive groundwater monitoring and corrective action requirements, among others, to ensure that any groundwater releases from the CCR unit are identified and promptly remediated, which will significantly mitigate the risks from these existing units. By themselves, the risk assessment results and the risk migration from the other regulatory requirements in this rule would not support a decision to allow these CCR units to continue to operate on a national basis. But when the risks associated with the level of disruption EPA estimates to be possible from requiring existing CCR landfills to retrofit are also included, the totality of the evidence supports a determination that allowing these units to continue operating meets the section 4004(a) standard.Start Printed Page 21371

b. Existing CCR Surface Impoundments

In a departure from the proposed rule and after considerable evaluation and analysis, the Agency is finalizing a provision to allow all existing CCR surface impoundments to remain in operation provided certain conditions are met.[73] Owners or operators of existing CCR surface impoundments are required, within one year of the effective date of the rule, to document, certified by a qualified professional engineer, whether the unit is constructed with any one of the three liner types: (1) A liner consisting of a minimum of two feet of compacted soil with a hydraulic conductivity of no more than 1 × 10−7 cm/sec; (2) a composite liner that meets the requirements of § 257.70(b); or (3) an alternative liner that meets the requirements of § 257.70(c). In some instances, owners or operators may have information readily available to determine if an existing CCR surface impoundment is constructed with one of the three liner types listed above. On the other hand, this information may not be readily available and may require an owner or operator to conduct an engineering evaluation to determine if the unit was constructed with any of the three liner type. Factors such as the availability of engineering personnel and weather may impede the engineering evaluation. Therefore, EPA believes that 12 months from the effective date, or 18 months from publication of the rule, is a reasonable amount of time to make the determination of whether the existing CCR surface impoundment was constructed with one of the three liner types described above. Existing surface impoundments with liners that meet the criteria established for any of the three specified liner types are considered to be an “existing lined CCR surface impoundments.” These existing lined surface impoundments can continue to operate until the owner or operator decides to initiate closure, provided the unit does not meet other requirements of the rule that independently mandate closure of the unit (e.g., location criteria (§§ 257.60-257.64) or structural integrity factors of safety (§ 257.73)). Existing unlined CCR surface impoundments must also cease receiving CCR and initiate closure if an owner or operator determines, at any point in time, as part of its groundwater monitoring program that the concentrations of one or more constituents listed in appendix IV to part 257 are detected at a statistically significant level above the groundwater protection standard established for that unit. EPA agrees with the many commenters who argued that existing unlined CCR surface impoundments should not be required to close prematurely if they are operating as designed and are complying with all of the requirements of the rule, including all groundwater protection standards. Taking into account the additional protections required under this rule (e.g., location restrictions, groundwater monitoring, corrective action, structural integrity criteria, inspections and fugitive dust controls), the Agency has concluded that the risks posed by unlined CCR surface impoundments that are not “leaking” (i.e., exceeding any groundwater protection standard) are not sufficient to warrant requiring these units to close. However, once a groundwater protection standard is exceeded (i.e., the unit is leaking), without any type of liner system in place, leachate will flow through the unit and into the environment unrestrained and the only corrective action strategy that EPA can determine will be effective at all sites nation-wide requires as its foundation the closure of the unit.

EPA acknowledges that it may be possible at certain sites to engineer an alternative to closure of the unit that would adequately control the source of the contamination and would otherwise protect human health and the environment. However, the efficacy of those engineering solutions will necessarily be determined by individual site conditions. As previously discussed, the regulatory structure under which this rule is issued effectively limits the Agency's ability to develop the type of requirements that can be individually tailored to accommodate particular site conditions. Under sections 1008(a) and 4004(a), EPA must establish national criteria that will operate effectively in the absence of any guaranteed regulatory oversight (i.e., a permitting program), to achieve the statutory standard of “no reasonable probability of adverse effects on health or the environment” at all sites subject to the standards. EPA was unable to develop a performance standard that would allow for alternatives to closure, but would also be sufficiently objective and precise to minimize the potential for abuse. There are too many factors that determine whether a particular engineering solution will meet the section 4004(a) standard at a particular site. And the risks of these units are simply too high.

Conversely, existing lined surface impoundments that exceed their groundwater protection standard are in a better position to manage the leak because it is usually caused by some localized or specific defect in the liner system that can more readily be identified and corrected. Consequently, this rule is not requiring existing lined CCR surface impoundment to close if an exceedance of a groundwater protection standard is detected; rather the Agency is affording the owner or operator with the opportunity to rely on corrective action measures to bring the risks back to acceptable levels (i.e., control the source of the release and remediate the contamination), without mandating closure of the unit.

c. New CCR Landfills and New CCR Surface Impoundments and All Lateral Expansions

Both the CCR damage case history and the risk assessment clearly show the need for and the effectiveness of appropriate liners in reducing the potential for groundwater contamination at CCR landfills and CCR surface impoundments. Accordingly, EPA is finalizing liner and leachate collection and removal system requirements for new CCR landfills and all lateral expansions of these units. Similarly, EPA is finalizing liner requirements for new CCR surface impoundments and all lateral expansions of these units.

Specifically, EPA is requiring new CCR landfills, new CCR surface impoundments, and all lateral expansions be constructed with a composite liner (see § 257.70). The composite liner must consist of two components; an upper component consisting of a minimum 30-mil geomembrane liner (GM), and a lower component consisting of at least a two-foot layer of compacted soil with a hydraulic conductivity of no more than 1 × 10−7 centimeters per second (cm/sec). GM components consisting of high density polyethylene (HDPE) must be at least 60-mil thick and the GM or upper liner component must be installed in direct and uniform contact with the compacted soil or lower liner component

New CCR landfills or lateral expansions of these units are also required to be constructed with a leachate collection and removal system designed to maintain less than a 30-centimeter depth of leachate over the composite liner. A leachate collection and removal system is not required for new CCR surface impoundments Start Printed Page 21372because, as previously discussed, a leachate collection system installed between a single composite liner system is not practicable and would compromise the integrity of the composite liner system.

In addition, in response to comments on the proposed rule, EPA is allowing alternatives to the lower component of the composite liner system provided the flow rate through the lower component is no greater than the flow rate through two feet of compacted soil with a hydraulic conductivity of 1 × 10−7 cm/sec. The lower component must also be a recognized liner material; e.g., soil, clay, or GCL. Alternative composite liners using compacted soil or clay as the lower component must be constructed with the upper component in intimate contact with the lower component; i.e., the geomembrane must be installed to ensure good and uniform contact with the lower component. The hydraulic conductivity for the two feet of compacted soil used in the flow rate comparison must be no greater than 1 × 10−7 cm/sec. The hydraulic conductivity of the lower component must be determined using recognized and generally accepted engineering methods, for example, ASTM D5084-10, “Standard Test Methods for Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter,” ASTM International, West Conshohocken, PA, 2012, DOI: 10.1520/D5084-10, www.astm.org for compacted soils or clays, or ASTM Standard D6766-12, “Standard Test Method for Evaluation of Hydraulic Properties of Geosynthetic Clay Liners Permeated with Potentially Incompatible Aqueous Solutions,” ASTM International, West Conshohocken, PA, 2012, DOI: 10.1520/D6766-12, www.astm.org for GCLs. The flow rate comparison for the lower component must be made using Darcy's Law for gravity flow through porous media, which is an empirical law which states that the velocity of flow through porous media is directly proportional to the hydraulic gradient. The use of Darcy's Law to calculate fluid flow through porous media is a well-established and generally accepted engineering methodology, and is the foundation for EPA's Composite Model for Leachate Migration with Transformation Products (EPACMTP) and is generally recognized to evaluate steady state flow of liquids through soils and GCLs.[74] EPACMTP is a subsurface fate and transport model EPA uses to simulate the impact of the release of constituents present in waste that is managed in land disposal units. Accordingly, the flow rate comparison for the lower component of alternative composite liner must be made using the following equation which is derived from Darcy's Law.

where:

Q = flow rate,

A = surface area of the liner,

q = flow rate per unit area,

k = hydraulic conductivity of the liner,

h = hydraulic head above the liner, and

t = thickness of the liner.

A qualified professional engineer must certify that the design and construction of either the composite liner or the alternative composite liner meets the requirements of §§ 257.70(b) or (c).

EPA has also supplemented the composite liner criteria for landfills with performance standards that provide more precise direction to the professional engineer regarding the “recognized and generally accepted good engineering practices” that need to be used in the design and construction of composite liner systems to ensure that the liner system will continue to perform as designed. These criteria, which have been codified at §§ 257.70(b) and 257.70(c), have been adopted in response to comments requesting that EPA provide the professional engineers that will be required to certify that CCR units meet the requirements of the rule, with more precise and objective criteria. These criteria reflect the engineering specifications necessary to prevent liner failures resulting from improper design and construction and to ensure that the liner will continue to perform correctly. These provisions will ensure not only that the liner is properly designed and constructed, but also that the system will continue to safely perform throughout the landfill's active life and through post closure care. The criteria have been adopted from the technical provisions proposed under the subtitle C provisions for CCR landfills, and are consistent with design requirements set forth for hazardous waste landfills regulated under part 265 of RCRA, as well as existing guidance and recognized good engineering practices for the design and construction of MSWLFs.[75]

Specifically, the Agency is modifying the composite and alternative liner design requirements by requiring the composite or alternative liner to be chemically compatible with the CCR and of adequate strength and thickness to prevent failure. The liner system must also provide appropriate shear strength between the two components to prevent sliding of the upper component. In addition, the Agency is requiring that liners be placed on an adequate foundation and installed to cover all areas that might come into contact with the CCR.

For new CCR landfills, which are required to have a leachate collection and removal system designed and operated to maintain less than a 30 centimeter depth of leachate, the Agency is also requiring, that the leachate collection and removal system be constructed of sufficient strength and thickness to prevent collapse from the pressure of the CCR and to minimize clogging during the active life and post closure care period.[76]

4. Vertical Expansions of New and Existing CCR Landfills and All Lateral Expansions

In the proposed rule, EPA stated that CCR landfills could vertically expand without retrofitting, in order to alleviate concerns with regard to CCR disposal capacity in the short term. In the few comments to the proposed rule which mentioned vertical expansions of landfills, commenters requested that the Agency clarify the design standards that vertical expansions would have to meet. Information collected to date, which is included in the docket supporting the final rule, leads the Agency to conclude there are no issues unique to vertical expansions of CCR landfills that warrant modifications to the technical standards Start Printed Page 21373being promulgated in this rule. Therefore, vertical expansions of existing CCR landfills are not subject to the provisions governing new units, but are subject to all applicable requirements for existing CCR landfills. To be clear however, while the location requirements relating to the placement above the water table, wetlands, fault areas, and seismic impact zones do not apply to existing CCR landfills, all of these restrictions apply to lateral expansions of existing CCR units, as well as new CCR units. Consequently, under this rule, owners or operators of existing CCR landfills can continue to vertically expand their existing facilities in these locations, but must comply with the provisions governing new units if they wish to laterally expand.

5. Construction of New CCR Landfills or Any Lateral Expansion Over an Existing CCR Unit

On August 2, 2013, EPA published a NODA that among other things, solicited comment regarding a particular type of CCR management unit described by some commenters in the proposed rule as “overfills” (see 78 FR 46940). Overfills are CCR landfills constructed over a closed CCR surface impoundment. As discussed in the NODA, in developing the proposed rule, EPA was not aware that CCR was managed in this fashion and so did not either evaluate this specific management scenario or propose technical requirements specifically tailored to this type of unit. Under the proposed rule, these types of units would need to comply with both the requirements applicable to the closure of surface impoundments or landfills, and with all of the technical requirements applicable to new landfills. Information collected since the proposal confirmed that the practice of constructing overfills for the disposal of CCR is conducted with some regularity, and raised questions as to whether overfills would be effectively regulated under the proposed technical requirements of the rule. In the NODA, to aid in the development of final technical requirements, EPA solicited data and information that directly addressed existing engineering guidelines or practices applicable to this units, as well as any regulatory requirements governing the siting, design, construction, and long-term protectiveness of these units for the disposal of CCR.

The Agency received numerous comments on the NODA. The majority of commenters agreed that overfills are commonly employed to allow continuing use of CCR disposal sites and to avoid the need to develop CCR management units at other sites. Some commenters added that: (1) The engineering design of an overfill can increase the stability of the underlying surface impoundment or landfill; (2) the use of an overfill facility reduces the need for new infrastructure construction; and (3) an overfill avoids having to transport CCR significant distances for off-site disposal.

Other commenters mentioned that several states had experience with overfills and have applied requirements such as liner systems, monitoring wells, and stormwater modeling on a case-by-case basis using best engineering practices. They added that overfills pose unique construction and operational issues depending on the site and the characteristics of the underlying unit, and that the construction of these units will therefore vary to account for these conditions. Commenters identified several issues requiring additional attention during design and construction of overfills including seismic and static liquefaction, settlement, foundation improvement, partial overfills, groundwater upwelling, groundwater monitoring, and wastewater infrastructure.

Upon review of these comments and further evaluation, the Agency has concluded that while there may be technical issues relating to the design, construction, and maintenance of overfills, the technical standards for CCR landfills are sufficiently flexible that no modifications are necessary to accommodate such units. For example, while the design and construction of groundwater monitoring systems may be technically more challenging, the final standards already allow for the construction of a multi-unit system. The performance standards and technical specifications laid out in the technical criteria developed for this rule are equally as applicable to overfills (and as protective) as to other new units. In essence, EPA is retaining the approach from the proposal that overfills will need to comply with both the requirements applicable to the closure of surface impoundments or landfills, and with all of the technical requirements applicable to new landfills. Thus, overfills cannot be constructed unless the underlying foundation—i.e., the existing CCR surface impoundment has first been dewatered, capped, and completely closed. And because overfills are considered to be “new CCR landfills,” the design and construction of such units must comply with the technical requirements that address foundation settlement, overall and side slope stability, side slope and subgrade reinforcement, and leachate collection and groundwater monitoring system requirements, which will all need to be evaluated independent of the underlying CCR unit to ensure that the overfill design is environmentally protective. This evaluation must also be certified by a qualified professional engineer.

Under the location standards applicable to new CCR units, subgrade soils must be capable of providing stable structural support to the new liner system. A foundation composed of unconsolidated materials, such as CCR that is susceptible to slip-plane failure, is an unstable area (man-made) and, under provisions of this rule, is therefore a prohibited location for new CCR units. The TVA Kingston ash fill failure was at least partly attributable to slip-plane failure of saturated CCR that made up the subgrade and foundation beneath the unit.

Similarly, prudent and standard engineering practice for new CCR landfills requires that the base and side slopes of the overlying CCR landfill be able to maintain the structural integrity of the unit. If necessary, the subgrade should be reinforced with a geotextile fabric, or otherwise improved, to stabilize existing CCR in the underlying unit and to minimize tensile strain in the liner system. Slopes should be reinforced to prevent downhill sliding and to protect the leachate drainage system.

EPA is aware from comments that at least one facility is consolidating wet CCR in an active CCR surface impoundment through placement of dry ash over the wet CCR, and thereby converting the impoundment to a dry landfill, without stabilizing the CCR in the unit or capping the unit. This practice will no longer be permitted under the final rule criteria. Although no modifications were determined to be necessary to the individual technical criteria, EPA has added specific provisions that clarify the status of overfills, and clearly prohibit construction of a CCR landfill over a CCR surface impoundment unless the CCR in the underlying unit has first been dewatered and the unit is capped and completely closed. Dewatering, capping and closure of the underlying CCR unit prior to construction of the overlying CCR landfill renders the CCR overfill less susceptible to slip-plane failure. Conversion of an impoundment to a landfill without these measures involves a complex construction process that is highly site specific; EPA was unable to develop sufficiently objective performance standards that could be Start Printed Page 21374independently verified outside of a supervised permit program. Because this rule is self-implementing EPA is, therefore, prohibiting construction of new CCR landfills over operational CCR surface impoundments to prevent the creation of structurally unstable units that could lead to catastrophic failures.

E. Design Criteria—Structural Integrity

Under the design criteria requirements, EPA proposed to establish structural stability standards for existing and new CCR surface impoundments and lateral expansions of these units based on a combination of existing federal programs and requirements applicable to dam safety. The proposed rule was largely based on the requirements promulgated for coal slurry impoundments regulated by the MSHA at 30 CFR 77.216. (See 75 FR 35176.) EPA also developed aspects of the proposal based on the USACE and FEMA's dam safety programs. Consistent with the MSHA requirements, EPA proposed that existing and new CCR surface impoundments that could impound CCR to an elevation of five feet or more above the upstream toe of the structure and have a storage volume of 20 acre feet or more, or that impound CCR to an elevation of 20 feet or more above the upstream toe of the structure would be required to provide detailed information on the history of construction of the existing CCR surface impoundment and to meet certain performance standards. Specifically, facilities would need to (1) develop plans for the design, construction, and maintenance of existing impoundments, (2) conduct periodic inspections by trained personnel knowledgeable in impoundment design and safety, and (3) provide an annual certification by an independent registered professional engineer that all construction, operation, and maintenance of impoundments is in accordance with the approved plan.

EPA also proposed to require the facility to obtain certification from a professional engineer that the “design of the CCR surface impoundment is in accordance with current, prudent engineering practices for the maximum volume of CCR slurry and CCR wastewater which can be impounded therein and for the passage of run-off from the design storm which exceeds the capacity of the CCR surface impoundment. To support this performance standard, EPA proposed to require the facility to conduct specific analyses, and to provide information on critical structures. This includes the proposed requirements to compute the minimum factor of safety for slope stability of the retaining structures of the unit, including the methods and calculations used to determine each factor of safety, and to provide information on the physical and engineering properties of the foundations of the CCR surface impoundment, any foundation improvements, drainage provisions, spillways, diversion ditches, outlet instrument locations and slope protections, and area capacity curves. EPA proposed to require more extensive information from new CCR surface impoundments addressing the design, construction, and maintenance of the new CCR unit, recognizing that such information may not be available for existing units.[77] In addition, EPA proposed to require existing and new CCR surface impoundments of a specified size to calculate and report the hazard potential classification of the unit. Finally, EPA proposed that any CCR surface impoundments classified as having a high or significant hazard potential, as certified by an independent registered professional engineer, be required to develop and maintain an Emergency Action Plan defining the responsible persons and actions to be taken in the event of a dam safety emergency.

The Agency solicited comment on a number of issues relating to the proposed structural stability requirements. In particular, the Agency solicited comment on the scope of these requirements and whether they should apply to all CCR surface impoundments regardless of height and/or storage volume or whether EPA should adopt, as proposed and consistent with the MSHA requirements, the size cut-off described in the proposed rule; i.e., impounding CCR to an elevation of five feet or more above the upstream toe of the structure and have a storage volume of 20 acre feet or more, or impounding CCR to an elevation of 20 feet or more above the upstream toe of the structure.

EPA also solicited comment on several alternative strategies for regulating the structural stability of CCR surface impoundments in lieu of regulation under RCRA subtitle D. The first alternative involved using NPDES permits rather than RCRA regulations to address dam safety and structural integrity. The second strategy would eliminate the structural integrity requirements from the RCRA subtitle D rule and, instead, have EPA establish and fund a program for conducting annual (or at some other frequency) structural stability assessments of CCR surface impoundments having a “high” or “significant” hazard potential rating as defined by criteria developed by the USACE for the NID. EPA would conduct these assessments and, using appropriate authorities already available under RCRA, CERCLA, and/or the Clean Water Act, would require facilities to respond to issues identified with their CCR surface impoundments. The rationale behind this suggested approach was that annual inspections would be far more cost effective than the phase-out of CCR surface impoundments—approximately $3.4 million annually for annual assessments, as compared to the $876 million annual cost of a rule that also phased out CCR. EPA also solicited comments on the effectiveness of this approach in ensuring the structural integrity of CCR surface impoundments. (See for example: 75 FR at 35176, 35223.)

On October 21, 2010, EPA published a NODA announcing that EPA intended to consider the information that had been developed through the Agency's Assessment Program as part of the CCR rulemaking. The NODA described the Assessment Program, and solicited comment on “the extent to which both the CCR surface impoundment information collection request responses and assessment materials on the structural integrity of these impoundments should be factored into EPA's final rule on the Disposal of Coal Combustion Residuals from Electric Utilities.” (See 75 FR 35128.) This included the responses to information requests that EPA originally sent to electric utilities, as well as reports and materials related to the site assessments developed through the Assessment Program. At that time, EPA had completed the assessments and the final reports for 53 units. On August 2, 2013, EPA published another NODA soliciting public comment on the additional assessments that had been completed since the 2010 NODA. In all, this included draft and final reports for a total of 522 units and 209 facilities. EPA again solicited comment on the extent to which this information should be taken into account as part of this rulemaking.

EPA received numerous comments on the proposed structural stability requirements. Many of these fell within two general areas: (1) EPA's approach of Start Printed Page 21375establishing the structural stability requirements, along with EPA's proposed reliance on MSHA's size thresholds to determine the applicability for the majority of structural stability requirements; and (2) the level of detail laid out in the technical criteria themselves.

With respect to the overall regulatory approach, the majority supported both the concept of structural stability requirements for existing and new CCR surface impoundments, and the adoption of the MSHA size threshold for complying with the majority of the structural stability requirements. EPA received comments from a number of state entities (the Association of State Dam Safety Officials (ASDSO) and the Association of State and Territorial Solid Waste Management Officials (ASTSWMO)) suggesting that EPA incorporate federal dam safety guidelines rather than rely solely on MSHA's dam safety guidelines. Commenters were concerned that the MSHA regulations “only exist to protect miners on mine property, and not the downstream public.” They urged that any EPA regulation also include consideration of hazards to the downstream public. These commenters also requested that EPA “incorporate specific safety standards consistent with the Federal Guidelines for Dam Safety,” referencing standards contained in FEMA documents 93, 333, 64, 94 and 65.

Little support was expressed for the alternative strategies presented in the proposal for addressing structural stability. Some comments were received suggesting additional alternatives. One commenter suggested that EPA consider limiting the volume of “primary containment ponds” to 10 acre-feet, reasoning that this provision would likely eliminate much of the concern regarding catastrophic failures, like TVA, and actually reduce the amount of slurry released in the event of a structural failure. Other commenters argued that EPA should limit the structural requirements to CCR surface impoundments both meeting the proposed size threshold and having a hazard potential classification of “high” or “significant” hazard potential rating based on FEMA's criteria for dam safety.[78] Commenters argued that a failure of a CCR surface impoundment with a “low hazard potential classification” posed only a low risk for on-site economic or environmental losses and would avoid the imposition of costly, arbitrary and unnecessary regulatory burdens on the owner or operator. In addition, commenters contended that this regulatory approach would be consistent with many state dam regulatory programs that apply dam integrity standards only to “high” or “significant” potential hazard facilities and would promote consistency with existing state controls.[79] Several commenters also suggested that EPA consider adding regulatory language or preamble discussion to assist owners or operators of CCR surface impoundments in interpreting the specific technical requirements in the regulation.

EPA disagrees with the suggestion that the Agency finalize a mandatory size limitation for operating CCR surface impoundments. While limiting the volume of CCR surface impoundments to ten acre-feet would limit the volume of CCR released in the event of a structural failure, limiting the size of CCR surface impoundments to 10 acre-feet may not always be practicable; nor does EPA believe that such a restriction is truly necessary to ensure that the section 4004(a) standard will be met. Many CCR surface impoundments are much larger than ten acre-feet and have been operating for many years without a structural failure. While EPA acknowledges that this fact in no way guarantees that a failure will not occur, the Agency is convinced that the implementation of all of the combined regulatory requirements in this rule (e.g., location criteria, structural integrity, inflow design flood controls and inspection requirements) provides the necessary safeguards that will ensure that CCR surface impoundments are designed, constructed, operated, and maintained to minimize the risks associated with a catastrophic release of impounded CCR due to structural failure. While limiting the size of CCR surface impoundments will reduce risks because there will be a lower volume of waste in the unit, the Agency is not convinced that, in practice, such a requirement would meaningfully reduce the risks at many facilities. EPA expects that such a restriction would only cause facilities to construct either several small units or a multi-unit system. Failure of one unit can lead to progressive failure of other units in the system, and thus, ultimately this may not reduce the total volume of waste that could be released into the environment. EPA also disagrees that structural stability requirements should only apply to “high” or “significant” potential hazard facilities. Similarly, EPA disagrees with commenters that structural integrity requirements should only apply to owners or operators of CCR surface impoundments that both meet the specified size criteria and have either a high hazard or significant hazard potential classification. Even for CCR units with a low hazard potential classification, EPA is still concerned with the risk to human health and the environment from any structural failure of a CCR unit. As discussed previously in Unit VI.C of this document, the environmental effects of the failure of even a low hazard potential impoundment can still be significant, given the size of these units, the nature of the material in the unit, and the potential volumes that could be released. Contamination of surface waters and groundwater resources is still a significant threat when CCR units of this size fail, irrespective of the lower likelihood that a release will affect human health, as reflected in the low hazard potential classification. Consequently, one focus of this rule is preventing any release, catastrophic or otherwise, of CCR to the environment, and limiting all structural stability requirements commenters suggested would be inconsistent with this goal.

The Agency agrees that the final regulation should incorporate provisions that address the hazards to the downstream public. Accordingly, the final rule incorporates a number of provisions consistent with the FEMA Guidelines, including a requirement that owners and operators know each CCR unit's hazard potential classification, as this is part of owners and operators' responsibility to actively ensure the integrity of their CCR unit(s) and that their operations do not endanger human health or the environment. EPA also agrees that the requirements should be differentiated based on the potential severity of the consequence posed by the unit's failure, and therefore the hazard potential can be relevant in determining the stringency of particular requirements. However, the hazard potential is, at best, only an indicator of the potential damage that may be incurred from the Start Printed Page 21376structural failure of the unit, and so EPA has generally not relied on hazard potential as the sole basis for determining the structural integrity requirements that are necessary for a CCR unit.[80] Although the hazard potential classification can serve as a proxy for the amount of water and CCR that could potentially be released to the environment in the event of a CCR surface impoundment failure, the amount of water and CCR potentially released is more directly correlated to the actual height and storage volume of the CCR surface impoundment. In addition, it is widely recognized that the hazard potential classification of an individual unit can often fail to encompass the overall magnitude of a release on human health and the environment. CCR surface impoundments can frequently be part of a facility's run-off system that is responsible for routing surface waters to a drainage basin or watershed. As previously discussed, the failure of a CCR unit that is part of such a system has the potential to inundate downstream surface water units and water bodies, resulting in progressive failures of other units, including other CCR surface impoundments at the facility, which in turn can have a much greater environmental impact than the failure of just the one unit for which a hazard potential classification was made. Using a “height and/or volume” threshold to determine the applicability of the structural integrity criteria ensures that CCR units with the potential to cause these progressive failures in downstream surface water management units are appropriately overseen and regulated. CCR surface impoundments exceeding a specified height and/or capacity threshold also pose a higher degree of risk of release of CCR to the environment than other types of CCR surface impoundments (e.g., incised or “small” CCR units). For all of these reasons, the size of the CCR unit, rather than the hazard potential classification, is the best indicator of potential severity of release of CCR to the environment and should therefore be the primary basis on which structural integrity criteria are applied. As such, EPA is promulgating, as proposed, a regulatory strategy that establishes some requirements for all CCR surface impoundments, but relies primarily on size as the basis for determining the majority of the specific technical criteria for minimizing risk from structural failure.

Regarding the second major issue presented in the comments, as noted previously, EPA received comments requesting the Agency to provide either more specific regulatory language or further guidance in the preamble, so that parties could certify that the CCR surface impoundment met the rule's overall performance standard. Commenters contended that guidance would be particularly critical if EPA did not establish more specific technical criteria, as owners or operators will be vulnerable to lawsuits for non-compliance. In addition, state officials requested that EPA adopt more specific standards consistent with those adopted under FEMA's Federal Guidelines for Dam Safety. As discussed throughout this section in more detail, EPA has adopted clarifications to the regulation, particularly in the sections on structural stability and safety factors, to more precisely lay out the specific technical standards that are considered to be the “generally accepted and recognized good engineering practices” that must be met. EPA relied extensively on existing MSHA requirements, FEMA's Federal Guidelines for Dam Safety, and guidance issued by the U.S. Army Corps of Engineers, as they were applied throughout EPA's Assessment Program, to supplement the technical detail originally contained in the proposed rule. EPA has also modified the criteria, where necessary, so they better reflect the information and experience developed through the Assessment Program, e.g., the engineering criteria used to evaluate the CCR surface impoundments and to make recommendations to improve the structural stability of the units.

In this rule, the Agency is finalizing structural integrity criteria to ensure that CCR surface impoundments are designed, constructed, operated, and maintained in a manner that ensures the structural integrity of the CCR surface impoundment throughout its active life (i.e., through closure of the CCR unit), detects actual or potential releases of CCR as early as practicable, and prevents catastrophic failures. Many of the requirements have been adopted without revision from the proposed rule for some requirements, however, as noted EPA has provided additional language to clarify the final regulation. These clarifications have been made in response to comments urging EPA to finalize regulatory requirements that were more precise or sufficiently objective (i.e., a specific standard of performance) to allow a qualified professional engineer to reasonably certify that the requirements of the rule have been met. These specific regulatory clarifications are discussed throughout this section.

A further change is that the final rule requires facilities to periodically reassess several elements of the structural integrity performance standards (i.e., re-assess every five years). Finally, in contrast to the programs established by MSHA and FEMA, the final rule establishes certain minimum requirements for all CCR surface impoundments. This is based on the fact that, unlike the dams regulated under other federal programs, the material in all CCR units is harmful, so even small releases can present environmental and human health concerns. But the majority of the structural integrity requirements vary depending on whether the CCR surface impoundment or lateral expansion exceeds particular size thresholds. The rulemaking record clearly demonstrates that these larger CCR surface impoundments present a greater risk of catastrophic failure, and therefore require a more robust set of regulatory requirements to ensure their continued structural integrity. The final rule's implementation of a size threshold for structural integrity requirements is consistent with the approach taken by the majority of dam safety programs and regulation.

These modifications are being made to better reflect the protections necessary to ensure that: (1) Structural integrity is maintained throughout the operational life of a CCR unit; and (2) the risk of catastrophic failure is minimized. The changes being made in this rule have been directly influenced by comments received, the observations and the conclusions drawn from EPA's Assessment Program, and the recommendations made by both MSHA and FEMA regarding dam safety. They are also generally consistent with the regulatory requirements of many other state and other federal agencies regulating dam safety.

1. Overview of Technical Criteria

Except for incised units, owners or operators of all existing and new CCR surface impoundments and any lateral expansion of these CCR units are required to: (1) Place a permanent identification marker on or immediately adjacent to the CCR units with the name associated with the CCR unit and the name of the owner or operator of the CCR unit; (2) conduct an initial hazard potential assessment to determine the current hazard potential classification of Start Printed Page 21377the CCR unit; (3) conduct periodic (i.e., every five years) hazard potential re-assessments; (4) develop an Emergency Action Plan (EAP) if the hazard potential classification of the CCR unit is classified as either a high- or significant hazard potential; and (5) maintain the CCR unit with vegetated slopes or other forms of slope protection.

Owners or operators of CCR surface impoundments that either have a height of five feet or more and a storage volume of 20 acre feet or more, or a height of 20 feet or more are required to comply with the following additional structural integrity criteria: (1) Document the design and construction of the CCR surface impoundment; (2) conduct an initial structural stability assessment; (3) conduct an initial safety factor assessment; and (4) conduct periodic (not to exceed five years) structural stability and safety factor assessments.[81] Owners and operators of CCR units that fail to make the safety factor assessment or fail to meet the factors of safety specified in the rule must stop placing CCR in the unit and initiate closure.

The structural integrity requirements of the final rule require the compilation of construction history of the existing CCR surface impoundment within one year of the effective date of the rule.

Within two months of the effective date of the rule, the structural integrity requirements (§ 257.73) state that the owner or operator must install a permanent marker on the existing CCR surface impoundment. This timeframe is being promulgated as proposed, as EPA did not receive comments on the timeframe for installation of a permanent marker.

2. Structural Integrity Requirements Applicable to All CCR Surface Impoundments

a. Hazard Potential Classification Assessments

A hazard potential classification provides an indication of the potential for danger to life, development, or the environment in the event of a release of CCR from a surface impoundment. In this rule, an owner or operator of any existing or new CCR surface impoundment or any lateral expansion of a CCR surface impoundment must determine which of the following hazard potential classifications characterizes their particular CCR unit.[82] These classifications are: a high hazard potential CCR surface impoundment, a significant hazard potential CCR surface impoundment; and a low hazard potential CCR surface impoundment and are defined as follows:

  • High hazard potential CCR surface impoundment means a diked surface impoundment where failure or mis-operation will probably cause loss of human life.
  • Significant hazard potential CCR surface impoundment means a diked surface impoundment where failure or mis-operation results in no probable loss of human life, but can cause economic loss, environmental damage, disruption of lifeline facilities, or impact other concerns.
  • Low hazard potential CCR surface impoundment means a diked surface impoundment where failure or mis-operation results in no probable loss of life and low economic and/or environmental losses. Losses are principally limited to the surface impoundment's owner's property.

Owners and operators of all CCR surface impoundments must determine each unit's hazard potential classification through a hazard potential classification assessment. Hazard potential classification assessments must be certified by a qualified professional engineer and documentation must be provided that supports the basis for the current hazard potential rating. An initial hazard potential assessment must be conducted within one year of the effective date of the rule for existing units and prior to the initial receipt of CCR in the unit for new units or lateral expansions. Hazard potential classifications, structural stability assessments, and safety factor assessments require significant planning and coordination, such as detailed site-work and investigations, modeling and analysis, design and construction planning and implementation, and post-construction investigation. Many of these efforts take several months to complete, compounded by the fact that much of the work cannot be completed in cold-weather or heavy-rain seasons.

As commenters noted, it is imperative that the owner or operator maintain a current assessment of a unit's hazard potential classification, rather than develop a single one-time classification “for which the facility was designed.” (See proposed § 257.71(d)(10).) Moreover, FEMA recommends that a unit's hazard potential classification should be reviewed no less frequently than every five years in order to take into account changes in the factors that are the basis for which a hazard potential classification is made (e.g., changed reservoir or downstream development).[83] Based on this information, EPA determined that a periodic reassessment of a CCR surface impoundment's hazard potential classification is a necessary component in maintaining the accuracy of the unit's hazard potential classification, as well as the overall safety of the unit. Consequently, EPA is requiring the owner or operator of a CCR surface impoundment to reassess the hazard potential classifications of their CCR unit and to have that classification, certified by a qualified professional engineer, at least every five years.

EPA has continued to rely on FEMA requirements as the basis for general CCR surface impoundment safety requirements, e.g., inflow design flood selection, inspection criteria, earthquake analyses and design for several reasons: (1) Structural failure risks for CCR surface impoundments are similar to the risks from the larger dam universe for which FEMA intends its guidance; and (2) risks to downstream development from CCR surface impoundment failures are equal or similar to those presented by other types of dams' failures.

In this rule, hazard potential classifications define the consequences in the event of a failure of a CCR surface impoundment. The classification is separate from the structural stability of a CCR unit or the likelihood of the impoundment failing. A surface impoundment that meets or exceeds all of the structural stability criteria and safety factors of this rule would still be classified as “high hazard potential” if, in the event of failure, loss of life would be likely to occur.Start Printed Page 21378

The hazard potential classification of the CCR surface impoundments is an essential element in determining how to properly design, construct, operate, and maintain a CCR surface impoundment. As such, the final rule bases the stringency of some technical requirements, in part, on the potential for adverse impacts on the failure of the CCR unit, as quantified by the hazard potential classification of this rule. Specifically, the requirements become more stringent as the potential for loss of life and/or property damage increases. This is reflected in both the criteria established under the structural stability assessments, . e.g., where the combined capacity of all spillways must adequately manage flow during and following peak discharge from the specified inflow design flood based on the hazard potential classification of the unit—and in the hydrologic and hydraulic capacity requirements, which are similarly specified based on the hazard potential classification of the CCR unit (see §§ 257.73(d)(2)(v); 257.74(d)(2)(v) and 257.82 respectively).[84] Additionally, high and significant hazard potential CCR surface impoundments must develop a written Emergency Action Plan which establishes emergency action procedures in the event of a previously defined emergency.

b. Emergency Action Plan

An Emergency Action Plan (EAP) is a document that identifies potential emergency conditions at a CCR surface impoundment and specifies actions to be followed to minimize loss of life and property damage. Typically an EAP includes: (1) Actions the owner or operator will take to moderate or alleviate a problem at the CCR unit; (2) actions the owner or operator will take, in coordination with emergency management authorities, to respond to incidents or emergencies related to the CCR surface impoundment; (3) procedures owner or operators will follow to issue early warning and notification message to responsible downstream emergency management authorities; (4) inundation maps to allow owners and operators of the CCR unit and emergency management authorities to identify critical infrastructure and population-at-risk sites that may require protective measures, warning and evacuation planning; and (5) delineation of the responsibilities of all those involved in managing an incident or emergency and how the responsibilities should be coordinated and implemented.[85] As FEMA guidance suggests, and EPA reiterates here, the level of detail in the EAP should be commensurate with the potential impact of a surface impoundment failure or other operational incident (e.g., its hazard potential classification). A surface impoundment with low potential hazard impact should not require an extensive evaluation or be subject to an extensive planning process, while high-hazard and significant hazard surface impoundments would typically require a much larger emergency planning effort. In addition, high hazard and significant hazard surface impoundments tend to involve more entities that must coordinate responsibilities and greater efforts would generally be necessary to effectively respond to an incident with such a surface impoundment than to a similar incident involving a low-hazard surface impoundment. As such, every EAP must be tailored to specific site conditions.

EPA is promulgating, as proposed, a provision that requires any CCR surface impoundment that is determined by the owner or operator, through the certification by a qualified professional engineer, to be either a high hazard potential CCR surface impoundment or a significant hazard potential CCR surface impoundment to prepare and maintain a written EAP. While EPA agrees that the level of detail contained in an EAP should be commensurate with its hazard potential rating, EPA has concluded that at a minimum, the EAP must: (1) Define responsible persons and the actions to be taken in the event of a CCR surface impoundment-safety emergency; (2) provide contact information for emergency responders, including a map which delineates the downstream area which would be affected in the event of a failure and a physical description of the CCR surface impoundment; (3) include provisions for an annual face-to-face meeting or exercise between representatives of the owner or operator of the CCR unit and the local emergency responders; and (4) define conditions that initiate implementation of the EAP and define emergency response actions which must be implemented upon the detection of these conditions, including all persons responsible for the implementation of the emergency response actions. The first three of these four requirements were proposed as part of the EAP and are being promulgated without revision. The fourth requirement, which requires facilities to explicitly define the conditions by which the EAP is activated, was inadvertently omitted from the proposal, and is being added to the final rule to ensure that the EAP includes at least the basic requirements necessary to function effectively.

The owner or operator must amend the written EAP whenever there is a change in conditions that would substantially affect the written EAP in effect, e.g., change in personnel, change in emergency responder contact information, a change in the CCR surface impoundments' designation from a significant-hazard potential classification to a high-hazard potential classification, or the vertical expansion of the CCR unit (i.e., increase in the amount of CCR that potentially could be released.) Consistent with the requirements for hazard potential classification reassessments, the Agency is requiring, at a minimum that the EAP be reassessed at least every five years. If an owner or operator determines that, as part of it periodic hazard potential re-assessment that the unit no longer is classified as a high-hazard or a significant-hazard potential classification, but is now classified as a low hazard potential CCR surface impoundment, then the owner or operator of the CCR unit is no longer subject to the requirement to prepare and maintain an EAP, effective when such documentation is placed into the facility's operating record. If, however, during the reassessment effort it is determined that an existing CCR unit classified as a low hazard potential has been re-classified as either a significant-hazard or high-hazard potential, the owner or operation must prepare an EAP for the CCR unit within six months of completing such a periodic hazard potential re-assessment.

Although the owner or operator is responsible for developing and maintaining the EAP, which must be certified by a qualified professional engineer, the plan should be developed and implemented in close coordination with all applicable emergency management authorities, including the appropriate local, state, and federal authorities. Generally, these coordination efforts, along with the EAP, provide emergency management authorities with the necessary information to facilitate the implementation of their responsibilities, and so, it is vital that the development of the EAP be coordinated with emergency responders and other entities, agencies, and jurisdictions, as Start Printed Page 21379appropriate. After the initial EAP has been developed and placed in the operating record and on the owner or operator's internet site, it should be periodically reviewed and updated on a regular basis, as it can become outdated and ineffective. While the Agency is only requiring the EAP to be re-assessed every five years, it is recommended that the EAP be reviewed at least annually for appropriateness, accuracy, and adequacy so as to remain current. EPA recommends that the EAP be promptly updated to address changes in personnel, contact information and/or significant changes to the facility or emergency procedures. Even if no revisions are necessary, the review should be documented.

The initial EAP must be prepared within 18 months from the effective date of the rule. In order to prepare an EAP, the owner or operator must accurately and comprehensively identify potential failure modes and at-risk development, and therefore completion of the emergency action plan needs to follow the completion of the initial hazard potential classification, structural stability assessment, and safety factor assessments, during which this information will be generated.

c. Vegetated Slopes of Dikes and Surrounding Areas

EPA proposed to require both new and existing CCR surface impoundments that exceed the MSHA size thresholds to document the slope protection measures that have been adopted and to compute the minimum factors of safety for slope stability, in order to support the certification from an independent professional engineer that the unit has been designed in accordance with “generally accepted engineering standards.” EPA is promulgating the requirement that all CCR surface impoundments have adequate slope protection because EPA determined through the Assessment Program that slope protection is an essential element in preventing slope erosion and subsequent deterioration of CCR unit slopes. EPA is requiring slope protection for all units, not just units exceeding the size threshold of the final rule, because EPA has identified that slope protection on CCR units is a generally accepted good practice which reduces the occurrence of erosion, degradation of surface waters due to run-off from the CCR unit, enhances slope stability, and that vegetated cover is an easily accomplished practice in the vast majority of climates where CCR surface impoundments are located. In conducting the Assessment Program, the protective cover of slopes of the CCR surface impoundment was determined to be relevant to the overall condition rating of all units, irrespective of size. This is consistent with FEMA guidance, which also lays out specifications for the ideal vegetative cover for a dam. EPA has adopted this requirement to be consistent with its findings from the Assessment Program, and in response to comments, and has elaborated on the slope protection measures necessary to achieve the factors of safety. The final rule provides performance standards drawn primarily from FEMA guidance, as applied during the Assessment Program.

All CCR surface impoundments are required to be designed, constructed, operated, and maintained with adequate slope protection to protect against surface erosion at the site. Slope protection is necessary to ensure that dike or embankment erosion does not occur. Additionally, slope protection is required of all CCR surface impoundments to maintain the stability of the CCR surface impoundment slope under rapid drawdown events [86] and low pool conditions of water bodies that may abut the CCR surface impoundment and are outside the control of the owner or operator, e.g., a natural river which the slopes of the CCR surface impoundment run down to and abut. The slope protection can act as a stabilizer in the slope of the embankment during rapid drawdown events. Adequate slope protection can be achieved in most climates through simple vegetation, typically a healthy, dense stand of low-growing grass, or other similar vegetative cover. In arid climates where the upkeep of vegetation is inhibited, alternate forms of slope protection, including rip-rap, or rock-armor is typically used. Additional slope protective measures are available and effective in certain circumstances, including but not limited to rock, wooden pile, or concrete revetments, vegetated wave berms, concrete facing, gabions, geotextiles, or fascines.

The owner or operator must ensure that the slopes of the CCR surface impoundment are protected from erosion by appropriate engineering slope protection measures. It is recommended throughout embankment technical literature that vegetative cover not be permitted to root too deeply, precipitating internal embankment issues. The rule requires a vegetative cover limit to prevent the establishment of rooted vegetation, such as a tree or a bush on the CCR surface impoundment slope. EPA has concluded that a vegetative cover of no more than six inches above the face of the embankment is adequate and is the uppermost limit for vegetative cover height for this final rule. In developing this requirement, EPA was strongly influenced by information contained in the FEMA document entitled, “Technical Manual for Dam Owners: Impacts of Plants on Earthen Dams” [87] in determining an appropriate vegetative cover height for CCR surface impoundments. Six inches represents a vegetative height which prevents any trees, bushes, or shrubbery from rooting deeply enough to warrant additional removal measures outside of simple mowing. Furthermore, the height prescribed by the final rule represents a maximum height of vegetative cover to allow for adequate observation of the slope of the CCR unit during inspection. Vegetative cover in excess of six inches above the slope of the dike would prevent the adequate observation of the slope of the CCR unit and detection of structural concerns such as animal burrows and minor sloughs, amongst others concerns. Consistent with FEMA guidance, as applied during the Assessment Program, other slope protection, such as rock armoring or vegetated berms, would also be considered adequate.[88]

3. Structural Integrity Criteria Applicable to CCR Surface Impoundments Exceeding a Specific Size Threshold

The structural integrity criteria discussed in this section of the preamble apply to existing and new CCR surface impoundments and any lateral expansion with: (1) A height of five feet or more and a storage volume of 20 acre-feet or more; or (2) a height of 20 feet or more. The rule defines height as the vertical measurement from the downstream toe of the CCR surface impoundment at its lowest point to the lowest elevation of the crest of the CCR surface impoundment. The downstream toe is defined as the junction of the downstream slope or face of the CCR surface impoundment with the ground surface. This final rule considers the lowest elevation of the crest of the CCR Start Printed Page 21380surface impoundment to be the maximum storage elevation of the reservoir or pool of the CCR unit, e.g., the invert of the lowest-elevation spillway. EPA is implementing this size threshold because it comports with thresholds established by other federal and state agencies regulating dam integrity and/or safety. Specifically, for the implementation of the size threshold of this final rule, EPA relied on the identical size parameters, i.e., height of five feet and capacity of 20 acre-feet, which is promulgated in MSHA coal slurry impoundment regulations in 30 CFR 77.216.

In the proposed rule, EPA used the size cut-off promulgated by MSHA in their dam safety requirements for coal slurry impoundments at 30 CFR part 77. In proposing this cut-off, EPA reasoned that the MSHA requirements affecting coal slurry impoundments were directly applicable and relevant to CCR surface impoundments and provided a size threshold that, when applied to the rule's structural integrity criteria, would generally meet RCRA's mandate to ensure protection of human health and the environment by minimizing the potential for catastrophic failure. Specifically, EPA proposed that surface impoundments: (1) Impounding CCR to an elevation of five feet or more above the upstream toe of the structure and can have a storage volume of 20 acre-feet or more; or (2) impounding CCR to an elevation of 20 feet or more above the upstream toe of the structure would be subject to the structural stability criteria. EPA also proposed to define upstream toe as the junction of the upstream slope of the dam with the ground surface, with the height of the CCR unit measured from the upstream toe or water-borne toe of the CCR unit.

While little comment was received on adopting this size threshold or the accompanying definition of upstream toe, the Agency was concerned that the size threshold presented in the proposed rule did not reflect standard measuring protocols used by other federal agencies and the dam sector in determining the size of a dam or, in the case of this rule, surface impoundment. Of particular concern to the Agency was the fact that EPA's own Assessment Program was measuring the height of a CCR unit from the downstream toe rather than the upstream toe, which was specified in the MSHA regulatory requirement and the subsequent CCR proposed rule.

A review of MSHA, FEMA and the USACE regulations and guidance, as well as the guidance of several state agencies that oversee dam safety, revealed that dam or surface impoundment height is more appropriately measured from the downstream and not the upstream toe of the unit. EPA based this conclusion on the near-universal position of dam safety guidance that the downstream slope height of the dike is of primary concern in the design, construction, operation, and maintenance of the dam or surface impoundment. Virtually all of the dam safety regulations, including state and federal guidance and regulations, that EPA reviewed considered measured dam height to be taken from the downstream slope of the dike. Some of these guidance and regulations include FEMA “Federal Guidelines for Dam Safety,” U.S. Army Corps “National Inventory of Dams,” and MSHA Metal and Nonmetal Tailings and Water Impoundment Inspection requirements in 30 CFR part 56 and § 57.20010.[89] This information, coupled with the information on the methodology used in the Assessments Program, convinced the Agency that a revised description of the CCR surface impoundment size cutoff was necessary, specifically requiring the height of the CCR unit to be measured from the downstream toe.

a. Design and Construction Information

The first element of the structural integrity criteria applicable to CCR units exceeding the specified size threshold requires the owner or operator to compile and place in the operating record design and construction information pertaining to the CCR unit. Among other things, this provision requires the following documentation to be provided by the owner or operator: (1) The name of the owner or operator of the unit; (2) the name of the unit; and (3) any identification number assigned by the state. In addition, it requires that the owner or operator identify: (5) The location of the CCR unit on a U.S. Geological Survey Map or a topographic map of equivalent scale; (6) provide dimensional drawings of the CCR unit with pertinent engineering structures and appurtenances identified; (7) describe the purpose of the CCR unit; and (8) identify the name and size of the watershed affecting the CCR unit, if any. Detailed information is also required documenting: (9) The design and construction of the unit including dates and descriptions of each zone or stage constructed; (10) instrumentation used to monitor the operation of the CCR unit, (11) spillway and diversion design descriptions and construction specifications; and (12) provisions for surveillance, maintenance and repair of the CCR unit.

While these requirements apply to both existing and new CCR surface impoundments, existing CCR surface impoundments are required to compile this information only “to the extent available,” within one year of the effective date of the rule. Conversely, new CCR surface impoundments or any lateral expansion must compile all of the information listed prior to the initial receipt of CCR. For existing CCR surface impoundments, EPA acknowledges that much of the construction history of the surface impoundment maybe unknown or lost. EPA's Assessment Program confirmed that many owners or operators of CCR units did not possess documentation on the construction history or operation of the CCR unit. Information regarding construction materials, expansions or contractions of units, operational history, and history of events was frequently difficult for the owners or operators to obtain. The Assessment Program also confirmed the Agency's initial assumption that this information, in many instances, will be difficult to compile. Therefore, in this rule, EPA is using the phrase “to the extent available” and clarifying that the term requires the owner or operator to provide information on the history of construction only to the extent that such information is reasonably and readily available. EPA intends facilities to provide relevant design and construction information only if factual documentation exists. EPA does not expect owners or operators to generate new information or provide anecdotal or speculative information regarding the CCR surface impoundment's design and construction history.

There are several other requirements under the design and construction criteria requiring clarification. First, the Agency is amending the requirement that all dimensional drawings of the CCR unit (see § 257.73(b)(vii) and § 257.74(b)(vii)) use a uniform scale of one inch equals 100 feet. After further consideration, EPA has deleted this requirement and has replaced the proposed scale of 1 inch equals 100 feet with the phrase “at a scale that details engineering structures and appurtenances relevant to the design, construction, operation, and maintenance of the CCR unit.” EPA made this change in response to comments arguing that this level of detail was unnecessary. EPA agrees that, given the extremely large variety in the size of CCR units, a prescriptive scale for all drawings of all CCR units is not necessary in many cases; this level of detail would be excessive for most Start Printed Page 21381units. The Agency is also clarifying, (see § 257.73(b)(2) and § 257.74(b)(2)) that if an owner or operator determines that a significant change has occurred in the information/documentation previously compiled under this provision, the owner or operator must update the relevant information and place it in the operating record.

b. Types of Assessments

A second element of the structural integrity criteria is the requirement for specific technical assessments of the CCR unit. Consistent with the requirements outlined in the proposed rule, two technical assessments are required for all CCR units exceeding the specified size threshold: (1) A structural stability assessment; and (2) a safety factor assessment. The owner or operator of an existing CCR surface impoundment is required to conduct an initial assessment addressing both structural stability and safety factors within one year of the effective date of the rule. New CCR surface impoundments or any lateral expansion of a CCR unit are required to complete the initial assessment prior to placing CCR into the unit. Following the initial assessments, EPA is also requiring periodic re-assessments of both a CCR surface impoundment's structural stability and factors of safety. EPA proposed to require an annual recertification, but in a departure from the proposed rule, EPA is only requiring these re-assessments to be conducted on a regular basis, not to exceed once every five years. In making this regulatory change, the Agency has relied heavily on the dam safety guidance established by FEMA in the document titled, Federal Guidelines for Dam Safety that a formal inspection, including “. . . a review to determine if the structures (i.e., CCR surface impoundments) meet current accepted design criteria and practices . . .” be taken at an interval not to exceed five years. EPA has interpreted this guidance to be applicable to both the structural stability assessment and the safety factor assessment.

A demonstration must be completed within the assessment period for the specific type of assessment. This means that, within this timeframe the owner or operator must demonstrate that the CCR unit meets all of the requirements of each type of assessment, as certified by a qualified professional engineer. It also means that the owner or operator must have taken all measures necessary to bring the unit into compliance with all of the requirements for assessments of this final rule within the assessment period. If the owner or operator cannot demonstrate that the unit meets these factors of safety (or otherwise fails to comply with the structural stability requirements) within the appropriate timeframe, the unit must initiate closure.

i. Periodic Structural Stability Assessments

In order to ensure the proper upkeep and operation of the CCR unit, the owner or operator must demonstrate that the CCR surface impoundment has been designed, constructed, operated and maintained to provide structural stability. Specifically, consistent with the proposal, the final rule requires the owner or operator to demonstrate that the design, construction, operation, and maintenance of the CCR surface impoundment is consistent with recognized and generally accepted good engineering practices for the maximum volume of CCR and water that can be impounded therein. As discussed previously, EPA has elaborated on this overall performance standard in response to comments from the engineers who would be required to make these certifications, urging EPA to specify more precisely the standards that must be met. Specifically the final rule focuses on the critical structural aspects of the CCR surface impoundment that EPA identified in the proposed rule, and identifies the minimum elements that a professional engineer must provide engineering details on or otherwise address. In certain cases, the final criteria identify specific engineering performance standards. EPA relied on existing MSHA requirements, FEMA dam safety guidance, and guidance issued by the USACE, as applied throughout EPA's Assessment Program to develop these criteria. Consistent with the proposal, these demonstrations must be certified by a qualified professional engineer. Each of these criteria is discussed in more detail below.

In addition to implementing adequate slope protection against erosion, which is a structural stability requirement applicable to all CCR units, the owner or operator of a CCR surface impoundment exceeding the specified size threshold must demonstrate that the unit, including any vertical and lateral expansions, is constructed with “stable foundations and abutments.” A stable foundation is an essential element of surface impoundment construction and prevents differential settlement of the embankment which can result in adverse internal stresses with the embankment cross-section. Soils tend to consolidate when subjected to loadings for extended periods, which can lead to strain incompatibility, a phenomena which prevents the full development of peak strength of the foundation. The stability of foundations and abutments can be determined by engineering monitoring, representative soil sampling, and modeling. Similarly, cohesion between the abutments of the CCR surface impoundment and the embankment of the CCR surface impoundment is critical. Frequently, CCR surface impoundments are subject to cracking and excessive seepage and piping in the groins where the abutment and embankment meet. These adverse conditions may lead to further structural deficiencies which threaten the safety of the CCR surface impoundment.

Consistent with general engineering construction methodologies, the structural stability assessment also requires the owner or operator to determine whether the CCR surface impoundment has been mechanically compacted to a density sufficient to withstand the range of loading conditions in the CCR unit.[90] Compaction of a dike or embankment is considered essential, as the compaction of soils leads to an increase in density and subsequently strength. Soil mechanics theory has established that the density of a soil corresponds to the moisture content and strength of the soil. The rule requires the owner or operator make this determination for all dikes of a CCR surface impoundment.

EPA notes that a number of existing voluntary consensus standards are available that can be useful in making this determination. For example, ASTM D 698 establishes a performance standard of 95% of the maximum standard Proctor density. Similarly, ASTM D 1557 establishes a standard of 90% of the maximum modified Proctor density. Alternatively, in certain instances, such as soils consisting of more than 30% material retained on the 3/4 in. sieve, Proctor testing is not appropriate and the relative density criteria can be met. In such cases, EPA recommends a 70% relative density. These specific soil compaction criteria are ubiquitous throughout engineering construction as sufficient to support engineered works based on the requirements. They are also consistent with the standards promulgated by the state of New Mexico's dam safety program in order to ensure proper compaction during construction of new CCR surface impoundments.

EPA recognizes that it would be highly difficult for owners or operators Start Printed Page 21382of older units to certify with any certainty that the unit's construction meets the specific numeric compaction criteria found in the ASTM standards. New units, however, can easily meet these standards, and should therefore be designed and constructed to meet the numeric compaction criteria.

The owner or operator must also design, construct, operate, and maintain the CCR surface impoundment spillway or spillways with appropriate material so as to prevent the degradation of the spillway, as well as to ensure that the CCR surface impoundment has adequate spillway capacity to manage the outflow from a specific inflow design flood. In addition, a demonstration must be made that the CCR surface impoundment has been designed, constructed, operated, and maintained with inflow design flood controls and/or spillway capacity to manage peak discharge during and following inflow design floods. This demonstration is required to ensure the CCR surface impoundments will have adequate hydrologic and hydraulic capacity to prevent such failures as overtopping and excessive internal seepage and erosion. Spillways must be designed to withstand discharge from the inflow design flood without losing their structural form and leading to discharge issues, such as erosion or overtopping of the embankment. This requirement is covered in more detail in the hydrologic and hydraulic capacity requirements for CCR surface impoundments section of this rule.

EPA is not requiring a facility to include any demonstration relating to the potential for rapid, or sudden, drawdown loading condition. Rapid or sudden drawdown is a condition in earthen embankments in which the embankment becomes saturated through seepage in an extended high pool elevation in the reservoir. A threat to the embankment emerges when the reservoir pool is drawn down or lowered at a rate significantly higher than the excess poor water pressure within the embankment can diminish. Typically, rapid drawdown scenarios are considered for embankments with reservoirs used for water supply and management, emergency reservoirs, or agricultural supply, in which the reservoir is rapidly discharged from the structure. In these scenarios, a high pool elevation is maintained in the reservoir in storage months. Subsequently, the water supply is drawn on in months where there is a high demand for the reservoir's contents. This drawing down of the pool can affect the structural stability of the unit. However, the management of CCR surface impoundments differs from that of conventional water supply, emergency, and agricultural reservoirs. The only instance of a rapid drawdown of a CCR surface impoundment which EPA has identified is in the event of a massive release of the reservoir of the CCR surface impoundment due to a failure of the dike of the CCR surface impoundment. In this instance, a massive release has occurred or is occurring. A subsequent failure of the upstream or internal embankment due to this rapid drawdown would only precipitate further embankment failure and not any further release of the contents of the impoundment, as the contents of the surface impoundment would have already been released. In these instances, remediation of a failure in a rapidly drawn-down section would be necessary prior to filling of the unit, but is not a concern precipitating a release of impounded contents.

A second consideration regarding rapid drawdown, however, is the rapid drawdown of a water body adjacent to the slope of the CCR surface impoundment which may periodically inundate the slope. Many CCR surface impoundments are located in areas in which the downstream slope of the CCR surface impoundment runs down to a lake, stream, or river. In such instances, rapid drawdown must be considered for the stability of the downstream slope of the embankment in the event of a rapid drawdown in the lake, stream, or river pool elevation or stage. Because the water ponded against the downstream slope of the CCR surface impoundment provides a stabilizing load on the slope of the CCR surface impoundment, the rapid or gradual loss of this stabilizing force must be considered in the analysis of the CCR surface impoundment. The rule, therefore, requires that existing and new CCR surface impoundments and any lateral expansions of such units with a downstream slope that can be inundated by an adjacent water body, such as rivers, streams, or lakes, be constructed with downstream slopes that will maintain structural integrity in events of low pool or rapid drawdown of the adjacent water body. This ensures that the structural integrity of the downstream slope of the CCR surface impoundment will be maintained, even though the conditions of an adjacent surface water body may be outside the owner or operator's control.

ii. Periodic Safety Factor Assessments

As previously discussed, EPA received comment requesting the Agency to supplement the proposed technical criteria to assist owners or operators of CCR surface impoundments in interpreting the factor of safety determination required by proposed § 257.71(d)(12). EPA proposed that facilities compute “a minimum factor of safety for slope stability of the CCR retaining structure(s),” and to provide the methods and calculations used to determine each factor of safety. In reviewing the proposed requirement, the Agency agrees that further elaboration on the requirement is necessary to ensure that engineers can accurately assess a CCR unit's structural stability using factor of safety calculations, and would be valuable to ensure a consistent national standard. EPA has therefore revised the criteria to be consistent with the criteria developed and used to assess these impoundments as part of the Assessment Program.

Accordingly, the final rule requires demonstrations of structural integrity using accepted engineering methodologies under specific loading conditions. Owners or operators must conduct and have certified by a qualified professional engineer, an initial assessment, supported by the appropriate engineering calculations, documenting whether the CCR unit achieves the following minimum factors of safety: (1) The calculated static factor of safety under the long-term, maximum storage pool loading condition, which must equal or exceed 1.50; (2) the calculated static factor of safety under the maximum surcharge pool loading condition, which must equal or exceed 1.40; (3) the calculated seismic factor of safety, which must equal or exceed 1.00; and (4) the calculated liquefaction factor of safety, which must equal or exceed 1.20. In addition to the safety factors specified for existing CCR surface impoundments, new CCR surface impoundments and any lateral expansion must also comply with a fifth safety factor, the calculated static factor of safety under the end-of-construction loading condition, which must equal or exceed 1.30.

The minimum static factors of safety are adopted directly from the USACE's Engineer Manual EM 1110-2-1902 entitled, “Slope Stability.” As discussed in more detail in Unit III of this document, EPA relied heavily on this manual and applied these specific factors of safety during its Assessment Program, and it is widely considered the benchmark in the dam engineering community for slope stability and methodology and analysis.

The seismic factor of safety is adopted from review of several dam safety guidance documents, including USACE guidance Engineer Circular 1110-2-6061: Safety of Dams-Policy and Procedures 2204, Engineer Circular Start Printed Page 213831110-2-6000: Selection of Design Earthquakes and Associated Ground Motions 2008, and Engineer Circular 1110-2-6001: Dynamic Stability of Embankment Dams 2004. EPA also reviewed MSHA's 2009 Engineering and Design Manual for Coal Refuse Disposal Facilities, in particular Chapter 7, “Seismic Design: Stability and Deformation Analyses.” These documents are viewed by ASDSO, FEMA and MSHA as generally accepted guidance on how to conduct seismic stability analyses. EPA chose the factor of safety of 1.00 because the 1.00 quantity represents the condition of the slope in which the strength of resistance to loading is equal to the anticipated loading stress acting upon the embankment, or the value which represents stability under the appropriate loading condition.

The liquefaction factor of safety is adopted from review of several dam safety guidance and liquefaction guidance, including “Soil Liquefaction During Earthquakes,” Idriss and Boulanger, Earthquake Engineering Research Institute, 2008,[91] “Geotechnical and Stability Analyses for Ohio Waste Containment Facilities,” Ohio EPA, Sept. 14, 2004, Chapter 5,[92] and Federal Guidelines for Dam Safety: Earthquake Analyses and Design of Dams, Document 65, FEMA May 2005.[93] EPA also reviewed several technical resources regarding soil liquefaction, including “Ground Motions and Soil Liquefaction During Earthquakes,” Seed and Idriss, 1982,[94] “Liquefaction Resistance of Soils: Summary report from the 1996 and 1998 NCEER/NSF Workshops on Evaluation of Liquefaction Resistance of Soils,” Youd and Idriss, 2001,[95] and Seismic Design Guidance for Municipal Solid Waste Landfill Facilities, US EPA, Office of Research and Development, 1995. EPA chose a liquefaction factor of safety of 1.20, identifying that consideration of liquefaction potential and post-liquefaction residual strength slope stability included several uncertainties in assumptions and analysis which must be accounted for in a factor of safety above unity (i.e., 1.00). FEMA guidance explicitly states that “post-liquefaction factors of safety are generally required to be a minimum of 1.2 to 1.3.”

In conjunction with this requirement, EPA continues to require periodic re-assessments of the safety factor calculations, but as discussed, has modified the frequency to be no less than once every five years for all affected CCR units. Periodic reassessments are necessary to account for factors that are subject to change and can adversely affect the structural stability of a CCR unit, e.g., age, use, volume of material contained within, and to reflect the dynamic nature of a CCR surface impoundment and the loads to which the dikes of the CCR surface impoundment may reasonably be expected to become subject to both the requirement to periodically reassess safety factor calculations and the five-year timeframes are consistent with the guidance set forth by other federal agencies in assessing dam safety, including MSHA, FEMA, and the USACE. For example, FEMA's Federal Guidelines for Dam Safety explicitly recommends that a dam be formally reassessed at an interval not to exceed every five years, and EPA has adopted this minimum frequency of assessment in this final rule.

(a) General Safety Factor Assessment Considerations

Generally accepted engineering methodologies specify that the determination of the structural stability factors of safety specified above is to be calculated by the qualified professional engineer using conventional analysis procedures or, if necessary, special analysis procedures. Conventional analysis procedures include, but are not limited to, limit equilibrium methods of slope stability analysis, whereas, special analysis procedures include, but are not limited to, finite element methods, finite difference methods, three-dimensional methods, or probabilistic methods. Whichever methodology is used to determine the factors of safety of the CCR surface impoundment, the qualified professional engineer must document the methodology used, as well as the basis for using that methodology, and the analysis must be supported by appropriate engineering calculations.

Limit equilibrium methods compare forces, moments, and stresses which cause instability of the mass of the embankment to those which resist that instability. The principle of the limit equilibrium method is to assume that if the slope under consideration were about to fail, or at the structural limit of failure, then one must determine the resulting shear stresses along the expected failure surface. These determined shear stresses are then compared with the shear strength of the soils along the expected failure surface to determine the factor of safety. Limit equilibrium methods include, but are not limited to, methods of slices. The most commonly applicable method of slices are the ordinary method of slices or Modified Swedish Method, Bishop's Modified Method, force equilibrium methods, Janbu's method, Morgenstern and Price's method, or Spencer's Method.

If conventional analysis procedures yield results that indicate complex failure mechanisms or the need for estimation of displacements, such as the need to determine internal stresses or displacements in an embankment or account for 3-dimensional effects in an embankment, special analysis procedures may be necessary to calculate factors of safety. Special analysis procedures include, but are not limited to: (1) The finite element method; (2) the finite difference method; (3) the three-dimensional limit equilibrium analysis method; or (4) the probabilistic method.[96]

Structural stability factors of safety need to be met in all cross-sections of the CCR surface impoundment since the failure of any cross-section of the CCR surface impoundment can result in the loss of the reservoir and stored CCR material in the CCR surface impoundment. However, it is not necessary to require the facility to fully analyze and calculate factors of safety for all cross sections under the specific loading conditions identified above. Rather, it is sufficient to calculate the factors of safety under both static, seismic, and liquefaction loading conditions only for the critical cross section of the CCR surface impoundment embankment, provided the facility carefully analyzes each cross section to properly identify the critical cross section. EPA has adopted this approach because the critical cross-section(s) represents a “most-severe” case and it is reasonably anticipated that all other cross-sections of the embankment will exceed the calculated factors of safety of the critical cross-section(s). The final rule therefore adopts this approach. The final rule Start Printed Page 21384defines the critical cross section of the embankment of a CCR surface impoundment to be that which is anticipated to be most susceptible amongst all cross sections of the embankment to structural failure based on several engineering considerations for the given loading condition, such as soil composition of the cross-section, phreatic surface level within the cross section, grade of the upstream and downstream slopes of the cross section, and presence or lack of reinforcing measures in the cross-section as opposed to other cross-sections, such as buttressing or slope protection on the slopes of the cross section. Due to the variance of qualitative and quantitative properties of embankment structural strength, EPA expects that a prudent engineering analysis will need to consider multiple cross sections to ensure proper selection of a critical cross section.

(b) The Calculated Static Factor of Safety Under the Long-Term, Maximum Storage Pool Loading Condition

It is generally accepted practice to analyze the stability of the downstream slope of the dam embankment for steady-state seepage (or steady seepage) conditions with the reservoir at its normal operating pool elevation (usually the spillway crest elevation) since this is the loading condition the embankment will experience most. This condition is called steady seepage with maximum storage pool. The maximum storage pool loading is the maximum water level that can be maintained that will result in the full development of a steady-state seepage condition. Maximum storage pool loading conditions need to be calculated to ensure that the CCR surface impoundment can withstand a maximum expected pool elevation with full development of saturation in the embankment under long-term loading. The final rule requires that the calculated static factor of safety for the critical cross section of the CCR surface impoundment under the long-term maximum storage pool loading condition meet or exceed 1.5. The generally accepted methodology for determining the long-term, maximum storage pool loading condition considers conditions at the CCR surface impoundment that exist for a length of time sufficient for steady-state seepage or hydrostatic conditions to fully develop within the embankment of the CCR unit.[97] The maximum storage pool loading needs to consider a pool elevation in the CCR unit that is equivalent to the lowest elevation of the invert of the spillway, i.e., the lowest overflow point of the perimeter of the embankment. The generally accepted methodology for the calculation of the factors of safety uses shear strengths expressed as effective stress and with pore water pressures that correspond to the long-term condition. Pore-water pressures should be estimated from the most reliable of the following sources: (1) Field measurements of pore pressures in existing slopes; (2) past experience and judgment of the qualified professional engineer; (3) hydrostatic pressure computation for conditions of no flow; or (4) steady-state seepage analysis using flow nets or finite element analyses.

(c) The Calculated Static Factor of Safety Under the Maximum Surcharge Pool Loading Condition

The maximum surcharge pool loading condition is calculated to evaluate the effect of a raised level (e.g., flood surcharge) on the stability of the downstream slope. This ensures that the CCR surface impoundment can withstand a temporary rise in pool elevation above the maximum storage pool elevation for which the CCR surface impoundment may normally be subject under inflow design flood stage, for a short-term until the inflow design flood is passed through the CCR surface impoundment. The final rule requires that the calculated static factor of safety for the critical cross section of the CCR surface impoundment under the long-term maximum surcharge pool loading condition meet or exceed 1.4.

Similar to the long-term, maximum loading condition, a prudent evaluation of the maximum surcharge pool loading condition needs to consider conditions at the CCR unit to exist for a length of time sufficient for steady-state seepage or hydrostatic conditions to fully develop within the embankment of the CCR surface impoundment. The maximum surcharge pool is considered a temporary pool that is higher than the maximum storage pool; the maximum surcharge loading condition should therefore consider a temporary condition in the pool at which the pool exists temporarily above the maximum storage pool elevation in the event of an inflow design flood and spillway discharge condition in the reservoir, i.e., above the lowest invert of the spillway during the anticipated inflow design flood.

(d) The Calculated Seismic Factor of Safety

All CCR surface impoundments, including any lateral expansions that exceed the size threshold must meet a seismic factor of safety equal to or greater than 1.0. EPA has included this requirement because the mechanics and response phenomena of geotechnical structures vary radically under dynamic loading from those under static loading. Consequently, reliance on the factors of safety under static loading is not sufficient to evaluate the structural stability of a CCR surface impoundment. Standard engineering methodology and guidance support EPA's conclusion that adequate seismic analysis of embanked structures is essential to ensure the continued structural stability of a geotechnical structure under dynamic, or seismic, loading is warranted.[98]

As discussed in the section of this preamble addressing the location criteria, all CCR surface impoundments must also be capable of withstanding a design earthquake without damage to the foundation or embankment that would cause a discharge of its contents. To further support the location criteria established in this rule, CCR surface impoundments and any lateral expansion exceeding a specific height and/or volume threshold must be assessed under seismic loading conditions for a seismic loading event with a 2% probability of exceedance in 50 years, equivalent to a return period of approximately 2,500 years, based on the USGS seismic hazard maps for seismic events with this return period for the region where the CCR unit is located. EPA chose the 2% exceedance probability in 50 years event based on its common use in seismic design criteria throughout engineering. See for example, ASCE 7 Minimum Design Loads for Buildings and Other Structures, International Building Code. Moreover, USGS seismic hazard maps, dictate that the life of a structure and the realistic probability of event occurrence be considered in the design of lateral force resisting systems for structures. As discussed in the Regulatory Impact Assessment, the expected life of a CCR surface impoundment can exceed 50 years. Consistent with the location criteria for seismic impact zones, EPA adopted 2% as a reasonable probability of occurrence.

Under standard engineering methodologies, seismic analysis includes several procedures to adequately analyze the structural Start Printed Page 21385strength of a CCR surface impoundment during dynamic, i.e., seismic, loading. Such analyses would typically need to include the appropriate characterization of ground motions at the site of the CCR surface impoundment for the 2% probability in 50 years seismic event.[99] In addition, the peak ground acceleration (PGA), velocity, and displacement should be selected using historic records, site-specific observations, or magnitude-distance attenuation relations. Additionally, the analysis would need to include an appropriate duration of earthquake, considering accelorograms for the anticipated event. Appropriate elastic response spectra should be selected using engineering methodology for selection, such as the Newmark-Hall Spectrum or other appropriate published spectra, USGS Probabilistic Maps, or site-specific response spectra.

(e) The Calculated Liquefaction Factor of Safety

All CCR surface impoundments, including any lateral expansions that exceed the size threshold and have been determined to contain soils susceptible to liquefaction must meet a liquefaction factor of safety equal to or greater than 1.20. A prudent engineering analysis of structural stability also includes a liquefaction potential analysis and analysis of post-liquefaction static factors of safety. As discussed previously, liquefaction is a phenomenon which typically occurs in loose, saturated or partially-saturated soils in which the effective stress of the soils reduces to zero, corresponding to a total loss of shear strength of the soil. The most common occurrence of liquefaction is in loose soils, typically sands. The liquefaction FOS determination in the final rule is used to determine if a CCR unit would remain stable if the soils of the embankment of the CCR unit were to experience liquefaction. Liquefaction analysis is only necessary in instances where CCR surface impoundments show, through representative soil sampling, construction documentation, or anecdotal evidence from personnel with knowledge of the CCR unit's construction, that soils of the embankment are susceptible to liquefaction.

EPA has included this requirement because the mechanics and response phenomena of geotechnical structures vary radically following induced liquefaction, i.e., post-liquefaction. Similar to the requirement for seismic factors of safety, liquefaction factors of safety are necessary because reliance on static loading is not sufficient to evaluate the structural stability of a CCR surface impoundment. Standard engineering methodology and guidance support EPA's conclusion that adequate liquefaction potential analyses and post-liquefaction residual strength slope stability analyses of embanked structures is essential to ensure the continued structural stability of a geotechnical structure following dynamic loading.

Under standard engineering methodologies, liquefaction potential analysis and post-liquefaction stability analysis includes several procedures to adequately analyze the structural strength of a CCR surface impoundment. Because only certain soils, such as loose sands, are susceptible to liquefaction, the rule requires only embankments constructed of such soils identified through liquefaction potential analysis to meet liquefaction factors of safety. Such liquefaction potential analysis would need to include proper soil characterization of the embankment soils for soil age and origin, fines content and plasticity index, water content, saturation, and maximum current, past, and anticipated future phreatic surface levels within the embankment, foundation, or abutments, location beneath the natural ground surface, and penetration resistance whether through standard penetration testing (SPT) or, ideally, cone penetration testing (CPT). Post-liquefaction stability analysis would need to include detailed characterization of the site conditions, identification of the minimum liquefaction-inducing forces based on soil characterization, determination of seismic effect on liquefied layers of the embankment, and calculation of factors of safety against each liquefied layer of the embankment.

(f) The Calculated Static Factor of Safety Under the End-of-Construction Loading Condition

The End-of-Construction loading condition must be calculated for new CCR surface impoundments to ensure that the CCR surface impoundment can withstand a “first-filling” of the embankment, during which time the embankment first become saturated and is subject to phreatic flow through the cross-section.

Embankments are typically constructed in layers with soils at or above their optimum moisture content that undergo internal consolidation because of the weight of the overlying layers. Embankment layers may become saturated during construction as a result of consolidation of the layers or by rainfall. Because of the low permeability of fine-grained soils of which many embankments are constructed and the relatively short time for construction of the embankment, there can be little drainage of the water from the soil during construction: resulting in the development of significant pore pressures. Soils with above optimum moisture content will develop pore pressures more readily when compacted than soils with moisture contents below optimum. In general, the most severe construction loading condition is at the end of construction.

The final rule requires that the calculated static factor of safety for the critical cross section of the CCR surface impoundment under end of construction loading conditions meet or exceed 1.30. The End-of-Construction loading condition is analyzed for new construction under their initial filling condition, following the completion of construction. Undrained shear strength conditions are typically assumed for the End-of-Construction loading condition. Both the upstream and downstream slopes of the embankment are analyzed for this condition

(g) Failure To Demonstrate Minimum Safety Factors or Failure To Complete a Timely Safety Factor Assessment

As previously discussed, the rule requires an owner or operator to document that the calculated factors of safety for each CCR surface impoundment achieve the minimum safety factors specified in the rule. For any CCR surface impoundment that does not meet these requirements, the owner or operator must either take any engineering measure necessary to ensure that the unit meets the requirements by the rule's deadlines, or cease placement of CCR and non-CCR waste into the unit and initiate closure of such CCR unit as provided in section 257.102 within six months. Similarly, if an owner or operator fails to complete the initial safety factor assessment or any subsequent periodic factor safety assessment by the deadlines established in the rule, the owner or operator must cease placing CCR and non-CCR waste into the unit and initiate closure within six months.

(h) Vertical Expansions of CCR Surface Impoundments and Structural Integrity Criteria

It is not uncommon for the owner or operator to raise the crest of a CCR surface impoundment to accommodate the additional capacity needs of the Start Printed Page 21386facility. The record documents that CCR surface impoundments are commonly expanded from the original design or as-built construction, through such “vertical expansions,” including where a CCR surface impoundment changes from a “small” CCR unit (i.e., below the height and/or volume threshold) to a “large” CCR unit (i.e., exceeding the height and/or volume threshold). In these situations, the owner or operator of the CCR unit becomes subject to additional structural integrity requirements as a result of the vertical expansion. Realizing that these newly created CCR units will require some time to meet the structural integrity requirements, the Agency is allowing one year from the completion of the vertical expansion for the owner or operator to comply with the requirements of §§ 257.73 or 257.74, as applicable.

F. Operating Criteria—Air Criteria

EPA proposed to require CCR landfills, CCR surface impoundments and any lateral expansion to control the creation of fugitive dust. Specifically, EPA proposed that facilities must ensure that fugitive dust either not exceed the standard of 35 μg/m[3] , established as the level of the 24-hour National Ambient Air Quality Standards (NAAQS) for fine particulate matter (PM-2.5), or any alternative standard established pursuant to applicable requirements developed under a State Implementation Plan (SIP) approved or promulgated by the Administrator pursuant to section 110 of the CAA (see 75 FR 55175). Consistent with the numerical standard, EPA proposed to require that CCR units be managed to control the wind dispersal of dust, and that CCR landfills also be required to emplace wet conditioned CCR (i.e., wetting CCR with water to a moisture-content that prevents wind dispersal and facilitates compaction, but does not result in free liquids) into the unit. EPA also required that documentation of the measures taken to comply with the requirements be certified by an independent registered professional engineer. EPA proposed these requirements based on the results of a screening level analysis of the risks posed by fugitive dust from CCR landfills, which showed that without fugitive dust controls, levels at nearby locations could exceed 35 μg/m[3] , established as the level of the 24-hour PM 2.5 NAAQS for fine particulate. These measures were also intended to reduce the excessive cancer risks associated with the inhalation of hexavalent chromium. This potential risk would apply to over six million people who live within the census population data “zip code tabulation areas” for the 495 rule-affected electric utility plant locations. (See 75 FR 35215.) [100]

As part of the proposal, EPA solicited comments on the following fugitive dust issues: (1) The location of air monitoring stations near CCR landfills or CCR surface impoundments; and (2) information on any techniques, such as wetting, compaction, or daily cover that are or can be employed to reduce exposures to fugitive dust. The Agency received no information from commenters on either of these issues.

The majority of comments received, however, took issue with the proposed technical standard of 35 ug/m3. Commenters argued that, as proposed, the standard would be impossible to implement because the Agency provided no information on particle size, form of the standards, whether an averaging period is available, point of compliance or how one considers upwind sources. More generally, however, commenters argued that the proposed provisions were unnecessary because fugitive dust issues were adequately addressed by existing air rules through the development and implementation of NAAQS, such as PM10 and PM2.5. These same commenters acknowledged, however, that if the Agency established a criterion to control fugitive dusts, a more appropriate and reasonable standard could be based on best management practices or BMPs. To that end, commenters offered information suggesting that CCR landfills typically used compaction, regular wetting and temporary covers in conjunction with visual air monitoring to effectively control fugitive dust at their facilities, and that these practices were included in facility operating plans.

As discussed in the proposed rule, EPA's decision to address fugitive dust was based on a peer review of the 2010 draft Risk Assessment, 2007 NODA stakeholder comments, photographic documentation of fugitive dust associated with the management of CCR, Agency actions to control fugitive emissions during the clean-up of the December 2008 TVA Kingston spill, and OSHA's Material Safety Data Sheets (now Safety Data Sheets (SDS)) requirements for coal ash. These lines of evidence have been bolstered since the proposal, by evidence collected during the eight 2010 CCR public hearings, where stakeholders provided extensive feedback about fugitive dust impacts associated with CCR management at facilities adjacent to their residences, and by documented reports on fugitive dust issues provided by citizen groups.[101] The stakeholders called for federal oversight to address those instances where complaints were seemingly ignored by state regulators and/or where state administrative enforcement measures failed to compel the utilities to effectively amend their dust emission control management practices. The Agency followed up on the complaints with state agencies and compiled a preliminary database on documented and alleged fugitive dust damage cases.[102]

In support of this rule, EPA compiled records of over 20 documented fugitive dust cases, in addition to several alleged cases that could not be verified. The documented cases indicate that fugitive dust concerns arise in all phases of the CCR life cycle—from conveyor belt transfer at the coal-fired power plant, through stockpiling and transport for disposal/beneficial use, and up to final disposition. Fugitive dust also is a potential concern associated with both—landfills and surface impoundments. Whereas a nexus between fugitive dust impacts and CCR landfill operations was to be expected, EPA discovered that fugitive dust was also of concern at CCR surface impoundments, either under conditions of windy winter spells affecting CCR exposed above or next to the CCR surface impoundment boundary, or due to the total CCR surface impoundment evaporation in arid areas.

Very few studies have been undertaken to test the health impacts caused by fugitive dust emissions, and of those few, due to inherent limitations, all failed to prove that fugitive dust was the cause of the documented health concerns. For example, in the wake of the January Start Printed Page 213872005 coal ash pile collapse at the Rostosky Ridge Road, in Allegheny County, Pennsylvania, both the federal and county studies [103] failed to test during this period and missed the narrow exposure window that would have possibly demonstrated a link between the event and the short-term health symptoms (e.g., sore throat, cough, fever, nausea, fatigue, diarrhea, and headaches) contracted by residents who ultimately removed approximately 1,500 tons of fly ash from their properties immediately after the incident without the benefit of any protective respiratory gear. The federal and county studies also found no evidence of long-term arsenic poisoning of the tested individuals. For recurring instances of CCR dispersion in the air at the Indian River Power Plant, Millsboro, Delaware, three consecutive state studies tentatively established other risk factors as the probable cause for a lung cancer cluster in a down-wind location of the presumable source term (CCR fugitive dust blowing of a landfill and stack emissions).[104] Critics claim that these studies used too small of a sample, and were not designed to capture the impact of long-term exposure to pollution.[105]

Nevertheless, in eleven other cases, states adopted measures to address concerns from fugitive dust emissions; these included conducting lung-cancer cluster and other health studies, conducting particle dispersion studies, issuing Notices of Violation and Consent Orders to the responsible facilities, waiving landfill cover exemptions, and requiring dust management plans for newly permitted CCR landfills. In addition, in several instances, citizens filed lawsuits or reached an out-of-court settlement with the primary responsible party; and in one case, OSHA imposed a steep fine on the owners of a facility manufacturing abrasive blasting and roofing materials from slag produced at a nearby coal-fired power plant, for willfully exposing their workers to dangerously high levels of hazardous dust, and for failing to provide adequate breathing protection and training for workers at the facility. According to stakeholder allegations, fugitive dusts generated by these same materials also adversely impacted residents in the facility's immediate vicinity.

As previously stated, many commenters argued that the proposed numeric particulates standard was incompatible with the air quality requirements established under the States' Implementation Plans (SIPs) or with provisions set up by the states in their Title V Clean Air Permits to the power producers. In addition, the commenters argued that the proposed standard lacked technical details to facilitate effective implementation, and that implementation of the standard required specialized equipment and advanced training to carry out a judicious reading and interpretation of opacity, a proxy measure for the level of fugitive dust emissions. In light of these comments, EPA re-evaluated the existing CAA standards applicable to these units; 40 CFR 70.2 identifies fossil-fuel-fired steam electric plants of more than 250 million BTU/hour heat input as potential sources of fugitive dust (PM sources) that must be covered by state permitting, and 40 CFR 70.3 stipulates that fugitive emissions from a part 70 source shall be included in the permit application and the part 70 permit in the same manner as stack emissions, regardless of whether the source category is included in the list of sources contained in the definition of major source. Based on these applicable CAA requirements, the Agency agrees that the adoption of a PM standard under the final rule would entail a potential for duplication or inconsistency with applicable state-established standards in SIP permits.

EPA also acknowledges the challenges involved in measuring the proposed compliance standard. Because fugitive dust is emitted from non-point sources, it cannot be easily measured by conventional methods. Usually, regulations developed by the states to control fugitive dust stipulate that no person or source shall cause or allow, from any activity, any emissions of fugitive particulate matter that are visible to an observer who looks horizontally along the source's property line. A quantitative measurement of fugitive dust levels (EPA's Reference Method 9) would require measuring opacity, which, as the commenters noted, necessitates specialized technical training, trainee certification, and judicious application of instrumentation.

Therefore, rather than requiring a potentially redundant and challenging-to-implement quantitative standard, EPA is substituting a performance standard for fugitive dust control. This standard requires owners or operators of a CCR unit to adopt measures that will effectively minimize CCR from becoming airborne at the facility, including CCR fugitive dust originating from CCR units, CCR piles, roads, and other CCR management activities. The Agency considers this standard to be consistent with the intent of the proposed rule, with the added advantage of allowing facilities the flexibility to determine the appropriate measures to achieve regulatory compliance at their individual site. This standard and the accompanying regulatory requirements supporting its implementation, will achieve the statutory obligation of “no reasonable probability of adverse effects on human health and the environment.”

As in the proposal, the Agency is also requiring documentation of the measures taken to comply with the technical standard in a “CCR fugitive dust control plan” (herein referred to as “plan”). Consistent with the proposal, the plan must be certified by a qualified professional engineer and placed in the operating record and on the owner or operators publicly accessible internet site. The plan requires owners or operators to elaborate on the types of activities applicable and appropriate for the conditions at the facility that will be employed to minimize CCR from becoming airborne at the facility. Examples of control measures that may be appropriate include: Locating CCR inside an enclosure or partial enclosure; operating a water spray or fogging system; reducing fall distances at material drop points; using wind barriers, compaction, or vegetative covers; establishing and enforcing reduced vehicle speed limits; paving and sweeping roads; covering trucks transporting CCR; reducing or halting operations during high wind events; or applying a daily cover.

The initial plan must be completed by the effective date of the rule (i.e., within six months of publication). Because this is an initial plan, and because it must be completed within a short timeframe, EPA acknowledges that the facility may only be able to present its initial judgment of the measures that it anticipates are likely to be effective based on the information that is readily available within this six month Start Printed Page 21388timeframe. EPA anticipates that owners or operators may need to revise the plan as they gain additional information and experience implementing the regulations. In recognition of this, the final rule also requires that the CCR fugitive dust control plan include a description of the procedures the owner or operator will follow to periodically assess the effectiveness of the control plan. Consistent with other plans required in this rule, the owner or operator may amend the written CCR fugitive dust control plan at any time. However, the owner or operator must amend the written plan whenever there is a change in conditions that would substantially affect the written plan in effect, such as the construction and operation of a new CCR unit. The plan and any subsequent amendments must be certified by a qualified professional engineer.

In addition, the Agency is promulgating with a slight modification the requirement for owners and operators of all CCR landfills and any lateral expansion to emplace CCR as conditioned CCR, as well as the definition of conditioned CCR. Conditioned CCR has been defined to mean CCR wetted with water to a moisture content that will prevent wind dispersal, but will not result in free liquids, consistent with the definition in the proposed rule. In response to several commenters' requests, and upon further evaluation the Agency is allowing that in lieu of water, CCR conditioning may be accomplished with an appropriate chemical dust suppression agent.[106] As with other requirements of this rule, in order to ensure that the provisions of the fugitive dust criteria are maintained throughout the operating life of the CCR unit, the Agency is requiring that the owner or operator prepare an annual CCR fugitive dust control report, describing the actions taken to control CCR fugitive dust, a record of all citizen complaints, and a summary of any corrective measures taken. The first annual report must be completed no later than 14 months after placing the initial CCR fugitive dust control plan in the facility's operating record. The owner or operator has completed the annual CCR fugitive dust control report when the plan has been placed in the facility's operating record.

The general public, as well as the Agency, is highly concerned with potential risks associated with CCR fugitive dusts. This was readily apparent during the public hearings and from the many comments received on this issue. The Agency continues to receive information regarding this human health and environmental concern. While the subtitle D provisions of this rule lack permitting oversight mechanisms to control fugitive dust from CCR units, it is clear to the Agency that additional substantive actions was needed to facilitate citizen suit enforcement of this criteria. Consequently, the Agency are adding a specific requirement to the CCR fugitive dust control plan to require owners and operators of all CCR units to develop and implement formal procedures to log citizen complaints involving CCR fugitive dust events. These complaints must, then, be included as part of the annual CCR fugitive dust control report. This report must be placed in the operating record and on the owner or operator's publicly accessible internet site. Promulgation of these measures will subject the owner or operator of the CCR disposal facility to public and state scrutiny, and create an incentive for the owner or operator of the CCR disposal facility to improve compliance with the fugitive dust control requirements.

G. Operating Criteria—Run-On and Run-Off Controls for CCR Landfills

EPA's proposal required owners or operators of CCR landfills and all lateral expansions to design, construct and maintain a run-on control system to prevent flow onto the active portion of these units during the peak discharge from a 24-hour, 25-year storm. As described in the proposed rule, run-on controls are designed to prevent erosion, which may damage the physical structure of the landfill, prevent the surface discharge of CCR in solution or suspension; and to minimize the downward percolation of run-on through wastes, creating leachate. Similarly, EPA proposed run-off controls in order to collect and control, at a minimum, the water volume resulting from a 24-hour, 25-year storm. This standard was proposed in order to protect surface waters from contamination. Under the existing 40 CFR part 257 requirements, to which CCR units are currently subject, run-off must not cause a discharge of pollutants into waters of the United States that is in violation of the National Pollutant Discharge Elimination System (NPDES) under section 402 of the Clean Water Act. EPA did not propose to revise the existing requirement, but merely incorporated it for ease of the regulated community.

The Agency proposed the 24-hour period because it was a timeframe that included storms of high intensity with short duration and storms of low intensity with long duration. EPA believed that this was a widely used standard that had been incorporated into the hazardous waste landfills and MSW landfills regulatory requirements. At the time, EPA had no information that warranted a more restrictive standard for CCR landfills. EPA received no significant comment on the proposed requirements, and for the most part, is adopting the proposed requirements without revision. However, in an effort to clarify and provide more direction to the owner or operator and the certifying qualified professional engineer, the Agency has added additional regulatory language that more specifically describes the technical criteria established under this section of the rule.

The run-on and run-off controls of the final rule require that the owner or operator prepare the initial run-on and run-off control system plan within 18 months of publication of the rule. Run-on and run-off control system plan reporting may require design, construction, and post-construction implementation. In instances where run-on and run-off capacity is insufficient, installing additional capacity may involve construction of diversion structures such as swales or ditches. Many of these efforts may require several months of design and construction, compounded by the fact that much of the work cannot be completed in cold-weather or heavy-rain seasons.

1. Run-On and Run-Off Controls for CCR Landfills and All Lateral Expansions [107]

All CCR landfills and all lateral expansions must be designed, constructed, operated, and maintained with a run-on control system to prevent flow onto the active portion of the CCR unit from the peak discharge from a 24-hour, 25-year storm and a run-off control system to collect and control at Start Printed Page 21389least the volume of water resulting from a 24-hour, 25-year storm from the active portion of the CCR unit.[108]

Consistent with the proposal, the rule requires the owner or operator of a CCR landfill or lateral expansion to prepare an initial run-on and run-off control system plan for the CCR unit. For existing CCR landfills, the plan must be prepared by the owner or operator no later than one year from the effective date of the rule. For new CCR landfills and any lateral expansion of a CCR landfill, the plan must be prepared no later than the date of initial placement of CCR in the landfill or lateral expansion. The plan must document how the run-on and run-off control systems have been designed and constructed to meet the requirements of rule and must be supported by appropriate engineering calculations. The run-on and run-off control system plan must be certified by a qualified professional engineer and is considered prepared when the owner or operator has placed the plan in the facility's operating record.

The rule also provides for the owner or operator to amend the plan at any time (e.g., prior to receipt of CCR in the CCR unit, during the operating life of the CCR unit, during closure of the CCR unit, or following closure of the CCR unit) provided the revised plan is placed in the facility's operating record. The owner or operator must, however revise the plan whenever there is a change in the conditions that would substantially affect the written plan in effect (e.g., closure of an existing portion or cell of the CCR landfill, resulting in a possible change in the size of the “active portion” of the CCR landfill).

In addition, consistent with other provisions in this rule, the Agency is requiring that the run-on and run-off control system plan be reviewed, and where necessary, revised or updated at least every five years. The Agency is specifying this periodic review in order to address factors having the potential to influence the run-on and run-off control system. Among other things, CCR landfills can be subject to build-out, operational changes, and surface cover changes, all of which have the potential to significantly alter run-on and run-off flows to and from the active portion of the CCR landfill. Changes in storm intensity and duration, as well as upstream catchment area characteristics, can alter flows that may significantly affect a previously adequate run-on and run-off control system. A mandated five year review of a control system plan is consistent with accepted good engineering practices and protocols for proper maintenance of operational systems supporting the overall performance of a CCR landfill. It is also consistent with the proposed requirement that an owner or operator “maintain” the run-on and run-off control system. EPA interprets this to require the owner or operator to ensure that the run-on and run-off control system is kept in a condition that meets the requirements of the rule, i.e., that the run-on and run-off control system both prevents flow onto the active portion of the unit during the peak discharge from a 24-hour, 25-year storm and collects and controls at least the water volume resulting from a 24-hour, 25-year storm event for the duration of the CCR landfill's operational life. A requirement to conduct a review of the control plan at least once every five years merely provides an explicit mechanism to ensure this occurs in a manner that facilitates citizen and state oversight.

The date of preparing the initial plan is the basis for establishing the deadline to complete the first subsequent plan; i.e., the subsequent plan must be completed within five years of the prior plan. The owner or operator may complete any required plan prior to the required deadline and must place the completed plan into the facility's operating record within the five year timeframe. A qualified professional engineer must certify that the run-on and run-off control system plan, including any subsequent amendments, meets the run-on and run-off control system requirements of this final rule.

a. Run-On Control

Consistent with the proposal, EPA is defining run-on to mean any liquid that drains over land onto any part of a CCR landfill or any lateral expansion of a CCR landfill. In surface water hydrology, run-on is a quantity of surface run-off, or excess rain, snowmelt, or other sources of water, which flows from an upstream catchment area onto a specific downstream location. This rule requires that the CCR landfill be designed, constructed, operated, and maintained to prevent flow onto the active portion of the CCR landfill during the peak discharge from a 24-hour, 25-year storm. EPA has adopted this requirement to minimize the amount of surface water entering the CCR landfill and to minimize disruption of the CCR landfills operation due to storm water inflow. Uncontrolled or undesirable storm water run-on may have significant impacts on the stability of the slopes of a CCR landfill and continued safe operation of the CCR landfill, due to such phenomena as erosion and infiltration.

b. Run-Off Control

EPA has adopted the definition of run-off from the proposal without revision. Run-off means any liquid that drains over land from any part of the CCR landfill. Effectively, run-off is the portion of rainwater, snowmelt, or other liquid which does not undergo abstraction, such as infiltration, and travels overland. Typically, run-off is the product of the inability of water to infiltrate into soil due to saturation or infiltration rate capacity being exceeded. The rule requires that the CCR landfill be designed, constructed, operated, and maintained to collect and control at least the water volume resulting from a 24-hour, 25-year storm. The owner or operator must design, construct, operate, and maintain the CCR landfill in such a way that any run-off generated from at least a 24-hour, 25-year storm must be collected through hydraulic structures, such as drainage ditches, toe drains, swales, or other means, and controlled so as to not adversely affect the condition of the CCR landfill. EPA has promulgated these requirements to minimize the detention time of run-off on the CCR landfill and minimize infiltration into the CCR landfill, to dissipate storm water run-off velocity, and to minimize erosion of CCR landfill slopes. An additional concern with run-off from CCR landfills is the water quality of the run-off, which may collect suspended solids from the landfill slopes. EPA acknowledges that the run-off requirements will also minimize the amount of run-off related pollution generated by the landfill run-off.

c. Run-On and Run-Off Control System Plan

The owner or operator of any CCR landfill must prepare an initial run-on and run-off control system plan documenting, with supporting engineering calculations, how the control systems have been designed and constructed to meet the requirements of the rule. This has been adopted without revision from the proposal. In most cases, EPA expects this documentation will include in addition to the supporting engineering calculations, references and drawings regarding the Start Printed Page 21390identification of the 24-hour, 25-year storm for the location of the CCR landfill, a characterization of the rainfall abstractions, including but not limited to depression storage and infiltration, the selection and basis of an appropriate run-off model, the selection and basis of an appropriate run-on or run-off routing model, and the selection and design of an appropriate run-on and run-off management system (e.g., swales, ditches, retention or detention ponds). Consideration of the above factors would generally constitute a comprehensive review of the hydraulic and hydrologic processes associated with the design of a run-on and run-off control system plan. EPA recognizes that over time, any number of factors, e.g., expansion of the facility, could affect a change in the run-on and run-off control system plan. Consequently in the final rule EPA is providing for flexibility in this area by stating that the plan can be amended by the owner or operator at any time during the life of the CCR landfill, provided the amendments are placed in the operating record and on the facility's publicly accessible Internet site.

H. Operating Criteria—Hydrologic and Hydraulic Capacity Requirements for CCR Surface Impoundments

As discussed in the previous section, EPA proposed to require owners or operators of CCR landfills to design, construct, operate, and maintain: (1) A run-on control system to prevent flow onto the active portion of the unit during the peak discharge from a 24-hour, 25-year storm; and (2) a run-off control system to collect and control, at a minimum, the water volume resulting from the same 24-hour, 25-year storm. EPA also proposed to apply these same run-on and run-off requirements to all CCR surface impoundments and lateral expansions.

Commenters overwhelmingly disagreed with EPA's decision to apply the same run-on and run-off requirements to both CCR landfills and CCR surface impoundments, arguing that a “control system to prevent flow onto the active portion of the surface impoundment” was at odds with a commonly employed practice of using CCR surface impoundments to manage incoming storm water and other inflow. While some commenters reasoned that preventing run-on may be appropriate for CCR landfills and CCR surface impoundments surrounded by above-ground dikes, the proposed requirement was entirely inappropriate for units specifically designed to retain storm water from an adjoining watershed or to operate as part of a facility's overall storm water management system. Numerous commenters suggested that instead of the run-on prevention provision for CCR surface impoundments, EPA adopt a requirement specifying that CCR surface impoundments be designed to accommodate “peak discharge events.” Other commenters argued that storm water run-on controls were only appropriate during and after the closure of CCR surface impoundments; while still other commenters suggested that EPA remove entirely the run-on and run-off requirements because CCR surface impoundments were typically designed to impound and discharge storm water flow far in excess of a 25-year/24-hour storm event.

In evaluating the arguments against the requirements to prevent flow onto the CCR surface impoundment, the Agency was strongly influenced by guidance developed by FEMA for selecting and accommodating hydraulic and hydrologic inflow and outflow as well as the application of this guidance to the CCR surface impoundments evaluated as part of EPA's Assessment Program.[109] A review of FEMA guidance confirmed commenters' contentions that managing flow both to and from dams and impoundments was a widely used practice, and a preferable management strategy for accommodating storm water flows. This was further confirmed by observations made during EPA's Assessment Program; EPA frequently observed units designed to detain or retain storm water inflows of an upstream catchment area to manage CCR, and/or to receive storm water inflow as part of the facility's overall storm water management system. Moreover, EPA relied on the same FEMA guidance to assess the adequacy of the hydrologic and hydraulic capacity of the CCR surface impoundments. In conducting these assessments, EPA considered a number of factors including operating freeboard, catchment area, hydrologic structures' inflow and outflow ratings, design precipitation event, spillway presence and capacity, and unit operating procedures to make this determination. The adequacy of the capacity was determined using FEMA guidance for selecting and accommodating inflow design floods (IDF) for dams. (Note: The use of the terminology related to “inflow design flood” for CCR surface impoundments rather than “run-on” and “run-off” is more directly applicable to the hydraulic and hydrologic capacity of CCR surface impoundments to adequately manage both the inflow and outflow from a design flood.)

During its assessment effort, EPA also found that, contrary to commenter's arguments CCR surface impoundments were often not designed to address floods in excess of a 24-hour, 25-year storm event. Rather many CCR surface impoundments were deficient in their hydrologic and hydraulic capacity requirements due to factors such as lack of operating freeboard, misunderstanding of the actual contributory area, lack of documentation, undersized decant structures, undersized spillways, and lack of spillways.

EPA also disagrees with the comment asserting that storm water controls are only appropriate during and after closure of CCR surface impoundments. Hydrologic and hydraulic capacity, as determined by an effective design flood control system, is an essential element of the overall structural integrity and safety of a CCR surface impoundment. CCR surface impoundments are subject to any number of stresses throughout their operational life; one of the most common causes of a dike or embankment failure being the inability of the CCR unit to adequately pass or manage flood flows resultant from direct or indirect precipitation. These failures can occur at any point in the CCR unit's life, not solely during and after closure, and are usually due to inadequate hydrologic and hydraulic capacity, leading to internal erosion due to seepage and piping, erosion of spillways, overtopping erosion, and overstressing of the embankment. Furthermore, according to the U.S. Bureau of Reclamation, a common dam failure mode is due to overtopping, accounting for 30% of the failures in the U.S. over the last 75 years.[110] Overtopping is the direct result of lack of adequate hydrologic and hydraulic capacity of a dam or surface impoundment. Therefore, EPA is not modifying the regulation as suggested by the commenter.

In light of comments received, observations made during EPA's Assessment Program, and guidance developed by FEMA, EPA has concluded that it was inappropriate to propose to prohibit all run-on discharge or inflow from storm water to CCR surface impoundments. EPA has also Start Printed Page 21391concluded that run-on and run-off criteria are inappropriate for CCR surface impoundments, and that a more appropriate standard involves determining the hydrologic and hydraulic capacity of a unit, measured by its inflow design flood or IDF. Therefore, EPA is amending the proposed run-on and run-off requirements for CCR surface impoundments to require owners or operators of all CCR surface impoundments to design, construct, operate, and maintain hydraulic and hydrologic capacity to adequately manage flow both into and from a CCR surface impoundment during and after the peak discharge resulting from the inflow design flood, based on the Hazard Potential Classification of the CCR surface impoundment.

The final rule requires the preparation of the initial inflow design flood control system plan within 18 months of publication of the final rule. In many cases, inflow design flood control system plan reporting may require design, construction, and post-construction implementation in order to provide sufficient hydrologic and hydraulic (H/H) capacity for the CCR unit. In instances where H/H capacity is insufficient, installing additional capacity may involve spillway construction or decant structure construction or installation. Many of these efforts may require several months of design and construction, compounded by the fact that much of the work cannot be completed in cold-weather or heavy-rain seasons.

1. Inflow Design Flood Controls for CCR Surface Impoundments and All Expansions

The Agency has concluded that the proposed requirement preventing run-on to a CCR surface impoundment was both impractical and unwarranted and could possibly disrupt effective storm water management systems operating at CCR facilities. Therefore, consistent with FEMA guidance, the Agency is modifying this requirement to require an owner or operator of an existing or new CCR surface impoundment or any lateral expansion to design, construct, operate, and maintain H/H capacity of CCR surface impoundments to: (1) Adequately manage flow into the CCR surface impoundment during and following the peak discharge of the inflow design flood; and (2) adequately manage flow from the CCR unit to collect and control the peak discharge resulting from the inflow design flood. The inflow design flood is based on the hazard potential classification of the unit as required by § 257.73 and § 257.74 of this rule.[111] The inflow design floods for specific hazard potential classifications are as follows: (1) The probable maximum flood (PMF) for high hazard potential CCR surface impoundments; (2) the 1000-year flood for significant hazard potential CCR surface impoundments; (3) the 100-year flood for low hazard potential CCR surface impoundments; and (4) the 25-year flood for incised CCR surface impoundments.[112]

EPA has based this revised requirement on the FEMA's guidance entitled, “Selecting and Accommodating Inflow Design Floods for Dams,” which represents current and accepted practices in dam engineering and provides a consistent and uniform standard that has been adopted throughout dam engineering.

Incised CCR surface impoundments, as defined in this rule, are also required to meet inflow design flood requirements.[113] While incised units do not pose the same potential for release as a diked unit, i.e., breach of dike and release of CCR, overtopping of an incised unit does represent a potential environmental hazard warranting control. EPA acknowledges, however, that overtopping of an incised unit would result in a release of CCR material through a surcharge flow, i.e., flow of a temporary stage overtopping the “crest” of the incised CCR surface impoundment, and would not precipitate the degradation of a dike and potential subsequent breach of a dike and massive release of contents of the CCR surface impoundment. To reflect the lower risks associated with such releases, and because incised CCR surface impoundments are not required to determine their hazard potential classification, the Agency is requiring that incised CCR surface impoundments only must accommodate a 25-year flood for the hydrologic and hydraulic capacity requirements of the rule. EPA chose the 25-year flood for incised CCR surface impoundments to maintain consistency with the proposed rule, which required that all units accommodate a 25-year storm event. As part of these requirements, EPA is also finalizing a definition of inflow design flood and flood hydrograph. Inflow design flood has been defined to mean the flood hydrograph that is used to design or modify the CCR surface impoundment and its appurtenant works, and flood hydrograph has been defined to mean the temporal distribution of inflow into a CCR surface impoundment.

2. Inflow Design Flood Control Systems

Controlling the inflow and outflow of the CCR surface impoundment reduces the risks of hydrologic failure, which include overtopping erosion, internal excessive seepage and piping, erosion of spillways, and overstressing of the structural components of the CCR surface impoundment. The CCR surface impoundment's H/H capacity is to be designed based on the unit's hazard potential classification as determined by a qualified professional engineer. To meet the performance standard in the rule, the CCR surface impoundment must be designed to have adequate H/H capacity to ensure that rainfall and watershed characteristics have been accounted for, the hydraulic ratings of all intake structures are adequate and free of obstruction, operating freeboard is adequate, all spillways and decant structures have adequate capacity, and all downstream hydraulic structures have adequate capacity. While not required, an antecedent flood study may be necessary to characterize the condition of the CCR surface impoundment under normal operating conditions.

EPA recognizes that in many impoundment configurations, an inflow design flood may be limited to the direct precipitation that falls within the perimeter of the CCR surface impoundment during a storm event, due to the lack of storm water inflow routing from adjacent catchment areas. Other CCR surface impoundments may have storm water or other hydrologic contributions from various catchment areas or other sources. The final rule's hydraulic and hydrologic capacity standards require all CCR surface impoundments to have adequate hydraulic and hydrologic capacity to accommodate all contributory inflow to CCR surface impoundments, regardless of the inflow's origin.

The hydraulic and hydrologic capacity requirements will minimize the potential for overtopping to occur from normal or abnormal operations, overfilling, wind and wave action, rainfall, and run-on, and will ensure that the unit is operated with appropriate consideration of these potentially adverse conditions. The Agency notes, however, that the operating freeboard of a CCR surface Start Printed Page 21392impoundment is subject to fluctuations, deviating from original design assumptions and specifications. Additionally, EPA notes that routine maintenance and alterations of hydraulic structures associated with the CCR surface impoundments, e.g., decant structures and spillways, can adversely impact the hydrologic and hydraulic capacity of the CCR surface impoundment. At no point should the inflow design flood exceed the capacity of the CCR surface impoundment, regardless of fluctuations in freeboard, maintenance of hydraulic structures, or other potential obstructions to the hydraulic and hydrologic capacity of the unit. The owner or operator must account for operational changes or diminished capacity in the calculation of hydraulic and hydrologic capacity of the CCR unit.

3. Inflow Design Flood Control System Plan

The owner or operator of an existing CCR surface impoundment must prepare an initial inflow design flood control system plan to document that the design and construction of the system will achieve the rule's performance standards no later than 18 months after the publication of this rule in the Federal Register. New CCR surface impoundments or lateral expansions of CCR surface impoundments must prepare an initial inflow design flood control system plan no later than the date of initial receipt of CCR in the unit. The owner or operator must obtain a certification from a qualified professional engineer that the plan meets all applicable requirements of the rule for inflow design flood control system plans. The plan must also be supported by appropriate engineering calculations. This documentation should also include references, and drawings regarding the identification of the design storm for the catchment area affecting the CCR surface impoundment and the CCR surface impoundment itself, a characterization of the rainfall abstractions, including but not limited to depression storage and infiltration in the upstream catchment area affecting the CCR surface impoundment. In addition, EPA expects supporting documentation to address the selection and basis of an appropriate run-off model and an appropriate run-on or run-off routing model; the identification and characterization of any intake or decant structures of the CCR surface impoundment; an appropriate characterization of the spillway(s) of the CCR surface impoundment and their capacity; and characterization of downstream hydraulic structures which ultimately receive the discharge from the CCR surface impoundment. Finally, the owner or operator must comply with the recordkeeping, notification and internet requirements specified in the rule for the plan.

The owner or operator may amend the written inflow design flood control system plan at any time prior to receipt of CCR in the CCR unit, during the operating life of the CCR unit, during closure of the CCR unit, or following closure of the CCR unit provided the revised plan is placed in the facility's operating record. The owner or operator must amend the written inflow design flood control system plan whenever there is a change in the conditions that would substantially affect the written plan in effect. The owner or operator of the CCR surface impoundment must also periodically update the inflow design flood control system plan. The owner or operator must review or update an existing plan at a frequency no less than every five years. Changes in storm characteristics (e.g., intensity and duration) and upstream catchment area characteristics, hazard potential classifications, as well as build-out, operational changes, and diminishing available capacity, all have the potential to influence inflow design flood volumes and therefore the effectiveness of the existing inflow design flood control systems. A periodic review of the plan to address these and other factors is necessary to ensure that the hydrologic and hydraulic capacity of the unit is maintained over time. An update of the inflow design flood control system plan should document any modifications pertinent to the inflow design flood control system.

The owner or operator may amend the written inflow design flood control system plan at any time and must place the revised plan in the facility's operating record. However, the owner or operator must amend the written inflow design flood control system plan whenever there is a change in the conditions that would substantially affect the written plan in effect. The owner or operator of the CCR unit must also review and, where necessary, update an inflow design flood control system plan every five years. As part of this review, the owner or operator must obtain certification from a qualified professional engineer must certify that the inflow design flood control system plan, and any subsequent amendments continues to meet the requirements of the rule. The date of completion of the initial plan is the basis for establishing the deadline to complete the first subsequent plan. The owner or operator may complete any required plan prior to the required deadline, and must place the completed plan into the facility's operating record within a reasonable amount of time.

I. Operating Criteria—Inspection Requirements for CCR Surface Impoundments

EPA proposed structural stability requirements for CCR surface impoundments based on the long-standing MSHA requirements, with only minor modifications. These structural stability requirements were covered in various sections of the proposed rule (see specifically proposed §§ 257.71, 257.72, 257.83, and 257.84). Section 257.83 addressed requirements for periodic inspections of CCR surface impoundments. In proposing these requirements, the Agency concluded that periodic inspections were critical to ensure that any problems relating to structural stability are quickly identified and remedied to prevent catastrophic releases, such as occurred at Martins Creek, Pennsylvania and TVA's Kingston, Tennessee facility. The proposed rule required owners or operators to conduct: (1) Weekly inspections to detect potentially hazardous conditions or structural weakness; and (2) annual inspections to assure that the design, operation, and maintenance of the surface impoundment was in accordance with generally accepted engineering standards. EPA proposed that weekly inspections be conducted by a person qualified to recognize specific signs of structural instability and other hazardous conditions by visual observation and, if applicable, to monitor instrumentation. The proposed rule also required annual inspection reports from an independent registered professional engineer, certifying that the design, operation, and maintenance of the CCR surface impoundment was in accordance with generally accepted engineering standards. Consistent with the annual inspection requirements, EPA, as part of its recordkeeping requirements also proposed that owners or operators of CCR surface impoundments annually document and report on, among other things: (1) Changes in the geometry of the impounding structure; (2) location and type of instrumentation monitoring the unit; (3) the minimum, maximum and present depth and elevation of the impounded water, sediment or slurry for the reporting period; and (4) storage capacity of the impounding structure (see 75 FR at 35246).

The annual inspection provisions also required that if a potentially hazardous Start Printed Page 21393condition developed, the owner or operator must immediately take several actions: Eliminate the potentially hazardous condition; notify potentially affected persons and state and local first responders; notify and prepare to evacuate, if necessary, all personnel from the property who may be affected by the potentially hazardous condition(s); and direct a qualified person to monitor all instruments and examine the structure at least once every eight hours, or more often as required by an authorized representative of the state. Finally, the proposed rule required that inspection and monitoring reports be maintained in the facility operating record and placed on the facility's publicly accessible Internet site as well as promptly reporting the results of the inspection or monitoring to the state.

EPA specifically requested comment on whether to cover all CCR impoundments for stability (including the inspection requirements), regardless of height and storage volume, whether to use the cut-offs in the MSHA regulations, or whether other regulations, approaches, or size cut-offs should be used. The Agency further requested commenters who believed that other regulations or size cut-offs should be used (and not the size cut-offs established in the MSHA regulations) to provide the basis and technical support for their position. (75 FR 35176, 35223). In response to EPA's general solicitation for alternative size cut-offs, the Agency received little response. However, many commenters questioned EPA's decision to require inspections for all CCR surface impoundments, given that the other structural stability requirements were triggered only if the CCR unit exceeded the proposed size threshold (consistent with MSHA requirements). Commenters argued that there was no basis to require inspections of all CCR surface impoundments given that units below the specified size threshold had a much lower risk of catastrophic failure. A more limited requirement the commenter's argued, was supported by MSHA's decision to regulate only those “larger” sized units. Other commenters argued that inspection timeframes should take into account site specific conditions at the site and be based on the recommendations of an independent registered professional engineer. Commenters reasoned that while, in theory, a short inspection interval (i.e., a weekly inspection) should increase the chances of finding an adverse condition, the judgment of a qualified professional engineer to establish the frequency and focus, as well as the purpose of the dam safety inspection was a far more effective method for detecting and preventing the development of a potentially adverse situation. Still other commenters questioned the overall value of a weekly inspection if, as proposed, no documentation of the results was required.

In reviewing the proposed regulatory language, it appears an error was made. Although the preamble generally stated that the proposed regulatory requirements addressing stability (which included inspections) applied only to those CCR surface impoundments exceeding the specified size threshold established by the MSHA regulations, the regulatory text required inspections for all CCR units. The final rule requires weekly general inspections and monthly instrumentation inspections to be conducted for all CCR surface impoundments. Periodic inspections of all CCR units are a necessary practice to ensure that the overall structural integrity of the CCR unit is maintained and that actual and potential structural weaknesses and other hazardous conditions are quickly identified and remediated throughout the active life of the unit. All CCR surface impoundments pose some risk of release—whether from a catastrophic failure or from a more limited structural failure, such as occurred at Duke Energy's Dan River plant. Periodic inspections are a generally accepted, prudent engineering practice that will significantly reduce the risks of such failures; during the Assessment Program, EPA discovered that many facilities routinely conduct some sort of periodic inspection and monitoring, although the frequency varied widely between facilities. The final rule merely codifies this practice, by establishing a consistent minimum timeframe. EPA is therefore requiring that all CCR surface impoundments be inspected by a qualified person both weekly (for visual signs of a potentially adverse condition) and monthly (for instrumentation monitoring). Consistent with the proposed rule, EPA is also requiring annual inspections for all CCR surface impoundments that exceed the specified size threshold of: (1) A height of five feet and a storage capacity of 20 acre-feet; or (2) a height of 20 feet, must also be inspected no less than annually by a qualified professional engineer. These inspection requirements are generally being promulgated as proposed, with minor technical clarifications.

The final inspection requirements have been drawn heavily from guidelines established by FEMA for dam safety, under which maintaining structural integrity involves continuous evaluation of the unit, based on periodic inspections. To be most effective, FEMA suggests, and EPA concurs, that inspections be varied with respect to both the time interval between inspections and the level of detail of the inspection. FEMA guidance, in part, suggests that inspections can be categorized as either: Visual observations to identify abnormal conditions (i.e., informal inspections); field inspections by a professional engineer (i.e., intermediate inspections); and a technical review to determine if the unit meets current and accepted design criteria and practices (i.e., formal inspection).[114] In general, FEMA recommends that inspections focusing on visual observations should be conducted often (e.g., weekly) while more substantive technical evaluation should be conducted every year to every five years depending on the engineering analyses required. (See also the preamble discussion on the requirements specified in §§ 257.73 and 257.74 of this rule, in particular the discussion addressing the five year time interval for structural stability and factor of safety reassessments.)

For the reasons discussed above, EPA has concluded, consistent with FEMA guidelines, that routine inspections of all CCR units are necessary to ensure that the units are safely operated and that issues that could disrupt the safety and continuing operation of these units are promptly identified and remediated. Accordingly, the final rule requires both weekly inspections and monthly instrumentation inspections to be conducted at all CCR surface impoundments to confirm that they are operating safely. These inspections must be conducted by a qualified person trained to recognize specific signs of structural instability and other hazardous conditions by visual observation and if, applicable monitor instrumentation. EPA is also retaining the annual inspection requirement for CCR surface impoundments exceeding the specified size threshold established in this rule. This inspection must be conducted and certified by a qualified professional engineer. Units exceeding this size threshold pose a higher degree of risk of release of CCR to the environment than other types of CCR surface impoundments (e.g., incised or “small” CCR units) and as such warrant additional regulatory control and oversight.Start Printed Page 21394

The final rule requires that both weekly inspections of the CCR unit and monthly monitoring of CCR unit instrumentation be initiated within 6 months of the publication of the rule.

Within nine months of the publication of the rule, the owner or operator must complete the initial annual inspection of the CCR unit. Initial annual inspection requires the retaining of a professional engineer along with the familiarization of the engineer with the facility and CCR units. Additionally, the annual inspection should not be conducted unless weekly inspection and monthly instrumentation monitoring has been initiated and established in order to generate a body of information for the professional engineer to consider. Furthermore, in some cold-weather regions of the United States, weather may inhibit adequate inspection of CCR units, whether through snow or ice cover. EPA is establishing a timeframe of nine months after the publication of the rule so as to allow for adequate weather conditions for inspection.

1. Surface Impoundment Inspection Requirements

a. Weekly Inspections

As presented in the proposed rule and finalized here, this rule requires all CCR surface impoundments to be examined by a qualified person at least once every seven days for any appearance of actual or potential structural weakness or other conditions that are disrupting or that have the potential to disrupt the operation or safety of the CCR unit. The results of the inspection by a qualified person must be recorded in the facility's operating record.

Weekly inspections are intended to detect, as early as practicable, signs of distress in a CCR surface impoundment that may result in larger, more severe conditions. They are also designed to identify potential issues with hydraulic structures that may affect the structural safety of the CCR surface impoundment and impact the hydraulic and hydrologic capacity of the CCR surface impoundment. The early detection of signs of structural weaknesses is an essential preventative measure which helps to impede structural failure. The required weekly inspections are designed to identify such signs of structural weakness before they develop into larger, debilitating concerns in the structural stability of the dike.

Appearances of structural weakness may include, but are not limited to: (1) Excessive, turbid, or sediment-laden seepage; (2) signs of piping and other internal erosion; (3) transverse, longitudinal, and desiccation cracking; (4) slides, bulges, boils, sloughs, scarps, sinkholes, or depressions: (5) Abnormally high or low pool levels; (6) animal burrows; (7) excessive or lacking vegetative cover; (8) slope erosion; and (9) debris.

In addition, EPA is also adopting a new provision that requires the qualified person to inspect the discharge of all outlets of hydraulic structures which pass underneath the base of the CCR surface impoundment or through the dike of the CCR unit for abnormal discoloration, flow, or discharge of debris or sediment. The requirement is being added to aid in the identification of any internal or sub-surface issues which cannot be reasonably identified in a routine visual inspection. Abnormal discharges from hydraulic structures are often an indication of potential issues with the sub-surface or internal integrity of the structure. Hydraulic structures, particularly corrugated metal pipe, are subject to deterioration and corrosion over time and, as deterioration proceeds, the hydraulic structure becomes more susceptible to collapse, translation, or malfunction. Issues with hydraulic structures within the dike may exacerbate structural or operational issues with the CCR surface impoundment due to the significant internal deterioration of the dike via the hydraulic structure. As an example, on February 2, 2014, Duke Energy's Dan River Fossil Plant experienced a structural collapse of a corrugated metal storm water discharge pipe which passed underneath the interior of a CCR surface impoundment. The subsequent collapse of the base of the CCR surface impoundment led to a massive release of CCR to the environment. Additionally, the adjacent dike of the CCR surface impoundment was severely damaged due to the erosion of the upstream slope.

Further, an owner or operator may want to consider inspections outside of the weekly, seven-day schedule if an unanticipated event, such as a flood, earthquake, or vandalism occurs on the site. While rare in occurrence, these events may increase the chances that a potential structural stability issue has arisen. Prudent CCR management practices dictate that a visual assessment is warranted after such events. For example, after a large flood (considered a flood with a return period of equal or greater frequency of ten years) there is potential for damage, including structural damage to the CCR surface impoundment, caused by increased reservoir levels that inundate areas infrequently inundated. The slopes of the dike should be inspected to ensure that no significant erosion has occurred due to the flood, or that any large debris or sediment has been deposited on the dike. An inspection should also be conducted following an earthquake where earthquake damage is observed or can be reasonably expected, where ground motion is felt at the CCR surface impoundment or in nearby locations, or following established magnitude-epicenter distance relationships.[115]

b. Monthly Instrumentation Inspection

In a departure from the proposed rule, EPA is requiring the monitoring of all instrumentation supporting the operation of the CCR unit to be conducted by a qualified person no less than once per month. This is a change from the proposal which required instrumentation to be monitored no less than every seven days.

Many commenters argued that requiring inspections every seven days was excessive, and that, based on FEMA guidelines for dam safety, a more reasonable timeframe would be once per month for CCR surface impoundments with a hazard potential rating of “high” and quarterly for those CCR surface impoundments with a hazard potential rating of “significant.” In considering these comments, the Agency was influenced by a number of factors including the FEMA guidelines suggested by the commenters. Also weighing heavily in EPA's decision were the observations made as part of the Assessment Program, which revealed that many CCR units are equipped with only “basic” measuring devices such as piezometers and pool elevation and freeboard instrumentation and not the more sophisticated (i.e., sensitive) measuring devices for measuring pressure, seepage, internal movement, slope movement; and vibration. These findings strongly suggested to the Agency that, given the status of current instrumentation employed at CCR facilities, weekly monitoring would be excessive, impractical, and—of greatest significance—unlikely to indicate any measurable changes in structural stability in such a short timeframe. EPA, therefore, agrees that a monthly timeframe is a more appropriate interval for detecting discernible or significant changes in the operation of the CCR Start Printed Page 21395unit. EPA has not, however, differentiated between high, significant, and low hazard potential CCR surface impoundments in the requirement that instrumentation be monitored monthly, as commenters suggested. Through the assessment effort, EPA identified that typically low hazard potential CCR surface impoundments were monitored less frequently than high- or significant hazard potential CCR surface impoundments by the owner or operator. Additionally, these low hazard potential CCR surface impoundments less commonly were equipped with sophisticated monitoring instrumentation, including remote monitoring instrumentation which would allow the owner or operator to monitor the unit from a remote location. Based on these observations, along with the limited burden that instrumentation monitoring places on the owner or operator, the rule requires all CCR surface impoundments with instrumentation to be monitored monthly.

c. Annual Inspections

The rule requires owners or operators of any CCR surface impoundments exceeding the MSHA size threshold (i.e., a height of five feet or more and a storage volume of 20 acre-feet or more; or a height of 20 feet or more) to conduct annual inspections of the CCR unit throughout its operating life. These annual inspections are focused primarily on the structural stability of the CCR surface impoundment and must ensure that the operation and maintenance of the CCR surface impoundment is in accordance with recognized and generally accepted good engineering standards. Inspections must be conducted and certified by a qualified professional engineer.[116] Incised CCR surface impoundments, as defined in § 257.53 are not subject to the annual inspection requirements. Incised units present lower risks of structural failure, and so weekly inspections are sufficient to address any risks associated with these CCR units.

Annual inspections of any CCR surface impoundment must include, at a minimum: (1) A review of all previously generated information regarding the status and condition of the CCR unit, including, but not limited to, all operating records and publicly accessible internet site entries, design and construction drawings and other documentation; (2) a thorough visual inspection to identify indications of distress, unusual or adverse behavior, or malfunction of the CCR unit and appurtenant structures; and (3) a thorough visual inspection of hydraulic structures underlying the base of the CCR unit and passing through the dike of the CCR unit for structural integrity and continued safe and reliable operation. Additionally, following each inspection, the qualified professional engineer must prepare an inspection report which documents the following: (1) Any changes in geometry of the impounding structure since the previous annual inspection; (2) the location and type of existing instrumentation and the maximum recorded readings of each instrument since the previous annual inspection; (3) the approximate minimum, maximum, and present depth and elevation of the impounded water and CCR since the previous annual inspection; (4) the storage capacity of the impounding structure at the time of inspection; (5) the approximate volume of the impounded water and CCR at the time of the inspection; and (6) any appearances of an actual or potential structural weakness of the CCR unit, in addition to any existing conditions that are disrupting or have the potential to disrupt the operation and safety of the CCR unit and appurtenant structures; and (7) any other change(s) which may have affected the stability or operation of the impounding structure since the previous annual inspection.

This last set of requirements was originally presented in § 257.84 of the proposed rule (i.e., recordkeeping requirements), however, the Agency has moved these requirements to the annual inspection section of the rule because (1) these requirements apply only to CCR surface impoundments exceeding the specified size threshold, rather than all CCR surface impoundments, as proposed; (2) must be reported annually; and (3) are more appropriately housed in the inspection section.

The owner or operator of existing CCR surface impoundments must ensure that the initial annual inspection by a qualified professional engineer is completed and documented with a report no later than nine months after the publication of the rule. EPA established this timeframe for completing an initial annual inspection based on its experience with the Assessment Program. In an effort similar to conducting an initial annual inspection, the following tasks were generally completed within three months: Retaining the services of a qualified professional engineer, developing a scope of work, reviewing existing documentation on the CCR unit, conducting a thorough field inspection, and completing an inspection report. Owners and operators of new CCR surface impoundment must commence annual inspections no later than one year from the initial placement of CCR into the new unit. An annual inspection is not required in any calendar year in which the five year structural stability reassessment is also required to be completed. (See §§ 257.73 and 257.74.) The report which the qualified professional engineer has certified must be placed in the facility's operating record and placed on the facility's publicly accessible internet site. An annual inspection is considered complete when the inspection report has been placed in the facility's operating record. Finally, if a deficiency is identified during an inspection, the owner or operator must take immediate measures to remedy the structural weakness or disrupting condition as soon as feasible.

J. Operating Criteria—Inspections for CCR Landfills

Under 40 CFR part 258, EPA does not require specific inspection requirements for MSWLFs. Rather, EPA relies on states to establish their own inspection criteria and frequency of inspections to ensure protection of human health and the environment. It is the Agency's understanding that many states require owners or operators of MSWLFs to conduct either daily, weekly, quarterly and annual inspections of these units to ensure that the design, construction, operation, and maintenance complies with all requirements. In addition, based on a review of selected state regulations most states conduct state inspections of operating landfills no less than annually.

Under the proposed subtitle D option, EPA did not propose to require mandatory inspections of new or existing landfills or any lateral expansion. However, under the subtitle C option, EPA proposed to apply the requirements of § 264.303 to permitted CCR landfills. Specifically, these requirements stated that CCR landfills while in operation would be required to be inspected weekly and after storms to detect evidence of any of the following: (1) Deterioration, malfunctions, or improper operation of run-on and run-off control systems; (2) proper functioning of wind dispersal control systems, where present; and (3) the presence of leachate in and proper functioning of the leachate collection and removal system where present. (See proposed § 264.1306, 75 FR 35257).Start Printed Page 21396

Upon further evaluation, the Agency has decided, consistent with the weekly inspection requirements proposed for CCR landfills under the subtitle C option, as well as many state requirements for MSWLFs, to require all existing and new CCR landfills and any lateral expansion to conduct, at intervals not exceeding seven days, inspections by a qualified person for any appearances of actual or potential structural weakness or any other conditions which are disrupting or have the potential to disrupt the operation or safety of the CCR landfill. In addition, EPA is also requiring inspections by a qualified professional engineer at intervals not exceeding one year to ensure that the design, construction, operation, and maintenance of the CCR landfill is consistent with recognized and generally accepted good engineering standards. This inspection must include a review of all data in the operating record as well as a visual inspection of the unit to identify signs of distress or malfunction that is or potentially could affect the safe operation of the unit. The qualified professional engineer must then also prepare a report to identify and discuss the findings of the inspection as well as a discussion of potential remedies for addressing any deficiencies discovered during the inspection. The Agency has concluded that all CCR landfills should be routinely inspected to ensure that they are operating as designed and are being maintained in compliance with the federal criteria.

The Agency is promulgating these inspection requirements based on: (1) A review of state municipal landfill inspection requirements; and (2) comments from parties that clearly supported inspections of all CCR landfills. The Agency reviewed MSWLF inspection checklists in a selected number of states to assess the scope of these inspections. The Agency also conducted a preliminary review of state MSWLF regulations for New York, Pennsylvania, Ohio, Wisconsin, Illinois, Missouri, North Dakota and California. All of these states require MSWLF owners or operators to conduct a either daily, weekly, monthly, quarterly and annual inspections addressing the following: (1) Proper placement of the waste; (2) slope stability and erosion control; (3) surface water percolation is minimized (i.e. reduce ponding); (4) liner systems and leachate collection systems are properly operated and maintained; (5) water quality monitoring systems are maintained and operating; (6) dust is controlled; and (7) a plan is in place to promptly address and correct problems and deficiencies discovered during the inspection. The Agency also noted during its review of state regulations that states reserve the right to inspect landfills at any time and routinely conduct state inspections on a no less than annual basis. CCR landfills present at least the same level of risks as MSWLFs, and while the operations may differ, both operating systems are equally susceptible to malfunction. Weekly inspections of all CCR landfills by a qualified person are therefore equally necessary to ensure that groundwater monitoring, run-on and run-off controls, liner systems, and leachate collection systems are operated and maintained to reduce adverse environmental and human health impacts.

This rule also requires that owners or operators of all existing and new CCR landfills and any lateral expansion conduct an annual inspection, certified by a qualified professional engineer, to assure that these units are designed, constructed, operated, and maintained throughout their operating life to ensure protection of human health and the environment. The Agency finds that annual inspections for these units are justified for a number of reasons. First, CCR landfills are large engineered units that require that a variety of design and operating parameters be assessed to assure that the CCR landfill is operating as designed. Of particular concern to the Agency is the fact that coal ash is a fine grained material that may have the potential to compact and clog leachate collection systems (see: “Operations and Maintenance Guidelines for Coal Ash Landfills” Christopher Hardin, et. al. 2011 World of Coal Ash Conference. May 2011). It is reasonable therefore that the rule requires annual inspections to assure that these liner and leachate systems are assessed to assure that they are performing their functions as designed. Second, a formal annual inspection would review data collected during weekly inspections and determine if any remedial actions are need to address deficiencies. Third, the annual review by a qualified professional engineer ensures that a detailed level of engineering analysis of operating conditions are evaluated which could lead to recommendations to address design or operating issues that need attention.

K. Groundwater Monitoring and Corrective Action

EPA is finalizing groundwater monitoring and corrective action requirements to ensure that groundwater contamination at new and existing CCR units will be detected and cleaned up as necessary to protect human health and the environment. These requirements reflect Congressional intent that protection of groundwater be a prime objective of any new solid waste regulations. As stated in the proposal, EPA's damage cases and risk assessments indicate there is significant potential for CCR landfills and CCR surface impoundments to leach hazardous constituents into groundwater, impair drinking water supplies and cause adverse impacts on human health and the environment. Indeed, groundwater contamination is one of the key environmental and human health risks EPA has identified with CCR landfills and CCR surface impoundments. Groundwater monitoring is a key mechanism for facilities to verify that the existing containment structures, such as liners and leachate collection and removal systems, are functioning as intended. Thus, in order for a CCR landfill or CCR surface impoundment to show no reasonable probability of adverse effects on health or the environment, a system of routine groundwater monitoring to detect any contamination from a CCR unit, and corrective action requirements to address identified contamination, are essential.

EPA proposed to require that a system of monitoring wells be installed at all new and existing CCR units. The regulation would also provide procedures for sampling these wells and methods for statistical analysis of the analytical data derived from the well samples to detect the presence of hazardous constituents released from these CCR units. The Agency proposed a groundwater monitoring program consisting of detection monitoring and assessment monitoring, and a corrective action program. This phased approach to groundwater monitoring and corrective action programs provides for a graduated response over time to the problem of groundwater contamination as the evidence of such contamination increases. This allows for proper consideration of the transport characteristics of CCR constituents in groundwater, while protecting human health and the environment.

EPA largely based these proposed groundwater monitoring requirements on those for MSWLFs in the 40 CFR part 258 criteria, albeit with certain modifications to tailor the requirements to the case at hand. In particular, the possibility that a state may lack a permit program for CCR units made it impossible to include some of the alternatives available in 40 CFR part 258, which establish alternative standards that allow a state, as part of Start Printed Page 21397its permit program to tailor the default requirements to account for site specific conditions at the individual facility. EPA also sought to tailor the proposed requirements for CCR units, by incorporating certain provisions from the interim status regulations, which operate in the absence of a permit, and by including in several of the proposed requirements, a certification by an independent registered professional engineer that the rule's requirements had been met.

In the proposed rule, the Agency required facilities to install a groundwater monitoring system that met a specified performance standard and that consisted of a minimum of one upgradient and three downgradient wells at all CCR units. EPA acknowledged in the proposal that the design of an appropriate groundwater monitoring system is particularly dependent on site conditions relating to groundwater flow, and on the development of a system that has a sufficient number of wells, installed at appropriate locations and depths, to yield groundwater samples from the uppermost aquifer that represent the quality of background groundwater that has not been affected by contaminants from a CCR unit. EPA's existing requirements under 40 CFR parts 258 and 264 recognize this, and because they operate in a permitting context, these requirements provide more flexibility in establishing groundwater monitoring systems. But because the same guarantee of permit oversight is not available under the criteria developed for the proposal, EPA proposed to establish a minimum requirement based on the part 265 interim status regulations, which are self-implementing. Long experience demonstrates that these monitoring requirements will be protective of a wide variety of conditions and wastes, and that facilities can feasibly implement these requirements. EPA also noted that in many instances a more detailed groundwater monitoring system will need to be in place, and EPA therefore proposed requiring a certification by the independent registered professional engineer that the groundwater monitoring system is designed to detect all significant groundwater contamination.

EPA also proposed to require that owners and operators of CCR units establish consistent sampling and analysis procedures to determine whether a statistically significant increase in the level of a hazardous constituent(s) has occurred, indicating the presence of groundwater contamination.

As noted, EPA proposed a phased approach to monitoring. The first phase is detection monitoring where indicators would be monitored to determine whether groundwater was potentially being contaminated. The parameters EPA proposed to be used as indicators of groundwater contamination were the following: Boron, chloride, conductivity, fluoride, pH, sulfate, sulfide, and total dissolved solids (TDS). In selecting the parameters for detection monitoring, EPA chose constituents that are present in CCR and would rapidly move through the subsurface, and thus provide an early detection of whether contaminants were migrating from the CCR unit. Under the proposed rule, monitoring would be required no less frequently than semiannually.

When a statistically significant increase over background levels is detected for any of these parameters, the proposed rule required the facility to begin an assessment monitoring program to determine if releases of CCR constituents of concern had occurred. The parameters that were proposed for assessment monitoring were aluminum, antimony, arsenic, barium, beryllium, boron, cadmium, chloride, chromium, copper, fluoride, iron, lead, manganese, mercury, molybdenum, pH, selenium, sulphate (sic), sulfide, thallium, and total dissolved solids.

The proposed rule also required that whenever monitoring results indicate a statistically significant level exceeding the groundwater protection standard for any of these parameters, the owner or operator must start the process for cleaning up the contamination, and initiate an assessment of corrective action remedies. The proposed rule required that the assessment of correction action remedies be initiated within 90 days and then completed within 90 days.

EPA proposed that the assessment of corrective measures must consider a number of factors, including the effectiveness, performance, and time needed for the potential remedies. As part of the assessment of corrective measures, the owner or operator was required to identify the source of the release. The owner or operator was also required to gather data on plume definition, fate of the contaminants, stratigraphy and hydraulic properties of the aquifer. The owner or operator also was required to consider whether immediate measures to limit further plume migration or measures to minimize further introduction of contaminants to groundwater would be necessary. EPA also proposed to require the owner or operator to provide notification of the corrective measures assessment to the State Director, place the corrective measures assessment in the operating record and on the owner's or operator's publicly accessible internet site, and discuss the results of the corrective measures assessment in a public meeting with interested and affected parties.

Based on the results of the corrective measures assessment, EPA proposed to require the owner or operator to select a remedy based on a number of factors, including: the long- and short-term effectiveness and protectiveness of the potential remedy, along with the degree of certainty that the remedy will prove successful; the effectiveness of the remedy in controlling the source to reduce further releases; the ease or difficulty of implementing a potential remedy; the degree to which community concerns are addressed by a potential remedy; and potential risks to human health and the environment from exposure to contamination prior to completion of the remedy. The owner or operator was also required to specify as part of the selected remedy a schedule for initiating and completing remedial activities.

Under the proposed rule, implementing the corrective action program required the owner or operator to establish and implement a corrective action groundwater monitoring program; implement the corrective action remedy selected; and take any interim measures necessary to ensure the protection of human health and the environment, all according to the schedule the owner or operator developed during the assessment of corrective measures.

The proposed rule also required that the owner or operator must demonstrate that concentrations of constituents have not exceeded the groundwater protection standards for three consecutive years in order to support a determination that the remedy is complete.

The majority of the commenters supported “appropriate groundwater monitoring standards for CCR waste management units” and the development of such standards under a RCRA subtitle D framework. Comments were received on various parts of the groundwater monitoring scheme laid out in the proposed rule. The majority of comments received requested EPA to provide “more flexibility” to the proposed requirements. Many commenters wanted the states to be more involved with the process and provided comments suggesting that additional “flexibility,” such as is provided in the 40 CFR part 258 Start Printed Page 21398regulations for MSWLFs as part of the permitting process, be extended to CCR units. For example, commenters wanted states to have the authority to add or drop monitoring constituents; approve alternative schedules; modify the number of wells needed; allow variances; allow alternatives to the point of compliance specified in the rule; employ alternative methods to detect potential groundwater contamination, such as leak detection systems; allow alternatives to the statistical methods used to determine whether groundwater contamination has occurred; and to replace the qualified professional engineer role in the certification process.

For the final rule, EPA has developed a groundwater monitoring program that is flexible and allows facilities to design a system that accounts for site specific conditions within specific parameters. The final rule establishes an overall performance standard that the system must meet, lays out the minimum requirements of an effective system, and requires the owner or operator to design a system that achieves that overall performance standard based on a full characterization of site conditions.

As described in more detail below, in certain cases, EPA was able to develop performance standards to serve as “more flexible” alternatives to the technical specifications laid out in the proposal. In these instances, the available information allowed the Agency to develop performance standards that were sufficiently objective and determinate that EPA could conclude that the 4004(a) standard would be met nationwide.

However, many of the commenters' requests related to alternatives that would be less stringent than the minimum criteria laid out in the proposal and were based on arguments that state regulators (or facilities) should be allowed to “tailor” those requirements to sites that did not need those particular requirements. As explained at length in the proposal, EPA is concerned that provisions allowing such modifications are particularly susceptible to abuse, since in many cases the provisions could allow substantial cost avoidance. In the absence of a mandated state oversight mechanism to ensure that the suggested modifications are technically appropriate, these kinds of provisions can operate at the expense of protectiveness. In Unit II of this preamble, EPA explains the extent of our authority to establish criteria under RCRA sections 1008(a)(3) and 4004(a), including the implications associated with the lack of any authority to establish a program analogous to part 258, which relies on approved states to implement the federal criteria through a permitting program. As a result of the statutory structure, this rule is self-implementing and is designed to operate to ensure that facilities will manage CCR in a manner that achieves the 4004(a) standard even in the absence of any regulatory entity available to judge the reasonableness of the desired alternatives. While some states currently do have programs for the regulation of CCR, which in some cases may be more stringent than this final rule, the federal program must be defensible on the record in place at the time the final rule is adopted. Based on the current rulemaking record, in most cases EPA lacked the information necessary to defend the commenters' less stringent alternatives (i.e., the commenters' requested “flexibilities”) to the minimum technical criteria specified in this rule for these units. Under both the subtitle C and part 258 programs, EPA can rely on subsequent proceedings to develop the information necessary to support such tailoring. This is clearly neither contemplated nor authorized under the regulatory program relevant to this rule.

In addition, given the extremely technical nature of these requirements, EPA remains concerned that such provisions would render the requirements appreciably more difficult for citizens to effectively enforce. Nevertheless, working within these constraints this rule specifically allows the qualified PE to design a system that accounts for site conditions within the parameters of the minimum technical criteria, and EPA has added language to the regulation that expressly clarifies this. Moreover, states that have programs can continue to impose more stringent requirements, and thus can require, for example, additional monitoring wells, monitoring of additional aquifers, and inclusion of additional parameters to the detection monitoring list or the assessment monitoring list. The following discussion addresses in more detail the technical requirements under groundwater monitoring and corrective action in the final rule.

1. Applicability

Consistent with the provisions in the proposed rule, the final rule requires a system of monitoring wells to be installed at all CCR landfills, CCR surface impoundments and lateral expansions. Existing CCR units must install the groundwater monitoring system, develop their groundwater sampling and analysis procedures, develop background levels for appendix III and appendix IV constituents, and begin detection monitoring (§ 257.90 through § 257.94) within two years of the effective date of this rule. The proposed rule required that existing CCR units comply with the groundwater monitoring requirements within one year of the effective date. EPA proposed one year believing that it would be feasible for facilities to install the necessary systems. EPA also believed that a one year timeframe would ensure that existing CCR disposal facilities begin monitoring groundwater as soon as possible, so that releases from existing CCR units are detected and addressed. Comments received on this issue argued that the one-year timeframe was not sufficient to complete a hydrogeologic study and develop a monitoring plan. Several commenters requesting more time mentioned staffing shortages and limited contractor and lab resources. One state, referencing its experience relating to development and implementation of groundwater monitoring systems, said that a one year timeframe to investigate, design and submit and obtain approval for the installation of an effective groundwater monitoring system was unreasonable. Most commenters thought that a timeframe of two years was reasonable. After review of the comments received on this issue and careful reexamination of the actual requirements in the final rule, EPA agrees that a one-year timeframe is not feasible, and has decided to extend the timeframes for completing installation of the system, including background monitoring, to two years. As important as it is to begin detecting and addressing releases to groundwater, it is equally important that these complex systems be designed and installed correctly. That generally entails a number of activities, many of which must occur sequentially, including: determining the uppermost aquifer, deciding whether to install a single or multi-unit monitoring system, collecting and evaluating hydrogeological information that can be used to model the site, characterizing the site geology, characterizing the groundwater flow beneath the site, determining the flow direction and hydraulic gradient, establishing horizontal and vertical flow direction, determining hydraulic conductivity, determining groundwater flow rate, determining the monitoring wells placement, selecting the drilling method, designing the monitoring wells, developing sampling and analysis procedures, choosing a statistical method for evaluating the data and Start Printed Page 21399beginning detection monitoring. We also recognize that in some states, the state may require the owner or operator to receive state approval before they can install a groundwater monitoring system. Two years is a more reasonable timeframe in which to carry out these activities. New CCR landfills, new CCR surface impoundments and any lateral expansion must comply with these same requirements (§§ 257.90 through 257.94) before any CCR can be placed in the CCR unit.

Consistent with the proposal, the final rule also requires that the owner or operator of the CCR facility annually certify that each CCR unit is in compliance with the groundwater monitoring and corrective action provisions and provide a copy of this certification to the State Director. Because this is a self-implementing rule that relies on citizen enforcement, it is important for the owner or operator of the facility to periodically document that they are in compliance with the existing groundwater monitoring requirements, and an annual certification is the easiest and most effective way to achieve this. While the groundwater monitoring data will be made available on the owner or operator's publicly accessible Web site and in the operating record of the facility, the analysis of these data is complicated and requires a certain level of scientific expertise to analyze the data correctly. As such, a document that serves as both an interpretative record of scientific analysis and regulatory compliance is critically important to the successful implementation of a self-implementing rule that is to be enforced exclusively by citizens and the states. For similar reasons, the certification must also be placed in the operating record, provided to the State Director, and posted on the owner or operator's publicly accessible Web site.

The groundwater monitoring requirements must be met throughout the active life of the CCR unit, as well as during the closure and post-closure care period.

EPA has added a new provision to § 257.90 to address the corrective action requirements that apply when CCR have been released into the environment, such as from the kind of structural failure that occurred with TVA's Kingston Fossil Fuel plant release, or from the kind of release that occurred in North Carolina at the Dan River. EPA inadvertently drafted the corrective action requirements in the proposed rule to apply exclusively upon detection of groundwater contamination caused by a leaking unit. However, there is no reason to establish different corrective action provisions for conducting clean-up operations for different kinds of releases; the same general process is applicable to all kinds of releases.

The new provision requires that in the event of a release from a CCR unit, the owner or operator must immediately take all necessary measures to control the source(s) of releases so as to reduce or eliminate, to the maximum extent practicable, further releases of contaminants into the environment. The owner or operator of the CCR unit is also required to comply with all of the relevant corrective action requirements in §§ 257.96, 257.97, and 257.98.

2. Groundwater Monitoring System Requirements

EPA received comments that supported establishing more prescriptive requirements for the design of the groundwater monitoring system. For example, one commenter argued that three downgradient wells are insufficient to ensure detection of leakage from the very large disposal units typically used for CCR; due to uncertainty in flow directions, the perimeter of the CCR unit must be monitored on its cross-gradient, as well as downgradient sides. The commenter suggested that the minimum number of non-background monitoring wells should instead be three, plus one for every 500 feet of downgradient and cross-gradient perimeter of the CCR unit (i.e., if the perimeter length adds up to 1200 feet, the minimum number of wells would be five), and that wells should be spaced no more than 500 feet apart along the downgradient and cross-gradient perimeter. EPA also received many comments arguing that the minimum requirements were overly prescriptive, and that the final rule should instead allow a professional engineer or hydrologist to design “an alternative, but equally effective, groundwater monitoring program.” The majority of comments on groundwater monitoring systems requested that EPA not promulgate requirements that would be incompatible with state requirements.

The final rule provisions are fundamentally the same as those in the proposal, although EPA has also added language to the regulations to better clarify how the requirements in the various sections collectively operate. The final rule establishes a general performance standard that all groundwater monitoring systems must meet: All groundwater monitoring systems must consist of a sufficient number of appropriately located wells (at least one upgradient and three downgradient wells) in order to yield groundwater samples from the uppermost aquifer that represent the quality of background groundwater and the quality of groundwater passing the waste boundary. This is the same performance standard included in the proposed rule. The objective of a groundwater monitoring system is to intercept groundwater to determine whether the groundwater has been contaminated by the CCR unit. Early contaminant detection is important to allow sufficient time for corrective measures to be developed and implemented before sensitive receptors are significantly affected. To accomplish this, the rule requires that wells be located to sample groundwater from the uppermost aquifer at the waste boundary. These requirements have been adopted without fundamental change from the proposal.

Because hydrogeologic conditions vary so widely from one site to another, the rule does not prescribe the exact number, location and depth of monitoring wells needed to achieve the general performance standard. Rather, the rule requires the owner or operator to install a minimum of one upgradient and three downgradient wells, and any additional monitoring wells necessary to achieve the general performance standard of accurately representing the quality of the background groundwater and the groundwater passing the waste boundary. The number, spacing, and depths of the monitoring wells must be determined based on a thorough characterization of the site, including a number of specifically identified factors relating to the hydrogeology of the site (e.g., aquifer thickness, groundwater flow rates and direction). Further, any owner or operator who determines that the specified minimum number of wells is adequate must provide a factual justification for that decision. Factors that may substantiate a reduced density of groundwater monitoring wells includes simple geology (i.e., horizontal, thick, homogenous strata that are continuous across site, with no fractures, faults, folds, or solution channels), a flat and constant hydraulic gradient, uniform hydraulic conductivity, low seepage velocity, and high dispersivity potential.

In essence, the rule establishes a presumption that the minimum of one upgradient and three downgradient wells is not sufficient, and requires the owner or operator to rebut that presumption in order to install only this minimum. This is fundamentally consistent with the proposed rule, which required the installation of a system that would achieve the general performance standard, as well as the Start Printed Page 21400“minimum” of one upgradient and three downgradient wells. The final regulation merely makes more explicit that both of these requirements must be met.

EPA considered establishing a more prescriptive set of requirements, including a specified number, location, and design of monitoring wells, but because of the highly site specific nature of developing an adequate groundwater monitoring system, determined that it lacked sufficient information to be able to design a single groundwater monitoring system that would be nationally protective at all sites. A properly designed system must account for many variables, most of which are highly dependent on the individual characteristics of the unit and the facility site. Consequently, the final rule leaves the exact system design to be determined by those at the site, including a qualified professional engineer, who can tailor the design of the system to the unit and site conditions.

Nevertheless, EPA is confident that the parameters laid out in the regulation will ensure that the design of groundwater monitoring systems at CCR facilities will be protective. As a practical matter, EPA expects that there will be few cases, if any, where four wells will be sufficient, given that this requirement was originally developed for hazardous waste management units that are typically much smaller than CCR units. As mentioned above, a small unit with simple geology, a flat and constant hydraulic gradient, uniform hydraulic conductivity, low seepage velocity, and high dispersivity potential would be the type of unit for which the minimum number of wells could be sufficient to meet the overall performance standard. Although EPA is finalizing a requirement for one upgradient and three downgradient wells as a regulatory minimum, the Agency expects large CCR units to have many more wells because most CCR sites have hydrologic settings that are too complex for the regulatory minimum to be adequate. Facilities with large CCR units could have as many as thirty or more downgradient wells. This is because the placement and spacing of detection monitoring wells along the downgradient perimeter of the CCR unit must be based on the abundance, extent, and physical/chemical characteristics of the potential contaminant pathways. All potential pathways need to be monitored.

Therefore, even though EPA is not requiring a specific number of wells, the Agency is confident that the combination of the requirements will ensure that protective groundwater monitoring systems will be installed. The owner or operator is required to install a sufficient number of wells to meet the performance standard in § 257.91(a)(1) and (2), provide a justification if they determine the required minimum is adequate, and have a qualified professional engineer certify that their groundwater monitoring system has been designed and constructed to ensure that the groundwater monitoring will meet this performance standard—i.e., accurately represent the quality of groundwater that has not been affected by leakage from any CCR unit—that is, groundwater from background wells and the quality of groundwater passing the waste boundary.

The final rule establishes certain parameters regarding the location of the wells. Upgradient background wells must be located beyond the upgradient extent of potential contamination. However, groundwater quality in areas where the geology is complex can be difficult to characterize. If the facility is new, groundwater samples collected from both upgradient and downgradient locations prior to waste disposal can be used to establish background water quality. Downgradient wells to monitor for any contaminants leaking into the groundwater must be located at the hydraulically downgradient perimeter (i.e., the edge) of the CCR unit or at the closest practical distance from this location.

Determining background groundwater quality by sampling wells that are not hydraulically upgradient may be necessary where hydrogeologic conditions do not allow the owner or operator to determine which wells are hydraulically upgradient (e.g., floodplains, where nearby surface water can influence groundwater). In such cases, the rule allows the owner or operator to establish groundwater quality at existing units by locating wells that are not upgradient under certain conditions (§ 257.91(a)(1)). This provision may be used when hydrogeologic conditions do not allow the owner or operator to determine which wells are hydraulically upgradient and when sampling at other wells will provide data establishing background groundwater quality that is equally or more representative than that provided by upgradient wells. These conditions could include one or more of the following:

  • The facility is located above an aquifer in which groundwater flow directions change seasonally.
  • The facility is located near production wells that influence the direction of groundwater flow.
  • Upgradient groundwater quality is affected by a source of contamination other than the CCR unit.
  • The proposed or existing CCR unit overlies a groundwater divide or local source of recharge.
  • Geologic units present at downgradient locations are absent at upgradient locations.
  • Karst terrain or fault zones modify flow.
  • Nearby surface water (e.g., rivers) influences groundwater flow directions.

Additionally, there is nothing in the rule that would prevent the owner or operator from monitoring multiple aquifers in addition to the uppermost significant aquifer. Certain site conditions warrant more extensive monitoring requirements, as discussed in “Technical Manual Solid Waste Disposal Facility Criteria”, EPA530-R-93-017, USEPA, November, 1993, Chapter 5, Subpart E, Ground-Water Monitoring and Corrective Action.

Each CCR unit must have its own groundwater monitoring system, unless the owner or operator chooses to install a multiunit groundwater monitoring system. The final rule specifies that if a multiunit system is installed, it must be based on the consideration of several factors, including the number, spacing, and orientation of the CCR units, the hydrogeologic setting, the site history and the engineering design of the CCR units. A multiunit groundwater monitoring system must be equally capable of detecting background and groundwater contamination at the waste boundary as an individual monitoring system. This documentation must be certified by a qualified professional engineer. Whether a single or multi-unit system has been installed, the monitoring wells must be cased in a manner maintaining the integrity of the borehole and must be maintained so as to meet design specifications. Both of these provisions have been adopted from the proposal without revision.

3. Sampling and Analysis Requirements

EPA received comment on several aspects of its proposed requirements for conducting groundwater sampling and analyses. Specifically mentioned here, commenters raised concern about the number of samples required to establish background concentrations and about the statistical test methodologies specified in the proposal. As discussed below, EPA has modified the rule to account for the issues raised by these commenters. The sampling and analysis requirements in the final rule have Start Printed Page 21401otherwise been adopted from the proposed rule with only minor clarifications.

The rule provides procedures for sampling monitoring wells and methods for the statistical analysis of groundwater monitoring of appendix III (detection monitoring) and appendix IV (assessment monitoring) constituents that may be released from CCR units. The sampling and analysis program must include procedures and documentation for sample collection (including the frequency, water level measurements, well purging, field analyses, and sample withdrawal and collection); sample preservation and handling (including sample containers, sample preservation, sample storage and shipment); chain of custody control; analytical procedures (appropriate methods can be found in “Test Methods for Evaluating Solid Waste, Physical/Chemical Methods,” SW-846 (USEPA, 1986), http://www.epa.gov/​waste/​hazard/​testmethods/​sw846/​online/​index.htm); and quality assurance/quality control. More information and guidance can be found in “Technical Manual Solid Waste Disposal Facility Criteria,” EPA530-R-93-017, USEPA, November, 1993, Chapter 5, Subpart E, Ground-Water Monitoring and Corrective Action, as well as the “Unified Guidance Document: Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities,” March 2009, EPA 530/R-09-007.

Similar to the approach used in designing a groundwater a number of system, the final rule adopts a combination of a general performance standard for groundwater sampling and analytical methods, along with particular technical specifications that must be met. The general performance standard requires that the method used must accurately measure hazardous constituents and other monitoring parameters. In addition, the rule specifies that groundwater elevations must be measured in each monitoring well immediately prior to sampling. Also, the rate and direction of the groundwater flow in the uppermost aquifer must be determined each time groundwater is sampled. Further, the rule specifies that the background groundwater quality must be established at a hydraulically upgradient well for each of the monitoring parameters or constituents required by the applicable groundwater monitoring program, except as provided in § 257.91. The number of samples collected to establish groundwater quality data must be consistent with the appropriate statistical procedures determined for the specific statistical method chosen. The sampling must also be conducted to account for both seasonal and spatial variability in groundwater quality.

To establish background levels, the proposed rule required that “a minimum of four independent samples from each background and downgradient well must be collected and analyzed . . .” 75 FR 35247-35248 (proposed §§ 257.93(f) and 257.94(b)). This is the same sampling protocol that EPA adopted for both the subtitle C and part 258 groundwater monitoring requirements.

EPA received comments criticizing this sampling protocol. Several commenters stated that more than the required four samples were needed in order to adequately represent background water quality and reduce the number of false negatives. For example, one commenter argued that EPA should require a minimum of one year of monthly monitoring of background concentrations to characterize fluctuations in parameters that will be evaluated statistically. The commenter claimed that this would also help to ensure that quarterly monitoring events are properly timed. Another comment stated that more data points and time were needed to ensure statistical confidence in the data. By contrast, another commenter objected to the requirement to obtain four independent samples, arguing that this requirement was unnecessary and should be deleted. The commenter argued that this requirement was inconsistent with EPA's Unified Guidance (EPA, 2009) for Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities, which specifies that replicate samples (i.e., multiple samples from the same location during a given sampling event) should typically be limited to the collection of two samples from the same location, rather than four. Another commenter requested clarification on the number of samples required when establishing background levels that would serve as the point of comparison in determining whether a statistically significant increase over background levels had occurred.

In response to these comments, EPA reviewed the available information to determine whether revisions to the proposed requirements were warranted.

More recent information developed since the promulgation of the subtitle C and part 258 groundwater monitoring requirements indicates that statisticians now generally consider sample sizes of four or less to be insufficient for good statistical analysis because the observations are too few to adequately characterize the parameters of the population. Tests utilizing a small background sample size have low statistical performance in terms of power and per-test false positive rates. In 2009, EPA issued a guidance document that accounts for more recent scientific developments, “Unified Guidance Document: Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities,” March 2009, EPA 530/R-09-007. This guidance recommends a minimum of eight to ten independent background observations be collected before performing the first statistical test. Sample sets of 20 are considered optimal.

RCRA regulations are predicated on having appropriate and representative background measurements. Samples should be tested against data which best represent current uncontaminated conditions. In addition, as discussed further in Unit VI.K.5 below, the detection of a statistically significant increase over background concentrations of the constituents of concern will have serious implications for unlined surface impoundments, as these units will be required to close whenever the facility makes such a finding. EPA is also cognizant of the significant differences between the subtitle C and part 258 regulations and the final regulations being promulgated for CCR units. Both the subtitle C and the part 258 MSWLF requirements are implemented under permit programs, under which regulatory authorities are specifically authorized to establish more stringent requirements to account for scientific advances (among other things). EPA expects that current permits generally specify a greater number of samples than the minimum laid out in the regulations (i.e., more than four) to determine background concentrations. And because of this it is less critical that those regulations (subtitle C and part 258) reflect the most current science. By contrast, as previously discussed, the provisions adopted under this rule are self-implementing, and will only be updated through a subsequent rulemaking. Accordingly, the Agency agrees with the comments that four samples would be insufficient and has amended the rule to require the owner or operator to collect, at a minimum, eight statistically independent and identically distributed (spatially invariant) samples from each well for each monitoring parameter. Although still a small sample size by statistical standards, eight independent observations allows for minimally acceptable estimates of variability and evaluation of trend and goodness-of fit. While more samples, including a full Start Printed Page 21402year of background monitoring, would be scientifically ideal, the Agency selected eight samples by balancing the minimum number needed to ensure the scientific accuracy of the results against the need to expedite initiating the groundwater monitoring process of detecting exceedances, along with any necessary corrective action at these facilities.

Background sampling (i.e., the requirement to collect eight statistically independent samples from each well) must be completed for all appendix III and IV constituents by the end of the 24 month period to begin implementation of the groundwater monitoring program.

EPA has also revised the regulatory text relating to the number of samples that must be collected during subsequent sampling events after background concentrations have been established to clarify how the various provisions collectively operate. Consistent with the proposal, the final rule requires the owner or operator to collect and analyze the number of samples from each well necessary to be consistent with the statistical test selected under § 257.93(e) and with the unique characteristics of the site, but at minimum, to collect at least one sample from each background and downgradient well. In cases where the groundwater is “well-behaved” one sample from each compliance well could be all that the owner or operator would need to conduct the necessary comparisons. But if statistical assumptions are not met (e.g., the observations are not statistically independent or background well data show trends) a comparison based on a single observation will not yield a significant result, and will likely result in a false positive. Further, detection monitoring tests, such as Student's t-test, look at the difference between the sample means (e.g., upgradient vs downgradient) to determine when an observed difference should be considered more than a chance fluctuation. Every t-test assumes that the observations that make up each data group meet the requirements of statistical independence and stationarity. Therefore, the larger the sample size the more significant the result. In other words, a facility can choose to use only one observation (a group size of one), but the chances are good that the result derived would be non-significant, since there are many reasons sample means can vary. Consequently, it is likely to be in the facility's best interest to take more samples than the minimum, particularly in the early stages of monitoring. As monitoring continues, each successive sample will be added to the sampling data base, which will increase the confidence in the statistical analyses performed. Additional guidance on sample size can be found in the “Unified Guidance Document: Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities,” March 2009, EPA 530/R-09-007.

The requirements for applying statistical procedures in the rule are the same as those included in the proposed rule, which were based on the statistical procedures used in the MSWLF regulations. The rule requires the owner or operator to select from among the listed statistical procedures based on a determination that the test is appropriate for evaluating groundwater at that site. The statistical method chosen must be appropriate for the distribution of chemical parameters or hazardous constituents. The rule has been revised to include the clarification that normal distributions of data values shall use parametric methods and non-normal distributions shall use non-parametric methods. The rule identifies four statistical procedures, along with an alternative procedure that must meet the performance standard of § 257.93(g). The four specific statistical procedures provided in this final rule are: (1) A parametric analysis of variance followed by multiple comparison procedures to identify statistically significant evidence of contamination; (2) an analysis of variance based on ranks followed by multiple comparison procedures to identify statistically significant evidence of contamination; (3) a tolerance or prediction interval procedure; and (4) a control chart approach. The performance standard for the alternative method in subsection (g) is the same as the performance standard in the proposal, with minor revisions. EPA has deleted the performance standard “protect human health and the environment” in subsections (3), (4) and (5). While that standard is perfectly appropriate in a context in which a regulatory authority will apply the standard, EPA is concerned that a qualified professional engineer will be unable to certify that any alternative statistical method meets that standard. EPA received comments from professional engineers raising concern about their ability to certify that many of the requirements in the proposed rule had been met without further specification or clarification. To address those concerns, in those three provisions EPA has substituted a more objective performance standard that more precisely defines the relevant issues to be considered. Specifically, the subsections now specify that those approaches must be “at least as effective as any other approach in this section for evaluating groundwater.”

The data objectives of the monitoring, in terms of the number of samples collected and the frequency of collection, must be consistent with the statistical method selected. Guidance on selecting a specific method is described in “Unified Guidance Document: Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities,” March 2009, EPA 530/R-09-007. The owner or operator must indicate in the operating record the statistical method that will be used in the analysis of groundwater monitoring results.

The owner or operator must conduct the statistical comparisons between upgradient and downgradient wells within 90 days of completion of each sampling event and receipt of validated data. The statistical comparison must be conducted in order to determine if a statistically significant increase has occurred over background levels for each parameter or constituent required in the particular groundwater monitoring program that applies to the unit as determined under §§ 257.94(a) or 257.95(a). This has been adopted without revision from the proposal.

EPA is finalizing as proposed the prohibition in § 257.93(b) on field filtering groundwater samples because filtration of samples for metals analyses will not provide accurate information concerning the mobility of metals contaminants, the primary objective of groundwater sampling. Metal contaminants may move through fractured and porous media not only as dissolved species, but also as precipitated phases, polymeric species, or adsorbed to particles of colloidal dimensions (<10 microns). For an assessment of mobility, all mobile species must be considered, including suspended or colloidal particles acting as absorbents for contaminants. Filtration of groundwater samples for metals analyses will not provide accurate information concerning the mobility of metal contaminants because some mobile species in solution are likely to be removed by filtration before chemical analysis. Significant underestimations of mobility may result if filters (typically 0.45 micron) are used to separate dissolved and particulate phases.

In its approach to sampling EPA is specifying in the final rule that owners and operators use `total recoverable metals' concentrations in measuring groundwater quality. Measurement of total recoverable metals captures both the particulate fraction and dissolved Start Printed Page 21403fraction of metals in natural waters. Exceedances of ambient water criteria on a total recoverable basis are an indication that metal loadings could be a stress to an ecosystem.

One commenter argued that to prohibit field filtering would potentially bias the results artificially high, particularly at sites where low yielding formations or naturally high levels of turbidity in groundwater are encountered. However, high turbidity can also be the consequence of faulty well design and/or construction, which causes the introduction of foreign materials (high turbidity) through created fracture pathways. A properly designed well should allow for sufficient groundwater flow for sampling, minimize the passage of materials into the well, and exhibit sufficient structural integrity to prevent collapse of the intake structure. It is vital that the well provide a representative hydraulic connection to the geologic formation of interest. Otherwise the water chemistry information cannot be correctly interpreted in relation to groundwater flow or transport of chemical constituents.

Sampling with no filtration means that increased importance is placed on proper well construction and purging sampling procedures to eliminate or minimize sources of sampling artifacts. There should be nothing in the well design that will lead to high levels of turbidity. Groundwater sampling should be conducted utilizing EPA protocol low stress (low-flow) purging and sampling methodology, including measurement and stabilization of key indicator parameters prior to sampling. For purposes of sampling, this final rule presumes that a properly constructed well is capable of yielding groundwater samples with low turbidity (≤5 Nephelometric Turbidity Units (NTU)), and by knowing the cause of turbidity the qualified professional engineer will be able to optimize well performance and reduce turbidity levels, eliminating the need for filtration.

EPA is revising § 257.93(i)(2) to specify a time period of 90 days to determine if a statistically significant increase over background concentrations of one of more of the contaminants has been detected. As proposed, this section specified: “Within a reasonable period of time after completing sampling and analysis, the owner or operator of the CCR landfill or surface impoundment must determine whether there has been a statistically significant increase over background at each monitoring well.” Commenters pointed out that this section of the regulation was very vague, and potentially unenforceable. Several commenters suggested that once sampling and analysis had been completed, 90 days would be a reasonable amount of time to complete the statistical analysis to determine whether an exceedance had occurred. No commenter suggested a longer period of time was necessary and that timeframe is consistent with the Agency's experience of the timeframes necessary to complete such analyses. Accordingly, we have revised the provision to require the determination of a statistically significant increase to be made within 90 days of sampling and analysis.

4. Detection Monitoring Program

With three exceptions, EPA is finalizing the regulatory provisions relating to detection monitoring as proposed. The three revisions are the appendix III list of monitoring parameters; the required number of samples to determine background concentrations; and the availability of an option to conduct detection monitoring on a less frequent basis due to a lack of groundwater.

The detection monitoring phase of the groundwater monitoring program in this rule requires that the owners or operators of CCR units establish background concentrations for all monitoring parameters (appendix III and IV of part 257) and sample at least semiannually during the active life of the facility, closure, and post closure periods for a set of detection monitoring indicator parameters (appendix III of part 257).

In response to comments, EPA has revised appendix III to delete conductivity and sulfide from the list of monitoring parameters and to add calcium. Thus, the list of parameters included on the detection monitoring list is boron, calcium, chloride, fluoride, pH, sulfate and total dissolved solids (TDS). The Agency has deleted conductivity from the detection monitoring program because it is merely a proxy for TDS, which is already included on the list of parameters to analyze during detection monitoring. The Agency has also deleted sulfide because it occurs in groundwater only under strongly reducing conditions, and such conditions are rather rare at CCR disposal facilities. Calcium is being added to appendix III because it is an indicator of the extent of leaching from fly ash and FGD gypsum and because of the strong demonstrated link between the leaching of calcium and arsenic, which is one of the primary risk drivers identified in the risk assessment.

As discussed in the preceding section, in detection monitoring, a minimum of eight independent samples from each background and downgradient well must be collected and analyzed for the appendix III and IV parameters no later than 24 months from the effective date of the rule. During subsequent sampling events, at least one sample from each background and downgradient well must be collected and analyzed, although the total number of samples must be consistent with the statistical procedures selected and with the performance standard in § 257.93(g). See discussion above in section 3. Sampling and Analysis Requirements.

Under the proposed rule, monitoring would be required no less frequently than semiannually. In the final rule, semiannual sampling remains the general requirement; however, in response to comments, EPA has decided to include a provision that would allow an alternative sampling frequency if there is not adequate groundwater to flow to sample wells semiannually. Specifically, EPA received comment stating that there may be instances where there simply is not enough water available to collect and analyze on a semiannual basis, especially in western climates where the rate of groundwater recharge may be too slow or a lack of precipitation exists. The commenter also provided an example demonstrating that mining practices in adjacent areas can greatly alter the groundwater flow. Accordingly, EPA has included a provision to address the situations where there is insufficient groundwater available to collect and analyze samples around CCR units on a semiannual basis.

An owner or operator seeking to establish an alternative frequency must demonstrate that less frequent monitoring is necessary based on the following three factors: (1) Lithology of the aquifer and the unsaturated zone; (2) hydraulic conductivity of the aquifer and the unsaturated zone; and (3) groundwater flow rates. In addition, the rule requires the owner or operator to demonstrate that any alternate sampling frequency would be no less effective in ensuring that any leakage from the CCR unit will be discovered within a timeframe that does not materially delay the initiation of any necessary remediation measures. The owner or operator must have a qualified professional engineer certify that the alternative (i.e., less frequent) monitoring will achieve this performance standard. The final rule also specifies that any alternate frequency during the active life (including closure) and the post-closure Start Printed Page 21404care period shall be no less than annual. As noted, the owner or operator will bear the burden of justifying an alternate frequency under this regulation, and in any court proceeding brought to enforce these requirements. This means that any uncertainty or lack of information will be weighed against the entity seeking to justify the alternate frequency.

Consistent with the proposed rule, if the owner or operator determines that there is a statistically significant increase (SSI) over background for one or more of the parameters listed in appendix III at any monitoring well at the waste boundary, the owner or operator must place a notice in the operating record and on the facility's internet site indicating which parameters have shown statistically significant changes from background levels and notify the State Director.

The facility must also then establish an assessment monitoring program and begin monitoring within 90 days. The owner or operator has the opportunity to demonstrate that a source other than the CCR unit caused the statistically significant increase or that the statistically significant increase resulted from error in sampling, analysis, statistical evaluation or a natural variation in groundwater quality. Within 90 days, the owner or operator must prepare a report documenting this demonstration which must then be certified by a qualified professional engineer verifying the accuracy of the information in the report. If a successful demonstration is made within 90 days, the owner or operator may continue detection monitoring. If a successful demonstration is not made within 90 days, the owner or operator must initiate assessment monitoring.

Commenters raised concern that 90 days would not be sufficient to complete all of the activities necessary to determine whether the detection of an SSI was from another source than the CCR unit or was based on inaccurate results. The Agency recognizes that in some circumstances it could take more than 90 days to resample and have laboratories conduct new analyses, or to conduct field investigations to determine that another source is causing the contamination. As a result, § 257.94(e)(3) does not place an ultimate time limit for owners and operators to complete the demonstration. However, if after 90 days the owner or operator has not made a successful demonstration, (s)he must begin an assessment monitoring program. At this stage, there is evidence to indicate that a release has occurred from the CCR unit, and while EPA agrees that the facility may want to confirm that the information is accurate, it is critical that the facility not delay indefinitely the more targeted monitoring to determine whether a constituent of concern is contaminating groundwater. It would not be consistent with the statutory standard to allow a facility unlimited time to delay taking reasonable steps to assess, and if necessary, address potential contamination by continuing to resample until they obtain a “better” answer. Moreover, initiation of an assessment monitoring program does not involve an irretrievable commitment of resources or even a significant investment by the facility, but only requires the facility to begin more targeted sampling for constituents of concern. This represents a reasonable first step to address a potential threat to groundwater. This requirement is also in the MSWLF part 258 regulations. For more information see 56 FR 51078 (October 9, 1991).

Subsequent to initiating the assessment monitoring program, if an owner or operator demonstrates that the statistically significant increase resulted from an error in sampling, analysis, statistical evaluation, or natural variation in groundwater quality, or was caused by a source other than the CCR unit, the owner or operator may cease assessment monitoring and return to detection monitoring. If the demonstration is successful, the owner or operator must have the demonstration certified by a qualified professional engineer, and is required by § 257.94(e)(3) to place a notice in the operating record, and on publicly accessible Internet site and send a copy of the report to the State Director.

5. Assessment Monitoring Program

EPA is adopting an assessment monitoring program that is largely identical to the program laid out in the proposal. However, as discussed in more detail below, some revisions have been made; some were made in response to comments, but most are conforming changes made to be consistent with changes adopted in other provisions, such as the detection monitoring program described previously.

Consistent with the proposed rule, if any of the detection monitoring parameters are detected at a statistically significant level over the established background concentrations, the owner or operator must proceed to the next step, assessment monitoring. Assessment monitoring requires annual sampling and analysis for the full list of constituents included in appendix IV. The number and frequency of samples required for assessment monitoring are the same as those established for detection monitoring. See discussion above in 3. Sampling and Analysis Requirements.

EPA has also revised the list of constituents in appendix IV by deleting the following constituents and parameters: Aluminum, boron, chloride, copper, iron, manganese, pH, sulfate, sulfide, and TDS; and adding the following constituents: Cobalt, lithium, and radium 226 and 228 combined. The following constituents and parameters are being removed from appendix IV because they are on appendix III and therefore will continue to be monitored throughout assessment monitoring: Boron, chloride, pH, sulfate and TDS. Although fluoride is on appendix III, we are also retaining it on appendix IV because it does have an MCL and was found to pose risks in the 2014 risk assessment, and therefore is appropriately considered to be a constituent that is relevant for purposes of corrective action. Aluminum, copper, iron, manganese, and sulfide have been removed because they lack maximum contaminant levels (MCLs) and were not shown to be constituents of concern based on either the risk assessment conducted for this rule or the damage cases (see Units X and XI of this document). Cobalt has been added to appendix IV because cobalt was found to be a risk driver in the 2014 risk assessment, based on certain waste management disposal practices that lead to highly acidic wastes conditions. Lithium is being added to appendix IV because it has been detected in several proven and potential damage cases at levels exceeding EPA's Regional Screening Level (RSL) of soil to groundwater and has been determined as potentially toxic if consumed concurrently with certain drug types.[117] Radium 226 and 228 combined (the sum of the radioactive isotopes radium-226 and radium-228) is being added because there is evidence from several damage cases of exceedances of gross alpha, indicating that radium from the disposal of CCR may be problematic. Appendix IV now contains antimony, arsenic, barium, beryllium, cadmium, chromium, cobalt, fluoride, lead, lithium, mercury, molybdenum, Start Printed Page 21405selenium, thallium and radium 226 and 228 combined.

If any appendix IV constituents are detected in any appendix IV analyses, the owner or operator must notify the State Director and continue to monitor, at least semiannually, for both the specific constituents in appendix IV that were detected and all parameters in appendix III. EPA has decided to also include a provision to allow an alternative sampling frequency if there is not adequate groundwater to flow to sample wells semiannually, consistent with the revised provision adopted for the detection monitoring program. If the owner or operator demonstrates at any time during assessment monitoring that all of the detected appendix III and IV constituents are at or below background values for two consecutive sampling events, (s)he must notify the state and may return to detection monitoring. In general, EPA expects that appendix III constituents are unlikely to remain elevated once measures have been taken to address the release of the detected appendix IV constituents. But should appendix III constituent levels remain elevated, detection monitoring continues to be necessary to determine whether another source of contamination is present.

After obtaining the sampling results the owner or operator must place a notice in the operating record and on the facility's internet site indicating which appendix IV constituents have been detected and notify the State Director. Within 90 days and on at least a semiannual basis thereafter, the owner or operator must resample all wells, conduct analyses for all parameters in appendix III and for those constituents in appendix IV that were detected in the initial assessment monitoring sampling event. The results of this resampling must be placed in the owner or operator's operating record, as well as its publicly accessible internet site. The results of the resampling must also be sent to the State Director. These provisions have been adopted without change from the proposal.

For each appendix IV constituent that is detected, a groundwater protection standard must be set. The groundwater protection standards must be the MCL or the background concentration level for the detected constituent, whichever is higher. If there is no MCL promulgated for a detected constituent, then the groundwater protection standard must be set at background. The proposed rule would have allowed the owner or operator to establish an alternative groundwater protection standard for constituents for which MCLs have not been established provided that the alternative groundwater protection standard has been certified by an independent registered professional engineer and the state has been notified that the alternative groundwater protection standard has been placed in the operating record and on the owner's or operator's publicly accessible internet site. This provision had been adopted from the part 258 regulations, but was determined to be inappropriate in a self-implementing rule, as it was unlikely that a facility would have the scientific expertise necessary to conduct a risk assessment, and was too susceptible to potential abuse. Additionally, numerous comments were received suggesting that only those constituents with MCLs be included in appendix IV. The commenters were concerned that only MCLs are enforceable. With the exception of cobalt, lead, lithium and molybdenum (included on appendix IV because of their relevance in the risk assessment and damage cases), all appendix IV constituents have an MCL. In the proposed rule, as stated above, owner or operators were allowed to establish certain types of alternative groundwater protection standards. In the final rule, if a constituent has no MCL (i.e., cobalt, lead, lithium and molybdenum), their groundwater protection standards will be their background levels. These background standards are sufficiently precise that they are enforceable.

The owner or operator must compare the levels of any detected appendix IV constituents to the appropriate groundwater protection standard. If the concentrations of all appendix IV constituents are shown to be at or below background values for two consecutive sampling events using the statistical procedures required by § 257.93, the owner or operator of the CCR disposal facility must place that information in the operating record and on the facility's publicly accessible internet site and notify the State Director. The owner or operator may then return to detection monitoring.

If the concentrations of any appendix III or IV constituents are above background values, but all concentrations are determined to be below the groundwater protection standard using the statistical procedures required by this rule, the owner or operator must continue assessment monitoring program.

If, however, the monitoring indicates a statistically significant increase for any appendix IV constituent over the groundwater protection standard, the owner or operator is required to notify the State Director and local officials of this finding and place a notice in the operating record and on the owner or operator's publicly accessible internet site.

The owner or operator also must characterize the nature and extent of the release. As part of characterizing the nature and extent of the release, the owner or operator must install additional wells, as necessary to define the contaminant plume(s) and collect data on the nature and estimated quantity of the material released. Adequate characterization of the release is critical in designing and effectively implementing a protective corrective action program if groundwater remediation is necessary. The purpose of these additional wells is to delineate the contaminant plume boundary and to eventually demonstrate the effectiveness of corrective action in meeting the groundwater protection standard.

Because the requirements for additional monitoring are entirely specific to the site conditions and the size and nature of the release, the Agency is not able to set requirements that precisely specify the location or the number of additional wells that must be installed. Instead EPA has adopted an approach that corresponds to the approach to designing the original groundwater monitoring system under § 257.91. The regulations establish a general performance standard (“install additional wells as necessary to define the contaminant plume”) and specify a true minimum of installing at least one well at the facility boundary in the direction of contaminant migration in order to ascertain whether the contaminants have migrated past the facility boundary. The regulations also establish a rebuttable presumption that this minimum is insufficient, requiring the owner or operator to justify a decision to install only this minimum. The requirement to justify the decision to only install the minimum number of additional wells is a revision from the proposal that has been adopted to be consistent with the Agency's overall approach to developing an effective groundwater monitoring system.

The Agency has also added some clarification to the proposed requirement to characterize the nature and extent of the release, by requiring the owner or operator to collect data on the nature and estimated quantity of material released, including specific information on the constituents listed in appendix IV and the levels at which they are present in the material released. This information will be necessary to help the owner or operator characterize the release and assist in ultimately deciding on a remedy.Start Printed Page 21406

If contamination has migrated off-site, the owner or operator must notify individuals who own land or reside on land overlying the plume.

In addition to characterizing the nature and extent of the release, the owner or operator must initiate an assessment of corrective measures within 90 days o