This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
1,142
as of
08/10/2026 at 8:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2015-25586 as it appeared on Public Inspection on
10/06/2015 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2015-25586 (80 FR 60647)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Army Corps of Engineers, DoD.
ACTION:
Notice of Interim Deauthorization List.
SUMMARY:
The U.S. Army Corps of Engineers is publishing an Interim Deauthorization List of water resources development projects and separable elements that have been identified for deauthorization in accordance with section 6001(c) of the Water Resources Reform and Development Act of 2014, Public Law 113-121, 128 STAT. 1346-1347 (WRRDA 2014), and is soliciting comments from the public on the list for 90 calendar days. Comments should be provided to the contact named below by January 4, 2016.
FOR FURTHER INFORMATION CONTACT:
Mr. Joseph W. Aldridge, Headquarters, U.S. Army Corps of Engineers, Attention: CECW-IP, Washington, DC 20314-1000. Tel. (202) 761-4130 or
joseph.w.aldridge@usace.army.mil.
SUPPLEMENTARY INFORMATION:
Interim Deauthorization List required by § 6001(c).
Section 6001(c) provides that the Secretary shall develop an Interim Deauthorization List that identifies each water resources development project, or separable element of a project, that meets the following criteria. Projects and separable elements eligible for deauthorization are those uncompleted construction projects and separable elements meeting all of the following criteria: (1) They were authorized for construction before November 8, 2007, or their most recent modification of the construction authorization predates November 8, 2007; (2) their construction has not been initiated, or, if construction has been initiated, there have been no obligations of Federal or non-federal funds for construction in the current fiscal year or any of the past 6 fiscal years; and, (3) there has been no funding for a post-authorization study in the current fiscal year or any of the past 6 fiscal years. As specifically provided in section 6001(f)(1)(B) of WRRDA 2014, water resources development projects include environmental infrastructure assistance projects and programs of the U.S. Army Corps of Engineers. In accordance with section 103(f) of the Water Resources Development Act of 1986, separable elements is defined as “a portion of a project—
(1) which is physically separable from other portions of the project; and
(2) which—
(A) achieves hydrologic effects, or
(B) produces physical or economic benefits, which are separately identifiable from those produced by other portions of the project.”
The following elements of an authorized water resources development project also qualify as separable elements: An element for which there is an executed design agreement or project partnership agreement specific to that element; an element that has received funding specified for that element; an element that was authorized separately from or as an amendment to the authorization for the remainder of the water resources development project, that was separately identified in the authorization for the water resources development project, or for which a statute specifies an authorized cost, estimated cost, or amount authorized to be appropriated; an element that has been placed in service or for which the Government or the non-federal partner has assumed operation and maintenance; an element that has been deauthorized; or the remaining portion of the water resources development project apart from other separable elements. Following a 90-day public review period of the Interim Deauthorization List, the Assistant Secretary of the Army for Civil Works (ASA(CW)) will publish a Final Deauthorization List in the
Federal Register
. Section 6001(d)(2)(A) of WRRDA 2014 requires that the Secretary shall include on the Final Deauthorization List projects and separable elements of projects that have, in the aggregate, an estimated Federal cost to complete that is at least $18 billion. The ASA(CW) has strived to meet the requirements of Section 6001, but was not able to identify projects that totaled $18 billion.
The projects and elements on the Final Deauthorization List will be deauthorized automatically after 180 days following the date that the ASA(CW) submits the Final Deauthorization List to Congress, unless
( printed page 60648)
the Congress passes a joint resolution disapproving the Final Deauthorization List or the non-Federal interest for the project or separable element of the project provides sufficient funds to complete the project or separable element. The amount shown as the Federal Balance to complete is a working estimate generally based on the authorization and as such any non-Federal interests considering providing sufficient funds to complete a project or separable element should contact the appropriate District Commander to discuss the process necessary to develop a final cost to complete a project or separable element.
The Interim Deauthorization List follows below in Table 1.
( printed page 60649)
Table 1 (Interim Deauthorization List)
State
Business line
Corps
district
Congressional districts
Project/element name
Project/element type (1)
Public law of
authorization
or latest
amendment
Section of
public law
Project/element phase
and status (2)
Latest fiscal year of federal or non-federal
obligations
for construction
Federal balance to complete (subject to Section 902 where applicable)
AL
NAV
SAM
AL 2, 3 & 4
ALABAMA-COOSA RIVER AND TRIBUTARIES, AL (COOSA RIVER BETWEEN MONTGOMERY AND GADSDEN)
PROJECT
99-662
813
CONSTRUCTION NOT INITIATED
1986
$3,781,921,691
AL
EI
SAM
AL 4
DUCK RIVER, AL
PROJECT
106-554
108a
CONSTRUCTION NOT INITIATED
NO OBLIGATION FOR CONSTRUCTION
5,000,000
AR
EI
MVK
AR 4
UNION COUNTY, AR
PROJECT
106-554
108d
CONSTRUCTION NOT INITIATED
2008
51,247,100
AR
FRM
MVM
AR 1
L'ANGUILLE RIVER BASIN, AR
PROJECT
99-662
103
CONSTRUCTION NOT INITIATED
2004
19,466,768
AR
FRM
SWL
AR 1, 2, 3 & 4; OK 1
ARKANSAS RIVER LEVEES, AR
PROJECT
101-640
110(a1)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
591,605
AR
AER
SWL
AR 3
BEAVER DAM , AR (TROUT PRODUCTION CENTER)
SEPARABLE ELEMENT
94-587
105
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
5,990,000
AR
EI
SWL
AR 3
BEAVER LAKE, BENTON/WASH, AR
SEPARABLE ELEMENT
104-303
523
CONSTRUCTION PAUSED
2002
5,000,000
CA
EI
SPK
CA 4
CALAVERAS COUNTY, CA
PROJECT
104-303
526
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,500,000
CA
EI
SPK
CA 3 & 5
CLEAR LAKE BASIN, CA
PROJECT
106-554
108a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
CA
FRM
SPK
CA 3
COLUSA TROUGH DRAINAGE CANAL, SACRAMENTO RIVER AND TRIBUTARIES, CA
PROJECT
99-662
830
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
18,900,846
CA
EI
SPK
CA 21
PINE FLAT DAM, CA
PROJECT
106-541
101b(7)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
41,502,918
CA
EI
SPL
CA 39
CHINO HILLS, CA
PROJECT
106-554
108a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
CA
EI
SPL
CA 39 & 45
EASTERN MUNICIPAL WATER DISTRICT, CA
PROJECT
106-554
108a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
CA
FRM
SPL
CA 24
GOLETA & VICINITY, CA
PROJECT
102-580
102b
CONSTRUCTION PAUSED
1984
1,233,626
CA
EI
SPL
CA 44
LOS ANGELES HARBOR/TERMINAL ISLAND, CA
PROJECT
106-554
108d
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
6,500,000
CA
FRM
SPL
CA 24
LOWER MISSION CREEK, CA
PROJECT
100-676
3a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
14,625,971
CA
EI
SPL
CA 26, 27 & 29
SAN DIEGO AREA WATER REUSE DEMOSTRATION FACILITIES, CA
PROJECT
102-580
217c(2)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
5,000,000
CA
EI
SPL
CA 52
SAN DIEGO COUNTY, CA (CORONADO TRANSBAY WASTEWATER PIPELINE)
PROJECT
106-554
108d
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
10,000,000
CA
EI
SPL
CA 26, 27 & 29
SOUTHERN CALIFORNIA COMPREHENSIVE WATER REUSE SYSTEM, CA
PROJECT
102-580
217c(1)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
5,000,000
( printed page 60650)
CT
EI
NAE
CT 4
BRIDGEPORT COMBINED SEWER OVERFLOW PTOJECT, CT
PROJECT
106-53
502b
CONSTRUCTION NOT INITIATED
NO OBLIGATION FOR CONSTRUCTION
10,000,000
CT
EI
NAE
CT 1
HARTFORD, CT
PROJECT
106-53
502b
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
10,000,000
CT
EI
NAE
CT 3
NEW HAVEN, CT
PROJECT
106-53
502b
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
10,000,000
CT, ME, MA, NH, RI & VT
AER
NAE
CT 1, 2, 3, 4 & 5; ME 1, & 2; MA 1, 2, 3, 4, 5, 6, 7, 8, & 9; NH 1 & 2; RI 1 & 2; VT AT LARGE
NEW ENGLAND WATER RESOURCES AND ECOSYSTEM RESTORATION, CT, ME, MA, NH, RI & VT
PROJECT
106-541
507
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
(3)0
DC & MD
EI
NAB
WASHINGTON DC AND MARYLAND, D.C. & MD
PROJECT
106-554
108d
CONSTRUCTION NOT INITIATED
1998
14,807,000
FL
AER
SAJ
FL 17, 18, 19, 20, 21, 22 & 23
COMPREHENSIVE EVERGLADES RESTORATION PLAN, FL (LAKE BELT GROUND RESERVOIR TECHNOLOGY)
SEPARABLE ELEMENT
106-541
601 b2biiii
CONSTRUCTION NOT INITIATED
2005
17,000,000
FL
AER
SAJ
FL 17, 18, 20, 21, 22, 23, 25, 26 & 27
COMPREHENSIVE EVERGLADES RESTORATION PLAN, FL (NORTH NEW RIVER IMPROVEMENTS)
SEPARABLE ELEMENT
106-541
601 b2cix
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
67,150,000
FL
AER
SAJ
FL 18, 20, 21, 22, 23, 24, 25, 26 & 27
COMPREHENSIVE EVERGLADES RESTORATION PLAN, FL (RAISE AND BRIDGE EAST PORTION OF TAMIAMI TRAIL AND FILL MIAMI CANAL WITHIN WATER) (CONSEVATION AREA 3)
TAMPA HARBOR, FL ((PORT SUTTON TURNING BASIN) WIDENING TO AN ADDITIONAL 105 FEET TO THE FENDER LINE ALONG PENDOLA POINT)
SEPARABLE ELEMENT
99-662
858
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
8,434,881
HI
FRM
POH
HI 1
WAIKIKI EROSION CONTROL, HI
PROJECT
89-298
301
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
16,584,000
IL
EI
LRC
IL 11 & 14
AURORA, IL
PROJECT
106-554
108d
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
8,000,000
IL
FRM
LRC
IL 9, 10 & 14
DES PLAINES RIVER, IL (NORTH FORK MILL CREEK DAM MODIFICATION)
SEPARABLE ELEMENT
106-53
101b10
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
5,795,400
IN
EI
LRE
IN 3
FORT WAYNE, IN
PROJECT
106-554
108a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,529,324
IN
EI
LRL
IN 7
INDIANAPOLIS, IN
PROJECT
106-554
108a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
KY
FRM
LRH
KY 5
BEAVER CREEK BASIN, KY
PROJECT
89-298
204
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
20,873,500
KY & TN
AER
MVM
TN 8; KY 1
REELFOOT LAKE, TN & KY
PROJECT
106-53
101b11
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
33,072,769
LA
FRM
MVK
LA 1
PEARL RIVER, SLIDELL, SAINT TAMMANY PARISH, LA
PROJECT
99-662
401b
CONSTRUCTION NOT INITIATED
2002
29,311,000
LA
FRM
MVN
LA 1, 2 & 6
AMITE RIVER AND TRIBUTARIES, LA
PROJECT
102-580
101(11)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
38,058,405
LA
FRM
MVN
LA 6
BAYOU COCODRIE AND TRIBUTARIES, LA
PROJECT
93-251
87
CONSTRUCTION PAUSED
1987
345,472,000
LA
NAV
MVN
LA 1, 2, 3 & 6
GULF INTRACOASTAL WATERWAY, LA-TX SECTION, LA & TX
PROJECT
87-874
101
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
201,422,000
LA
EI
MVN
LA 1 & 2
KENNER, LA
PROJECT
106-554
108
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
5,000,000
LA
EI
MVN
LA 1 & 2
ST. CHARLES, ST. BERNARD, AND PLAQUEMINES PARISHES, LA
PROJECT
106-554
108a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
LA
EI
MVN
LA 2 & 6
ST. JOHN THE BAPTIST AND ST. JAMES PARISHES, LA
PROJECT
106-554
108a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
LA
FRM
MVN
LA 1
TANGIPAHOA, TCHEFUNCTE, AND TICKFAW RIVERS, LA
PROJECT
99-662
401
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
21,723,000
MA
EI
NAE
MA 9
FALL RIVER AND NEW BEDFORD, MA
PROJECT
106-554
108c
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
35,000,000
( printed page 60652)
MA
FRM
NAE
MA 4, 7 & 8
MUDDY RIVER, BROOKLINE AND BOSTON, MA (AQUATIC ECOSYSTEM RESTORATION FEATURES)
SEPARABLE ELEMENT
106-541
522
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
24,050,000
MI
NAV
LRE
MI 1
ALPENA HARBOR, MI (25 FOOT CHANNEL)
PROJECT
104-303
363d
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
4,063,120
MI
NAV
LRE
MI 5
BAY CITY, MI
PROJECT
101-640
105
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
8,466,275
MI
EI
LRE
MI 6
BENTON HARBOR, ST JOSEPH WASTEWATER TREATMENT PLANT, ST JOSEPH, MI
PROJECT
106-554
108d
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,500,000
MI
NAV
LRE
MI 1
CHARLEVOIX, MI (REVETMENT CONNECTION)
SEPARABLE ELEMENT
106-53
373
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
52,500
MI
NAV
LRE
MI 1
ONTONAGON HARBOR, ONTONAGON COUNTY MI
PROJECT
104-303
363e
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
37,134,623
MI
FRM
LRE
MI 5
SAGINAW RIVER AND TRIBUTARIES, MI (CASS RIVER AT VASSAR)
SEPARABLE ELEMENT
106-53
364(3)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
13,909,394
MI
FRM
LRE
MI 4 & 5
SAGINAW RIVER AND TRIBUTARIES, MI (CURTIS ROAD BRIDGE)
SEPARABLE ELEMENT
99-662
845
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
720,653
MI
FRM
LRE
MI 5
SAGINAW RIVER AND TRIBUTARIES, MI (FLINT RIVER AT FLINT)
SEPARABLE ELEMENT
104-303
329
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
571,781
MI
FRM
LRE
MI 4 & 5
SAGINAW RIVER AND TRIBUTARIES, MI (SHIAWASSEE FLATS)
SEPARABLE ELEMENT
106-53
364(4)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
106,825,583
MI, MN & WI
NAV
LRE
MI 1; MN 8; WI 7
GREAT LAKES CONNECTING CHANNELS & HARBORS, MN, MI & WI
PROJECT
101-640
101a15
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
17,938,174
MN
NAV
LRE
MN 8
DULUTH, MN (ALTERNATIVE TECHNOLOGY PROJECT)
PROJECT
104-303
541a/b
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,000,000
MN
EI
LRE
MN 8
LAKE SUPERIOR CENTER, MN
PROJECT
104-303
542
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
10,000,000
MN
EI
MVP
MN 5
MISSISSIPPI PLACE, MN
PROJECT
106-53
577
CONSTRUCTION NOT INITIATED
2006
2,968,178
MN & WI
NAV
LRE
MN 8; WI 7
DULUTH—SUPERIOR CHANNEL EXTENSION, MN & WI
PROJECT
99-662
201a
CONSTRUCTION PAUSED
1995
14,064,481
MO
EI
NWK
MO 4 & 6
KANSAS CITY, MO
PROJECT
106-53
502b
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
15,000,000
( printed page 60653)
MO & IL
NAV
MVS
MO 1, 2, 3, & 8; IL 12 & 13
ST LOUIS HARBOR, MO & IL
PROJECT
99-662
601a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
43,253,100
MS
FRM
MVK
MS 2
YAZOO BASIN, TRIBUTARIES, MS
PROJECT
89-298
204
CONSTRUCTION PAUSED
2007
233,490,728
MS
NAV
MVK
MS 2
YAZOO RIVER, MS (SHEPARDSTOWN BRIDGE)
SEPARABLE ELEMENT
99-662
822
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
2,011,094
MS & LA
AER
MVN
LA 2
MISSISSIPPI AND LOUISIANA ESTUARINE AREAS, MS & LA
PROJECT
100-676
3(a)8
CONSTRUCTION NOT INITIATED
2003
70,668,540
NC
EI
SAW
NC 8
LUMBERTON, NC
PROJECT
106-53
502b
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,700,000
NC
EI
SAW
NC 8 & 9
UNION COUNTY, NC
PROJECT
106-554
108a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
NC & SC
FRM
SAW
NC 9 & 12
SUGAR CREEK BASIN, NC & SC
PROJECT
99-662
401a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
54,523,100
NH
EI
NAE
NH 2
NASHUA, NH (COMBINED SEWER OVERFLOW)
PROJECT
106-53
502b
CONSTRUCTION NOT INITIATED
NO OBLIGATION FOR CONSTRUCTION
19,853,000
NH
EI
NAE
NH 1
ROCHESTER, NH
PROJECT
104-303
504(e) (4)
CONSTRUCTION NOT INITIATED
NO OBLIGATION FOR CONSTRUCTION
10,897,120
NJ
EI
NAN
NJ 8
ELIZABETH, NJ
PROJECT
106-53
502(f)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
20,000,000
NJ
EI
NAN
NJ 8
NORTH HUDSON, NJ
PROJECT
106-53
502(f)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
20,000,000
NJ
EI
NAN
NJ 9
PATTERSON AND PASSAIC COUNTY, NJ
PROJECT
106-554
108c
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
30,000,000
NJ
EI
NAP
NJ 4, 6 & 12
STATE OF NEW JERSEY AND NEW JERSEY WASTEWATER TREATMENT TRUST, NJ
PROJECT
102-580
219c (10)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
NJ
EI
NAP
NJ 5
TOWN OF NEWTON, NJ
PROJECT
106-554
108d
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
7,000,000
NV
FRM
SPL
NV 4
LAS VEGAS WASH AND TRIBUTARIES, NV
PROJECT
102-580
101(13)
CONSTRUCTION NOT INITIATED
NO OBLIGATION FOR CONSTRUCTION
3,360,938
NV
FRM
SPL
NV 4
LAS VEGAS, NV
PROJECT
109-103
115
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
20,000,000
NY
EI
LRB
NY26 & 27
ERIE COUNTY, BUFFALO AMHRST, NY
SEPARABLE ELEMENT
102-580
221
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
7,000,000
NY
EI
LRB
NY 26 & 27
ERIE COUNTY, NY (SLUDGE DISPOSAL)
PROJECT
102-580
219c (12)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
NY
EI
LRB
NY 26 & 27
ERIE COUNTY, NY (WATER QUALITY TUNNEL)
PROJECT
102-580
219c (11)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
NY
EI
LRB
NY26 & 27
LEWISTON STORMWATER, NY
SEPARABLE ELEMENT
102-580
222
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
200,000
NY
EI
LRB
NY 24
LIVERPOOL, NY
PROJECT
106-554
108d
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
2,000,000
NY
EI
NAN
NY 10 & 11; NJ 8
INNER HARBOR PROJECT, NEW YORK, NY
PROJECT
106-53
502(f)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
15,000,000
NY
FRM
NAN
NY 17, 18, 19 & 20
LOWER HUDSON RIVER & TRIBUTARIES, NY
PROJECT
106-53
212e
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
30,000,000
NY
EI
NAN
NY 6 & 11
OUTER HARBOR PROJECT, NEW YORK, NY
PROJECT
106-53
502(f)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
15,000,000
( printed page 60654)
NY/NJ
NAV
NAN
NJ 6, 9 & 13; NY 7, 8, 9, 12, 13,14 & 15
NEW YORK HARBOR COLLECTION AND REMOVAL OF DRIFT, NY & NJ
PROJECT
101-640
102
CONSTRUCTION PAUSED
2005
201,549,768
OH
NAV
LRB
OH 9
OTTAWA RIVER HARBOR, OH
PROJECT
101-640
107a7
CONSTRUCTION NOT INITIATED
2006
13,218,200
OH
FRM
LRH
OH 15
HOCKING RIVER, LOGAN, OH
PROJECT
99-662
401a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
16,282,709
OH
FRM
LRL
OH 8
MIAMI RIVER BASIN, PLEASANT RUN, VICINITY FAIRFIELD, OH
PROJECT
99-662
401a
CONSTRUCTION NOT INITIATED
NO OBLIGATION FOR CONSTRUCTION
18,041,480
OK
HYD
SWT
OK 2
FORT GIBSON LAKE, OK (POWER UNITS 5 & 6)
SEPARABLE ELEMENT
99-662
601a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
45,485,000
OR
EI
NWP
OR 1
ASTORIA, OR
PROJECT
106-53
502b
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
5,000,000
OR
EI
NWP
OR 2
HOOD RIVER, OR
PROJECT
106-554
108a (36)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
OR
EI
NWP
OR 2
MEDFORD, OR
PROJECT
106-554
108a (37)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
OR
EI
NWP
OR 1 & 2
PORTLAND, OR
PROJECT
106-554
108a (38)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
PA
EI
LRP
PA 5
COUDERSPORT, PA
PROJECT
106-554
108
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
PA
EI
LRP
PA 18
FINDLAY TOWNSHIP, PA
PROJECT
106-53
502
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
11,000,000
PA
EI
LRP
PA 9
GREENSBORO AND GLASSWORKS, PA
PROJECT
102-580
219c(15)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,543,324
PA
EI
LRP
PA 9
JEFFERSON TOWNSHIP, GREENE COUNTY, PA
PROJECT
106-53
502
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,000,000
PA
EI
LRP
PA 18
NORTH FAYETTE TOWNSHIP, ALLEGHENY COUNTY, PA
PROJECT
106-53
502
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
500,000
PA
EI
LRP
PA 18
ROBINSON TOWNSHIP, PA
PROJECT
106-53
502
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,200,000
PA
EI
LRP
PA 14
SPRINGDALE BOROUGH, PA
PROJECT
106-53
502
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
500,000
PA
EI
LRP
PA 3
TITUSVILLE, PA
PROJECT
106-554
108
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
7,300,000
PA
EI
LRP
PA 9, 12, 14 & 18
WASHINGTON, GREENE, WESTMORELAND, AND FAYETTE COUNTIES, PA
PROJECT
106-554
108
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
8,000,000
PA
EI
NAB
PA 10
BRADFORD AND SULLIVAN COUNTIES, PA
SEPARABLE ELEMENT
106-53
548
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
13,000,000
PA
EI
NAB
PA 11 & 15
DAUPHIN COUNTY, PA
PROJECT
106-53
502b
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
2,000,000
PA
EI
NAB
PA 4
DILLSBURG BOROUGH AUTHORITY, PA
PROJECT
106-53
502b
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
2,000,000
PA
EI
NAB
PA 4
HAMPDEN TOWNSHIP, PA
PROJECT
106-53
502b
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
3,000,000
( printed page 60655)
PA
EI
NAB
PA 4 & 11
MOUNT JOY TOWNSHIP AND CONEWAGO TOWNSHIP, PA
PROJECT
106-554
108d
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
8,300,000
PA
EI
NAB
PA 5
PATTON TOWNSHIP, PA
PROJECT
106-53
502b
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,400,000
PA
EI
NAB
PA 4
UPPER ALLEN TOWNSHIP, PA
PROJECT
106-53
502b
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
3,400,000
PA
FRM
NAP
PA 17
DELAWARE RIVER BASIN—WABASH CREEK, BOROUGH OF TAMAQUA, PA
PROJECT
93-251
2
CONSTRUCTION NOT INITIATED
1993
13,194,000
PA
FRM
NAP
PA 2 & 3
PHILADELPHIA, PA (FRANKFORD DAM)
PROJECT
104-303
564e
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
900,000
PA
FRM
NAP
PA 1, 2, 3 & 13
PHILADELPHIA, PA (PENNYPACK PARK)
PROJECT
104-303
564d
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
15,000,000
PA
FRM
NAP
PA 2 & 3
PHILADELPHIA, PA (WATER WORKS RESTORATION)
PROJECT
104-303
564a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,000,000
PA
EI
NAP
PA 6
PHOENIXVILLE BOROUGH, CHESTER COUNTY, PA
PROJECT
106-554
108d
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
2,400,000
PA
EI
NAP
PA 8
TOWAMENCIN TOWNSHIP, PA
PROJECT
106-53
502b
CONSTRUCTION NOT INITIATED
2005
1,462,000
PR
FRM
SAJ
PR AT LARGE
GUANAJIBO RIVER, PR
PROJECT
106-53
101
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
33,495,941
PR
FRM
SAJ
PR AT LARGE
RIO NIGUA AT SALINAS, PR
PROJECT
106-53
101
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
12,145,000
RI
EI
NAE
RI 2
CRANSTON, RI
PROJECT
101-640
54
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
6,000,000
RI
EI
NAE
RI 1 & 2
DREDGING OF SALT PONDS IN THE STATE OF RHODE ISLAND, RI
PROJECT
106-53
578
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
1,100,000
SC
EI
SAC
SC 1
CHARLESTON, SC
PROJECT
108-137
127
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
10,000,000
TN
NAV
MVM
TN 9
MEMPHIS HARBOR, MEMPHIS, TN
PROJECT
106-53
364
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
110,044,000
TN
FRM
MVM
TN 8
NONCONNAH CREEK, TN & MS (EXTENSION)
SEPARABLE ELEMENT
106-541
334
CONSTRUCTION NOT INITIATED
2004
36,188,000
TX
FRM
SWF
TX 8 & 17
NAVASOTA RIVER BASIN, TX (MILLICAN LAKE, TX)
SEPARABLE ELEMENT
90-483
203
CONSTRUCTION NOT INITIATED
1983
778,421,000
TX
FRM
SWF
TX 2, 8 & 14
TRINITY RIVER AND TRIBUTARIES, TX (LIBERTY LOCAL PROTECTION PROJECT)
SEPARABLE ELEMENT
108-447
116
CONSTRUCTION NOT INITIATED
1981
19,985,000
TX
NAV
SWF
TX 2, 8 & 14
TRINITY RIVER AND TRIBUTARIES, TX (NAVIGATION CHANNEL ABOVE LIBERTY)
SEPARABLE ELEMENT
108-447
116
CONSTRUCTION NOT INITIATED
1981
5,412,060,000
TX
FRM
SWF
TX 2, 8 & 14
TRINITY RIVER AND TRIBUTARIES, TX (WEST FORK FLOODWAY)
SEPARABLE ELEMENT
108-447
116
CONSTRUCTION NOT INITIATED
1981
119,408,000
TX
FRM
SWG
TX 2, 7, 8, 10, 18 & 29
BUFFALO BAYOU AND TRIBUTARIES, TX (HALLS BAYOU)
SEPARABLE ELEMENT
101-640
101(21)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
112,536,000
( printed page 60656)
TX
FRM
SWG
TX 15 & 34
LOWER RIO GRANDE BASIN, TEXAS (SOUTH MAIN CHANNEL), TX
SEPARABLE ELEMENT
99-662
401a
CONSTRUCTION NOT INITIATED
2005
207,183,000
TX & OK
NAV
SWT
TX 4; OK 2
RED RIVER WATERWAY (BANK STABILIZATION FEATURES)
SEPARABLE ELEMENT
90-483
101
CONSTRUCTION NOT INITIATED
2004
685,324,228
UT
EI
SPK
UT 1
CACHE COUNTY, UT
PROJECT
106-53
502b
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
5,000,000
UT
FRM
SPK
UT 4
UPPER JORDAN RIVER, UT
PROJECT
106-53
357
CONSTRUCTION NOT INITIATED
2004
11,087,268
VA
FRM
LRH
VA 9
LEVISA AND TUG FORKS AND UPPER CUMBERLAND RIVER VA, WV, KY (HAYSI LAKE, VA)
SEPARABLE ELEMENT
104-303
353
CONSTRUCTION NOT INITIATED
1989
185,915,319
VA
NAV
NAO
VA 3
NORFOLK HARBOR ANCHORAGES, VA
PROJECT
101-640
107a13
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
63,130,000
VA
FRM
NAO
VA 2
WALLOPS ISLAND, VA
PROJECT
106-53
567
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
8,000,000
WA
REC
NWW
WA 5
SNAKE RIVER INTERPRETIVE CENTER, CLARKSTON, WA
PROJECT
108-137
124
CONSTRUCTION NOT INITIATED
2004
3,750,044
WA
AER
NWS
WA 1 & 2
STILLAGUMAISH RIVER BASIN, WA
PROJECT
106-541
101b (27)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
26,047,966
WV
FRM
LRH
WV 2
CABIN CREEK LPP, WV
PROJECT
99-662
601a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
10,409,900
WV
FRM
LRH
WV 3
ISLAND CREEK BASIN, VICINITY OF LOGAN, WV (NON-STRUCTURAL FEATURES)
SEPARABLE ELEMENT
99-662
401a
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
107,707,600
WV
NAV
LRH
WV 1
WEST VIRGINIA PORT DEVELOPMENT, WV
PROJECT
106-53
557(3)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
24,144,000
WV
NAV
LRP
WV 1
WEIRTON PORT, WV
PROJECT
106-53
557(2)
NEVER FUNDED
NO OBLIGATION FOR CONSTRUCTION
15,274,778
# PROJECTS
147
TOTAL
14,348,670,778
NOTES:
(1) PROJECT/ELEMENT TYPE: PROJECT = WATER RESOURCES DEVELOPMENT PROJECT AUTHORIZED FOR CONSTRUCTION, INCLUDING AUTHORIZED ENVIRONMENTAL INFRASTRUCTURE ASSISTANCE PROGRAM IN ACCORDANCE WITH WRRDA 2014, SECTION 6001(f)(1)(B).
(2) PROJECT/ELEMENT PHASE AND STATUS: NEVER FUNDED = NEVER FUNDED FOR CONSTRUCTION, INCLUDING PROJECTS IN PRECONSTRUCTION ENGINEERING AND DESIGN; CONSTRUCTION NOT INITIATED = CONSTRUCTION FUNDED BUT PHYSICAL CONSTRUCTION NOT INITIATED; CONSTRUCTION PAUSED = CONSTRUCTION FUNDED BUT PHYSICAL CONSTRUCTION PAUSED.
(3) PER PUBLIC LAW 106-541, SEC. 507, NO CRITICAL RESTORATION PROJECT MAY BE INITIATED UNDER THIS SUBSECTION AFTER SEPTEMBER 30, 2005.
( printed page 60657)
Authority:This notice is required by § 6001(c) of the Water Resources Reform and Development Act of 2014, Public Law 113-121, 128 STAT 1346-1347.