Skip to Content

Notice

Published Document: 2016-01192 (81 FR 3420)

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

AGENCY:

Department of Defense (DOD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).

ACTION:

Notice of request for public comments regarding an extension to an existing OMB clearance.

SUMMARY:

Under the provisions of the Paperwork Reduction Act, the Regulatory Secretariat Division will be submitting to the Office of Management and Budget (OMB) a request to review and approve an extension of a previously approved information collection requirement concerning change order accounting.

DATES:

Submit comments on or before March 21, 2016.

ADDRESSES:

Submit comments identified by Information Collection 9000-0026, Change Order Accounting, by any of the following methods:

  • Regulations.gov: http://www.regulations.gov. Submit comments via the Federal eRulemaking portal by inputting “Information Collection 9000-0026, Change Order Accounting” under the heading “Enter Keyword or ID” and selecting “Search”. Select the link “Submit a Comment” that corresponds with “Information 9000-0026, Change Order Accounting”. Follow the instructions provided at the “Submit a Comment” screen. Please include your ( printed page 3421) name, company name (if any), and “Information Collection 9000-0026, Change Order Accounting” on your attached document.
  • Mail: General Services Administration, Regulatory Secretariat Division (MVCB), 1800 F Street NW., Washington, DC 20405. ATTN: Ms. Flowers/IC 9000-0026, Change Order Accounting.

Instructions: Please submit comments only and cite Information Collection 9000-0026, Change Order Accounting, in all correspondence related to this collection. Comments received generally will be posted without change to http://www.regulations.gov, including any personal and/or business confidential information provided. To confirm receipt of your comment(s), please check www.regulations.gov, approximately two to three days after submission to verify posting (except allow 30 days for posting of comments submitted by mail).

FOR FURTHER INFORMATION CONTACT:

Mr. Michael O. Jackson, Procurement Analyst, Office of Governmentwide Acquisition Policy, GSA, 202-208-4949, or email .

SUPPLEMENTARY INFORMATION:

A. Purpose

FAR 43.205 allows a contracting officer, whenever the estimated cost of a change or series of related changes under a contract exceeds $100,000, to assert the right in the clause at FAR 52.243-6, Change Order Accounting, to require the contractor to maintain separate accounts for each change or series of related changes. Each account shall record all incurred segregable, direct costs (less allocable credits) of work, changed and unchanged, allocable to the change. These accounts are to be maintained until the parties agree to an equitable adjustment for the changes or until the matter is conclusively disposed of under the Disputes clause. This requirement is necessary in order to be able to account properly for costs associated with changes in supply and research and development contracts that are technically complex and incur numerous changes.

B. Annual Reporting Burden

Respondents: 8,850.

Responses per Respondent: 12.

Annual Responses: 106,200.

Hours per Response: 1.

Total Burden Hours: 106,200.

C. Public Comments

Public comments are particularly invited on: Whether this collection of information is necessary for the proper performance of functions of the Federal Acquisition Regulations (FAR) and whether it will have practical utility; whether our estimate of the public burden of this collection of information is accurate, and based on valid assumptions and methodology; ways to enhance the quality, utility, and clarity of the information to be collected; and ways in which we can minimize the burden of the collection of information on those who are to respond, through the use of appropriate technological collection techniques or other forms of information technology.

Obtaining Copies Of Proposals: Requesters may obtain a copy of the information collection documents from the General Services Administration, Regulatory Secretariat Division (MVCB), 1800 F Street NW., Washington, DC 20405, telephone 202-501-4755.

Please cite OMB Control No. 9000-0026, Change Order Accounting, in all correspondence.

Dated: January 15, 2016.

Lorin S. Curit

Director, Federal Acquisition Policy Division, Office of Governmentwide Acquisition Policy, Office of Acquisition Policy, Office of Governmentwide Policy.

[FR Doc. 2016-01192 Filed 1-20-16; 8:45 am]

BILLING CODE 6820-EP-P