This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Army Corps of Engineers, DoD.

ACTION:

Notice of Final Deauthorization Report.

SUMMARY:

The U.S. Army Corps of Engineers is publishing a Final Deauthorization Report of water resources development projects and separable elements that have been identified for deauthorization in accordance with section 6001(d) of the Water Resources Reform and Development Act of 2014, Public Law 113-121, 128 STAT. 1346-1347 (WRRDA 2014). The Assistant Secretary of the Army for Civil Works transmitted the Final Deauthorization Report to Congress on February 26, 2016. An electronic copy of the complete report is available at: http://www.usace.army.mil/​Portals/​2/​docs/​civilworks/​budget/​final_​deauth_​report_​23feb2016.pdf.

Start Further Info

For Further Information Contact or To Provide Comments:

Mr. Joseph W. Aldridge, Headquarters, U.S. Army Corps of Engineers, Attention: CECW-IP, Washington, DC 20314-1000. Tel. (202) 761-4130 or joseph.w.aldridge@usace.army.mil.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Final Deauthorization Report required by § 6001(d).

Section 6001(d) provides that the Secretary shall develop a Final Deauthorization Report. This report includes a list of each water resources Start Printed Page 16148development project, or separable element of a project, described in Section 6001(c) and the other provisions of Section 6001(d), as well as an appendix (Appendix A) that lists any project, or separable element of a project, included as part of the Interim Deauthorization List but not included in the Final Deauthorization Report and the reasons why they are not included in the report. Appendix B of the Final Deauthorization Report (available on the U.S. Army Corps of Engineers Web site referenced below) contains copies of the comments received during the public comment period. The Final Deauthorization Report with Appendix A follows below in Table 1. An electronic copy of the Final Deauthorization Report with appendices can be found at: http://www.usace.army.mil/​Portals/​2/​docs/​civilworks/​budget/​final_​deauth_​report_​23feb2016.pdf.

The Interim Deauthorization List was developed in accordance with Section 6001(c) of WRRDA 2014 and was published for public comment in the Federal Register on October 7, 2015. Per Section 6001(d), not later than 120 days following the 90-day public comment period of the Interim Deauthorization List, that ended on January 4, 2016, the Assistant Secretary of the Army for Civil Works (ASA(CW)) will transmit the Final Deauthorization Report to the Environment & Public Works Committee of the Senate and the Transportation and Infrastructure Committee of the House of Representatives. Additionally, the ASA(CW) will publish the Final Deauthorization Report in the Federal Register. The ASA(CW) transmitted the Final Deauthorization Report to the Committees on February 26, 2016.

Section 6001(d)(2)(A) of WRRDA 2014 requires that the Secretary shall include on the Final Deauthorization Report, projects and separable elements of projects that have, in the aggregate, an estimated Federal cost to complete that is at least $18 billion. The ASA(CW) has strived to meet the requirements of Section 6001, but was not able to identify projects that totaled $18 billion based upon the criteria provided in Section 6001. The projects and elements on the Final Deauthorization Report will be deauthorized automatically after 180 days following the date that the ASA(CW) submits the Final Deauthorization List to the Committees, unless the Congress passes a joint resolution disapproving the Final Deauthorization Report or the non-Federal interest for the project or separable element of a project provides sufficient funds to complete the construction of the project or separable element. The amount shown as the Federal Balance to complete is a working estimate generally based on the authorization and as such any non-Federal interests considering providing sufficient funds to complete a project or separable element should contact the appropriate District Commander to discuss the process necessary to develop a final cost to complete a project or separable element.

The Final Deauthorization Report identifies water resources development projects, or separable elements of a project, that meet the following criteria. Projects and separable elements eligible for deauthorization are those uncompleted construction projects and separable elements meeting all of the following criteria: (1) They were authorized for construction before November 8, 2007, or their most recent modification of the construction authorization predates November 8, 2007; (2) their construction has not been initiated, or, if construction has been initiated, there have been no obligations of Federal or non-Federal funds for construction in the current fiscal year or any of the past 6 fiscal years; and, (3) there has been no funding for a post-authorization study in the current fiscal year or any of the past 6 fiscal years. As specifically provided in section 6001(f)(1)(B) of WRRDA 2014, water resources development projects include environmental infrastructure assistance projects and programs of the U.S. Army Corps of Engineers. In accordance with section 103(f) of the Water Resources Development Act of 1986, separable elements is defined as “a portion of a project—

(1) which is physically separable from other portions of the project; and

(2) which—

(A) achieves hydrologic effects, or

(B) produces physical or economic benefits, which are separately identifiable from those produced by other portions of the project.”

The following elements of an authorized water resources development project also qualify as separable elements: an element for which there is an executed design agreement or project partnership agreement specific to that element; an element that has received funding specified for that element; an element that was authorized separately from or as an amendment to the authorization for the remainder of the water resources development project, that was separately identified in the authorization for the water resources development project, or for which a statute specifies an authorized cost, estimated cost, or amount authorized to be appropriated; an element that has been placed in service or for which the Government or the non-Federal partner has assumed operation and maintenance; an element that has been deauthorized; or the remaining portion of the water resources development project apart from other separable elements.

Start Authority

Authority: This notice is required by § 6001(d) of the Water Resources Reform and Development Act of 2014, Public Law 113-121, 128 STAT 1346-1347.

End Authority Start Signature

Jo-Ellen Darcy,

Assistant Secretary of the Army (Civil Works).

End Signature

Table 1 (Final Deauthorization Report)

StateProject/Element namePublic law of authorization or latest amendmentSection of public lawLatest fiscal year of Federal or non-Federal obligations for constructionFederal balance to complete (subject to section 902 where applicable) ($)
ALALABAMA-COOSA RIVER AND TRIBUTARIES, AL (COOSA RIVER BETWEEN MONTGOMERY AND GADSDEN)99-66281319863,781,921,691
ALDUCK RIVER, AL106-554108aNO OBLIGATION FOR CONSTRUCTION5,000,000
ARUNION COUNTY, AR106-554108d200851,247,100
L'ANGUILLE RIVER BASIN, AR99-662103200419,466,768
ARKANSAS RIVER LEVEES, AR101-640110(a1)NO OBLIGATION FOR CONSTRUCTION591,605
BEAVER DAM, AR (TROUT PRODUCTION CENTER)94-587105NO OBLIGATION FOR CONSTRUCTION5,990,000
Start Printed Page 16149
BEAVER LAKE, BENTON/WASH, AR104-30352320025,000,000
CACALAVERAS COUNTY, CA104-303526NO OBLIGATION FOR CONSTRUCTION1,500,000
CLEAR LAKE BASIN, CA106-554108aNO OBLIGATION FOR CONSTRUCTION1,543,324
COLUSA TROUGH DRAINAGE CANAL, SACRAMENTO RIVER AND TRIBUTARIES, CA99-662830NO OBLIGATION FOR CONSTRUCTION18,900,846
PINE FLAT DAM, CA106-541101b(7)NO OBLIGATION FOR CONSTRUCTION41,502,918
CHINO HILLS, CA106-554108aNO OBLIGATION FOR CONSTRUCTION1,543,324
EASTERN MUNICIPAL WATER DISTRICT, CA106-554108aNO OBLIGATION FOR CONSTRUCTION1,543,324
GOLETA & VICINITY, CA102-580102b19841,233,626
LOS ANGELES HARBOR/TERMINAL ISLAND, CA106-554108dNO OBLIGATION FOR CONSTRUCTION6,500,000
LOWER MISSION CREEK, CA100-6763aNO OBLIGATION FOR CONSTRUCTION14,625,971
SAN DIEGO AREA WATER REUSE DEMOSTRATION FACILITIES, CA102-580217c(2)NO OBLIGATION FOR CONSTRUCTION5,000,000
SAN DIEGO COUNTY, CA (CORONADO TRANSBAY WASTEWATER PIPELINE)106-554108dNO OBLIGATION FOR CONSTRUCTION10,000,000
SOUTHERN CALIFORNIA COMPREHENSIVE WATER REUSE SYSTEM, CA102-580217c(1)NO OBLIGATION FOR CONSTRUCTION5,000,000
CTBRIDGEPORT COMBINED SEWER OVERFLOW PTOJECT, CT106-53502bNO OBLIGATION FOR CONSTRUCTION10,000,000
CT, ME, MA, NH, RI & VTNEW ENGLAND WATER RESOURCES AND ECOSYSTEM RESTORATION, CT, ME, MA, NH, RI & VT106-541507NO OBLIGATION FOR CONSTRUCTION0
DC & MDWASHINGTON, DC AND MARYLAND, DC & MD106-554108d199814,807,000
FLCOMPREHENSIVE EVERGLADES RESTORATION PLAN, FL (LAKE BELT IN-GROUND RESERVOIR TECHNOLOGY)106-541601b2bii200517,000,000
COMPREHENSIVE EVERGLADES RESTORATION PLAN, FL (NORTH NEW RIVER IMPROVEMENTS)106-541601b2cixNO OBLIGATION FOR CONSTRUCTION67,150,000
COMPREHENSIVE EVERGLADES RESTORATION PLAN, FL (RAISE AND BRIDGE EAST PORTION OF TAMIAMI TRAIL AND FILL MIAMI CANAL WITHIN WATER) (CONSEVATION AREA 3)106-541601b2cviiiNO OBLIGATION FOR CONSTRUCTION21,500,000
COMPREHENSIVE EVERGLADES RESTORATION PLAN, FL (TAYLOR CREEK/NUBBIN SLOUGH STORAGE AND TREATMENT AREA)106-541601b2cviiNO OBLIGATION FOR CONSTRUCTION67,800,000
COMPREHENSIVE EVERGLADES RESTORATION PLAN, FL (WASTEWATER REUSE TECHNOLOGY)106-541601b2biv200520,500,000
HUDSON RIVER, FL81-516101NO OBLIGATION FOR CONSTRUCTION3,650,000
KEY BISCAYNE, FL106-554108aNO OBLIGATION FOR CONSTRUCTION1,543,324
LITTLE TALBOT ISLAND, FL106-53101(b)(7)20006,786,030
SOUTH TAMPA, FL106-554108aNO OBLIGATION FOR CONSTRUCTION1,543,324
TAMPA HARBOR, ALAFIA RIVER, FL106-554107200664,771,847
TAMPA HARBOR, FL ((PORT SUTTON TURNING BASIN) WIDENING TO AN ADDITIONAL 105 FEET TO THE FENDER LINE ALONG PENDOLA POINT)99-662858NO OBLIGATION FOR CONSTRUCTION8,434,881
Start Printed Page 16150
HIWAIKIKI EROSION CONTROL, HI89-298301NO OBLIGATION FOR CONSTRUCTION16,584,000
IDSNAKE RIVER INTERPRETIVE CENTER, CLARKSTON, WA108-13712420043,750,044
ILAURORA, IL106-554108dNO OBLIGATION FOR CONSTRUCTION8,000,000
DES PLAINES RIVER, IL (NORTH FORK MILL CREEK DAM MODIFICATION)106-53101b(10)NO OBLIGATION FOR CONSTRUCTION5,795,400
INFORT WAYNE, IN106-554108aNO OBLIGATION FOR CONSTRUCTION1,529,324
INDIANAPOLIS, IN106-554108aNO OBLIGATION FOR CONSTRUCTION1,543,324
KYBEAVER CREEK BASIN, KY89-298204NO OBLIGATION FOR CONSTRUCTION20,873,500
KY & TNREELFOOT LAKE, TN & KY106-53101b(11)NO OBLIGATION FOR CONSTRUCTION33,072,769
LAPEARL RIVER, SLIDELL, SAINT TAMMANY PARISH, LA99-662401b200229,311,000
BAYOU COCODRIE AND TRIBUTARIES, LA93-251871987345,472,000
GULF INTRACOASTAL WATERWAY, LA & TX (LA-TX SECTION—UNCONSTRUCTED FEATURES)87-874101NO OBLIGATION FOR CONSTRUCTION201,422,000
KENNER, LA106-554108NO OBLIGATION FOR CONSTRUCTION5,000,000
ST. CHARLES, ST. BERNARD, AND PLAQUEMINES PARISHES, LA106-554108aNO OBLIGATION FOR CONSTRUCTION1,543,324
ST. JOHN THE BAPTIST AND ST. JAMES PARISHES, LA106-554108aNO OBLIGATION FOR CONSTRUCTION1,543,324
TANGIPAHOA, TCHEFUNCTE, AND TICKFAW RIVERS, LA99-662401NO OBLIGATION FOR CONSTRUCTION21,723,000
MAMUDDY RIVER, BROOKLINE AND BOSTON, MA (AQUATIC ECOSYSTEM RESTORATION FEATURES)106-541522NO OBLIGATION FOR CONSTRUCTION24,050,000
MIALPENA HARBOR, MI (25-FOOT CHANNEL)104-303363dNO OBLIGATION FOR CONSTRUCTION4,063,120
BAY CITY, MI101-640105NO OBLIGATION FOR CONSTRUCTION8,466,275
BENTON HARBOR, ST JOSEPH WASTEWATER TREATMENT PLANT, ST JOSEPH, MI106-554108dNO OBLIGATION FOR CONSTRUCTION1,500,000
CHARLEVOIX, MI (REVETMENT CONNECTION)106-53373NO OBLIGATION FOR CONSTRUCTION52,500
ONTONAGON HARBOR, ONTONAGON COUNTY MI104-303363eNO OBLIGATION FOR CONSTRUCTION37,134,623
SAGINAW RIVER AND TRIBUTARIES, MI (CASS RIVER AT VASSAR)106-53364(3)NO OBLIGATION FOR CONSTRUCTION13,909,394
SAGINAW RIVER AND TRIBUTARIES, MI (CURTIS ROAD BRIDGE)99-662845NO OBLIGATION FOR CONSTRUCTION720,653
SAGINAW RIVER AND TRIBUTARIES, MI (FLINT RIVER AT FLINT)104-303329NO OBLIGATION FOR CONSTRUCTION571,781
SAGINAW RIVER AND TRIBUTARIES, MI (SHIAWASSEE FLATS)106-53364(4)NO OBLIGATION FOR CONSTRUCTION106,825,583
MI, MN & WIGREAT LAKES CONNECTING CHANNELS & HARBORS, MN, MI & WI101-640101a15NO OBLIGATION FOR CONSTRUCTION17,938,174
MNDULUTH, MN (ALTERNATIVE TECHNOLOGY PROJECT)104-303541a/bNO OBLIGATION FOR CONSTRUCTION1,000,000
LAKE SUPERIOR CENTER, MN104-303542NO OBLIGATION FOR CONSTRUCTION10,000,000
MISSISSIPPI PLACE, MN106-5357720062,968,178
MN & WIDULUTH-SUPERIOR CHANNEL EXTENSION, MN & WI99-662201a199514,064,481
Start Printed Page 16151
MOKANSAS CITY, MO106-53502bNO OBLIGATION FOR CONSTRUCTION15,000,000
MO & ILST LOUIS HARBOR, MO & IL99-662601aNO OBLIGATION FOR CONSTRUCTION43,253,100
MSYAZOO BASIN, TRIBUTARIES, MS (UNCONSTRUCTED FEATURES)89-2982042007233,490,728
YAZOO RIVER, MS (SHEPARDSTOWN BRIDGE)99-662822NO OBLIGATION FOR CONSTRUCTION2,011,094
MS & LAMISSISSIPPI AND LOUISIANA ESTUARINE AREAS, MS & LA100-6763(a)8200370,668,540
NCLUMBERTON, NC106-53502bNO OBLIGATION FOR CONSTRUCTION1,700,000
UNION COUNTY, NC106-554108aNO OBLIGATION FOR CONSTRUCTION1,543,324
NC & SCSUGAR CREEK BASIN, NC & SC99-662401aNO OBLIGATION FOR CONSTRUCTION54,523,100
NHNASHUA, NH (COMBINED SEWER OVERFLOW)106-53502(b)NO OBLIGATION FOR CONSTRUCTION19,853,000
ROCHESTER, NH104-303504(e)(4)NO OBLIGATION FOR CONSTRUCTION10,897,120
NJELIZABETH, NJ106-53502(f)NO OBLIGATION FOR CONSTRUCTION20,000,000
NORTH HUDSON, NJ106-53502(f)NO OBLIGATION FOR CONSTRUCTION20,000,000
PATTERSON AND PASSAIC COUNTY, NJ106-554108cNO OBLIGATION FOR CONSTRUCTION30,000,000
STATE OF NEW JERSEY AND NEW JERSEY WASTEWATER TREATMENT TRUST, NJ102-580219c(10)NO OBLIGATION FOR CONSTRUCTION1,543,324
TOWN OF NEWTON, NJ106-554108dNO OBLIGATION FOR CONSTRUCTION7,000,000
NVLAS VEGAS WASH AND TRIBUTARIES, NV102-580101(13)NO OBLIGATION FOR CONSTRUCTION3,360,938
LAS VEGAS, NV109-103115NO OBLIGATION FOR CONSTRUCTION20,000,000
ERIE COUNTY, BUFFALO AMHERST, NY102-580221NO OBLIGATION FOR CONSTRUCTION7,000,000
NYERIE COUNTY, NY (SLUDGE DISPOSAL)102-580219c(12)NO OBLIGATION FOR CONSTRUCTION1,543,324
ERIE COUNTY, NY (WATER QUALITY TUNNEL)102-580219c(11)NO OBLIGATION FOR CONSTRUCTION1,543,324
LEWISTON STORMWATER, NY102-580222NO OBLIGATION FOR CONSTRUCTION200,000
LIVERPOOL, NY106-554108dNO OBLIGATION FOR CONSTRUCTION2,000,000
INNER HARBOR PROJECT, NEW YORK, NY106-53502(f)NO OBLIGATION FOR CONSTRUCTION15,000,000
LOWER HUDSON RIVER & TRIBUTARIES, NY106-53212eNO OBLIGATION FOR CONSTRUCTION30,000,000
OUTER HARBOR PROJECT, NEW YORK, NY106-53502(f)NO OBLIGATION FOR CONSTRUCTION15,000,000
NY/NJNEW YORK HARBOR COLLECTION AND REMOVAL OF DRIFT, NY & NJ101-6401022005201,549,768
OHOTTAWA RIVER HARBOR, OH101-640107a(7)200613,218,200
HOCKING RIVER, LOGAN, OH99-662401aNO OBLIGATION FOR CONSTRUCTION16,282,709
MIAMI RIVER BASIN, PLEASANT RUN, VICINITY FAIRFIELD, OH99-662401(a)NO OBLIGATION FOR CONSTRUCTION18,041,480
OKFORT GIBSON LAKE, OK (POWER UNITS 5 & 6)99-662601aNO OBLIGATION FOR CONSTRUCTION45,485,000
ORASTORIA, OR106-53502bNO OBLIGATION FOR CONSTRUCTION5,000,000
HOOD RIVER, OR106-554108a(36)NO OBLIGATION FOR CONSTRUCTION1,543,324
MEDFORD, OR106-554108a(37)NO OBLIGATION FOR CONSTRUCTION1,543,324
PORTLAND, OR106-554108a(38)NO OBLIGATION FOR CONSTRUCTION1,543,324
Start Printed Page 16152
PACOUDERSPORT, PA106-554108NO OBLIGATION FOR CONSTRUCTION1,543,324
FINDLAY TOWNSHIP, PA106-53502NO OBLIGATION FOR CONSTRUCTION11,000,000
GREENSBORO AND GLASSWORKS, PA102-580219c(15)NO OBLIGATION FOR CONSTRUCTION1,543,324
JEFFERSON TOWNSHIP, GREENE COUNTY, PA106-53502NO OBLIGATION FOR CONSTRUCTION1,000,000
NORTH FAYETTE TOWNSHIP, ALLEGHENY COUNTY, PA106-53502NO OBLIGATION FOR CONSTRUCTION500,000
ROBINSON TOWNSHIP, PA106-53502NO OBLIGATION FOR CONSTRUCTION1,200,000
SPRINGDALE BOROUGH, PA106-53502NO OBLIGATION FOR CONSTRUCTION500,000
TITUSVILLE, PA106-554108NO OBLIGATION FOR CONSTRUCTION7,300,000
WASHINGTON, GREENE, WESTMORELAND, AND FAYETTE COUNTIES, PA106-554108NO OBLIGATION FOR CONSTRUCTION8,000,000
BRADFORD AND SULLIVAN COUNTIES, PA106-53548NO OBLIGATION FOR CONSTRUCTION13,000,000
DAUPHIN COUNTY, PA106-53502bNO OBLIGATION FOR CONSTRUCTION2,000,000
DILLSBURG BOROUGH AUTHORITY, PA106-53502bNO OBLIGATION FOR CONSTRUCTION2,000,000
HAMPDEN TOWNSHIP, PA106-53502bNO OBLIGATION FOR CONSTRUCTION3,000,000
MOUNT JOY TOWNSHIP AND CONEWAGO TOWNSHIP, PA106-554108dNO OBLIGATION FOR CONSTRUCTION8,300,000
PATTON TOWNSHIP, PA106-53502bNO OBLIGATION FOR CONSTRUCTION1,400,000
UPPER ALLEN TOWNSHIP, PA106-53502bNO OBLIGATION FOR CONSTRUCTION3,400,000
DELAWARE RIVER BASIN—WABASH CREEK, BOROUGH OF TAMAQUA, PA93-2512199313,194,000
PHILADELPHIA, PA (FRANKFORD DAM)104-303564eNO OBLIGATION FOR CONSTRUCTION900,000
PHILADELPHIA, PA (PENNYPACK PARK)104-303564dNO OBLIGATION FOR CONSTRUCTION15,000,000
PHILADELPHIA, PA (WATER WORKS RESTORATION)104-303564aNO OBLIGATION FOR CONSTRUCTION1,000,000
PHOENIXVILLE BOROUGH, CHESTER COUNTY, PA106-554108dNO OBLIGATION FOR CONSTRUCTION2,400,000
TOWAMENCIN TOWNSHIP, PA106-53502b20051,462,000
PRGUANAJIBO RIVER, PR106-53101NO OBLIGATION FOR CONSTRUCTION3,495,941
RIO NIGUA AT SALINAS, PR106-53101NO OBLIGATION FOR CONSTRUCTION12,145,000
RICRANSTON, RI101-64054NO OBLIGATION FOR CONSTRUCTION6,000,000
DREDGING OF SALT PONDS IN THE STATE OF RHODE ISLAND, RI106-53578NO OBLIGATION FOR CONSTRUCTION1,100,000
SCCHARLESTON, SC108-137127NO OBLIGATION FOR CONSTRUCTION10,000,000
TNMEMPHIS HARBOR, MEMPHIS, TN106-53364NO OBLIGATION FOR CONSTRUCTION110,044,000
NONCONNAH CREEK, TN & MS (EXTENSION)106-541334200436,188,000
TXNAVASOTA RIVER BASIN, TX (MILLICAN LAKE, TX)90-4832031983778,421,000
TRINITY RIVER AND TRIBUTARIES, TX (LIBERTY LOCAL PROTECTION PROJECT)108-447116198119,985,000
TRINITY RIVER AND TRIBUTARIES, TX (NAVIGATION CHANNEL ABOVE LIBERTY)108-44711619815,412,060,000
TRINITY RIVER AND TRIBUTARIES, TX (WEST FORK FLOODWAY)108-4471161981119,408,000
Start Printed Page 16153
BUFFALO BAYOU AND TRIBUTARIES, TX (HALLS BAYOU)101-640101(21)NO OBLIGATION FOR CONSTRUCTION112,536,000
LOWER RIO GRANDE BASIN, TEXAS (SOUTH MAIN CHANNEL), TX99-662401(a)2005207,183,000
TX & OKRED RIVER WATERWAY (BANK STABILIZATION FEATURES)90-4831012004685,324,228
UTCACHE COUNTY, UT106-53502(b)NO OBLIGATION FOR CONSTRUCTION5,000,000
UTUPPER JORDAN RIVER, UT106-53357200411,087,268
VALEVISA AND TUG FORKS AND UPPER CUMBERLAND RIVER VA, WV, KY (HAYSI LAKE, VA)104-3033531989185,915,319
NORFOLK HARBOR ANCHORAGES, VA101-640107(a)(13)NO OBLIGATION FOR CONSTRUCTION63,130,000
WALLOPS ISLAND, VA106-53567NO OBLIGATION FOR CONSTRUCTION8,000,000
WASTILLAGUMAISH RIVER BASIN, WA106-541101b(27)NO OBLIGATION FOR CONSTRUCTION26,047,966
WVCABIN CREEK LPP, WV99-662601aNO OBLIGATION FOR CONSTRUCTION10,409,900
ISLAND CREEK BASIN, VICINITY OF LOGAN, WV (NON-STRUCTURAL FEATURES)99-662401aNO OBLIGATION FOR CONSTRUCTION107,707,600
WEST VIRGINIA PORT DEVELOPMENT, WV106-53557(3)NO OBLIGATION FOR CONSTRUCTION24,144,000
WEIRTON PORT, WV106-53557(2)NO OBLIGATION FOR CONSTRUCTION15,274,778
TOTAL14,255,612,373

Final Deauthorization Report WRRDA 2014, Section 6001(d)(3)(B)

Appendix A—Projects Removed From the Interim Deauthorization List

StateProject/Element nameReason project removed from interim deauthorization list
LouisianaAmite River and TributariesTechnical Correction: The Amite River and Tributaries project is identified in later authorizations as the Comite River Diversion project, which is under construction.
ConnecticutHartford Environmental InfrastructureTechnical Correction: Project Previously Deauthorized (Federal Register 74.126).
ConnecticutNew Haven Environmental InfrastructureTechnical Correction: Project Previously Deauthorized (Federal Register 74.126).
MaineFall River and New Bedford Environmental InfrastructureTechnical Correction: Project Previously Deauthorized (Federal Register 74.126).
End Supplemental Information

[FR Doc. 2016-06695 Filed 3-24-16; 8:45 am]

BILLING CODE 3720-58-P