This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
857
as of
09/13/2026 at 12:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2016-11003 as it appeared on Public Inspection on
05/13/2016 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2016-11003 (81 FR 30447)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).
ACTION:
Final rule.
SUMMARY:
DoD, GSA, and NASA are issuing a final rule amending the Federal Acquisition Regulation (FAR) to implement section 814 of the Carl Levin and Howard P. `Buck' McKeon National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2015 that requires the head of the contracting activity to approve any determinations to select more than five offerors to submit phase-two proposals for a two-phase design-build construction acquisition that is valued at greater than $4 million.
DATES:
Effective:
June 15, 2016.
FOR FURTHER INFORMATION CONTACT:
Mr. Curtis E. Glover, Sr., Procurement Analyst, at 202-501-1448, for clarification of content. For information pertaining to status or publication schedules, contact the Regulatory Secretariat Division at 202-501-4755. Please cite FAC 2005-88, FAR Case 2015-018.
SUPPLEMENTARY INFORMATION:
I. Background
DoD, GSA, and NASA published a proposed rule in the
Federal Register
at 80 FR 60833 on October 8, 2015, to implement section 814 of the Carl Levin and Howard P. `Buck' McKeon NDAA for FY 2015, Public Law 113-291. Section 814 requires the head of the contracting activity, delegable to a level no lower than the senior contracting official, to approve any determinations to select more than five offerors to submit phase-two proposals for a two-phase design-build construction acquisition that is valued at greater than $4 million. Five respondents submitted comments on the proposed rule.
II. Discussion and Analysis
The Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (the Councils) reviewed the public comments in the development of the final rule. One change was made to the rule as a result of those comments. A discussion of the comments is provided as follows:
Comment:
One respondent requested that the maximum number of offerors allowed to submit phase-two proposals be limited to three of the most highly qualified offerors.
Response:
The scope of this rule is limited to the implementation of Section 814 of the FY 2015 NDAA, which requires a higher approval authority when selecting more than five offerors to participate in Phase 2 of a design-build acquisition. Identifying the ideal number of contractors for participation in Phase 2 is beyond the scope of the case and the statute that is being implemented.
Comment:
Two respondents recommended that the rule be revised to add a reporting requirement for those instances when more than five offerors are selected to submit phase-two proposals.
Response:
The scope of this rule is limited to the implementation of Section 814 of the FY 2015 NDAA. Adding a public reporting requirement is beyond the scope of the case and the statute that is being implemented.
Comment:
One respondent recommended that the rule be revised to include a requirement that the senior contracting official's approval be documented in the contract file.
Response:
The requirement to document the contract file was in the proposed rule at FAR 36.303-1(a)(4). In civilian agencies, for paragraph (a)(4) of FAR section 36.303-1, the senior contracting official is the advocate for competition for the procuring activity, unless the agency designates a different position in agency procedures. The approval shall be documented in the contract file.
Comment:
One respondent recommended that the FAR be revised to limit the use of single-step design-build procurements by requiring the use of two-step design-build procurement process for all design-build procurements above $4 million.
Response:
The recommendation is beyond the scope of the case and the statute that is being implemented.
III. Executive Orders 12866 and 13563
Executive Orders (E.O.s) 12866 and 13563 direct agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). E.O. 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility. This is not a significant regulatory action and, therefore, was not subject to review under Section 6(b) of E.O. 12866, Regulatory Planning and Review, dated September 30, 1993. This rule is not a major rule under 5 U.S.C. 804.
IV. Regulatory Flexibility Act
DoD, GSA, and NASA have prepared a Final Regulatory Flexibility Analysis (FRFA) consistent with the Regulatory Flexibility Act, 5 U.S.C. 601,
et seq.
The FRFA is summarized as follows:
( printed page 30448)
This rule implements section 814 of the Carl Levin and Howard P. `Buck' McKeon National Defense Authorization Act for Fiscal Year 2015. Section 814 is entitled Improvement in Defense Design-Build Construction Process. Section 814 requires the head of the contracting activity, delegable to a level no lower than the senior contracting official, to approve any determinations to select more than five offerors to submit phase-two proposals for a two-phase design-build construction acquisition that is valued at greater than $4 million.
No comments were received by the public comments in response to the initial regulatory flexibility analysis. The number of design-build construction awards is not currently tracked by the Federal government's business systems. In Fiscal Year 2014, the Federal Government awarded 3,666 construction awards to 2,239 unique small business vendors. It is unknown what percentage of these contracts involved design-build construction services.
This rule does not impose new recordkeeping or reporting requirements. The new approval requirement for advancing more than five contractors to phase two of a two-phase design-build selection procedure only affects the internal operating procedures of the Government. For acquisitions valued over $4 million, the head of the contracting activity (HCA) is required to now make a determination that it is in the best interest of the Government to select more than five offerors to proceed to phase two. Any burden caused by this rule is expected to be minimal and will not be any greater on small businesses than it is on large businesses.
No alternative approaches were considered. The new approval requirement for advancing more than five contractors to phase two of a two-phase design-build selection procedure only affects the internal operating procedures of the Government. It is not anticipated that the proposed rule will have a significant economic impact on small entities.
Interested parties may obtain a copy of the FRFA from the Regulatory Secretariat Division. The Regulatory Secretariat Division has submitted a copy of the FRFA to the Chief Counsel for Advocacy of the Small Business Administration.
V. Paperwork Reduction Act
The final rule does not contain any information collection requirements that require the approval of the Office of Management and Budget under the Paperwork Reduction Act (44 U.S.C. chapter 35).
(4) A statement of the maximum number of offerors that will be selected to submit phase-two proposals. The maximum number specified in the solicitation shall not exceed five unless the contracting officer determines, for that particular solicitation, that a number greater than five is in the Government's interest and is consistent with the purposes and objectives of the two-phase design-build selection procedures. The contracting officer shall document this determination in the contract file. For acquisitions greater than $4 million, the determination shall be approved by the head of the contracting activity, delegable to a level no lower than the senior contracting official within the contracting activity. In civilian agencies, for this paragraph (a)(4), the senior contracting official is the advocate for competition for the procuring activity, unless the agency designates a different position in agency procedures. The approval shall be documented in the contract file.