Skip to Content

Notice

Western Minnesota Municipal Power Agency; Notice of Surrender of Preliminary Permit

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

Take notice that Western Minnesota Municipal Power Agency, permittee for the proposed Mississippi Lock and Dam, Iowa—Hydroelectric Water Power Project, has requested that its preliminary permit be terminated. The permit was issued on July 5, 2011, and would have expired on June 30, 2016.[1] The project would have been located at Start Printed Page 35007the existing U.S. Army Corps of Engineers' (Corps) Mississippi River Lock and Dam No. 15, in Rock Island and Scott Counties near Davenport, Iowa.

The preliminary permit for Project No. 14108 will remain in effect until the close of business, June 24, 2016. But, if the Commission is closed on this day, then the permit remains in effect until the close of business on the next day in which the Commission is open.[2] New applications for this site may not be submitted until after the permit surrender is effective.

Start Signature

Dated: May 25, 2016.

Kimberly D. Bose,

Secretary.

End Signature End Preamble

Footnotes

1.  Western Minnesota Municipal Power Agency, 136 FERC ¶ 62,005 (2011).

Back to Citation

[FR Doc. 2016-12831 Filed 5-31-16; 8:45 am]

BILLING CODE 6717-01-P