Fine Particulate Matter National Ambient Air Quality Standards: State Implementation Plan Requirements

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble Start Printed Page 58010

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Final rule.

SUMMARY:

The Environmental Protection Agency (EPA) is finalizing requirements that state, local and tribal air agencies would have to meet as they implement the current and future national ambient air quality standards (NAAQS) for fine particulate matter (PM2.5). Specifically, this document provides details on meeting the statutory state implementation plan (SIP) requirements that apply to areas designated nonattainment for any PM2.5 NAAQS, such as: General requirements for attainment plan due dates and attainment dates; emissions inventories; attainment demonstrations; provisions for demonstrating reasonable further progress; quantitative milestones; contingency measures; and nonattainment New Source Review (NNSR) permitting programs, among other things. This rule clarifies the specific attainment planning requirements that apply to PM2.5 NAAQS nonattainment areas based on their classification (either Moderate or Serious), and the process for reclassifying Moderate areas to Serious. Additionally, in this document the EPA is revoking the 1997 primary annual standard for areas designated as attainment for that standard because the EPA revised the primary annual standard in 2012. The EPA first established the PM2.5 NAAQS in 1997, completed a review and revision of those standards in 2006, and most recently completed a review and revision of the PM2.5 NAAQS on December 14, 2012.

DATES:

This final rule is effective on October 24, 2016.

ADDRESSES:

The EPA has established a docket for this action, identified by Docket ID No. EPA-HQ-OAR-2013-0691. All documents in the docket are listed in the http://www.regulations.gov Web site. Although listed in the index, some information is not publicly available, e.g., Confidential Business Information or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the Internet and will be publicly available only in hard copy. Publicly available docket materials are available either electronically in http://www.regulations.gov.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

For general information on this rule, contact Mr. Rich Damberg, Office of Air Quality Planning and Standards, U.S. EPA, by phone at (919) 541-5592 or by email at damberg.rich@epa.gov; or Mr. Patrick Lessard, Office of Air Quality Planning and Standards, U.S. EPA, by phone at (919) 541-5383 or by email at lessard.patrick@epa.gov. For information on the Information Collection Request (ICR), contact Mr. Butch Stackhouse, Office of Air Quality Planning and Standards, U.S. EPA, by phone at (919) 541-5208 or by email at stackhouse.butch@epa.gov.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

I. General Information

A. Preamble Glossary of Terms and Acronyms

The following are abbreviations of terms used in the preamble.

AERR Air Emissions Reporting Requirements

BACM Best Available Control Measures

BACT Best Available Control Technology

BART Best Available Retrofit Technology

BC Black Carbon

CAA Clean Air Act

CAIR Clean Air Interstate Rule

CAMx Comprehensive Air Quality Model with Extensions

CBI Confidential Business Information

CBSA Core-based Statistical Area

CDD Clean Data Determination

CFR Code of Federal Regulations

CMAQ Community Multi-Scale Air Quality Model

CSAPR Cross-State Air Pollution Rule

CSN Chemical Speciation Network

DOD Department of Defense

DOT Department of Transportation

EC Elemental Carbon

EGU Electric Generating Unit

EPA Environmental Protection Agency

Fe Iron

FEM Federal Equivalent Method

FIP Federal Implementation Plan

FRM Federal Reference Method

HCl Hydrogen Chloride

ICR Information Collection Request

LAER  Lowest Achievable Emission Rate

MACT Maximum Achievable Control Technology

MATS Mercury and Air Toxics Standards

MSM Most Stringent Measures

MPO Metropolitan Planning Organization

NAAQS National Ambient Air Quality Standards

NAICS North American Industry Classification System

NAPAP National Acid Precipitation Assessment Program

NEI National Emissions Inventory

NESHAP National Emissions Standard for Hazardous Air Pollutants

NH3 Ammonia

NH4 Ammonium

NH4 NO3 Ammonium Nitrate

NH4 HSO4 Ammonium Bi-Sulfate

(NH4)2 SO4 Ammonium Sulfate

NNSR Nonattainment New Source Review

NOX Nitrogen Oxides

NO3 Nitrate

NSPS New Source Performance Standards

O3 Ozone

OM Organic Mass

OMB Office of Management and Budget

PM Particulate Matter

PM2.5 Particulate Matter Equal to or Less than 2.5 Microns in Diameter (Fine Particulate Matter)

PM10 Particulate Matter Equal to or Less than 10 Microns in Diameter

PRA Paperwork Reduction Act

PSD Prevention of Significant Deterioration

RACM Reasonably Available Control Measures

RACT Reasonably Available Control Technology

RFP Reasonable Further Progress

RICE Reciprocating Internal Combustion Engines

SIP State Implementation Plan

SOA Secondary Organic Aerosols

SO2 Sulfur Dioxide

SO4 Sulfate

TAR Tribal Authority Rule

TIP Tribal Implementation Plan

TIP Transportation Improvement Program

TSP  Total Suspended Particles

μm Micrometer (Micron)

VMT Vehicle Miles Traveled

VOC Volatile Organic Compounds

B. Entities Affected by This Rule

Entities potentially affected directly by this final rule include state, local and tribal governments and air pollution control agencies responsible for attainment and maintenance of the NAAQS. Entities potentially affected indirectly by this final rule as regulated sources include owners and operators of sources that emit PM2.5, sulfur dioxide (SO2), oxides of nitrogen (NOX), volatile organic compounds (VOC) and/or ammonia (NH3). Parties affected by the conformity-related elements include state and local transportation and air quality agencies, metropolitan planning organizations (MPOs), and all federal agencies including the U.S. Department of Transportation, the U.S. Department of Defense, the U.S. Department of Interior and the U.S. Department of Agriculture. Others potentially affected indirectly by this final rule include members of the general public who live, work, or recreate in areas affected by elevated ambient PM2.5 levels in areas designated nonattainment for a PM2.5 NAAQS.Start Printed Page 58011

C. Obtaining a Copy of This Document and Other Related Information

In addition to being available in the docket, an electronic copy of this Federal Register document will be posted at http://www3.epa.gov/​airquality/​particlepollution/​actions.html.

D. Organization of This Federal Register Document

The information presented in this document is organized as follows:

I. General Information

A. Preamble Glossary of Terms and Acronyms

B. Entities Affected by This Rule

C. Obtaining a Copy of This Document and Other Related Information

D. Organization of This Federal Register Document

II. Background

A. Introduction

B. Overview of PM2.5 NAAQS and Implementation

C. Atmospheric Chemistry of PM2.5 and Its Precursors

III. Requirements With Respect to the Treatment of PM2.5 Precursors in Attainment Plans and the NNSR Program

A. Background

B. Summary of Proposal

C. Final Rule

IV. Requirements for PM2.5 Moderate Nonattainment Area Plans

A. Plan Due Dates

B. Emissions Inventory Requirements

C. Pollutants To Be Addressed in the Plan

D. Attainment Plan Control Strategy

E. Modeling for Attainment Demonstrations

F. RFP Requirements

G. Quantitative Milestones

H. Contingency Measures

I. Attainment Dates

J. Attainment Date Extensions

V. Reclassification of a PM2.5 Moderate Nonattainment Area to Serious

A. Discretionary Authority

B. Mandatory Duty

VI. Requirements for PM2.5 Serious Nonattainment Area Plans

A. Plan Due Dates

B. Emissions Inventory Requirements

C. Pollutants To Be Addressed in the Plan

D. Attainment Plan Control Strategy

E. Modeling for Attainment Demonstrations

F. RFP Requirements

G. Quantitative Milestones

H. Contingency Measures

I. Attainment Dates

J. Attainment Date Extensions

VII. Requirements Under CAA Section 189(d) for PM2.5 Serious Areas That Fail To Attain the NAAQS by the Applicable Attainment Date

A. Plan Due Dates

B. Emissions Inventory Requirements

C. Pollutants To Be Addressed in the Plan

D. Attainment Plan Control Strategy

E. Modeling for Attainment Demonstrations

F. RFP Requirements

G. Quantitative Milestones

H. Contingency Measures

I. Attainment Dates

VIII. NNSR Requirements for PM2.5 Nonattainment Areas

A. Background

B. What are the final NNSR requirements for PM2.5?

C. Transition Provisions for Major Source Permitting in PM2.5 Nonattainment Areas

IX. Other Requirements and Considerations for PM2.5 Nonattainment Areas

A. Waivers Under Section 188(f)

B. Conformity Requirements

C. Clean Data Policy

D. Section 179B/International Border Areas

E. Enforcement and Compliance

F. Multi-Pollutant Considerations

G. Measures To Ensure Appropriate Protections for Overburdened Populations

H. Tribal Issues

I. Voluntary Programs for Reducing Ambient PM2.5

J. Improved Stationary Source Emissions Monitoring

K. Stationary Source Test Methods for Emissions of Condensable PM2.5

X. Revocation of the 1997 Primary Annual PM2.5 NAAQS

A. Background

B. History of Revocation of Other NAAQS

C. Requirements for Revocation and Related Anti-Backsliding Requirements for the 1997 Primary Annual PM2.5 NAAQS

XI. Environmental Justice Considerations

XII. Statutory and Executive Order Reviews

A. Executive Order 12866: Regulatory Planning and Review and Executive Order 13563: Improving Regulation and Regulatory Review

B. Paperwork Reduction Act (PRA)

C. Regulatory Flexibility Act (RFA)

D. Unfunded Mandates Reform Act (UMRA)

E. Executive Order 13132: Federalism

F. Executive Order 13175: Consultation and Coordination With Indian Tribal Governments

G. Executive Order 13045: Protection of Children From Environmental Health and Safety Risks

H. Executive Order 13211: Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use

I. National Technology Transfer and Advancement Act

J. Executive Order 12898: Federal Actions To Address Environmental Justice in Minority Populations and Low-Income Populations

K. Congressional Review Act (CRA)

L. Determination Under Section 307(d)

M. Judicial Review

XIII. Statutory Authority

II. Background

A. Introduction

Ambient, or outdoor, air can contain a variety of pollutants, including particulate matter (PM). Airborne PM can be comprised of either solid or liquid particles, and can be a complex mixture of particles in both solid and liquid form. The most common constituents of airborne PM include the following: Sulfate (SO4); nitrate (NO3); ammonium (NH4); elemental carbon (EC); organic mass (OM); and inorganic material, generally referred to as “crustal” material, which can include metals, dust, sea salt and other trace elements. Airborne PM can be of different sizes, commonly referred to as “coarse” and “fine” particles. Fine particles, in general terms, are PM with an aerodynamic diameter less than or equal to a nominal 2.5 micrometers (µm). For this reason, particles of this size are referred to as PM2.5. PM2.5 particles commonly include “primary” particles and “secondary” particles. Primary particles, or direct PM2.5, are emitted by sources directly into the air as solid or liquid particles (e.g., elemental carbon from diesel engines or wildfires, or condensable organic particles from gasoline engines). Secondary particles are formed in the atmosphere as a result of chemical reactions between specific pollutants known as PM2.5 precursors (e.g., reactions between NOX and SO2 emissions from mobile and stationary sources combined with ammonia to form ammonium nitrate and ammonium sulfate).

The human health effects associated with long or short-term exposure to PM2.5 are significant and include premature mortality, aggravation of respiratory and cardiovascular disease (as indicated by increased hospital admissions and emergency room visits) and development of chronic respiratory disease. In addition, welfare effects associated with elevated PM2.5 levels include visibility impairment as well as effects on sensitive ecosystems, materials damage and soiling and climatic and radiative processes.[1]

On December 14, 2012, the EPA made revisions to the suite of the NAAQS for PM to provide requisite protection of public health and welfare with an adequate margin of safety. The EPA also made corresponding revisions to the data handling conventions for PM and the ambient air monitoring, reporting and network design requirements for PM. Specifically, the agency revised the primary annual PM2.5 standard by lowering the level from 15.0 to 12.0 μg/Start Printed Page 58012m[3] to provide increased protection against health effects associated with long- and short-term PM2.5 exposures. The EPA did not revise the secondary annual PM2.5 standard, which remains at 15.0 μg/m[3] .[2] The EPA eliminated spatial averaging as part of the form of the PM2.5 annual standards to avoid potential disproportionate impacts on at-risk populations. In addition, the EPA retained the level and form of the primary and secondary 24-hour PM2.5 standards to continue to provide supplemental protection against health effects associated with short-term PM2.5 exposures. Although not directly relevant to this rulemaking with respect to implementation of the PM2.5 NAAQS, it should be noted that in December 2012, the EPA also did not revise the level or form of the primary and secondary 24-hour PM10 NAAQS, which remain at 150 μg/m[3] .[3]

Estimates show that attainment of the primary PM2.5 standards will result in hundreds fewer premature deaths each year, prevent tens of thousands of hospital admissions each year and prevent hundreds of thousands of doctor visits, absences from work and school and respiratory illnesses in children annually.[4] Attainment of the primary PM2.5 standards will have welfare co-benefits in addition to direct human health benefits. The term “welfare co-benefits” covers both environmental and societal benefits of reducing pollution, such as reductions in visibility impairment, materials damage and ecosystem damage.[5]

B. Overview of PM 2.5 NAAQS and Implementation

1. General Background

Sections 108 and 109 of the Clean Air Act (CAA or Act) govern the establishment, review and revision, as appropriate, of the NAAQS for widespread pollutants emitted from numerous and diverse sources considered harmful to public health and the environment. The CAA requires two types of NAAQS: (i) Primary standards, which set limits to protect public health, including the health of at-risk populations; and (ii) secondary standards, which set limits to protect public welfare, including protection against visibility impairment, damage to animals, crops, vegetation and buildings.

The CAA also establishes important roles both for state and tribal governments and for the EPA in implementing the NAAQS. In accordance with the principle of cooperative federalism, both state and tribal governments and the EPA have respective authorities and responsibilities under the CAA. At the outset, the EPA has the authority and responsibility to promulgate the NAAQS. In turn, state, local and tribal air pollution control agencies (“air agencies”) have the authority and primary responsibility for developing and implementing attainment plans that contain emission control measures needed to achieve the air quality standards in a timely manner in each nonattainment area, consistent with the requirements of the CAA. The EPA often assists states by promulgating regulations or providing guidance for meeting implementation requirements and by providing technical tools, including information on control measures.[6 7]

The EPA also promulgates nationally applicable control requirements and emission limits for many sources such as new motor vehicles, certain categories of new and modified major stationary sources and existing stationary sources of toxic air pollutants. These federal actions assist states by achieving emissions reductions from certain categories of sources nationwide, which can help with local attainment needs in a given nonattainment area. The EPA also has authority to provide funding, technical assistance, and guidance to states to support implementation of the NAAQS. In addition, the EPA has authority to address interstate transport of pollutants, in the event that states fail to do so. Through this authority, the EPA has addressed regional transport of pollutants from upwind states to downwind states, and has previously done so for purposes of the PM2.5 NAAQS.[8] In addition, the EPA has the authority and responsibility to review and take action to approve or disapprove attainment plans submitted by states based upon whether they meet applicable statutory and regulatory requirements and to initiate the process for imposition of sanctions and/or issue federal implementation plans (FIPs) when states fail to fulfill their CAA obligations.

2. History of PM2.5 NAAQS Implementation

The EPA first promulgated annual and 24-hour NAAQS for PM2.5 in July 1997.[9] Prior to that time, the EPA had addressed ambient PM through other means, first by regulating “total suspended particles” (TSP) and then later by regulating PM10. After protracted litigation, the 1997 NAAQS for PM2.5 were upheld by the U.S. Court of Appeals for the District of Columbia Circuit in March 2002.[10] The EPA subsequently promulgated designations for the 1997 PM2.5 NAAQS nationwide, designating a number of areas as nonattainment for the 1997 PM2.5 NAAQS, effective April 2005.[11] In April 2007, the EPA issued a detailed implementation rule to assist states with the development of SIP submissions to meet attainment plan requirements for the 1997 NAAQS (the “2007 PM2.5 Implementation Rule”).[12] In May 2008, the EPA issued another rule to assist states with SIP submissions to meet the specific requirements for permitting programs for NNSR purposes in designated nonattainment areas (the “2008 PM2.5 NSR Rule”).[13] The EPA premised both the 2007 PM2.5 Implementation Rule and the 2008 PM2.5 NSR Rule on the EPA's interpretation of the statute that Start Printed Page 58013nonattainment areas for the PM2.5 NAAQS were subject solely to the general attainment plan requirements of subpart 1, part D of title I of the CAA (“subpart 1”).

Section 109(d)(1) of the CAA requires the EPA periodically to review the science upon which the standards are based and the standards themselves, and to revise the standards as may be appropriate. In October 2006, the EPA promulgated revisions to the suite of the NAAQS for PM, and in particular the EPA revised the 24-hour PM2.5 standards.[14] In accordance with section 107(d), the EPA subsequently designated a number of areas as nonattainment for the revised 2006 24-hour PM2.5 standards, effective December 2009.[15] In March 2012, the EPA issued a guidance document specifically to aid states in preparing their SIP submissions to meet attainment plan requirements for the 2006 24-hour PM2.5 NAAQS in designated nonattainment areas.[16] The EPA's guidance for the 2006 PM2.5 NAAQS was based, in large part, on the requirements finalized in the 2007 PM2.5 Implementation Rule, which the EPA based solely upon the statutory requirements of subpart 1.

The EPA initiated a review of the PM2.5 NAAQS in June 2007, proposing revisions to the primary and secondary PM2.5 NAAQS on June 29, 2012.[17] The EPA issued its final rule on December 14, 2012, in which it lowered the primary annual PM2.5 standard from 15.0 μg/m[3] to 12.0 μg/m[3] to provide increased protection against health effects associated with long- and short-term fine particle exposures.[18] The EPA also eliminated spatial averaging as part of the form of the annual standard to avoid potential disproportionate impacts on at-risk populations.[19] The EPA retained the level (35 μg/m[3] ) and form (98th percentile, averaged over 3 years) of the primary 24-hour PM2.5 standard, as revised in 2006, to provide supplemental protection against health effects associated with short-term PM2.5 exposures, especially in areas with high peak PM2.5 concentrations.[20] This suite of primary PM2.5 standards provides increased public health protection, including the health of at-risk populations which include children, older adults, persons with pre-existing health and lung disease and persons of lower socioeconomic status, against a broad range of PM2.5-related effects that include premature mortality, increased hospital admissions and emergency department visits and development of chronic respiratory disease.[21] With regard to the secondary (welfare-based) standards, the EPA retained the existing annual PM2.5 standard of 15.0 μg/m3 and the existing 24-hour PM2.5 standard of 35 μg/m3 to protect against PM-related non-visibility welfare effects including ecological effects, effects on materials and climate impacts. In addition, the secondary 24-hour PM2.5 standard provides protection for PM-related visibility impairment.

On January 4, 2013, shortly after the EPA promulgated the 2012 revisions to the suite of PM NAAQS, the D.C. Circuit issued its decision in a challenge to the 2007 PM2.5 Implementation Rule and the 2008 PM2.5 NSR Rule. In NRDC v. EPA, the court held that the EPA erred in implementing the 1997 PM2.5 NAAQS pursuant only to the general implementation requirements of subpart 1, rather than also to the implementation requirements specific to particulate matter (PM10) in subpart 4, part D of title I of the CAA (“subpart 4”).[22] The court reasoned that the plain meaning of the CAA requires implementation of the 1997 PM2.5 NAAQS under subpart 4 because PM2.5 particles fall within the statutory definition of PM10 and thus implementation of the PM2.5 NAAQS is subject to the same statutory requirements as the PM10 NAAQS. In addition, although the court stated that its decision that the EPA must implement the PM2.5 NAAQS pursuant to subpart 4 requirements meant that it did not have to reach decisions on other issues concerning the regulation of precursors to PM2.5, the court nonetheless noted that subpart 4 has specific requirements with respect to regulation of such precursors. As a result, the court remanded to the EPA both the 2007 PM2.5 Implementation Rule and the 2008 PM2.5 NSR Rule, both of which were premised on the EPA's interpretation of the statute that subpart 1 was the only applicable subpart for the implementation of the 1997 PM2.5 NAAQS in nonattainment areas. The court instructed the EPA “to repromulgate these rules pursuant to subpart 4 consistent with this opinion.” Given the D.C. Circuit's opinion in NRDC v. EPA, the EPA withdrew its 2012 guidance document for the 2006 24-hour PM2.5 NAAQS in June 2013. Because the court had concluded that the EPA and states must implement the PM2.5 NAAQS consistent with the statutory requirements of subpart 4, the EPA's 2012 guidance for attainment plans for the 2006 PM2.5 NAAQS premised solely upon subpart 1 requirements was no longer appropriate.

The EPA issued a notice of proposed rulemaking (NPRM) on March 23, 2015 (80 FR 15340) titled, “Fine Particulate Matter National Ambient Air Quality Standards: State Implementation Plan Requirements” (PM2.5 SIP Requirements Rule) to meet a number of objectives. This final rule accomplishes those objectives. It clarifies how states should meet the statutory SIP requirements that apply to areas designated nonattainment for any PM2.5 NAAQS under subparts 1 and 4. It does so by establishing regulatory requirements and providing guidance that will be applicable to attainment plans for the 2012 PM2.5 NAAQS and any future revisions of the PM2.5 NAAQS, subject to revisions that may be necessary for implementation purposes in the future. In addition, this action responds to the D.C. Circuit's remand of the 2007 PM2.5 Implementation Rule and the 2008 PM2.5 NSR Rule. As a result, the requirements of the rule will also govern future actions associated with states' ongoing implementation efforts for the 1997 and 2006 PM2.5 NAAQS.

The public comment period for the proposed PM2.5 SIP Requirements Rule closed on May 29, 2015, and the EPA received 56 comments during that period. The preamble to this final rule includes discussion of the most significant comments received on the proposal and how the EPA considered them in developing the agency's final action concerning the specific nonattainment planning requirements. The Response to Comments document that accompanies this final rule provides more detailed responses to the significant comments received. The public comments received on the NPRM and the EPA's Response to Comment Start Printed Page 58014document are posted in the docket at http://www.regulations.gov (Docket ID No. EPA-HQ-OAR-2013-0691).

C. Atmospheric Chemistry of PM 2.5 and Its Precursors

1. Overview

In order to determine how to regulate sources of direct PM2.5 and PM2.5 precursors to attain the PM2.5 NAAQS in a given nonattainment area, it is necessary to understand the basic chemical processes that cause or contribute to the formation of ambient PM2.5. Accordingly, an understanding of these processes is necessary to design appropriate regulations for implementation of the PM2.5 NAAQS.

As noted earlier, the term PM2.5 refers to particles of solid and liquid material less than 2.5 microns in aerodynamic diameter.[23] “Primary” PM2.5 is emitted directly from emissions sources or activities, such as from diesel fuel combustion, wood burning, construction activities, and unpaved roads, and it includes both filterable and condensable particles.[24] “Secondary” PM2.5 is formed as a result of emissions of certain precursor gases that undergo chemical reactions in the atmosphere. The principal precursor gases that contribute to secondary PM2.5 formation are SO2, from the combustion of coal or other high sulfur fuels; NOX, from many types of fossil fuel combustion; VOC, from certain fuels, solvents and industrial processes; and ammonia, from sources such as animal feeding operations, wastewater treatment and fertilizer. To illustrate the types of sources that emit relevant pollutants, Table 1 provides National Emissions Inventory (NEI) data for 2011 that represent nonattainment area anthropogenic and wildfire emissions estimates for direct PM2.5 and the four main PM2.5 precursor gases from major source sectors.

Table 1—Total Emissions of PM2.5 and Precursors for Major Sectors in PM2.5 Nonattainment Areas a

[In tons/year]

Source: 2011 National Emissions Inventory (Version 2) b

CategoryDirect PM2.5SO2NOXVOCNH3
Fuel combustion, electric generating utilities (EGUs)11,339324,65882,5093,0013,572
Fuel combustion, industrial10,28623,76257,6906,251892
Fuel combustion, other29,5828,22460,63632,3208,819
Chemical and allied products1,5041,3291,0562,828685
Metals processing4,03719,4904,5434,586130
Petroleum and related industries1,5347,2733,77518,830215
Other industrial processes24,1688,46622,59924,9281,094
Solvent utilization1,0893956242,02268
Storage and transport3,4206287,06755,4103,684
Waste disposal and recycling4,1438304,13016,49219,389
Onroad mobile21,0732,598540,800234,13617,525
Offroad mobile13,6605,874239,169152,504150
Miscellaneous (includes emissions from fire,c dust and some agricultural operations)158,5657,36813,734248,835236,577
Total284,401410,5401,037,7641,042,144292,800
a There were 33 areas designated as nonattainment for the 1997, 2006, or 2012 PM2.5 NAAQS as of June 6, 2016. These areas were comprised of 67 whole or partial counties. The emissions data in this table represents whole county emissions for the 67 counties because such data is readily available in EPA databases. Actual emissions totals for the 33 nonattainment areas in aggregate would be somewhat lower because some nonattainment areas include partial counties.
b For more details on the definitions of the emission categories listed in Table 1, see Sector/Tier crosswalk table for the 2011 NEI, available at: ftp://ftp.epa.gov/EmisInventory/2011/doc/scc_eis_crosswalk_2011neiv1.xlsx.
c Emissions from fire include wildfire, prescribed fire, and agricultural burning.

2. Composition and Sources of PM2.5 Constituents

PM2.5 is a complex and highly variable mixture of particles, but the majority of PM2.5 by mass is often comprised of five constituents: (i) OM; (ii) EC; (iii) crustal material; (iv) ammonium sulfate ((NH4)2 SO4); and (v) ammonium nitrate (NH4 NO3).[25] The discussion that follows provides an overview of each of the five major components of PM2.5, all of which are known to contribute to ambient PM2.5 levels in areas throughout the U.S.[26] Section II.C.3.d of this preamble provides more details on the atmospheric chemistry involved in the formation of sulfate, nitrate and OM, to illustrate the importance of controlling emissions of PM2.5 precursors as part of any comprehensive strategy to reduce ambient PM2.5 levels in excess of the NAAQS. Section II.C.4 of this preamble presents a brief overview of PM2.5 composition by region of the U.S.

OM is the fraction of ambient PM2.5 with the most diverse chemical composition, containing potentially thousands of different organic compounds (i.e., those compounds containing carbon) composed primarily of carbon, hydrogen, oxygen and nitrogen. Both primary particles and secondary particles contribute to ambient OM concentrations, with Start Printed Page 58015combustion sources being the dominant type of emissions sources. Another portion of primary OM particles results from direct emissions of organic compounds from sources of incomplete combustion, such as gas and diesel engines. Secondary OM particle formation involves oxidation of both anthropogenic and biogenic (plant-derived) VOC, and can involve other, more complex chemical reactions. Further details of the chemistry behind the formation of secondary OM, known more commonly as secondary organic aerosols (SOA), are described in Section II.C of this preamble.

EC refers to particulate carbon that has a graphitic molecular structure, and is sometimes referred to as “black carbon” (BC). It is emitted directly from emission sources and does not undergo any significant reactions with other gases in the atmosphere. EC particles result from primary emissions involving combustion, especially from diesel-fueled vehicles, but also from other processes involving the burning of fossil fuels. The latter include anthropogenic sources such as boilers and waste disposal. In addition, some EC particles originate from biomass combustion such as from prescribed fires, wildfires and residential wood combustion.

Crustal PM is comprised of particles of soil and oxides of metals from some industrial processes. Compounds comprised of elements such as silicon, aluminum, iron, calcium, titanium, magnesium and potassium, as well as oxygen, are major components.[27] Sources of crustal PM2.5 include windblown dust, dust from mechanical resuspension (e.g. dust from construction activities or vehicles driving on unpaved roads) and some forms of combustion, especially of coal. Crustal PM2.5 comprised of elements, like iron (Fe), and their oxides can also be emitted from industrial sources.

The remaining portion of ambient PM2.5 is mostly composed of SO4, NO3 and NH4, which react in the ambient air to form ammonium sulfate ((NH4)2 SO4) and ammonium nitrate (NH4 NO3). Another common PM2.5 particle is ammonium bi-sulfate (NH4 HSO4). In some areas, less common ions such as chloride are also found in PM2.5 samples in the form of particles that include sodium chloride and ammonium chloride. Particle-bound water is often also associated with this fraction of PM2.5. Sulfate, nitrate and ammonium particles originate through both primary and secondary mechanisms, although the vast majority of these PM2.5 particles are formed through secondary formation, as described in the following section.

3. Secondary Formation of PM2.5 From Gaseous Precursors

a. Overview. The composition of PM2.5 is complex and highly variable due in part to the large contribution of secondary PM2.5 to total fine particle mass in most locations, and to the complexity of secondary particle formation processes. A large number of possible chemical reactions, often non-linear in nature, can convert the gases SO2, NOX, VOC and ammonia to PM2.5. Thus, these gases are precursors to PM2.5. A brief discussion of SO4, NO3 and SOA formation, as well as the role of ammonia in their formation, follows.

b. SO4Formation. SO2 is emitted mostly from the combustion of fossil fuels in boilers operated by electric utilities and other industries, with less than 10 percent of SO2 emissions nationwide currently coming from other industrial sources, such as oil refining and pulp and paper production.[28] When SO2 oxidizes it forms sulfuric acid, a highly corrosive compound toxic to humans and to ecosystems that contributes to acid deposition (acid rain). In the presence of ammonia, however, sulfuric acid will react to form (NH4)2 SO4, a less acidic compound and one of the five major components of PM2.5. If there is not enough ammonia present to fully neutralize the sulfuric acid, part of it may convert to NH4 HSO4, which is more acidic than (NH4)2 SO4, but less so than sulfuric acid. There is a large amount of emerging scientific evidence that SO2 may also contribute to the formation of SOA from biogenic VOC emissions (see section later on SOA). Sulfate levels in the ambient air peak in summer months due to increased SO2 emissions, generally from electric generating units (EGUs), and from meteorological conditions that are conducive to sulfate formation.

c. NO3Formation. The main sources of NOX emissions are combustion of fossil fuel in boilers and mobile sources, accounting for more than 80 percent of national anthropogenic NOX emissions (based on the 2011 NEI), with boilers and EGUs contributing about 27 percent and mobile sources contributing 56 percent. Oxides of nitrogen react in the atmosphere to form nitric acid, another prime contributor to acid deposition in the environment. Nitric acid converts to ammonium nitrate, one of the five main components of PM2.5, in the presence of ammonia. Low temperatures and high relative humidity create ideal conditions for the formation of ammonium nitrate, typically leading to higher atmospheric levels in winter months and lower levels in summer months.[29]

d. SOA Formation. As discussed earlier, the OM component of ambient PM2.5 is a complex mixture of hundreds or even thousands of anthropogenic and biogenic organic compounds. These compounds are either emitted directly from sources (i.e., as “primary” PM2.5) or formed by reactions in the ambient air to make SOA (i.e., as “secondary” PM2.5).

VOC (both anthropogenic and biogenic) are key precursors to the SOA component of PM2.5. The relative importance of these compounds in the formation of organic particles varies between geographic areas, depending upon local emission sources, atmospheric chemistry and season of the year. It should be further noted that not all inventoried VOC may be contributing to the formation of organic particles. For example, chemical reactions involving VOC are generally accelerated in warmer temperatures, and for this reason studies show that SOA typically comprises a higher percentage of PM2.5 in the summer than in the winter.[30]

Anthropogenic sources of VOC include mobile sources, petrochemical manufacturing, oil and gas emissions, fire emissions, and solvents.[31] In addition, some biogenic VOC, emitted by vegetation such as trees, can also contribute significantly to SOA formation, especially in heavily forested areas, such as the southeastern U.S. It should be noted, however, that Start Printed Page 58016anthropogenic contributions to SOA are likely highest in the wintertime when biogenic SOA levels are lower; conversely, in the summertime, biogenic contributions to SOA are likely higher. Despite significant progress that has been made in understanding the origins and properties of SOA, it remains the least understood component of PM2.5 and continues to be a significant topic of research and investigation.

e. Role of Ammonia in Sulfate, Nitrate and SOA Formation. Ammonia is a gaseous pollutant emitted by natural and anthropogenic sources. The EPA's 2011 NEI shows that the two main sources of ammonia emissions are fertilizer application (27 percent) and livestock raising (54 percent). It should be noted that the 2011 NEI indicates that mobile sources in the aggregate contribute about 3 percent of nationwide ammonia emissions. Catalytic converters installed on light-duty gasoline vehicles are designed to convert NOX to nitrogen (N2); however, some ammonia is formed as a secondary product and emitted during this process.

As indicated earlier, ammonia plays an important role in neutralizing acids, such as sulfuric acid and nitric acid, in clouds, precipitation and particles. On the other hand, deposited ammonia can contribute to problems of eutrophication in water bodies due to its nutritive properties.[32] Ammonia would not exist in particles if not for the presence of acidic species with which it can combine to form a particle. In the eastern U.S., sulfate, nitrate and the ammonium associated with them can together account for between roughly 30 percent and 75 percent of the total PM2.5 mass in a given area. The ammonium portion by itself roughly accounts for between 5 percent and 20 percent of the total PM2.5 mass in the East.[33]

f. Role of NOXin Nitrate and SOA Formation. In addition to the contribution of NOX emissions to secondary particulate nitrate formation, NOX also reacts with anthropogenic and biogenic VOC to enhance the secondary formation of organic compounds that make up SOA. NOX is thus involved in all secondary PM chemistry, not just in particulate nitrate formation.[34]

4. Fine Particulate Composition by Location.

Table 2 shows regional 3-year mean concentrations (2009-2011) of PM2.5 and its main components at sites in the Chemical Speciation Network (CSN).[35] In addition to the mean values for all sites in each region, the table includes the minimum and maximum observed PM2.5 and species concentrations for sites within each region. These data illustrate broad observed spatial patterns across the U.S. in PM2.5 concentrations and its composition. For example, PM2.5 concentrations are highest on average in the Central and West regions. Sulfate mass comprises a larger fraction of PM2.5 than nitrate mass in the northeastern U.S., whereas nitrate has a greater contribution than sulfate in the West. OM is the dominant component in all regions, with the highest concentrations of OM on average found in the West, Northwest and Southeast. On a percentage basis, the concentrations of EC and crustal material are relatively low throughout all regions of the U.S. compared to the other major PM2.5 components.

The composition of PM2.5 also varies between urban and rural areas. This is reflective of the distribution of urban and regional emission sources, atmospheric reactions and transport of fine particles. More details about the spatial distribution and origins of PM2.5 components can be found in the docket for this action.[36]

Table 2—PM2.5 Chemical Composition Data at 2009-2011 Nonattainment Sites

[Source: EPA Speciation Trends Network]

RegionStatisticConcentration (μg/m3)
SulfateNitrateOMECCrustalPM2.5
CentralMin (μg/m3)1.460.32.730.310.018.92
Mean (μg/m3)2.691.493.570.680.2611.63
Max (μg/m3)4.193.344.811.11.013.51
N616150506142
East North CentralMin (μg/m3)0.830.381.970.190.016.03
Mean (μg/m3)1.681.82.840.480.199.86
Max (μg/m3)2.513.573.690.790.6111.87
N292820202823
North EastMin (μg/m3)0.580.121.740.1404.42
Mean (μg/m3)2.060.973.140.690.179.33
Max (μg/m3)5.122.265.051.690.5215.05
N595939395946
North WestMin (μg/m3)0.240.052.910.420.016.06
Mean (μg/m3)0.540.45.020.810.158.33
Max (μg/m3)1.091.798.441.250.5310.96
N333313133314
SouthMin (μg/m3)0.880.181.360.120.025.22
Mean (μg/m3)2.060.83.320.570.510.05
Max (μg/m3)3.081.675.11.482.3814.27
N362723233623
South EastMin (μg/m3)1.60.21.750.370.016.76
Mean (μg/m3)2.390.534.120.630.2610.77
Start Printed Page 58017
Max (μg/m3)4.331.515.711.20.8513.38
N444330304329
South WestMin (μg/m3)0.340.072.340.460.025.3
Mean (μg/m3)0.630.493.010.70.57.93
Max (μg/m3)1.132.654.391.041.969.73
N464611114612
WestMin (μg/m3)0.330.081.790.520.016.84
Mean (μg/m3)0.91.45.220.850.3211.49
Max (μg/m3)2.085.1410.271.561.0516.57
N444420204421
West North CentralMin (μg/m3)0.290.061.220.0903.23
Mean (μg/m3)0.670.483.160.440.227.25
Max (μg/m3)1.792.028.281.210.5313.72
N3030773010

III. Requirements With Respect to the Treatment of PM2.5 Precursors in Attainment Plans and the NNSR Program

A. Background

The EPA recognizes that the treatment of PM2.5 precursors is an important issue in developing a PM2.5 attainment plan [37] or implementing the NNSR program in a nonattainment area. The EPA has long recognized the scientific basis for concluding that there are multiple scientific precursors to PM10[38] and PM2.5.[39] Appropriate control of precursors is especially important for attaining the PM2.5 NAAQS because secondarily formed particles (such as ammonium nitrate, ammonium sulfate, and some portion of organic carbon) comprise a large fraction of ambient PM2.5 concentrations in many nonattainment areas. However, in some PM2.5 nonattainment areas, a particular precursor or precursors may not contribute significantly to PM2.5 levels that exceed the relevant NAAQS. This section of the preamble describes optional precursor demonstrations that a state may choose to submit to the EPA in order to establish that sources of particular precursors need not be regulated for purposes of attainment planning or in the NNSR permitting program for a specific nonattainment area.

Section III.A of this preamble provides background on the January 2013 NRDC v. EPA court decision, in which the court found that subpart 4 of part D of the CAA presumptively requires regulation of all PM2.5 precursors, except under certain circumstances. Section III.A of this preamble also provides information on the requirements of the subpart 4 provisions applicable to attainment plans for PM NAAQS. Section III.B of this preamble provides a summary of the precursor demonstration options in the proposed rule and comments received. Section III.C of this preamble provides a discussion of the optional precursor demonstrations provided in the final rule.

The final rule describes how in some cases a state may demonstrate that the adoption of additional emission reduction measures for a particular precursor is not needed for purposes of achieving expeditious attainment nor for advancing the attainment date by at least a year in a nonattainment area. (This is referred in the preamble as an “expeditious attainment demonstration.”) The rule also describes three optional approaches for demonstrating that a particular precursor is not a significant contributor to ambient PM2.5 levels that exceed the standard in a particular nonattainment area. These three precursor demonstrations are: (a) Comprehensive precursor demonstration; (b) major stationary source precursor demonstration; and (c) NNSR precursor demonstration. If a state chooses to submit a precursor demonstration, it must do so in accordance with provisions in the final rule. A state may use this type of demonstration to justify that sources of the given precursor may be excluded from certain PM2.5 attainment plan requirements and/or NNSR requirements, although the particular sources and requirements eligible for exclusion will depend on the type of demonstration submitted.

Section III.C of this preamble also outlines certain technical issues, such as the appropriate geographic scope of a precursor demonstration, recommended significance thresholds, and recommended analytical approaches for evaluating precursor contributions to ambient PM2.5 levels and the sensitivity of PM2.5 levels in an area to decreases or increases of emissions.

January 2013 court decision in NRDC v. EPA. As explained in the proposed rule, the EPA's approach to the evaluation and regulation of PM2.5 precursors pursuant to subpart 1 in both the 2007 PM2.5 Implementation Rule and the 2008 PM2.5 NSR Rule was invalidated in the court's 2013 decision in NRDC v. EPA. As an example of the distinction between the divergent substantive requirements of subpart 1 and subpart 4 of part D of the CAA, the court noted that subpart 4 has specific provisions related to regulation of precursors not present in subpart 1. Although the court stated that it was not reaching a decision on the issue of regulation of precursors, the court's opinion specifically discussed the approach to precursors in both the 2007 PM2.5 Implementation Rule and the 2008 PM2.5 NSR Rule and compared that approach to section 189(e) of the CAA, which contains the sole explicit reference to the regulation of precursors in subpart 4. The court decision included the following statements with regard to precursors:

Ammonia is a precursor to fine particulate matter, making it a precursor to both PM2.5Start Printed Page 58018and PM10. For a PM10 nonattainment area governed by subpart 4, a precursor is presumptively regulated. See 42 U.S.C. 7513a(e) [CAA section 189(e)]. Under the PM rules challenged here, the EPA established a rebuttable presumption against regulating ammonia unless a state or the EPA “provides an appropriate technical demonstration” that shows emissions from ammonia “significantly contribute to PM concentration in the nonattainment area.” 40 CFR 51.1002(c)(4)(i). When Congress enacted subpart 4, it sought to end this administrative gamesmanship.[40]

The court continued to hold that “[i]n light of our disposition, we need not address the petitioners' challenge to the presumptions in 40 CFR 51.1002(c)(3)-(4) that volatile organic compounds and ammonia are not PM2.5 precursors, as subpart 4 expressly governs precursor presumptions.” [41]

Section 189(e) of the CAA establishes requirements for precursors to PM10 (which the court concluded expressly includes PM2.5) and provides that: “The control requirements applicable under plans in effect under this part for major stationary sources of PM10 shall also apply to major stationary sources of PM10 precursors, except where the Administrator determines that such sources do not contribute significantly to PM10 levels which exceed the standard in the area.” The court reasoned that the EPA's approach to precursors in the 2007 PM2.5 Implementation Rule and 2008 PM2.5 NSR Rule had the effect of reversing the presumption embodied within subpart 4 that a state should address all PM10 precursors unless the state has made a specific showing why regulation of a particular precursor is not necessary.

Subpart 4 of part D of the CAA. The provisions of subpart 4 (CAA sections 188-190) do not define the term “precursor” for purposes of PM10, nor do they explicitly require the control of any specifically identified PM precursor. However, the statutory definition of “air pollutant” provides that the term “includes any precursors to the formation of any air pollutant, to the extent the Administrator has identified such precursor or precursors for the particular purpose for which the term `air pollutant' is used.” See CAA section 302(g). The EPA has determined that SO2, NOX, VOC and ammonia are factual and scientific precursors to PM and, thus, the attainment plan requirements of subpart 4 apply equally to emissions of direct PM2.5 and these precursors in PM2.5 nonattainment areas, except as otherwise provided in the statute. Section 189(e) of the CAA explicitly requires the control of precursors from all major stationary sources in PM2.5 nonattainment areas unless there is a demonstration to the satisfaction of the Administrator that such major stationary sources do not contribute significantly to PM levels that exceed the standards in the nonattainment area.[42] Section 189(e) of the CAA contains the only express exception to control requirements for PM precursors under subpart 4.

When Congress adopted the 1990 CAA Amendments, the NAAQS for PM10 was in effect, but no standard for PM2.5 had yet been established. At that time, it was understood that the interaction of PM10 precursors in the atmosphere led to the formation of PM10 in many areas. However, in some of the PM10 nonattainment areas, air quality problems were caused primarily by area sources emitting direct PM emissions (e.g., a nonattainment area with numerous wood burning devices, or with substantial sources of windblown coarse particles from construction sites), and precursor emissions from major stationary sources were not considered to make a significant contribution to the local nonattainment problem. For cases such as these, CAA section 189(e) provided a possible exception to the requirement to control all PM10 precursors from major sources in a particular nonattainment area.

Consistent with past practice for implementation of the PM10 NAAQS, the EPA proposed to interpret the control requirements addressed by CAA section 189(e) to include RACM/RACT (and additional reasonable measures) for Moderate nonattainment areas, BACM/BACT (and additional feasible measures) for Serious nonattainment areas, most stringent measures (MSM) (for Serious areas as applicable) and NNSR on all major sources of precursors in the nonattainment areas. The General Preamble indicates that consideration of precursors is necessary for attainment plans, and it recognizes the specific applicability of CAA section 189(e) to both existing and new major stationary sources, including new and modified sources subject to NNSR permitting requirements. Even though CAA section 189(e) only explicitly contemplates exceptions to control requirements for PM2.5 precursors from major stationary sources in nonattainment areas, the EPA believes that by analogy it has authority to promulgate regulations that allow states to determine that it is not necessary to regulate PM2.5 precursors from other sources in nonattainment areas as well, under appropriate circumstances.

While CAA section 189(e) expressly requires control of precursors from major stationary sources, it is clear that subpart 4 and other CAA provisions collectively require the control of direct PM2.5 and all PM2.5 precursors from all types of sources (i.e., stationary sources, area sources, and mobile sources) as may be needed for the purposes of demonstrating attainment as expeditiously as practicable in a given nonattainment area.[43] Longstanding EPA guidance for RACM has indicated that the state should inventory all emissions of the relevant pollutants and precursors in the nonattainment area, evaluate the available control measures for the relevant pollutant and precursors to determine if such controls are economically and technologically feasible, and then adopt those measures that are deemed reasonably available and necessary in order to attain the NAAQS as expeditiously as practicable.[44] The EPA guidance has also long indicated that the state must ensure that there is no other collection of available control measures that if adopted would advance the attainment date by at least 1 year.[45] Section IV.D of this preamble provides additional discussion on the development of emissions inventories and the identification, adoption and implementation of reasonably available control measures for PM2.5 nonattainment areas, including a discussion particular to wildfire and wildland prescribed fire found in Section IV.D.3.b.[46]

Start Printed Page 58019

In light of the court's decision in NRDC v. EPA, the EPA considers it necessary to describe how states must address regulation of PM2.5 precursors in attainment plans and NNSR programs for the PM2.5 NAAQS. The court's decision made clear that appropriate regulation of all precursors in designated nonattainment areas is presumptively required under the CAA, and the regulation of precursors in general is a critical issue for attainment of the PM2.5 NAAQS because secondarily formed particles are a substantial component of PM2.5 concentrations in most nonattainment areas of the United States.

For the purposes of this rule, the EPA considers that for all PM2.5 nonattainment areas, the PM2.5 precursors for regulatory purposes are the four scientific precursors that the EPA has previously identified: SO2, NOX, VOC and ammonia. This rule does not include any national presumption that would allow a state to exclude, without a demonstration, sources of emissions of a particular precursor from further analysis for attainment plan or NNSR control requirements in a PM2.5 nonattainment area. However, the EPA's interpretation of subpart 4 requirements with respect to precursors in attainment plans for PM10, as set out in the General Preamble, contemplates that the state may develop an attainment plan that regulates only those precursors that are necessary to control for purposes of timely attainment in the nonattainment area, i.e., states may determine that only certain precursors need to be regulated in a particular PM2.5 nonattainment area for attainment purposes.[47] Courts have upheld this approach to the requirements of subpart 4 for PM10.[48] The EPA believes that application of a similar approach to PM2.5 precursors under subpart 4 is appropriate and reasonable.

The EPA interprets the CAA to require states to inventory emissions and adopt control measures as appropriate for direct PM2.5 and all PM2.5 precursors. This interpretation is based on CAA section 302(g), which defines an air pollutant as including precursors contributing to the formation of that pollutant; the EPA's identification of the four main scientific PM2.5 precursors; and the CAA provisions requiring adoption of all control measures (i.e., RACM and RACT) needed in order to attain the standard as expeditiously as practicable. CAA section 189(e) explicitly requires that the control requirements applicable for major stationary sources of direct PM2.5 emissions must also apply to major stationary sources of PM2.5 precursors, unless the state provides a showing that emissions of a particular precursor from major stationary sources do not contribute significantly to levels that exceed the standard in the nonattainment area of concern. Thus, the statute generally requires control of all PM2.5 precursors in a nonattainment area, but it provides an express exception applicable to major stationary sources in such areas if an appropriate demonstration is made.

The EPA also notes that CAA section 189(e) contains certain ambiguities that require interpretation. For example, CAA section 189(e) does not specify the precise method by which a state or the EPA should determine whether precursor emissions from major stationary sources do not “contribute significantly” to levels which exceed the standard in a given nonattainment area. Subpart 4 also does not explicitly address whether it would be appropriate to include a potential exemption from precursor controls for all source categories under certain circumstances, because a specific exemption from precursor controls is expressly made available in the statute only for major stationary sources. These issues are addressed in this final rule.

B. Summary of Proposal

In the proposal, the EPA sought comment on how states could focus regulatory efforts on the appropriate PM2.5 precursors in each area. Rather than simply requiring each state to regulate direct PM2.5 and all PM2.5 precursors without regard to whether that would be appropriate and necessary for expeditious attainment of the NAAQS, EPA took comment on different approaches for states to focus regulatory efforts on the appropriate pollutants. Thus, in the proposal, the EPA sought comment on three options by which a state could demonstrate that emission control requirements for a particular PM2.5 precursor or precursors would not be required for sources in a particular nonattainment area.[49] The proposed “precursor demonstration” options outlined procedures and technical analyses a state could elect to perform to demonstrate that control requirements for sources of a particular precursor are not needed for expeditious attainment, or that a particular PM2.5 precursor does not significantly contribute to PM2.5 concentrations in the area. The proposal indicated that if the EPA were to approve such a precursor demonstration, then it would not be necessary for the state to adopt control requirements for sources of the precursor or precursors in the PM2.5 attainment planning process generally and/or in the NNSR permitting process for that particular area. The EPA requested comment on whether the final rule should include one or more precursor demonstration approaches, and whether it would be appropriate to combine specific elements from different options.

The EPA also described three technical issues associated with any such precursor demonstration and sought comment on the following: (1) The appropriate geographic scope of the analysis; (2) whether specific types of technical analyses (such as evaluating the contribution of the precursor to total PM2.5 concentrations, or evaluating the sensitivity of the area to decreases or increases of the precursor) should be required for a precursor demonstration; and (3) whether the EPA should establish a bright-line ambient air quality threshold (e.g., 3 percent of the level of the relevant NAAQS in the area) to define an air quality change below which a precursor contribution should not be considered to be significant, thereby establishing that control of sources of the precursor is unnecessary in the area.

Lastly, the EPA indicated in the proposal that if a state had an approved precursor demonstration for a particular precursor in a Moderate area and the EPA later reclassifies the area to Serious, then the state would be required to develop an updated precursor demonstration if the state were again interested in having the precursor treated as insignificant for purposes of the Serious area plan. An updated precursor demonstration is necessary because many factors (e.g., emissions, air quality and fine particle concentrations) could have changed substantially since the original Start Printed Page 58020demonstration for the Moderate area attainment plan.[50]

C. Final Rule

The EPA received many comments on the three proposed precursor demonstration approaches. Most commenters supported the inclusion of some kind of optional precursor demonstration in the final rule. Some commenters suggested that states should have the flexibility to develop any of the types of demonstrations that the EPA described in the three proposed options. One group of commenters opposed any option that would exempt a particular precursor from control measures even if the state could demonstrate it could expeditiously attain the standard by the attainment date without controls on sources of the precursor. Another group of commenters suggested that if only one option is finalized, it should allow a state to rely on a sensitivity analysis to show that changes in emissions of a particular precursor would not have a substantial contribution to PM2.5 concentrations in the area.

The EPA agrees with commenters who suggested that states should have the flexibility to conduct different types of precursor demonstrations appropriate to the area in question. Regardless of the type of precursor demonstration, the state will still need to provide adequate technical support and that demonstration will be subject to EPA approval. Thus, the EPA concludes that the specific form of the demonstration is not as crucial as its content and adequacy, in light of the facts and circumstances in the area. The EPA disagrees with commenters who argued that a state should not be able to determine insignificance for a precursor based on an attainment planning analysis showing expeditious attainment in the area without adopting new emissions reduction measures for the precursor in question. This approach has been upheld under subpart 4 with respect to implementation of the PM10 NAAQS, and the EPA finds that it is reasonable to allow for a similar policy when implementing the PM2.5 NAAQS.[51]

After consideration of the numerous comments received on this issue, the EPA has decided to adopt a final approach that allows exclusion of certain precursor sources from certain SIP requirements, provided that states make the appropriate demonstrations. However, the EPA has revised the details of the specific types of demonstrations based on further evaluation of the comments received. Section III.C.1 of this preamble describes the expeditious attainment demonstration, in which a state shows that control requirements for a particular precursor are not needed for expeditious attainment by the Moderate area attainment date. Section III.C.2 of this preamble describes the three types of optional precursor demonstrations a state may submit to the EPA to establish that emissions of a precursor do not contribute significantly to PM2.5 levels in a particular nonattainment area: (a) Comprehensive precursor demonstration; (b) major stationary source precursor demonstration; and (c) NNSR precursor demonstration. Each option is described in detail in the following subsections.

Section III.C.3 of this preamble highlights various technical issues associated with precursor demonstrations, including the appropriate geographic scope of the analyses, thresholds for characterizing an insignificant air quality change, and different analytical methods for assessing precursor contributions. Section III.C.4 of this preamble discusses certain procedural issues associated with precursor demonstrations. Section III.C.5 of this preamble addresses other relevant comments and responses.

1. Expeditious Attainment Demonstration

As noted earlier, the EPA's interpretation of subpart 1 and 4 requirements with respect to precursors in attainment plans for PM10 has been that a state may develop an attainment plan that regulates only those precursors that are necessary to control for purposes of timely attainment in the area. The EPA believes that a similar policy approach for PM2.5 precursors is also appropriate.

Under the expeditious attainment demonstration, a state may be able to determine through its identification of RACM/RACT for existing sources in an area whether expeditious attainment could be achieved without new control measures for a particular PM2.5 precursor. It is important to note that this approach is available to a state only if the demonstration for the area (1) ensures attainment by the Moderate area attainment date (i.e., the end of the sixth calendar year after designation), and (2) ensures that the area could not advance the attainment date by at least 1 year if it were to adopt reasonable control measures for the precursor in question. If the state determines that the area cannot practicably attain by the relevant Moderate area attainment date, then the state still would have the option of developing one of the precursor demonstrations described in Sections III.C.2.a-c of this preamble for showing that the precursor contribution is not significant. The expeditious attainment option is not available for Serious nonattainment areas because BACM/BACT measures for Serious areas are not solely limited to those measures needed for expeditious attainment under this final rule. (See further discussion of this issue in Section VI.D of this preamble, Serious Area Attainment Plan Control Strategies.)

For the expeditious attainment demonstration, the required analysis is what is already needed for a Moderate area attainment demonstration: The identification of reasonably available control measures that provide for expeditious attainment by the attainment date, and a determination that attainment cannot be advanced through the imposition of other reasonable measures (i.e. RACM/RACT and other reasonable measures that are identified for the area but not necessary for the area to attain within 6 years). See 40 CFR 51.1006(a). After a comprehensive emissions inventory has been developed, the state should then identify potential control measures and assess factors related to technological feasibility, economic feasibility, and time needed for implementation for all types of sources in the area (i.e., stationary, area, mobile) and all precursors emitted by such sources as included in the emissions inventory.

After identifying the set of control measures that are economically and technologically feasible for all precursors, the state may be able to show (using best available information on emissions, control options, technologies, and costs, along with appropriate air quality modeling) that those measures that could be identified as RACM/RACT and additional reasonable measures would not need to include new control measures for sources of a given precursor.[52] The state could show this by demonstrating that one set of control measures to be adopted into the plan would provide for attainment by the statutory attainment date; and that an additional set of potential control measures (including measures for the precursor in question, and remaining measures for all other contributing pollutants) collectively Start Printed Page 58021would not advance the attainment date by at least 1 year (i.e., enable the area to attain 1 year earlier). Under these circumstances, the state would not need to adopt the second set of measures (including measures for the particular precursor) because they would not expedite attainment of the NAAQS in the area.

If the attainment planning demonstration shows that the area can attain the NAAQS expeditiously without new emission reduction measures for a particular precursor, the state would be required to adopt control measures for only a subset of the four PM2.5 precursors as part of the attainment plan for the area, and existing sources in the nonattainment area would not be required to adopt new control measures for the particular precursor. Accordingly, the state would not need to address the precursor in the reasonable further progress plan, in quantitative milestones and associated reports, or be required to adopt contingency measures to reduce the precursor. See 40 CFR 51.1009(a)(4)(i). (Note that for purposes of meeting the contingency measure requirement, however, the state would still have the discretion to adopt control measures as contingency measures for a precursor that would otherwise not be subject to RACM/RACT requirements.)

It also should be noted that development of an approvable attainment plan that does not include new control measures for a particular precursor would not exempt the state from the requirements to address the same precursor with respect to the NNSR program, nor would it excuse the state from reconsidering the significance of the precursor to the PM nonattainment problem in any subsequent Serious area SIPs that could be required for the nonattainment area.

2. Optional Precursor Demonstrations

a. Comprehensive Precursor Demonstration. In line with the EPA's proposal for precursor insignificance demonstrations, the EPA is finalizing an option whereby a state may submit a comprehensive precursor demonstration as part of any Moderate or Serious area attainment plan. The use of the term “comprehensive” here refers to the fact that the demonstration covers all existing stationary, area, and mobile sources, rather than major sources alone. Note, however, that the comprehensive precursor demonstration does not affect precursor requirements for future new sources. Under this comprehensive precursor demonstration, the state would need to show that emissions of a particular precursor from all existing stationary, area, and mobile sources located in the nonattainment area do not contribute significantly to PM2.5 levels that exceed the standard in the area. The state would first need to evaluate the contribution of all existing source emissions of the particular precursor to PM2.5 concentrations that exceed the PM2.5 standard (described in Section III.C.2 of this preamble). If the state cannot demonstrate via the concentration-based precursor demonstration that sources of a particular precursor have an insignificant contribution to PM2.5 levels in an area,, then the state could still demonstrate that the precursor's contribution is insignificant by conducting a sensitivity analysis to evaluate the sensitivity of ambient PM2.5 concentrations in the nonattainment area to decreases in the precursor emissions in the area (e.g., whether a given decrease is insignificant) as discussed further in Section III.C.2.c of this preamble.

If a comprehensive precursor demonstration for a precursor is approved, the state would not establish a motor vehicle emissions budget for the relevant precursor, and regional emissions analyses for the precursor would not be required to be included in transportation conformity determinations. This is consistent with the transportation conformity rule's provisions concerning PM2.5 precursors. (See 40 CFR 93.102(b)(2)(iv) and (v)). Separately, states may continue to determine that on-road emissions of PM2.5 precursors are insignificant even if emissions of a given precursor from other sources are significant. (See 40 CFR 93.102(b)(2)(iv) and (v) and 93.109(f)). With regard to general conformity, if a state precursor demonstration is approved for one or more precursors, federal agencies would not be required to address the affected precursor(s) in general conformity determinations.

If a comprehensive precursor demonstration is approved by the EPA, then in developing the attainment plan for the area, the state would not be required to adopt control measures (e.g., RACM/RACT) for the precursor for any existing stationary, area, or mobile sources in the nonattainment area. The attainment plan also would not be required to address the relevant precursor in meeting the RFP or quantitative milestone requirements, or in adopting contingency measures because these requirements commonly apply to pollutants that are the subject of emission reduction measures in the attainment plan. (Note that for purposes of meeting the contingency measure requirement, however, the state would still have the discretion to adopt emission reduction requirements on the precursor in question, in conjunction with emission reduction requirements on other pollutants.) The state would still need to include the precursor in all nonattainment area emission inventory submissions.

It also should be noted that development of an approvable attainment plan that does not include new control measures for a particular precursor would not exempt the state from the requirements to address that precursor with respect to the NNSR program, nor would it excuse the state from reevaluating the significance of the precursor to the PM nonattainment problem in any subsequent Serious area SIPs that could be required for the nonattainment area.

b. Major Stationary Source Precursor Demonstration. The state has the option of submitting a major stationary source precursor demonstration as part of any Moderate or Serious area plan, consistent with CAA section 189(e). This demonstration differs from the comprehensive demonstration in that it only evaluates existing major sources, and therefore may only be used to justify the exclusion of existing major sources from the control requirements for the applicable precursor. Although the EPA expects that most states making precursor demonstrations will opt for comprehensive demonstrations, this option is provided to offer additional flexibility. The requirements for a stationary source precursor demonstration are nearly identical to those of the comprehensive precursor demonstration, except the state would only need to show that a particular precursor from all existing major stationary sources located in the nonattainment area do not contribute significantly to PM2.5 levels that exceed the standard in the area. Similar to the comprehensive demonstration, the state must first evaluate the contribution of major stationary source emissions of the particular precursor to PM2.5 levels that exceed the PM2.5 standard (pursuant to section III.C.3.c of this preamble). If the state cannot demonstrate via the concentration-based precursor demonstration that sources of a particular precursor have an insignificant contribution to PM2.5 levels in an area, then the state could still try to demonstrate that the precursor is insignificant by conducting a sensitivity analysis to evaluate the sensitivity of PM2.5 levels in the nonattainment area to a reduction in major stationary source Start Printed Page 58022emissions in the area (pursuant to Section III.C.3.d of this preamble).

If such a demonstration is approved by the EPA, then in developing the attainment plan for the area, the state would not be required to adopt control measures for the precursor for existing major stationary sources in the nonattainment area. The attainment plan also would not be required to address the emissions of the relevant precursor from major stationary sources in meeting the RFP or quantitative milestone requirements, or in adopting contingency measures. (Note that for purposes of meeting the contingency measure requirement, however, the state would still have the discretion to adopt emission reduction requirements on the precursor in question, in conjunction with emission reduction requirements on other pollutants.) The state would still need to include stationary source emissions of the precursor in all nonattainment area emission inventory submissions.

Note that a state might consider developing a major stationary source demonstration to avoid the requirement to adopt nonattainment planning control measures for a particular precursor emitted from existing major stationary sources in the area if the state does not believe that it could comprehensively demonstrate that the precursor does not have a significant contribution, and if major stationary source emissions of the precursor do not make up a very large percentage of the emissions inventory in the area. For example, it might be possible that in a particular area the overwhelming amount of emissions of a certain precursor could originate from mobile or area sources, or both, but not from existing major stationary sources. If the EPA approves a major stationary source precursor demonstration, the attainment plan would still need to evaluate and potentially impose control requirements for the relevant precursor for existing non-major stationary sources, area sources and mobile sources in order to demonstrate expeditious attainment.

It also should be noted that development of an approvable attainment plan that does not include new control measures for a particular precursor would not exempt the state from the requirements to address that precursor with respect to the NNSR program, nor would it excuse the state from the requirement to evaluate and adopt control measures for the precursor in any subsequent Serious area SIPs that could be required for the nonattainment area.

c. NNSR Precursor Demonstration. The state also has the option of submitting a NNSR precursor demonstration as part of any Moderate or Serious area plan. This specific type of precursor demonstration is the only one of the three demonstrations described in this section that if approved would exempt new and modified major stationary sources of a precursor from regulation under the NNSR permitting program.

Under the NNSR precursor demonstration, the state would need to conduct an analysis to evaluate the sensitivity of PM2.5 levels in the nonattainment area to an increase in emissions of a particular precursor in the area, simulating the response of the atmosphere (and associated PM2.5 concentrations) to the addition of one or more new or modified stationary sources in the nonattainment area (see Section III.C.3.d of this preamble). Section III.C.3 of this preamble addresses additional issues related to technical analyses for precursor demonstrations.

The EPA believes that this approach to interpreting CAA section 189(e) of the statute as it applies to control requirements for the NNSR program is appropriate because (1) an analysis that evaluates the sensitivity of the atmosphere in an area to increases in emissions would most closely replicate the scenario of concern, where precursor emissions from new major stationary sources or major modifications are added to the existing inventory for the area; and (2) this approach would take into consideration the specific atmospheric chemistry and emissions profile that varies from area to area. For example, one nonattainment area may have low emissions of a particular precursor from all existing sources (and corresponding low current ambient contributions from the precursor), but the introduction of a new major stationary source of emissions of that particular precursor could in some cases significantly contribute to the ambient PM2.5 levels in the area because other pollutants with which the precursor reacts in the atmosphere could be relatively abundant.

For purposes of the NNSR precursor demonstration, the state is not required to first evaluate the contribution of existing major sources to PM2.5 levels that exceed the standard in the area, as would be required by the comprehensive and major stationary source demonstrations. Since NNSR permitting requirements do not apply to existing sources (unless such sources engage in a major modification), the EPA does not believe it is necessary or reasonable to require evaluation of current emissions from existing major stationary sources as it would not inform the question of whether increases in emissions would significantly contribute to PM2.5 levels in the area. Note, however, that the NNSR precursor demonstration is used only to justify an exclusion of sources of the precursor from the NNSR control requirements in the area. A state would need to pair the NNSR precursor demonstration with another type of precursor demonstration to address control requirements beyond NNSR, as described previously for each type of demonstration.

3. Technical Issues Associated With Precursor Demonstrations

a. Geographic Area. The proposal indicated that the emissions inventory to be used as the starting point for the comprehensive, major stationary source, and NNSR precursor demonstrations should represent emissions from sources located in the nonattainment area, and the final rule remains unchanged. The EPA believes that limiting the emissions inventory for these analyses to sources in the nonattainment area is appropriate based on the statutory construction of CAA section 189(e), in which the relevant test is whether “such sources contribute significantly to [PM2.5] levels which exceed the standard in the area.” The EPA believes that a reasonable interpretation is that this provision applies to sources in the nonattainment area.

b. Significance Threshold. The proposal described the concept of including a bright-line threshold of 3 percent of the relevant NAAQS in the rule for precursor demonstrations other than the expeditious attainment approach, such that if an air quality contribution was found not to exceed the threshold amount, then it would not be considered significant. The proposal also included an option for no bright-line threshold in the final rule, based on the recognition that all nonattainment area situations are different.

Some commenters supported the bright-line threshold concept, but they suggested thresholds across a broad range, from less than 1 percent of the relevant NAAQS, to up to 5 percent. Some commenters stated that inclusion of a bright-line threshold of 3 percent of the relevant NAAQS was preferred because without such a threshold, states would be unsure about whether their proposed precursor assessment would be acceptable. Other commenters supported having no bright line threshold because the circumstances of each area are unique, and for that reason Start Printed Page 58023each area should be considered on a case-by-case basis.

The EPA found merit in comments supporting both proposed options. The EPA agrees that an insignificance threshold can help avoid situations where lack of clarity may lead to delays in the EPA assessment of precursor demonstrations. At the same time, the EPA understands that PM2.5 nonattainment problems are complex and vary greatly based on the facts and circumstances of each area.

After considering the range of comments on this issue and the complexity of the types of analyses that may be conducted for precursor demonstrations, the EPA has decided that the best approach is for the final rule to codify the availability and basic requirements for precursor demonstrations, but to provide technical details (such as a recommended approach for assessing whether a particular air quality concentration threshold can be considered to be insignificant in a given area) in guidance supporting this final rule.

c. Concentration-based Contribution Analysis. The first type of analysis required for the comprehensive precursor demonstration (or, less commonly, the major stationary source precursor demonstration) is an existing source contribution analysis that would demonstrate whether emissions of a particular precursor from all existing sources (or, for a major source precursor demonstration, emissions from existing major sources) in the nonattainment area do not significantly contribute to PM2.5 concentrations that exceed the standard in the area. The state should use technically credible approaches for estimating the ambient contribution of emissions of a particular precursor to total PM2.5 concentration in the nonattainment area. The EPA anticipates that the forthcoming technical guidance will discuss the possible use of advanced air quality modeling tools to estimate precursor contributions to total PM2.5 concentrations in an area. For example, several photochemical air quality models (e.g., Community Multi-Scale Air Quality Model (CMAQ) and the Comprehensive Air Quality Model with Extensions (CAMx)) can be used to quantify the contributions of precursor emissions to PM2.5 concentrations in the area.[53]

Other techniques such as the analysis of chemical speciation data and emissions inventories also may be appropriate for determining the contribution of a particular precursor to PM2.5 concentrations. For example, SO2 emissions and measured sulfate concentrations (in the form of ammonium sulfate or other forms) may be small in a particular nonattainment area. A simple analysis of measured species concentrations (attributable to a particular precursor) combined with nonattainment area emissions and other relevant data analyses may be sufficient to show that a precursor does not contribute significantly to PM2.5 concentrations in the area.

d. Sensitivity-based Contribution Analysis. A second type of analysis may also be used in developing comprehensive precursor demonstrations (or, less commonly, major source precursor demonstrations). This type of analysis is a sensitivity-based contribution analysis that would demonstrate the degree to which concentrations in the nonattainment area are sensitive to decreases of a precursor. Changes in PM2.5 concentrations at a particular location often will not be linear with respect to changes in PM2.5 precursor emissions; therefore, sensitivity analyses are useful for better understanding the complexity and variability of the atmospheric chemistry affecting PM2.5 concentrations in different areas across the country. A sensitivity-based contribution analysis evaluating the effect of precursor emissions reductions could be used in the event the state cannot demonstrate via the concentration-based analysis that sources of a particular precursor have an insignificant contribution to PM2.5 levels in an area.

The EPA also requires a sensitivity-based analysis as the means for conducting the NNSR precursor demonstration. In this case, in contrast to the assessment of decreases described for the comprehensive (or major source) precursor demonstration for existing sources, the appropriate sensitivity analysis is one that evaluates the impact of precursor emissions increases—without the need for a separate evaluation of existing source contribution to PM2.5 concentrations. This analysis is clearly most appropriate for NNSR, which is a program that governs emissions increases. Thus, the final rule requires that such an analysis must be used if a state chooses to submit a NNSR precursor demonstration.

The EPA states in the final rule that a sensitivity-based analysis is an appropriate approach for understanding whether emissions of a precursor make an insignificant contribution to PM2.5 levels in an area. Several main components of PM2.5 are secondarily formed in the atmosphere and are the result of chemical reactions between various PM2.5 precursors. In some areas, one precursor may be abundant while a second precursor, with which it primarily reacts, may be less abundant. In such cases, a sensitivity analysis may find that reducing emissions of the second, less abundant precursor (the “limiting” precursor) may be generally more effective for reducing PM2.5 concentrations. It may also find that increasing emissions of the less abundant precursor may be more effective at increasing PM2.5 concentrations than a comparable tonnage increase of a more abundant precursor.

In another type of area, the PM2.5 concentrations that exceed the standard may be commonly dominated by primary PM2.5 emissions rather than by secondarily formed PM2.5. In such an area, a sensitivity analysis may be able to demonstrate that sources of a particular precursor in the nonattainment area do not contribute significantly to PM2.5 levels that exceed the standard, and that the potential air quality improvement from reducing emissions of the precursor in the area may be limited.

Thus, the most effective precursor strategies for reducing PM2.5 concentrations as part of attainment planning will vary from area to area, depending upon which specific precursors play a role in forming or limiting PM2.5 formation in the particular area. The EPA therefore believes that it is a reasonable interpretation of the statute to allow a precursor to be excluded from control requirements if the PM2.5 concentration in the area is insensitive to decreases of that precursor.

For states that choose to develop an optional precursor demonstration, the final rule provides that in addition to the basic requirement to do a concentration-based contribution analysis, the state may choose to develop a sensitivity-based contribution analysis evaluating potential emissions reductions for either a comprehensive precursor demonstration or a major stationary source demonstration intended to show that emissions reductions of the particular precursor are not effective in reducing PM2.5 levels that exceed the standard in the area. As noted previously, the EPA expects to recommend approaches for assessing whether a particular air quality concentration threshold can be considered to be insignificant in a given area. If a concentration-based contribution analysis conducted for Start Printed Page 58024either a comprehensive precursor demonstration or a major stationary source precursor demonstration shows that the contribution from a precursor is less than a particular threshold which may be considered insignificant at each PM2.5 monitor in the area, then the EPA could approve the concentration-based contribution analysis. However, if a concentration-based contribution analysis cannot be approved (e.g., shows that the contribution of a precursor to PM2.5 levels in the area is not less than such a threshold at one or more monitors), then the overall precursor demonstration still could be approved, but only if the state also provides an appropriate sensitivity-based contribution analysis. If the sensitivity-based contribution analysis shows that the reduction in PM2.5 concentration at each PM2.5 monitor resulting from an emission reduction level that would not exceed such a threshold, then the EPA could approve the overall precursor demonstration, and the state would not be required to adopt control requirements for the precursor or address the precursor for attainment planning purposes.

In evaluating whether it would be appropriate to exclude sources of any precursors from NNSR regulation in a nonattainment area, it is important to understand the sensitivity of the atmosphere to potential increases in precursor emissions that could result from major source growth (from both new sources and major modifications at existing major sources) in the nonattainment area. For example, in some circumstances, adding a few hundred tons of a “less abundant” precursor to an area could result in a significant increase in PM2.5 concentrations even if there are currently very few existing major sources of the precursor in the area. In contrast to the emissions reduction analyses described for attainment planning purposes, sensitivity analyses that consider the effect of potential emissions increases of a particular precursor in the nonattainment area will help the state and the EPA to understand the potential response of PM2.5 concentrations to increased emissions in the area in order to assess whether the contribution from such increases is not significant under CAA section 189(e). In assessing whether a state precursor demonstration (i.e., for attainment planning or for NNSR) can be approved, the EPA will consider the air quality changes estimated in the state's technical sensitivity analyses, their relationship to thresholds developed under any EPA-recommended approaches (including any thresholds that EPA may recommend), and any other information presented by the state.

4. Procedural Considerations

a. Consultation and Public Review. The EPA anticipates that a state's development of an approvable PM2.5 precursor demonstration will require a substantial level of effort and consultation with the EPA. Such a demonstration by the state would likely involve technically rigorous and complex analyses, such as air quality modeling and ambient data analyses. Accordingly, the EPA strongly recommends that any state that is considering limiting the applicability and associated control strategy decisions only to specific precursors, either for the attainment plan, for the NNSR permitting program, or for both, should develop a precursor demonstration early in the attainment plan development process. The EPA is committed to consulting with states on designing technically appropriate precursor demonstrations consistent with EPA technical guidance. If a state chooses to develop a precursor demonstration, it must be submitted to the appropriate EPA regional office no later than the date of submission of the relevant attainment plan or NNSR program revision; an earlier submission is preferable. For example, if a state submits the Moderate area plan elements no later than 18 months from the date of designation (as discussed in Section IV.A of the preamble), it should submit any precursor demonstration no later than this same date. In its review of any precursor demonstration provided by a state, the EPA will consider all relevant information.

The critical first step in any precursor analysis is the development of a comprehensive inventory of all precursor emissions in the nonattainment area. A state will not be able to reasonably determine whether reductions of a given PM2.5 precursor are needed for expeditious attainment, or whether sources of such precursor are insignificant contributors to PM2.5 levels above the standard in an area, unless the state has adequately accounted for all nonattainment area emissions in its emissions inventory. (See section IV.B of this preamble for more details on emission inventory requirements.)

In the preamble to proposed rule, we indicated that if a state developed a precursor demonstration as part of its draft attainment plan or NNSR program submission, then in accordance with the state rulemaking process, the demonstration would be subject to public review at the state level. We also stated that, as required under any rulemaking process, the state had to consider and provide a response in the rulemaking record to any information or evidence brought forward by commenters during the state's SIP planning, development and review process. By ensuring that this important issue was explicitly addressed and supported in any attainment plan or NNSR program revision submitted to the EPA, the EPA could better evaluate the precursor demonstration in accordance with its obligations under the CAA. The EPA believes these are sound procedural steps for a state rulemaking process, and the final rule includes similar language requiring public review of any proposed precursor demonstration.

If a state chooses to develop a comprehensive precursor demonstration or major stationary source precursor demonstration for a nonattainment area, it must submit a concentration-based contribution analysis and, if applicable, a sensitivity-based contribution analysis conducted for the area. In cases where a sensitivity-based analysis was developed the concentration-based analysis must also still be submitted. Although the rule clearly provides that the precursor demonstration requirement may still be satisfied in such cases, the information in the concentration-based analysis will help inform review of the overall demonstration by the EPA. Similarly, the data from the concentration-based analysis should be available in the public record because it will help inform the review of the overall precursor demonstration by the public. See 40 CFR 51.1006(b).

b. Precursor Demonstration to be Reevaluated for Each New State Implementation Plan. There may be situations where the EPA approved a Moderate area plan that excluded a precursor from regulation from one or more requirements based on an approvable precursor demonstration, and then the area is reclassified as a Serious area, triggering an additional plan submission requirement. (Section V of this preamble provides additional detail on reclassification of areas from Moderate to Serious under subpart 4.) In addition, an area that had been reclassified as Serious later may be required to submit one or more additional SIPs if it obtains an extension of the Serious area attainment date, or if it fails to attain the standard by the end of the tenth year after designation. For a state seeking to continue a precursor exclusion in a subsequent attainment plan or NNSR program Start Printed Page 58025submission, the final rule requires the state to assess the appropriateness of continuing the exclusion by providing a new precursor demonstration updated to reflect the type of plan and the conditions in effect when the new plan is submitted.

When an area is reclassified to Serious, existing sources of all PM2.5 precursors in the area are again presumptively subject to evaluation for BACM/BACT control measures and potential future control requirements, unless a new precursor demonstration is developed and approved as part of the Serious area plan. As noted in the discussion of the provisions for excluding sources of precursors from certain Moderate area requirements based on an expeditious attainment demonstration, this option is not available for Serious areas. Accordingly, if the state seeks to submit an updated precursor demonstration for a Serious area, at this stage it must submit a comprehensive, major stationary source, or NNSR precursor demonstration. Regardless of the type of demonstration(s) provided in the Moderate area plan, the final rule requires that the state must submit a reevaluated and updated precursor demonstration for the Serious area plan. The reason for this is that the Serious area plan would be due several years after the submission of a state's original precursor demonstration, and over that period, substantial emissions changes could have occurred that might call into question the basis of the previous precursor demonstration. In addition, because the area failed to attain by the Moderate area attainment date, it is reasonable and appropriate to require the state to reconsider and update its prior precursor demonstration. The final rule also requires similar updates for each successive plan beyond the initial Serious area plan (such as a revised Serious area plan for an area that fails to attain by the end of the tenth calendar year after designation). The EPA recommends that in developing a revised precursor demonstration, the state should consider changes in a number of factors, including: Changes in emissions inventory levels due to implementation of control programs, growth in emissions, and changes in emission estimation methodologies; recent ambient air quality concentrations; fine particle composition and the sensitivity of the atmosphere to increases and decreases of different precursors; advances in technical tools and modeling techniques to assess the effectiveness of precursor reductions; and advances in control technologies and emission reduction programs.

5. Comments and Responses.

Comment: With regard to whether the existing source contribution analysis or the sensitivity-based contribution analyses should be required if a state opts to submit a precursor demonstration, a number of commenters supported only the sensitivity analysis because they believed the analysis would help identify the control measures that are most effective at reducing PM2.5 concentrations. Some commenters noted that conducting a “zero-out” analysis (i.e., simulating the change in atmospheric chemistry and PM2.5 concentrations due to a hypothetical removal of 100 percent of the emissions of a precursor from the inventory) is not appropriate for a sensitivity analysis because the response of the photochemical grid model is highly non-linear under such circumstances.

Another group of commenters supported requiring only the concentration-based existing source contribution analysis because only that analysis would address the question alluded to in the statute, which is whether sources of the precursor contribute significantly to levels which exceed the standard in the area. These commenters stated that sensitivity-based analyses reflect localized conditions and do not represent a consistent effect across an air basin. The commenters suggested that sensitivity analyses might be considered to inform what pollutants are most cost-effective to control, but believed that this is dubious because the fact that certain pollutants are very abundant is likely the result of a history of under-regulation. They suggested that it actually may be cheaper to control the more abundant pollutant than the less abundant pollutant in order to achieve an equal amount of air quality improvement.

Response: The EPA agrees with commenters who suggested that the rule should closely align with the statutory language in CAA section 189(e) of subpart 4 and include provisions for evaluating the contribution of existing sources to PM2.5 levels which exceed the standard in the area. For this reason, the final rule states that the existing source contribution analysis should be required for any comprehensive precursor demonstration or major stationary source precursor demonstration seeking to exempt a precursor from attainment planning requirements.

The EPA also believes that a sensitivity-based contribution analysis is consistent with the language and intent of CAA section 189(e). As applied to attainment plans, CAA section 189(e) allows states to evaluate whether PM2.5 precursors significantly contribute to levels which exceed the standard in the area. The intent of CAA section 189(e) in applying control requirements to PM2.5 precursors is to ensure expeditious attainment of the standard. However, if conditions in a particular area are such that control of sources of one or more precursors does not reduce PM2.5 concentrations in the area, then those controls will not help the area attain (expeditiously or otherwise). Therefore, the EPA disagrees with commenters who argue that sensitivity-based contribution analyses are not appropriate for determining if precursors do not significantly contribute to PM2.5 levels in the area. The EPA believes that sensitivity-based contribution analyses can be useful for determining whether adoption of control requirements for sources of a particular precursor would be effective in reducing PM2.5 concentrations, and can be useful for determining whether potential emissions increases under the NNSR program would lead to insignificant air quality changes. For this reason, the final rule allows states to conduct sensitivity-based contribution analyses for the comprehensive, major stationary source, and NNSR precursor demonstrations.

Comment: Some commenters expressed support for the precursor option from the proposal (i.e., Option 3) that would have allowed for an expeditious attainment precursor demonstration to be deemed to demonstrate under CAA section 189(e) that emissions of the precursor do not need to be addressed for all major stationary source requirements, such as the NNSR program.

Response: Upon further consideration of this potential approach, the EPA decided that it would not be appropriate to include such an approach in the final rule. The reason for this is that an expeditious attainment planning analysis on its own would determine that the area could attain the standard by the Moderate area attainment date without new control requirements for sources of a particular precursor, but it would not address the potential impact of increased emissions of the precursor in the area due to new or modified sources, as is reasonably needed under the NNSR precursor demonstration. The evaluation of controls required for expeditious attainment does not consider what happens if new sources move into an area. Thus, while a state might be able to show that controlling existing sources of a precursor does not Start Printed Page 58026advance attainment, the analysis would not determine whether a new major source of that precursor might have a significant contribution to air quality. The EPA believes it is important for purposes of CAA section 189(e) and our overall environmental goal under the NNSR program to evaluate emissions increases. Consequently, the EPA has revised the details of the specific types of demonstrations to include a specific stand-alone demonstration for purposes of exempting new major stationary sources and major modifications of a precursor from regulation under the NNSR permitting program.

IV. Requirements for PM2.5 Moderate Nonattainment Area Plans

Sections 189(a), (c), and (e) of the CAA require that Moderate area attainment plans contain the following: (i) An approved permit program for construction of new and modified major stationary sources (CAA section 189(a)(1)(A)); (ii) a demonstration that the plan provides for attainment by no later than the applicable Moderate area attainment date or a demonstration that attainment by that date is impracticable CAA (section 189(a)(1)(B)); (iii) provisions for the implementation of RACM and RACT no later than 4 years after designation (CAA section 189(a)(1)(C)); (iv) quantitative milestones that will be used to evaluate compliance with the requirement to demonstrate reasonable further progress (RFP) (CAA section 189(c)); and, (v) evaluation and regulation of PM2.5 precursors (in general to meet RACM and RACT and other attainment planning requirements, and as specifically provided for major stationary sources under CAA section 189(e)). In addition, subpart 1 requirements for attainment plans continue to apply to PM2.5 nonattainment areas unless they are superseded by subpart 4 provisions and include the following: (i) A description of the expected annual incremental reductions in emissions that will demonstrate RFP (CAA section 172(c)(2)); (ii) emissions inventories, as necessary (CAA section 172(c)(3)); (iii) other control measures (besides RACM and RACT) needed for attainment (CAA section 172(c)(6)); and, (iv) contingency measures (CAA section 172(c)(9)). The EPA notes that its longstanding guidance on interpreting these statutory requirements is embodied in the General Preamble and the Addendum.[54] The preamble for the proposed rule presented several interpretations of these provisions, and further explained where its proposal varies from past EPA guidance and the reasons for the variance. The following sections of this preamble explain the EPA's final approach and, where different from the proposal, also explain EPA's reasons for finalizing an amended approach. This final rule reflects our careful consideration of the numerous thoughtful comments we received from air agencies, who are responsible under the CAA for these implementation activities, and a variety of other stakeholders.

A. Plan Due Dates

1. Summary of Proposal

The EPA proposed to require that all Moderate area plan elements for a nonattainment area be submitted by the state no later than 18 months from the effective date of designation. The attainment plan submission would thus include all necessary plan elements required under CAA subparts 1 and 4.

2. Final Rule

The final regulations at 51.1003(a) require all Moderate nonattainment area elements to be submitted by no later than 18 months from the date of designation, as proposed. Section 189 of the CAA specifies the schedule by which states must submit attainment plans for the PM2.5 NAAQS. Specifically, CAA section 189(a)(2)(B) requires states to submit an attainment plan that meets Moderate area attainment plan requirements no later than 18 months from the date of nonattainment designation.[55] While subpart 1 of the CAA could potentially be interpreted to authorize the EPA to provide up to 3 years after designation for states to submit certain attainment plan elements, the EPA believes that such an interpretation would be inconsistent with the specific deadlines that Congress imposed in subpart 4. The EPA concludes that all subpart 1 and subpart 4 nonattainment area requirements should be considered together in order to facilitate state development, and EPA review, of a comprehensive plan to attain the PM2.5 NAAQS in a given nonattainment area. In fact, the EPA finds that meeting key subpart 1 requirements within the 18-month timeframe of subpart 4 is fundamentally necessary for the state to develop an approvable plan. For example, the state must develop an emissions inventory (or inventories) either before or at the same time as the other attainment plan elements due under subpart 4 because the information contained in the emissions inventory is critical for development of other elements of the Moderate area attainment plan, such as its precursor analysis, analysis of RACM and RACT and additional reasonable measures, and attainment demonstration modeling. The EPA's ability to evaluate the submitted attainment plan therefore will be impaired if the state does not submit all the required plan elements at the same time.

3. Comments and Responses

Comment: Commenters suggested that the EPA should interpret the statute to allow more time for states to develop and submit contingency measures.

Response: As discussed earlier in this section, the EPA believes that it would be inconsistent with the specific deadlines that Congress imposed in subpart 4 to allow contingency measures to be submitted later than the other elements of the attainment plan. Contingency measures need to be adopted and ready for rapid and timely implementation in the event a nonattainment area fails to meet RFP requirements or fails to attain the PM2.5 NAAQS by the applicable attainment date. The state's evaluation of what emissions controls are appropriate to meet the contingency measure requirement is closely related to other aspects of the attainment plan, such as the pollutants and sources to be addressed in meeting the RACM/RACT requirements, and the amount of emissions reductions that the contingency measures should achieve, based upon the facts and circumstances of the attainment plan for the area. The same types of facts and analyses that are necessary for the other elements of an attainment plan are directly relevant to the development of contingency measures.

Although nothing in the CAA prohibits states from making separate attainment plan submissions to meet the Start Printed Page 58027individual required elements for attainment plans in advance of the required date, the EPA presumes that development and submission of all of the attainment plan elements simultaneously will be most efficient, both for the state and for the EPA in reviewing the state's submission. A Moderate area implementation plan with a single SIP submission due date will be less administratively burdensome than a program with two SIP submission due dates. Under an approach with two submissions, the state would likely need to issue two sets of proposed regulations, hold two sets of public hearings, and respond to two sets of public comments, rather than dealing with all of these requirements in one comprehensive action. Likewise, the EPA would have two separate submissions to review and two sets of proposed and final actions to publish in the Federal Register for every Moderate nonattainment area. Thus, for the reasons outlined earlier, the final rule includes a single Moderate area attainment plan submission deadline of 18 months after designation. Accordingly, the areas designated as nonattainment for the 2012 PM2.5 NAAQS (with an effective date of April 15, 2015) are required to submit Moderate area attainment plans to the EPA no later than October 15, 2016. See 40 CFR 51.1003(a).

B. Emissions Inventory Requirements

1. Summary of Proposal

In the proposal, the EPA proposed for both Moderate and Serious areas to require both a “base year inventory for the nonattainment area” and an “attainment projected inventory for the nonattainment area.” The proposal spelled out a list of requirements for each of these inventories. The proposal also specified, based on the timing requirements of CAA section 172(b), that the emissions inventories required for a Moderate area must be submitted within 18 months after the effective date of the designation of the nonattainment area.

The EPA proposed that the base year inventory for the nonattainment area: (a) Be required to represent one of the 3 years used for designations or another technically appropriate year; (b) include actual emissions of all sources within the nonattainment area; (c) be annual total or average-season-day emissions in accordance with the NAAQS violation(s) (annual and/or 24-hour); (d) include direct PM2.5 (filterable and condensable) as well as all scientific PM2.5 precursors; (e) follow the Air Emissions Reporting Requirements (AERR), 40 CFR part 51, subpart A for the emissions thresholds for point sources; (f) use the level of detail as prescribed by the AERR; and (g) still meet the public review requirements even if submitted as a separate plan.

The EPA further proposed that the attainment projected inventory for the nonattainment area (a) be required to represent projected emissions in the first year for which attainment is demonstrated by the modeled attainment demonstration; (b) include projected emissions of the same sources included in the base year inventory for the nonattainment area; (c) use the same temporal period as the base year inventory (annual or average-season-day); (d) include the same pollutants as the base year inventory; (e) report as point sources the same sources treated as point sources in the base year inventory; (f) be consistent in inventory detail with the base year inventory; and (g) still meet the public review requirements even if submitted as a separate plan.

2. Final Rule

The final regulations at 51.1008 provide the inventory requirements for Moderate areas. The EPA received a number of comments on the emissions inventory requirements for Moderate areas. Commenters both supported the provisions of the proposed rule and objected to some aspects of the inventory requirements. The EPA is finalizing all of the proposed Moderate area requirements with some modifications based on comments. Specifically, the definition of what can constitute a seasonal inventory has been made more flexible to accommodate certain cases, as explained in Section IV.B.2.c of this preamble.

Pursuant to its authority under section 110 of title I of the CAA, the EPA has long required states to submit inventories of the emissions of criteria pollutants and their precursors. The EPA codified these requirements in 40 CFR part 51, subpart Q in 1979 and amended them in 1987. Additionally, the 1990 CAA Amendments revised many of the provisions of the CAA related to attainment of the NAAQS and the protection of visibility in mandatory Class I federal areas (certain national parks and wilderness areas). These revisions established new emissions inventory requirements applicable to areas that were designated nonattainment for certain pollutants. In the case of PM, Congress did not create a specific emissions inventory requirement in subpart 4 that would supersede the emissions inventory requirement under subpart 1. Thus, the CAA section 172 (c)(3) emissions inventory requirements continue to apply, and that provision explicitly requires “a comprehensive, accurate, and current inventory of actual emissions of the relevant pollutants” in the nonattainment area. In addition, the specific attainment plan requirements for the PM2.5 NAAQS set forth in CAA section 189(a) and associated modeling requirements make an accurate and up-to-date emissions inventory a critical element of any viable attainment plan. Because of the nature of PM2.5, the EPA concludes that the statutory requirements for emissions inventories need further elaboration through additional regulatory requirements as described later.

Emissions inventory data serve as the foundation for various types of analyses performed by states and by the EPA. For example, these data enable states to evaluate the degree to which different emissions sources contribute to the nonattainment problem in a given nonattainment area and enable states to estimate the air quality improvement that can be achieved through different control measures. States should use the best available, current emissions inventory information for attainment plan development, because high quality emissions inventory data are essential for the development of an effective control strategy. To assist states in preparing complete, high quality inventories, the EPA provides guidance for developing emissions inventories called “Emissions Inventory Guidance for Implementation of Ozone and Particulate Matter National Ambient Air Quality Standards (NAAQS) and Regional Haze,” which is available from https://www.epa.gov/​air-emissions-inventories/​emissions-inventory-guidance-documents. This guidance is commonly called the “SIP Emissions Inventory Guidance.” The EPA recommends that states consult this guidance while developing the emissions inventories to meet statutory and regulatory requirements.

a. Inventory Requirements. As explained in the proposed rule, CAA section 172(c)(3) requires states to submit an emissions inventory and periodic revisions thereof with an attainment plan. 80 FR at 15363. In addition, pursuant to CAA section 301, the EPA has authority to promulgate regulations as necessary for the implementation of the PM2.5 NAAQS, including requirements pertaining to emissions inventories. In this final action, the EPA is establishing several different inventory requirements that the agency has determined are necessary Start Printed Page 58028for the proper implementation of the PM2.5 NAAQS in attainment plans.

There are three key facets of the emissions inventory requirements, as described later: (i) The type of inventories required; (ii) the timing of submission of these inventories; and (iii) the content of these inventories. These content requirements are described in this section; however, the EPA's rationale for these content requirements is in some cases further described in subsequent sections of this document.

First, states must submit at least two separate and distinct nonattainment area emissions inventories as elements of an attainment plan. The first emissions inventory is relevant for assessing the current or base year emissions from sources located in the nonattainment area; the second emissions inventory is a projected inventory relevant for assessing emissions in the target attainment year in the nonattainment area. The first type of inventory is called the “base year inventory for the nonattainment area,” and the second type of inventory is called the “attainment projected inventory for the nonattainment area.” See 40 CFR 51.1000. The base year inventory for the nonattainment area is necessary for development and evaluation of various elements of the attainment plan, such as the determination of appropriate pollutants, sources, and emission controls addressed in other elements of the attainment plan for the nonattainment area. The attainment projected inventory is necessary to implement the attainment demonstration requirement of CAA section 189(a)(1)(B), and it also may be used as part of meeting the RFP requirement (see Section IV.F of this preamble). The need for the attainment projected inventory also stems from the need for both the EPA and the public to be able to compare, during their reviews of the attainment plan, the base year inventory against the attainment projected inventory for the nonattainment area. For these reasons, this rule establishes a regulatory requirement at 51.1008 that Moderate area attainment plans must include a base year inventory for the nonattainment area and an attainment projected inventory for the nonattainment area.

Second, as noted in Section IV.A of this preamble, to meet the statutory requirements for submission of certain attainment plan elements required under subpart 4, the EPA believes that states must meet the same submission schedule for emissions inventories as for the other elements of an attainment plan, i.e., within 18 months after the effective date of the designation of the nonattainment area. This schedule must apply to both of these emissions inventories because they are necessary for effective evaluation of the attainment plan as a whole. Consequently, under the authority of CAA section 172(b), this rule establishes a regulatory requirement for Moderate areas that states must submit the required base and projected emissions inventories by 18 months after designation.

Third, the EPA is establishing specific requirements for both the base year inventory for the nonattainment area and for the attainment projected inventory for the nonattainment area in order to implement the PM2.5 NAAQS most effectively. Accordingly, this final rule requires that the base year inventory for Moderate nonattainment areas must meet the following minimum criteria 1 through 7:

(1) The inventory year must be one of the 3 years used for designations for the relevant PM2.5 NAAQS or another technically appropriate inventory year. Another inventory year may be chosen under specific circumstances (e.g., to account for a change in sources in the nonattainment area, changes in nonattainment area boundaries, to allow the base year to be consistent with the base year needed for the conformity rule, or significant time lag between designations and preparation of the inventory) with consultation from the appropriate EPA Regional Office. This requirement is intended to ensure that the inventory will adequately represent the emissions sources that contributed to the nonattainment designation for the area. See 40 CFR 51.1008(a)(1)(i).

(2) The inventory must include actual emissions of all sources within the nonattainment area. This requirement stems directly from the language in CAA section 172(c)(3). Sources outside of the nonattainment area are explicitly not included in the section 172(c)(3) requirement with the words “in such area.” Furthermore, the EPA interprets the Act requirement for “actual emissions from all sources” in CAA section 172(c)(3) as intending to include all emissions that may contribute to the formation of PM2.5 within the nonattainment area. This means that the inventory must include point sources, stationary nonpoint sources,[56] mobile sources, prescribed fires and wildfires. The EPA encourages states and tribes to work together to ensure that the information used in developing the base year inventory for the nonattainment area is inclusive of all emissions from the designated nonattainment area, including emissions from sources in tribal areas located therein. See 40 CFR 51.1008(a)(1)(ii).

(3) The emissions must be reported as annual total emissions, average-season-day emissions, or both, as appropriate for the relevant PM2.5 NAAQS. The rationale for the type(s) of emissions provided must be included as part of the attainment plan. When seasonal emissions are included, the rationale for the seasonal period must also be included as part of the attainment plan. A discussion of the EPA's rationale for including the option of seasonal or annual inventories is provided in Section IV.B.2.c of this preamble. See 40 CFR 51.1008(a)(1)(iii).

(4) As discussed earlier and consistent with past implementation rule requirements, the inventory must include emissions of direct PM2.5 (both filterable PM2.5 and condensable PM2.5, provided as separate components), as well as all scientific PM2.5 precursors (SO2, NOX, VOC and ammonia). A discussion of the EPA's rationale for including this requirement is provided in Section IV.B.2.d of this preamble. See 40 CFR 51.1008(a)(1)(iv).

(5) States must follow the Air Emissions Reporting Requirements (AERR), 40 CFR part 51, subpart A criteria for emissions thresholds for states to use to determine which emissions sources must be reported as point sources. This requirement is consistent with past implementation rules and is needed to specify whether emissions must be submitted as specific major source stationary facilities with detailed emissions processes or whether emissions can be provided as county totals (i.e., area sources, also called nonpoint sources). A discussion of the use of 40 CFR part 51, subpart A for the emissions thresholds is provided in Section IV.B.2.e of this preamble. See 40 CFR 51.1008(a)(1)(v).

(6) The level of detail of the emissions included in the inventory must be consistent with the detail required by 40 CFR part 51, subpart A. For example, all emissions must be subdivided to individual emissions processes within a facility or county. While these details should underlie the emissions Start Printed Page 58029inventory, this information can be summarized for other elements of the attainment plan. This requirement is consistent with the remanded 2007 PM2.5 Implementation Rule and is needed to define the data reporting elements (i.e., how they are reported) as opposed to the emissions values (i.e., how much emissions derive from each source or source category) of the emissions inventories submitted to the EPA. See 40 CFR 51.1008(a)(1)(vi).

(7) If the base year inventory for the nonattainment area is submitted to the EPA as a separate plan submission (i.e., severed from the overall attainment plan and provided separately), the inventory must still meet the notice and public hearing requirements of CAA sections 110(a)(1) and 110(a)(2).

For the attainment projected inventory for Moderate nonattainment areas, this final rule also establishes specific requirements necessary to implement the PM2.5 NAAQS effectively. Accordingly, the attainment projected inventory must meet the following minimum criteria 1 through 7:

(1) The year of the projected inventory must be the most expeditious year for which projected emissions show modeled PM2.5 concentrations below the level of the NAAQS, consistent with the requirement for expeditious attainment by no later than the applicable deadlines provided in the statute. See 40 CFR 51.1008(a)(2)(i).

(2) The emissions must be projected emissions from the same sources included in the base year inventory for the nonattainment area and any new sources projected to locate within the boundaries of the nonattainment area. The projected emissions should be the best available representation of expected emissions, and thus should take into account emissions growth and contraction, facility closures, new facilities, new controls and other changes in emissions forecast to occur between the base year and the attainment year. In deciding what factors are relevant, states should consider factors affecting projected emissions that could significantly alter the conclusions of the modeled attainment demonstration. See 40 CFR 51.1008(a)(2)(ii). For prescribed and wildfire emissions, Section IV.D.3.b of this preamble describes in more detail the appropriate way to handle these sources in the attainment projected inventory.

(3) The temporal period of emissions must be the same temporal period (annual, average-season-day, or both) as the base year inventory for the nonattainment area. See 40 CFR 51.1008(a)(2)(iii).

(4) Consistent with the base year inventory for the nonattainment area, the inventory must include all emissions of direct PM2.5 (both filterable and condensable PM2.5 provided as separate components), as well as all emissions of the scientific precursors (SO2, NOX, VOC and ammonia). See 40 CFR 51.1008(a)(2)(iv).

(5) The same sources reported as point sources in the base year inventory for the nonattainment area must also be provided as point sources in the attainment projected inventory for the nonattainment area. Likewise, nonpoint and mobile source projected emissions must also be provided using the same delineations as the base year inventory. See 40 CFR 51.1008(a)(2)(v).

(6) The detail of the emissions included must be consistent with the level of detail in the base year inventory (i.e., as required by 40 CFR part 41, subpart A). See 40 CFR 51.1008(a)(2)(vi).

(7) If the attainment projected inventory for the nonattainment area is submitted to the EPA as a separate plan submission (e.g., severed from the overall attainment plan and provided separately), then the inventory must still meet all the notice and public hearing requirements of CAA sections 110(a)(1) and 110(a)(2).

b. Comparison to Inventory Requirements from Earlier PM2.5Implementation Rules. The 2007 PM2.5 Implementation Rule required states to submit specific emissions inventories in connection with the RFP requirements of CAA section 172(c)(2) under subpart 1. In this rule, no specific RFP related inventory is required, but the attainment projected inventory for the nonattainment area also may serve a purpose for evaluation of RFP. Past EPA guidance with respect to RFP requirements under subpart 4 has not explicitly required a separate emissions inventory for this purpose for PM10 NAAQS. Through evaluation of the RFP requirement in connection with this rulemaking, however, EPA has determined that there may be circumstances in which such an approach may be appropriate. For this reason, the EPA describes this issue more fully in Section IV.F of this preamble.

The 2007 PM2.5 Implementation Rule also required states to submit a statewide base year emissions inventory as part of the attainment plan. The EPA included the statewide emissions inventory requirement because it was relevant to evaluation of emissions reductions from sources outside of the designated nonattainment area for purposes of RFP. The EPA no longer interprets the CAA to allow such reductions for purposes of RFP, so this particular form of emissions inventory is not needed for attainment plan for the PM2.5 NAAQS. Furthermore, statewide inventories are already required as part of the AERR (40 CFR part 51, subpart A) on a triennial basis. While these inventories do not receive the same level of scrutiny as inventories associated with attainment plans, the EPA believes that this existing statewide inventory requirement is sufficient for understanding the PM2.5 nonattainment contributions from areas outside of the nonattainment area, which is a necessary component of modeled attainment demonstrations described in Section IV.E of this preamble.

c. Seasonal Inventories. The statute does not explicitly address whether the emissions inventory required under CAA section 172(c)(3) should include emissions throughout an entire calendar year or emissions during some shorter portion of the year that may be appropriate for implementation of a particular NAAQS. In the case of the PM2.5 NAAQS, the standards currently include both annual NAAQS and 24-hour NAAQS. With respect to the annual NAAQS, the form of the NAAQS includes monitored ambient PM2.5 values at all times throughout the course of the year, and thus an annual emissions inventory is necessarily required for development of an appropriate attainment plan for a given area. In the case of the 24-hour NAAQS, however, the form of the NAAQS is based upon monitored values on particular days with high levels of ambient PM2.5, and in some nonattainment areas those days may occur only during a distinct and definable season of the year. The EPA considers it appropriate to interpret the emissions inventory requirements of the CAA in light of the specific inventory needs that are relevant for the NAAQS in question. For the PM2.5 NAAQS, states can meet the inventory requirement with different combinations of temporal resolutions for the emissions. For the annual standard, annual emissions must be submitted. For the 24-hour standard, states must submit either an annual or an average-season-day inventory and optionally may submit both. For a nonattainment area for both the annual and 24-hour standard, states can meet the inventory requirement with only an annual inventory or with both an annual and average-season-day inventory.

In contrast with the annual PM2.5 NAAQS, the 24-hour PM2.5 NAAQS are designed to protect against peak exposures. Thus, for the 24-hour PM2.5Start Printed Page 58030NAAQS, there are circumstances in which the EPA believes that only seasonal emissions inventories may be useful for attainment planning purposes. This rule at 40 CFR 51.1008(a)(1)(iii) allows states to use seasonal inventories for attainment plan development for attaining the 24-hour PM2.5 standard in areas that are designated nonattainment for only the 24-hour standard. Use of a seasonal emissions inventory will also be appropriate only if the monitored violations of the 24-hour PM2.5 NAAQS in the area occur during an identifiable season. In the event that it is appropriate to rely on a seasonal emissions inventory, the state should confer with the EPA concerning the exact length of the season and the start and stop dates of the season. The duration and start and stop dates of the season will be an important component of the attainment plan and must be approved by the EPA along with other elements of the attainment plan for a given nonattainment area. Further, this rule requires that seasonal inventories must use average-season-day emissions values for this purpose, defined by 40 CFR 51.1000. The nature of some seasonal PM2.5 emissions sources (e.g., residential wood combustion) does not allow for only weekday emissions to be included in the inventory, therefore all days must be included. The state would need to explain the rationale for the duration of the season used for the inventory as part of the attainment plan submission. To justify the use of a seasonal emissions inventory, the state must demonstrate why a seasonal emissions inventory is appropriate for the particular PM2.5 nonattainment area in question.

Commenters recommended that the EPA should allow episode-specific inventories, in lieu of seasonal inventories. As a result, the EPA acknowledges in this final rule that, for some source categories, it may be advisable to limit the “season” considered in calculating emissions to an episodic period to reflect periods of higher emissions during periods of high ambient PM2.5. Such an approach could help to ensure the nonattainment area inventory reflects the emissions conditions that led to an initial nonattainment area designation. For example, if nonattainment conditions are associated only with periods of peak emissions from residential wood combustion, then an episodic average for residential wood combustion may be more appropriate than a seasonal average. The resulting seasonal emissions inventory would then have a mix of the seasonal averages as defined by 40 CFR 51.1000 for most categories, but using a shorter period for the emissions categories that can be justified and an improvement. In such cases, in addition to the requirement to justify the seasonal period, the state must additionally justify the factual basis for the period used to calculate emissions from such categories, and this would be subject to EPA approval. While the EPA encourages using the same averaging period for all sectors for purposes of simplicity, an episodic averaging period may only be needed for a select group of sources or even for a single category of sources. Those special cases must be explained in the emissions inventory part of the state implementation plan [see 40 CFR 51.1008(a)(1)(iii)]. For the purposes of the definitions included in this final rule, all non-annual emissions (whether seasonal or episodic) will be referred to as “seasonal” in this rule.

d. Pollutant Requirements. This rule requires that states must submit emissions inventories that include all emissions of direct PM2.5 and all emissions of scientific PM2.5 precursors: SO2, NOX, VOC and ammonia. Furthermore, the inventories must differentiate between the condensable and filterable portions of direct PM2.5 emissions, and states must provide this information in the emissions inventories as separate components. As described in Section IV.B.3 of this preamble, commenters disagreed with the EPA's proposal to require inclusion of ammonia emissions and to require separate reporting of condensable and filterable emissions. The approach being finalized in this rule does not differ from the EPA's proposal despite these adverse comments.

Section II.B of this preamble describes the background needed to understand the importance of including these precursors in emissions inventories for attainment plan purposes for the PM2.5 NAAQS. Emissions information about PM2.5 and its precursors is a necessary precondition to meeting other core attainment plan requirements, such as effective evaluation of control measures and adequate demonstration of projected future attainment of the NAAQS through modeling. The EPA notes that, with respect to requiring states to include emissions of direct PM2.5 and PM2.5 precursors in emissions inventories, the agency is following the requirements it established for the 2007 PM2.5 NAAQS Implementation Rule in the past.[57] Section 172(c)(3) of the CAA explicitly requires states to submit a “comprehensive, accurate, current inventory of actual emissions of the relevant pollutants” and the EPA continues to believe that to meet these basic statutory requirements for the PM2.5 NAAQS, states must address PM2.5 and all PM2.5 precursors in their emissions inventories.

The EPA requires states to use the best available methodologies for estimating emissions of PM2.5 and its precursors.

e. The AERR Defines the Thresholds, Data Elements and Data Methods. Because the provisions of the CAA do not specify the form of the emissions information to be reported to the EPA for meeting the attainment plan inventory requirement under CAA section 172(c)(3), it is necessary for the EPA to prescribe specifically the data elements of that emissions inventory and the attainment projected inventory. The EPA uses the AERR to define basic requirements/parameters of reporting emissions for all pollutants. This approach creates consistency and eases the burden for the states, because states have one basic set of rules that apply to all emissions they have to report to the EPA.

Distinct from the emissions values (i.e., how much emissions derive from each source or source category), the emissions elements (i.e., how they are reported) refer to the reporting definitions, data codes and required data fields. Under this final rule, states must use the emissions elements from 40 CFR part 51, subpart A in preparing their inventories to be submitted to the EPA for implementing the PM2.5 NAAQS. It also requires that states use point source thresholds from Appendix A of the same subpart. This is consistent with past requirements for the form of emissions inventories.

In addition to defining the point source thresholds and data elements, 40 CFR part 51, subpart A also requires states to submit emissions information to the EPA. The EPA is not referring to those emissions submission requirements here, but rather to the emissions elements—the definitions, data codes and required data fields. Later, the EPA addresses the issue of whether the emissions values submitted through the AERR are relevant to the inventory requirements of this final rule (see Section IV.B.2.g of this preamble).

As noted earlier, the EPA recommends that states consult the SIP Emissions Inventory Guidance in preparing the inventories required by this rule. In addition to the AERR, this guidance includes definitions for data fields that are not required by the AERR, such as seasonal emissions values and Start Printed Page 58031other fields that are optional in the AERR data collection system. The EPA is updating the SIP Emissions Inventory Guidance in coordination with this final rule. It provides specific guidance to states on how to develop base year inventories for the nonattainment area and attainment projected inventories for 8-hour ozone, PM2.5, and regional haze SIPs. While the AERR sets forth requirements for data elements and definitions, the guidance complements these requirements, defines all data elements (even those that are voluntary AERR elements), and indicates how states should prepare and document the data for attainment plan submissions.

In the case of prescribed fires and wildfires, the AERR no longer requires those categories to be submitted, but rather the emissions data can be optionally provided as an “Event” source, which is a day-specific source at a point location. For this rule as described earlier, states are required to include prescribed fires and wildfires for the base year inventory for the nonattainment area and the attainment projected inventory for the nonattainment area. For this rule, states are not expected to use the “Event” detail to meet their inventory reporting requirements. Instead, states can report these fire emissions by county as nonpoint sources are reported.

f. Emissions Inventories for Support of Modeled Attainment Demonstrations. This section clarifies the difference between the inventories required to be a part of a state's Moderate area attainment plan submission (as described earlier) and other modeling inventories that are also relevant for attainment planning. While the EPA is not establishing additional modeling inventory requirements in this rule (i.e., for which a state must submit an emissions inventory to the EPA), to meet the attainment demonstration requirements of CAA sections 189(a)(1) and 189(b)(1), states are required to submit either an attainment demonstration (which includes air quality modeling) to show how the area will attain the NAAQS by the applicable attainment date or a demonstration that the area cannot attain by the attainment date. The modeled attainment demonstration requirements for Moderate areas are described fully in Section IV.E of this preamble.

As part of the modeled attainment demonstration, the EPA presumes that states will need to prepare attainment demonstration modeling inventories for both a modeled base year and projected attainment year. Respectively, these are called the “base year (baseline) inventory for modeling” and the “attainment projected inventory for modeling.” These inventories contain emissions for all regions (i.e., not just from sources in the nonattainment area) within the modeling domain being used for the attainment plan modeling demonstration, which typically includes counties and even states outside of the nonattainment area. They include detailed spatial and temporal elements needed to support air quality modeling. States should follow the requirements laid out in Section IV.E of this preamble and the procedures described in the SIP Emissions Inventory Guidance and the Air Quality Modeling Guidance to meet the minimum requirements for documentation and emissions summaries supporting modeling demonstrations.

The base year inventory and projected attainment year inventory include emissions from only within the nonattainment area. The EPA expects that modeling inventories will be consistent with those nonattainment area inventories; however, some exceptions may exist. Where possible, the nonattainment area base year and projected attainment year inventories can be a sum (for annual data) or average (for PM2.5 season-day data) of day-specific or hour-specific data used for modeling. In some cases, however, annual or season-day data may not be sufficient for modeling purposes. For example, greater spatial detail (gridded rather than county total) and temporal detail (hourly rather than annual) are needed for on-road mobile modeling inventories as compared to the base year inventory for the nonattainment area. Rather, for the nonattainment area base year inventory, one goal is to allow for the repeatability of the approach in order to create average-season-day or annual inventories to help meet other attainment plan requirements, such as RFP or motor vehicle emissions budgets established for transportation conformity purposes. That goal is not necessarily compatible with the modeling need for greater spatial and temporal detail, which requires much greater effort and expense than is practical for RFP or establishing motor vehicle emissions budgets. In cases where some differences are unavoidable, states should attempt to promote consistency where feasible.

g. Using AERR (40 CFR part 51, subpart A) Inventory Submission to Meet the Requirement for the Base Year Inventory for the Nonattainment Area. The AERR includes both triennial and annual statewide reporting requirements, with more extensive reporting requirements for triennial inventory years. All AERR submissions are required to be made electronically. For the interim annual inventories, reporting is limited to emissions data from only the larger point sources (Type “A” sources), as defined by Appendix A of 40 CFR part 51, subpart A. For the triennial inventories, lower point source thresholds are given in Appendix A, consistent with the definition of major sources in 40 CFR part 70, and data from all other sources of emissions must be reported as from either nonpoint or mobile sources on a county basis.

In the past, some states have incorrectly asserted that their AERR submission meets the requirements for base year inventories required by other implementation rules. To avoid confusion, the EPA explains here the limited circumstances under which the AERR emissions inventories will be considered to meet the base year inventory requirement for Moderate nonattainment areas. The following conditions must be met to use AERR inventories for attainment planning:

(1) The AERR emissions inventory must have gone through the notice and public hearing requirements of CAA sections 110(a)(1) and 110(a)(2).

(2) The AERR emissions inventory includes all sources of emissions and all pollutants required for the base year inventory for the nonattainment area. This is only possible if the year for the base year inventory for the nonattainment area aligns with a triennial AERR year, because the data system implementing the AERR only accepts emissions from point sources and not other source categories in non-triennial years.

(3) The EPA's inventory data system must be accepting data for the inventory year being submitted. Inventories are allowed to be submitted to the AERR for a given year for only a limited time during the development cycle of the National Emissions Inventory.

(4) The AERR submission must include emissions from all sources required for the base year inventory for the nonattainment area consistent with 40 CFR 51.1008(a)(1), and must include mobile source emissions in nonattainment areas (instead of simply providing inputs or other data that is allowed under the AERR). In some cases, the AERR requirement can be met without actually “submitting” emissions; for example, states may elect to accept the EPA estimates for some nonpoint emissions sectors. Accepting EPA emissions does not meet the requirements of CAA section 172(c)(3) or this rule. In addition, the AERR revision finalized in February 2015 (80 FR 8787) replaces the prior requirement of reporting onroad mobile and nonroad Start Printed Page 58032mobile source emissions with a requirement for reporting the input parameters that can be used to run the EPA models to generate the emissions. If choosing to use an AERR submission to meet the base year inventory for the nonattainment area requirement, the state should submit the nonattainment area emissions, irrespective of the options provided to meet the AERR requirements. Because the “statewide” emissions are actually provided for individual point sources and counties, the EPA believes that the AERR submission can be sufficient for most PM2.5 nonattainment areas.

h. Mobile Source Emissions Models. A key part of emissions inventory development includes estimating mobile source emissions. For all of the mobile source inventories used for PM2.5 NAAQS implementation, states should use the latest emissions models available at the time that the attainment plan inventory is developed.[58] In general, for states other than California that choose to fulfill various modeling requirements by using the latest EPA emissions model, the latest approved version of the MOVES model should be used to estimate emissions from onroad transportation sources. States should use the latest available planning emission inputs including, but not limited to, vehicle miles traveled (VMT), speeds, fleet mix, SIP control measures and fuels. The current version of MOVES is available at http://www.epa.gov/​otaq/​models/​moves/​index.htm. The appropriate EPA-approved model(s) should similarly be used for California onroad source emissions.[59]

When using MOVES, states should follow the most current version of the MOVES Technical Guidance, available at http://www.epa.gov/​otaq/​models/​moves/​index.htm. MOVES includes multiple options for estimating and processing emissions that could result in different emissions inventories. The EPA recommends that states use the same approach in any analysis that compares two or more emissions cases (e.g., different control scenarios, different years). If different approaches are taken for inventories that serve different purposes (for example, between inventories developed for air quality modeling, which may require greater temporal and spatial detail, and inventories used as the motor vehicle emissions budget), states should seek to understand and minimize any differences in results. For example, an approach may be used for the modeled attainment demonstration that uses gridded temperatures and other meteorological data, but this approach could be too burdensome for use in the base year inventory for the nonattainment area. If a state chooses to use MOVES to create emissions inventories for purposes of RFP and establishing motor vehicle emissions budgets for transportation conformity purposes, it must use the same MOVES approach in the base year inventory for the nonattainment area, and using a straightforward MOVES approach without gridded meteorology is more reasonable for that purpose.

Likewise, if states choose to fulfill various inventory requirements by using the latest EPA emissions model, the most current version of the NONROAD model or its successor must be used for estimates of nonroad mobile source emissions, preferably with state-supplied model input data. States can alternatively develop technologically equivalent or superior state-specific nonroad emissions estimates, but should explain why their approach gives a better estimate than the EPA model. For nonroad sources not estimated by the NONROAD model, the best available methods should be used, and the EPA recommends that states refer to the SIP Emissions Inventory Guidance for more information on emissions from these sources. Links to Federal Register documents and policy guidance memos on the latest approved versions of MOVES and NONROAD can be found at http://www3.epa.gov/​otaq/​models.htm.

3. Comments and Responses

Comment: Several commenters pointed out the uncertainties associated with ammonia emissions and organic matter emissions from livestock and fertilizer application sources, including in data developed by the EPA such as the National Emissions Inventory. Commenters pointed to the data available through the National Air Emissions Monitoring Study (NAEMS) for use in developing improved ammonia estimation approaches from livestock activities, and asserted that the EPA cannot move forward with SIP implementation requirements that implicate livestock and poultry farmers without using the NAEMS data. The commenters stated that not only is this technically unsound, but that the idea of moving forward on regulating livestock operations without the most critical tool for establishing requirements is a violation of the spirit of the consent agreements [60] and the NAEMS.

Response: The EPA acknowledges that there is some uncertainty in quantifying ammonia emissions and other PM2.5 precursors from source categories such as livestock and fertilizer application. This uncertainty extends to the emissions and chemical composition of VOC and PM2.5, which also have an impact on ambient PM2.5. These uncertainties have an impact on attainment demonstrations because they cause uncertainty in the modeling done to demonstrate future attainment of the PM2.5 standard. However, the EPA disagrees with the assertion that these uncertainties should eliminate certain pollutants from consideration for control measures or should slow progress on attainment planning.

Emissions uncertainty is a fact of air quality planning and cannot be avoided. Despite uncertainties in inventories of all kinds throughout the NAAQS program, great progress in improving air quality has been made through the attainment planning process and the implementation of control measures selected in part based on modeled attainment demonstrations. While emissions uncertainties remain, enough information is available for PM2.5 implementation planning purposes. The requirements contained in this final rule may drive further improvements in our understanding of emissions, and while the EPA strives to provide approaches for estimating emissions from a variety of source categories, the CAA places the burden for developing accurate emissions inventories on the states. The CAA does not allow for implementation of the NAAQS to be put on hold until all emissions uncertainties are eliminated. In fact, in spite of numerous uncertainties, states have developed emissions inventories for PM2.5 and PM2.5 precursors and performed modeling for PM2.5 attainment demonstrations for the previous 1997 and 2006 NAAQS over the last 10 or more years.

Updated emissions estimating methodologies for animal feeding operations are under development using data collected during the period 2007-2009 from representative operations pursuant to the National Air Emissions Start Printed Page 58033Monitoring Study.[61] For the 2008 and 2011 national emission inventories, the EPA compiled state and county-level ammonia emissions estimates using information from state and local governments, the USDA Census of Agriculture and National Agriculture Statistical Service, and from existing ammonia emissions models. A new approach in development for use in the 2014 NEI uses the NAEMS data to improve the EPA's approach for estimating county-total emissions. The EPA expects that this update and other uses of the NAEMS data will help to reduce uncertainties in current ammonia inventories and will improve the quality of future emissions inventories needed for implementing the PM2.5 NAAQS. The EPA disagrees that implementation planning should wait until NAEMS results are fully available. The EPA continues to make progress in using these data; however, the full use and implementation of new methods based on these data is not a prerequisite for progress on considering ammonia as a PM2.5 precursor for the NAAQS implementation purposes. Moreover, in order for a state to demonstrate a precursor's insignificance (as necessary under this rule before excluding it from certain control or planning requirements), in some cases it may need to move forward without waiting until the NAEMS results are fully available. The EPA and USDA are continuing to work collaboratively to better understand agricultural ammonia related emissions in order to more accurately represent the emissions and impacts of ammonia in relation to PM2.5.

Comment: Commenters supported the EPA's proposed approach to require distinct emissions for filterable and condensable PM2.5. Commenters asserted that this proposed requirement created an additional inventory requirement beyond what is already required in the AERR. Commenters also asserted that this requirement places an unnecessary burden on states and industry.

Response: The EPA disagrees with the assertion that an additional inventory requirement has been imposed by this rule. Within the AERR, 40 CFR 51.15(a)(1)(vi) states (with regard to what must be reported): “Primary PM2.5. As applicable, also report filterable and condensable components.” The term “also” implies “in addition to total primary PM2.5,” and the phrase “as applicable” is intended to mean when such emissions are emitted from the source. This requirement has been in place since 2008, providing ample time for states to ensure compliance with this reporting requirement in advance of this final rule. Furthermore, the EPA points out that it would be much more difficult for the EPA to assess (as part of evaluating an attainment plan) whether states have met the requirement to include condensable emissions, and thus a complete PM2.5 inventory, without the states providing condensable emissions as something separate and distinct from filterable and total PM2.5. In addition, having a complete emission inventory of filterable and condensable PM2.5 emissions will enable a state to better identify contributing sources and develop a more effective plan.

The EPA also notes that new electric generating units that are subject to (40 CFR part 60, subpart Da) without PM continuous emissions monitors (CEMs) have to conduct annual testing for condensable PM using Method 202 of appendix M of part 51.

Comment: Some commenters supported the EPA's proposed approach to require an attainment projected inventory for the nonattainment area. Other commenters asserted that such an inventory should not be required because it has not been required before and because the attainment demonstration is sufficient.

Response: The EPA disagrees with the latter commenters, noting that the rationale that such inventories have not been required before is not in and of itself a reasonable basis on which to exclude such a requirement now. The purpose of these inventories is well justified by the need for both the EPA and the public to be able to compare, during their reviews of the attainment plan, the base year inventory to the attainment projected inventory. Without such information, it is extremely difficult for the EPA to assess the projected emissions changes in the nonattainment area that the state asserts contribute to attainment. The attainment projected inventory may also play a role in meeting the RFP requirements of this rule. Furthermore, while the EPA has not explicitly required submittal of an attainment projected inventory in regulation, many states have developed such future year inventories as part of attainment demonstrations and have submitted them as part of PM2.5 attainment plans in the past, thus demonstrating their viability and utility.

Comment: Commenters supported the EPA's proposed approach to allow seasonal inventories. Some commenters requested the use of clear language stating an allowance for episode-specific inventories in lieu of seasonal inventories.

Response: The EPA agrees with the commenters that for some source categories, seasonally averaged winter conditions would not be sufficient to represent the conditions leading to violations of the 24-hour PM2.5 standard. As described in Section IV.B.2.c of this preamble, some modifications have been made to the explanation of seasonal inventories to clarify that it would be reasonable to use an episodic average from the modeled attainment demonstration in some cases.

C. Pollutants To Be Addressed in the Plan

Under subpart 4 of the CAA, states are presumptively required to analyze and evaluate emissions reduction measures for all sources of direct PM2.5 and PM2.5 precursors (i.e., SO2, NOX, VOC and ammonia) in developing PM2.5 attainment plans. Direct PM2.5 emissions include both filterable and condensable PM2.5 emissions. See further discussion of filterable and condensable PM2.5 emissions in the background section (Section II of this preamble) and in the emissions inventory requirements for Moderate area attainment plans (Section IV.B of this preamble). Thus, a state must evaluate control measures for sources of filterable and condensable PM2.5 emissions as part of an approvable control strategy for a Moderate PM2.5 nonattainment area.

With regard to PM2.5 precursors, Section III of the preamble describes that the rule provides for the possibility that the state may demonstrate that nonattainment area emissions of a particular precursor may not make a significant contribution to PM2.5 levels that exceed the standard in the area, or that emissions reductions of the precursor may not be needed for expeditious attainment. Thus, the rule presumptively requires the state to evaluate potential control measures for all four precursors, but the state may not need to address one or more requirements for a particular precursor with an approvable precursor demonstration.

D. Attainment Plan Control Strategy

1. Background on Attainment Planning and the Evaluation of Control Measures

a. Summary of Proposal. The proposal included an overview of the statutory requirements and general guidance associated with attainment planning and evaluation of control measures.

b. Final Rule. The following overview of statutory requirements and general Start Printed Page 58034guidance remains unchanged except as discussed in this final rule.

The attainment planning requirements of subparts 1 and 4 were established to ensure that two important CAA goals are met: (i) That states implement measures that provide for attainment of the PM2.5 NAAQS as expeditiously as practicable, but not later than the statutory attainment date; and (ii) that states adopt effective emissions reduction strategies in nonattainment areas. The Moderate nonattainment area attainment date is as expeditiously as practicable, but not later than the end of the sixth calendar year after designation.

CAA section 172(c) of subpart 1 of the CAA describes the general attainment plan requirement for RACM and RACT, requiring that attainment plan submissions “provide for the implementation of all reasonably available control measures as expeditiously as practicable (including such reductions in emissions from existing sources in the area as may be obtained through the adoption, at a minimum, of reasonably available control technology) and shall provide for attainment” of the NAAQS.[62] The attainment planning requirements in subpart 4 that are specific to PM10 (including PM2.5) likewise impose upon states an obligation to develop attainment plans that require RACM and RACT for sources of direct PM2.5 and PM2.5 precursors within a Moderate nonattainment area. CAA section 189(a)(1)(C) requires that states with areas classified as Moderate have attainment plan provisions to assure that RACM/RACT are implemented by no later than 4 years after designation of the area.[63] The EPA reads CAA sections 172(c)(1) and 189(a)(1)(C) together to require that attainment plans for Moderate nonattainment areas must provide for the implementation of RACM and RACT for existing sources of PM2.5 and PM2.5 precursors in the nonattainment area as expeditiously as practicable but no later than 4 years after designation.[64] The terms RACM and RACT are not defined within subpart 4, nor do the provisions of subpart 4 specify how states are to meet the RACM and RACT requirements. However, the EPA's longstanding guidance in the 1992 General Preamble helps inform our interpretation of RACM and RACT for the purpose of implementing the PM2.5 NAAQS.

The EPA's guidance on RACM for sources of PM10 and PM10 precursors under subpart 4 in the General Preamble and Serious area Addendum includes the following: (i) A recommended list of potential measures to reduce PM10 for states to consider; [65] (ii) an emphasis on state evaluation of the technological and economic feasibility of potential control measures to determine whether such measures are reasonably available for implementation; (iii) an expectation that the state will provide a reasoned explanation for a decision not to adopt a particular control measure, including those measures recommended to the state in public comments or at a public hearing; and (iv) a discussion that in some cases partial implementation of an emissions reduction program may be considered RACM when full implementation would be infeasible within the given Moderate area timeframe.[66] Thus, the RACM requirement under subpart 4 applies to all types of sources and is not focused only on forms of control that are technology-based.

With respect to RACT requirements, the EPA's guidance in the General Preamble includes the following: (i) RACT has historically been defined as “the lowest emission limit that a source is capable of meeting by the application of control technology that is reasonably available considering technological and economic feasibility”; (ii) RACT generally applies to stationary sources, both stack and fugitive emissions; (iii) major stationary sources (i.e., sources with potential to emit 100 tons per year or more of direct PM2.5 or any PM2.5 precursor) should be the minimum starting point for a state's RACT analysis, but states are recommended to evaluate RACT for smaller stationary sources as needed for attainment and considering the feasibility of controls; [67] and (iv) it is possible that a State could demonstrate that an existing source in an area should not be subject to a control technology especially where such technology is unreasonable in light of the area's attainment needs, or such technology is infeasible. In such a case, it could be concluded that no control technology is “reasonably available,” and RACT for the source could be considered to be no additional control.[68] Thus, the RACT requirement under subpart 4 is primarily focused on stationary sources and forms of emissions control that are technology-based.

The appendices to the General Preamble noted that reducing air emissions may not justify adversely affecting other resources, for example, by increasing pollution in bodies of water, creating additional solid waste disposal problems or creating excessive energy demands. An otherwise available control technology may not be reasonable if these other environmental impacts are sufficiently adverse and cannot reasonably be mitigated. A state may consider a control measure for direct PM2.5 or a PM2.5 precursor not reasonable if, considering the availability of mitigating adverse impacts of that control on pollution of other media, the control would not, in the state's reasoned judgment, provide a net benefit to public health and the environment. It should be noted that, in many past situations, states and owners of existing sources have adopted control technologies for direct PM2.5 and/or PM2.5 precursors with known energy penalties and some adverse effects on other media, based on the reasoned judgment that installation of such technology would result in a net benefit to public health and the environment. States should consider this before determining that a control technology is not reasonable because it may have other, negative environmental impacts that are on balance marginal.

This final rule specifies the basic requirements that states must meet in identifying and selecting the complete suite of measures needed for an attainment plan submission for a Moderate PM2.5 nonattainment area. This preamble, together with the General Preamble, provides further description of the recommended process for states to follow in meeting these requirements. Under this process, the specific determination of RACM and RACT is to be made within the broader context of assessing control measures for all stationary, area and mobile sources of direct PM2.5 and PM2.5 precursors that would collectively contribute to meeting the Moderate area attainment date as expeditiously as practicable.[69]

Start Printed Page 58035

The final rule requires that all moderate area plans contain RACM, which is defined as any technologically and economically feasible measure that can be implemented in whole or in part within 4 years after the effective date of designation of a PM2.5 nonattainment area and that achieves permanent and enforceable reductions in direct PM2.5 emissions and/or PM2.5 precursor emissions from sources in the area. RACM includes reasonably available control technology (RACT). The EPA recommends that to meet this definition, the state should follow a process by which it first identifies all sources of emissions of direct PM2.5 (including filterable and condensable PM2.5) and all PM2.5 precursors in the nonattainment area, and all potential control measures to reduce emissions from those source categories.[70] The state next determines if any of the identified potential control measures are not technologically feasible and whether any of the identified technologically feasible control measures are not economically feasible. Measures that are not necessary for attainment need not be considered as RACM/RACT.[71]

Measures that can only be implemented after the 4-year deadline for RACM and RACT, but before the end of the sixth calendar year following designation, are defined in the final rule as “additional reasonable measures.” [72] The EPA has created this new definition based on the recognition that in some areas there could be emission reduction strategies that still could be implemented beginning 4 years after designation through the attainment date that could help to improve air quality and attain the standard expeditiously in the area. Note also that the state has discretion to require reductions from any source inside or outside of a PM2.5 nonattainment area (but within the state's boundaries) in order to fulfill its obligation to demonstrate attainment in a PM2.5 nonattainment area as expeditiously as practicable, and it may need to require emissions reductions on sources located outside of a PM2.5 nonattainment area if such reductions are needed in order to provide for expeditious attainment of the PM2.5 NAAQS.

Lastly, the final rule requires the state to perform an analysis (typically an air quality modeling analysis) to determine the earliest practicable attainment date for the area. This analysis should take into account projected emissions reductions associated with existing federal and state regulations, plus any additional reductions that would be achieved due to new control measures that would be needed for expeditious attainment.

In the case of a Moderate area that can demonstrate it can attain by the statutory attainment date without implementing all reasonably available control measures (i.e. RACM/RACT and additional reasonable measures), the state would not be required to adopt certain otherwise reasonable measures if the state demonstrates that collectively such measures would not enable the area to attain the standard at least 1 year earlier (i.e., “advance the attainment date” by 1 year). The EPA has long applied this particular test to satisfy the statutory provision related to an area demonstrating attainment “as expeditiously as practicable.” [73] The EPA continues to believe that this approach provides an appropriate degree of flexibility to a state to tailor its attainment plan control strategy to the actual attainment needs of a particular PM2.5 nonattainment area. In the case of a Moderate area that cannot demonstrate that it will practicably attain by the statutory attainment date, the state would be required to evaluate potential control measures for sources in the nonattainment area and adopt all reasonable measures (i.e., RACM and RACT, and any “additional reasonable measures”).

The following sections of the preamble describe the steps of the control measure evaluation process in more detail, and include discussion of the consideration of public comments as appropriate.

2. Step 1: Identify Sources of Emissions

a. Summary of Proposal

The proposal stated that the identification of all sources of emissions of direct PM2.5 (including filterable and condensable PM2.5) and all four PM2.5 precursors in the nonattainment area is the starting point for the state's analysis of potential control measures. It was noted that an exception to this comprehensive review requirement might be possible if the final rule includes a policy that would allow a state to demonstrate that one or more precursors in a nonattainment area do not significantly contribute to PM2.5 levels that exceed the standard. If such a demonstration were approved by EPA, then the state would not be required to adopt control measures for the precursor.

The proposal also included discussion of a possible de minimis source category exemption concept for Moderate areas. Under the approach, the analysis and identification of “de minimis source categories” for Moderate areas would occur early in the planning process, before potential control measures are identified or attainment modeling is conducted. The proposal recognized the challenges associated with defining “source categories.” The proposal also included potential options on how source categories could be defined, and requested comment on using the North American Industry Start Printed Page 58036Classification System (NAICS) (which provides a detailed hierarchy of numeric codes for different industries and process types) at the two, four, or six digit levels.

The proposal also presented the concept of a possible bright line ambient impact threshold for determining whether a source category should be considered de minimis (in the event a de minimis concept is adopted). Comments were requested on two options: (1) No bright line threshold; and (2) a threshold in the range of 1-3 percent of the relevant PM2.5 NAAQS. This range was selected because it was similar to the de minimis source category threshold range (2.0-3.3 percent of the PM10 NAAQS) included in the 1994 Serious Area Addendum.

b. Final Rule

Section 172(c)(3) of the CAA requires that attainment plans for PM2.5 nonattainment areas include a “comprehensive, accurate, current inventory of actual emissions from all sources of the relevant pollutant or pollutants.” Consistent with the proposal, the final rule maintains the policy that the state must begin the control consideration process by identifying potential control measures for all the sources included in the most recently available emissions inventory for the nonattainment area. The inventory must include emissions information for all existing major stationary sources as point sources, nonpoint sources (as defined by 40 CFR 51.50) including non-major point sources, and mobile sources of direct PM2.5 (including filterable and condensable PM2.5) and PM2.5 precursors in the nonattainment area. Section IV.B of this preamble provides a detailed discussion of emission inventory requirements.

The rule requires that a state must identify all of the sources reflected in the nonattainment area's base year inventory as the initial step in developing reasonable control measures for the area, as each of these sources may play a role in the area's PM2.5 problem. A state would need to consider all inventoried sources of direct PM2.5 emissions (including filterable and condensable PM2.5) and sources of all four scientific PM2.5 precursors as it conducts its determination of reasonable control measures for an area.

Some commenters suggested that subpart 4 only provides authority to regulate precursors from major stationary sources and not from other types of sources, such as area or mobile sources. However, EPA disagrees with these commenters, given that the CAA provides an overarching requirement to attain the standard as expeditiously as practicable, PM2.5 precursor emissions play a very significant role in fine particle concentrations nationally, non-major sources are important sources of precursor emissions, and nothing in the statutory requirements for RACM and BACM limits these requirements only to major stationary sources.

As discussed in the previous section, the final rule provides that states may develop a precursor demonstration showing that a particular PM2.5 precursor does not contribute significantly to PM2.5 levels that exceed the standard. If such a demonstration is approved by the EPA, then the state would not be required to adopt control measures for the precursor. Note that the state would still be obligated to evaluate and adopt control measures from a source if the source has emissions of direct PM2.5 and/or the remaining PM2.5 precursors that must be controlled in the plan.

The EPA received a diverse set of comments on whether to include a de minimis source category exemption policy. Some commenters questioned why an up-front (i.e., before analysis of potential control measures) source category by source category exemption should be included in the final rule in the first place, when the traditional RACT/RACM policy approach for the NAAQS implementation has enabled states not to adopt otherwise reasonable control measures if after analyzing potential control measures it is determined that such measures are not needed for expeditious attainment. These commenters also suggested that a de minimis source category approach would undermine any RACM/RACT analysis to evaluate whether a collection of measures could advance the attainment date by a year, because a de minimis exemption policy would potentially allow for an area to exempt many categories which together could have a substantial ambient impact. Other commenters noted that providing a source category exemption in one nonattainment area would give those companies a competitive advantage over the same types of sources in other areas.

A number of commenters supported the de minimis source category concept because they believed it could result in a reduced burden in the control measure evaluation stage and help avoid regulating sources with limited impact on PM2.5 levels. However, a number of commenters also expressed concern about the analytical resources that might be needed to conduct air quality modeling for a de minimis source category analysis. To address this analytical concern, some commenters suggested that the EPA include an emissions-based threshold (e.g., tons per day) rather than an air quality based threshold, and allow for its use only if controls on the source are not needed for expeditious attainment. However, the commenters did not address the fact that the air quality impact of a specific tons per day rate could vary widely from one pollutant to another within a particular nonattainment area. Other commenters noted that the NAICS system does not provide categories for nonpoint sources, and that this issue would need to be addressed if the NAICS approach were to be included in the final rule. Other commenters suggested that the rule not have a de minimis threshold at all but include the ability for the state to propose de minimis source categories to the EPA on a case-by-case basis.

After taking the range of comments on the de minimis source category concept into consideration, the EPA has decided to not finalize a de minimis source category approach for Moderate areas. The EPA is persuaded by commenters who argued it is not necessary, and believes that without this concept, the final rule will nevertheless provide sufficient flexibility in the Moderate area control measure analysis and attainment demonstration process due to the availability of precursor demonstrations, considerations of case-specific factors in determining technical and economic feasibility, and the longstanding ability for the state not to adopt certain otherwise reasonable measures if they are not needed for expeditious attainment. The EPA also finds that from a technical perspective, it would be very challenging to implement a de minimis source category process in a consistent manner nationally without clear guidelines describing how narrowly or how broadly a de minimis exemption could apply, or how the technical analysis would need to be performed. The EPA agrees with commenters that NAICS codes do not provide an appropriately comprehensive approach for defining source categories for this purpose. We note that a de minimis source category exemption process has been available in PM10 NAAQS implementation guidance (the Addendum) since 1994, and remains available. In many PM10 areas, it is relatively straightforward to identify the predominant source categories contributing to the NAAQS violations (such as direct PM emissions from dust or wood smoke), and therefore to be able to identify what categories might be considered de Start Printed Page 58037minimis. However, implementation of the PM2.5 NAAQS presents more complex challenges. Precursors and their contribution to secondarily formed PM play a much greater role in PM2.5 nonattainment areas than in PM10 nonattainment areas. In addition, the relative impact of each precursor to local PM2.5 concentrations varies from area to area. For these reasons, a de minimis source category concept for PM2.5 is not included in this final rule.

c. Comments and Responses

Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

3. Step 2: Identify Existing and Potential Control Measures

a. General Guidance

i. Summary of Proposal

The proposal preamble described general guidance for identifying existing and potential control measures.

ii. Final Rule

The guidance remains largely unchanged from the proposal. The state's compilation of existing and potential control measures [74] should be sufficiently broad to provide a basis for identifying all technologically and economically feasible controls that may be RACM or RACT for sources of direct PM2.5 (including filterable and condensable PM2.5) and PM2.5 precursor emissions in the nonattainment area at issue. Because RACM applies to area and mobile sources as well as stationary sources, states should identify and consider control measures for all types of sources.[75]

It is important to note that the emission inventory provisions of this rule require states with sources of direct PM2.5 to include emissions data for both filterable PM2.5 and condensable PM2.5 in the base year inventory for the nonattainment area. For some types of sources, condensable emissions can be much larger than filterable emissions, in some cases by ten times or more. Because the availability of condensable PM2.5 emissions data has been limited to date but more data will become available through nonattainment planning efforts, the EPA recommends that states pay particular attention to identifying potential control measures for source categories with substantial condensable emissions. If measures are found to be technically and economically feasible for reducing condensable PM2.5 emissions as well as filterable PM2.5 emissions from a source, the state will need to adopt a new emissions limit for the source that accounts for both the filterable and condensable portions, and includes requirements for ensuring compliance using source test methods updated in 2011.[76]

The control measure evaluation process described in this section generally allows states to apply reasoned judgment as they identify potential control measures for sources of direct PM2.5 and PM2.5 precursors in their respective nonattainment areas. In section 51.1009(a)(3)(iii) of the final rule, the state is required to include a complete and reasoned explanation to support its selection and rejection of control measures as part of the attainment plan submission for any Moderate nonattainment area.

Existing control measures. As a starting point when identifying candidate control measures, a state should include an initial list of control measures that are being implemented or will be implemented due to promulgated and/or adopted (i.e., “on the books”) regulations for sources of direct PM2.5 and PM2.5 precursors in its Moderate PM2.5 nonattainment area. The EPA expects that the state will incorporate anticipated emissions reductions from these “existing” control measures (such as expected SO2 reductions from the MATS; reductions of NOX and direct PM2.5 from engine and fuel standards to reduce emissions from on-road and nonroad mobile sources) into its attainment demonstration modeling for the nonattainment area, and therefore the EPA believes it is appropriate for the state to clearly indicate the existence of such measures in the attainment plan for the area.

The EPA recognizes that for some sources located in a Moderate PM2.5 nonattainment area, a state may have previously conducted control technology analyses to address emissions for previous RACM/RACT analyses or for other statutory purposes. Some of these determinations may have been done relatively recently, while other determinations may be several years old. A state may not simply rely on a previous RACM or RACT determination or other control technology analysis for a particular source or source category, regardless of how recently it was performed, when developing the attainment plan for a PM2.5 NAAQS. Past experience has shown that due to ongoing innovation, cost-effective control technologies and process alternatives for many sectors continue to be developed, and new reasonable opportunities to reduce emissions in the future are expected to be available for existing sources, particularly those with technology determinations made several years ago. For this reason, the state must determine whether the existing controls or emissions reduction approach at the source can be updated or improved with reasonably available controls or strategies to achieve increased levels of emission reduction. In cases where a stationary source has installed new state-of-the-art emissions controls fairly recently (e.g., within the last 3 years), the state technically would still need to provide a RACT analysis for the source, but in such cases it may be appropriate to find that existing controls satisfy the RACT requirement. Based on this policy, the state's updated RACM and RACT analyses will represent the most thorough, up-to-date review of control measures for its PM2.5 nonattainment area. The collection of existing control measures, any updated RACT/RACM determinations, and potential new control measures can then be considered together by the state as part of a comprehensive analysis to ensure the area will attain expeditiously. The EPA notes, however, that the more recently this analysis has been done, the less effort is expected to be needed to verify that it is up to date.

Potential control measures. In addition to identifying and reviewing existing control measures for sources in a Moderate PM2.5 nonattainment area, a state must develop a comprehensive list of potential new control measures. This process should involve close coordination between the state, source owners, municipalities, and other interested stakeholders. The potential measures should also have a strong technical basis. Analysis of emission inventory data summaries, fine particle speciation monitoring data and source apportionment air quality modeling data can help identify key sectors contributing to the PM2.5 problem in an area. Other analyses to characterize the seasonal variation of PM2.5Start Printed Page 58038concentrations and associated meteorology may help inform the state in identifying contributing sources and potential control measures.

Information about potential control measures and control technologies is available from a number of sources. One important source of information is the combined regulatory experience of other states. A compilation of existing control regulations that are on the books in other states can be a useful starting point for identifying potential control measures. Another source of information is the EPA's Office of Air Quality Planning and Standards (OAQPS) “Menu of Control Measures” document, available online at http://www3.epa.gov/​ttn/​naaqs/​pdfs/​MenuOfControlMeasures.pdf. This document was developed to provide information useful in the development of local emissions reduction and the NAAQS SIP scenarios, and identifying and evaluating potential control measures. It provides a broad, though not comprehensive, listing of potential emissions reduction measures for direct PM2.5 and precursors of ozone and PM2.5 from stationary, area and mobile sources. More complete information on mobile source control measures can be found on the EPA's Office of Transportation and Air Quality Web site at http://www.epa.gov/​otaq.

The RACT/BACT/LAER Clearinghouse (RBLC) provides a central database of air pollution technology information (including past RACT, BACT and LAER decisions contained in NSR permits) to promote the sharing of information among permitting agencies and to aid in future case-by-case control measure determinations. The RBLC permit database contains over 5,000 determinations that can help a state identify appropriate technologies to mitigate most air pollutant emission streams. The RBLC includes data submitted by several U.S. territories and all 50 states on over 200 different air pollutants and 1,000 industrial processes, and can be searched for control approaches that address specific pollutants. The RBLC can be found at: http://cfpub.epa.gov/​rblc.

Additionally, the EPA maintains a Web site with links to other online sources of information on control measures for states to consider.[77] Again, the EPA recognizes that control technology guidance for certain source categories has not been updated for many years, and, for this reason, the agency expects states to identify and consider new and updated information in their RACM and RACT determinations as it becomes available.

iii. Comments and Responses

Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

b. Managing Emissions From Wildfire and Wildland Prescribed Fire.

i. Proposed Rule

The EPA proposed to recommend as guidance but not as a requirement of the final rule that, if wildfire impacts are significant, contributing to exceedances of the standard, then states should consider RACM for wildfires (which RACM could include a required program of prescribed fires). The EPA also proposed to recommend that states should consider RACM for managing emissions from prescribed fires (including those prescribed fires conducted to reduce future wildfire emissions). The proposal noted that information is available from the DOI and the USDA Forest Service on smoke management programs and basic smoke management practices (BSMP). The EPA requested comment on the concept of, and practical considerations associated with RACM for wildfire and RACM for prescribed fire, including such issues as how such measures can be characterized in the emissions inventory and attainment demonstration and made federally enforceable for adoption in a SIP.

ii. Final Rule

Wildfire can make a large contribution to air pollution (including PM2.5), and wildfire events can threaten public safety. These effects can be mitigated through management of wildland vegetation, including through prescribed fire. Such mitigation can help manage the contribution of fires to PM2.5 levels in nonattainment areas. Prescribed fire (and some wildfires) can mimic the natural processes necessary to maintain fire dependent ecosystems, minimizing catastrophic wildfires and the risks they pose to safety, property and air quality.

Upon consideration of public comments and further consultation with other federal agencies, the EPA recommends, as guidance for states as they implement the final rule, that states follow a different approach to addressing RACM for wildland fire than the approach that the EPA proposed to recommend. Before explaining this recommendation further, the EPA wishes to clarify that the recommendation is focused on wildland fire management. There are other uses of prescribed fire and other types of burning that occur in nonattainment areas, or that affect downwind nonattainment areas, such as burning of land clearing debris, agricultural burning, and burning of logging slash on land where the primary purpose of the logging is for commercial timber sale.[78] The challenges with applying the traditional nonattainment planning framework that are raised in this discussion are particular to wildland fire, and the EPA believes that addressing these other uses of prescribed fire does not present nearly the same level of challenge, and thereby can still be accommodated within the nonattainment planning framework. For example, where these other types of burning currently contribute to PM2.5 levels in a nonattainment area, states may, with an adequate technical demonstration, be able to take credit for reductions resulting from improvement in smoke management techniques for these types of prescribed fire where the improvement results in a demonstrated reduction in impacts in the nonattainment area. The remainder of this discussion is not meant to address these categories, and is instead focused on prescribed fire on wildlands.

The EPA also wants to clarify that it is not the intention to in any way discourage federal, state, local or tribal agencies or private land owners from taking situation-appropriate steps to minimize impacts from prescribed fire emissions on wildland. The EPA encourages all land owners and managers to apply appropriate basic smoke management practices to reduce emissions from prescribed fires, especially where a state has determined that prescribed fires are a significant source affecting air quality. The EPA understands that the federal land managers (FLMs) apply these measures routinely and will be available to consult with other agencies and private parties interested in doing the same.

However, for several reasons, the EPA does not believe it would be effective policy or technically appropriate to recommend that control measures for wildland fire be adopted into the SIP as enforceable measures and credited for emissions reductions (of PM2.5 and precursors) that would help the area Start Printed Page 58039attain the standard.[79] Instead, EPA recommends that PM2.5 nonattainment plans (and in particular the attainment demonstrations) not expressly account for expected air quality changes over the planning period resulting from changes in the use of wildland prescribed fire to reduce future wildfires, or air quality changes over the planning period resulting from changes in wildland fire emissions due to a program of prescribed fire or due to any other cause including climate change. In most cases, state attainment demonstration modeling should assume that wildland prescribed fire and wildfire emissions in the attainment year will be equal to, and have the same temporal and geographic pattern as, those assumed in the baseline inventory year.

The EPA acknowledges that some temporal and spatial patterns of fire emissions must still be assumed in the attainment demonstration in order to ensure that the required air quality modeling results in a realistic physical and chemical environment and a correspondingly realistic model response against which to analyze the changes from categories where express accounting of changes is still being done. This rule is not intended to constrain the options for states regarding the appropriate assumptions to make for fire emissions. Rather, it simply recommends that once this base level is established, PM2.5 plans should not attempt to expressly project changes over the planning period in emissions from wildfires or prescribed fires on wildland within the nonattainment area, or in upwind areas included in the modeling domain, that are due to variability in wildfire occurrence or changes in the use of prescribed fire or other wildland fire management practices. Moreover, the EPA anticipates that changes in spatial and temporal patterns of wildfire will likewise be too uncertain for them to be allowed to have the effect of reducing or increasing the control requirement on conventional anthropogenic sources. The EPA therefore recommends that baseline wildland fire emissions should generally be held constant over the planning period, regardless of whether wildland fire management practices by land managers are expected, and possibly encouraged, to change.

States still have flexibility in determining how best to represent baseline wildland fire emissions. As noted earlier, base year emission inventories for the nonattainment areas should represent the conditions leading to nonattainment and be consistent with inventories used for modeling. For fires, the EPA additionally encourages states to use a representative mix of prescribed fire and wildfire in their inventories. In the past, some plans under previous PM2.5 NAAQS have estimated the actual fire emissions and temporal and spatial patterns from a given year and used this estimate as the assumed future baseline for planning, while others have used average emissions over multiple years. Other approaches may be appropriate as well. Moreover, regardless of the approach used, the EPA still encourages states to submit actual wildfire and prescribed fire activity data that are critical to developing emissions estimates to the NEI as suggested in the AERR.

A consequence of the recommendation of not expressly accounting for changes in wildland fires in attainment demonstrations is that measures to reduce emissions from wildland fires, such as prescribed fire for wildland wildfire prevention and mitigation purposes or smoke management programs and BSMP for prescribed fires in wildland, need not be included as RACM for the respective fire types. This is because the changes in emissions due to such measures would not be accounted for in determining what is necessary for attainment and/or what would advance the attainment date, which is how the EPA is recommending that RACM be determined. So, for example, in an area that can attain in 6 years with measures that do not address wildland fire, the EPA does not recommend that states attempt to quantify whether increased prescribed fire could advance the attainment date by 1 year, due to aforementioned difficulties associated with such quantification.

To be clear, nothing about this policy regarding RACM is intended to suggest that fires should be ignited in wildland (or elsewhere) without regard to the air quality or public health consequences. As noted earlier, the EPA believes these consequences are important to address, and intends to engage in dialogue with the FLMs, air agencies, tribes, state and private land owners and other stakeholders at appropriate times, such as during the process for the development of land management plans, about how land managers determine when and where prescribed fire is appropriate for particular wildlands and how to identify and implement appropriate mitigation measures. The policy simply makes clear the EPA's view regarding its recommendation for RACM for wildland fires.

The EPA notes that this recommendation regarding RACM differs somewhat from the recommendation that was offered in the preamble as guidance to states as they implement the EPA's recent SIP Requirements Rule for the 1997 and 2008 ozone NAAQS. The reasons for the strategy outlined earlier apply equally well to attainment demonstrations for the ozone NAAQS, and so EPA hereby makes the same recommendation for implementation of these ozone NAAQS as well. This recommendation, offered here in the same manner as the prior recommendation, supersedes the prior recommendation on RACM for wildfire in the preamble to the final SIP Requirements Rule for the 1997 and 2008 ozone NAAQS. The EPA will convey this revised recommendation to the air agencies that are working to prepare these ozone SIPs. The EPA also anticipates making this recommendation as part of our planned rulemaking on implementation of the 2015 ozone NAAQS. Note that this discussion pertains only to the RACM policy, and that other aspects of the fire discussions in the ozone SIP Requirements Rule remain applicable.

Finally, the EPA notes that, because a significant element of the rationale for this policy is the uncertainty in the timing of wildfires, we may reconsider this recommendation in the future, if adequate tools emerge that allow for predicting fire emissions with sufficient specificity. However, even if such tools emerge, due to inherent uncertainties it may be impossible to satisfactorily incorporate the use of such information into an attainment demonstration framework.

iii. Comments and Responses

The EPA received many comments expressing agreement with EPA's recognition of the importance of wildland prescribed fire, and welcoming continued dialogue among states, the EPA, and other federal agencies on how best to ensure that land managers have adequate management tools available, including prescribed fire and some wildfire, but also to ensure that use of these tools does not result in unhealthy air. The EPA intends to engage in such dialogue.Start Printed Page 58040

Some commenters also took positions on how specifically to define RACM for wildfires, ranging from required smoke management plans to simply stating that fires themselves are RACM with no further measures required. In light of the fact that EPA did not propose specific guidance on defining RACM for wildfires and typically does not define RACM for specific categories, and the fact that EPA is not recommending that states include RACM as proposed, we are not providing further guidance in response to those comments. Similarly, regarding baseline fire emissions, some commenters provided detailed suggestions regarding approaches to calculating baselines based not on actual fires (which may include periods when fires were suppressed) but on science-based fire regimes, fire return intervals and ecosystem types, including characteristics of wildland vegetation. The EPA notes that this guidance is not establishing or recommending any particular approach to calculating baseline fire emissions.

c. RACT for EGUs

i. Summary of Proposal

Through guidance in the preamble to the 2007 PM2.5 Implementation Rule, the EPA established a rebuttable presumption that compliance with the CAIR would satisfy RACM and RACT requirements for SO2 and NOX emissions from EGUs in states participating in the CAIR cap-and-trade program for such emissions.[80] The EPA indicated that states could presume that EGUs located within a given nonattainment area were meeting the RACM and RACT requirements, based solely upon a regional program that imposed controls for SO2 and NOX emissions from sources both within and outside designated nonattainment areas.

In June 2007, the EPA received a petition for reconsideration questioning the legality of this presumption, which the D.C. Circuit later found to be unlawful in the context of a similar presumption in the Phase 2 Ozone (NAAQS) Implementation Rule.[81] The agency granted the petition for reconsideration in 2011 and proposed to withdraw from the 2007 PM2.5 Implementation Rule any presumption that compliance with the CAIR automatically satisfies RACM and RACT requirements for SO2 and NOX emissions from EGUs located in nonattainment areas for the 1997 PM2.5 NAAQS.[82 83] In that proposal, the EPA explained that given the explicit wording of CAA section 172(c)(1) that sources “in the area” (i.e., in the nonattainment area) must at a minimum adopt RACT controls for that area, the agency believes that it is no longer appropriate to presume that this requirement is satisfied merely based upon the participation of a source in a regional cap-and-trade program. Indeed, implicit in a regional cap-and-trade program is that some sources, including those located within nonattainment areas, may elect to buy allowances in lieu of controlling emissions in order to meet the regional emissions reductions requirements.

Accordingly, in the proposal the EPA stated that it did not intend to include any rebuttable presumption that the CAIR or any other regional control strategy constitutes RACM or RACT for EGUs or any other source category. Instead, the EPA stated that it is clarifying that in order to meet the RACM and RACT requirements for the PM2.5 NAAQS, states should evaluate EGU sources for RACM and RACT level controls just like any other source category, and not merely presume for EGUs located in a nonattainment area that compliance with a cap-and-trade program, including the CAIR or any other program, would satisfy their obligation to implement RACM and RACT. As required by the CAA, states are required to analyze what constitutes RACM and RACT for EGUs in each nonattainment area.

ii. Final Rule

The final rule maintains the proposed policy approach as described earlier. As required by the CAA, states are required to analyze what constitutes RACM and RACT for EGUs in each nonattainment area, just as they are required to do for all other types of sources.

iii. Comments and Responses

Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

4. Step 3: Determine Whether an Available Control Measure or Technology Is Technologically Feasible

a. Summary of Proposal

The proposal cited longstanding guidance from the General Preamble regarding factors to consider when determining the technological feasibility of a potential control measure or control technology, and it requested comment on the factors. These factors included a source's processes and operating procedures, raw materials, physical plant layout, and potential environmental impacts such as increased water pollution, waste disposal, and energy requirements. One sentence in the proposal stated: “With respect to determining whether a given control measure might not be technologically feasible for an area or mobile source, the EPA also proposes to retain its longstanding practice that a state may consider relevant factors in conducting its analysis, such as the social acceptability of the measure . . .” [84]

b. Final Rule

Several comments addressed the EPA's inclusion of the social acceptability factor in the proposal. In reviewing this issue, the EPA determined that this factor actually has not been identified as a factor in the EPA's longstanding guidance, and thus was mischaracterized in the proposal. Nevertheless, some commenters supported inclusion of the factor because no other factor is presented to help limit or eliminate a potential measure with strong public opposition. Other commenters that opposed use of such a factor suggested that including it in the final rule could allow a state to reject almost any control measures that is otherwise found to be technically and economically feasible.

When the EPA issued a proposed PM2.5 NAAQS implementation rule in 2005, it requested comment on the same social acceptability factor, and ultimately did not include social acceptability as a factor for determining RACM in the final 2007 PM2.5 implementation rule. In the 2007 final rule, however, the EPA stated: Start Printed Page 58041“Therefore, given the concerns raised by commenters that establishment of `social acceptability' as a factor in the RACM analysis is without basis in the CAA and might result in inappropriate skewing of control strategies, we have removed this term from the final rule. We reiterate, however, that capability of effective implementation and enforcement are relevant considerations in the RACM analysis, even though public `unpopularity' is not. Moreover, in assessing the efficacy of measures and the credit they should be given in the context of attainment demonstrations or RFP calculations, EPA believes that such considerations are important.” For the same reason it was not included in the previous implementation rule, the EPA has decided to not include the social acceptability factor in this final rule as well. See 40 CFR 51.1009(a)(3)(i).

The following guidance is similar to what was presented in the proposal but has been updated to exclude the social acceptability factor:

Once a state has identified existing and potential control measures and technologies for sources of direct PM2.5 and PM2.5 precursors in the nonattainment area(s), it must evaluate these controls to determine if any of those controls would be technologically infeasible in the particular nonattainment area.

With respect to the technological feasibility of control technologies for stationary sources, the EPA has a longstanding approach to evaluating facts relevant to this criterion under subpart 4.[85] The EPA interprets the term technological feasibility to include consideration of factors such as a source's processes and operating procedures, raw materials, physical plant layout, and potential environmental impacts such as increased water pollution, waste disposal and energy requirements. For example, the EPA recognizes that the process, operating procedures and raw materials used by a source can affect the feasibility of implementing process changes that reduce emissions and can also affect the selection of add-on emissions control equipment. The feasibility of modifying processes or applying control equipment also can be influenced by the physical layout of the particular plant, if the physical space available in which to implement such changes limits the choices. A state may consider such factors in determining whether a control measure is or is not technologically feasible to implement.[86]

In addition, with respect to determining whether a given control measure might not be technologically feasible for an area or mobile source, the EPA also retains its longstanding practice that a state may consider relevant factors in conducting its analysis, such as the condition and extent of needed infrastructure, population size, or workforce type and habits, which may prohibit certain potential control measures from being implementable.

c. Comments and Responses

Comment: Some commenters stated that the EPA should make clearer in its rule and guidance that some categories of sources, particularly those such as animal and crop production, do not lend themselves to national determinations of best control practices; instead, these types of sources should be evaluated on nonattainment area specific conditions in determining the appropriate level of control measures.

Response: The EPA agrees that nonattainment area-specific conditions are important factors when considering emission reduction options. States need to consider the feasibility of all identified options that have been demonstrated to reduce PM2.5 and PM2.5 precursors to determine whether such measures are appropriate for use in a particular PM2.5 nonattainment area.

The EPA believes the determination of best control practices for any operation, particularly for animal production or crop production operations, should be a case-specific process. The process should start with the identification of PM2.5 and PM2.5 precursor emissions from the operation. Then it should consider which of the measures for reducing PM2.5 and PM2.5 precursors in a particular PM2.5 nonattainment area are technically and economically feasible for a particular operation. The EPA recognizes that there are a number of factors specific to each operation that could determine whether a potential emission reduction measure is technically and economically feasible for implementation.

Although the EPA is not making any national determinations of best control practices for animal production and crop production operations, we do note that there are many relevant references on potential emissions reduction options, including the Agricultural Air Quality Conservation Measures Reference Guide for Cropping Systems and Land Management.[87] The EPA and USDA jointly developed this document to identify measures that have been demonstrated to reduce emissions and describe factors related to the applicability of each measure. A companion document is under development by the EPA and USDA that will identify potential emission reduction approaches for livestock operations. Additionally, USDA's Natural Resources Conservation Service (NRCS) provides a list of approved practices in managing air emissions of concern for particulate matter, ozone, greenhouse gas, and odor-related issues.[88] A number of regulatory and non-regulatory programs are already being implemented (in nonattainment and attainment areas alike) to reduce emissions of PM2.5 and PM2.5 precursors from agricultural operations. Finally, a large body of information is available on topics such as feed management, livestock housing, conservation tillage, road use and other topics from federal agencies, states, industry groups, academic institutions, and international organizations.

5. Step 4: Determine Whether an Available Control Measure or Technology Is Economically Feasible

a. Summary of Proposal

The proposal described that in the 1992 General Preamble, EPA's longstanding interpretation of the term “economic feasibility” in the context of evaluating potential RACM and RACT has included a presumption that it is reasonable for similar sources to bear similar costs of emissions reductions, even if they are in different nonattainment areas or different states. The proposal indicated that this presumption was not included in the 2007 implementation rule for the PM2.5 NAAQS that the EPA had received a petition for reconsideration with respect to this issue, and that EPA had granted this petition in 2011.[89 90] The March Start Printed Page 580422015 proposed PM2.5 SIP requirements rule indicated the EPA's intention to not adopt the economic feasibility factors as described in the 2007 rule, but to return to the original interpretation from the 1992 General Preamble, including the presumption that it is reasonable for similar sources to bear similar costs of emissions reductions.

The proposal also characterized past guidance from the 1992 General Preamble as stating that if a state contends that a source-specific control level should not be established because the source(s) cannot afford the control measure that is demonstrated to be economically feasible for other sources in its source category, then the state must support the claim with information regarding the impact of imposing the identified control measure or technology on the several financial indicators. The proposal also recommended that cost effectiveness should generally be evaluated by assessing the cost per ton of emissions reduced associated with a control measure, but the proposal also requested comment on an alternative metric to assess cost effectiveness in terms of the cost per unit of air quality improvement (i.e., “cost per microgram”).

b. Final Rule

Based on a consideration of the comments received, the EPA has determined that economic feasibility considerations should generally align with the interpretation in the 1992 General Preamble. Note that the proposal indicated that if it is claimed that a control approach is not economically feasible for a specific source, the state needs to provide information related to several financial indicators to support the claim. We note that the original policy in the 1992 General Preamble suggests that if a source desires to make such a claim, it should provide such information to the state for its consideration. This final rule characterizes the policy in a similar manner, where the source would have the option of providing this financial information to the state for its review. This approach should address the concerns of some commenters that such financial information may not be readily available to the state. Thus, the final policy for considering economic feasibility of control measures is described in the following paragraphs.

The EPA has a longstanding interpretation of the term “economic feasibility” in the context of evaluating potential RACM and RACT which involves considering the cost of reducing emissions and the difference between the cost of an emissions reduction measure at a particular source and the cost of emissions reduction measures that have been implemented at other similar sources in the same or other areas.[91] Absent other indications, the EPA presumes that it is reasonable for similar sources to bear similar costs of emissions reductions. Economic feasibility of RACM and RACT is thus largely informed by evidence that other similar sources have implemented the control technology, process change or measure in question.

For each technologically feasible control measure, a state should evaluate the economic feasibility of the measure or control, through consideration of factors such as the capital costs, operating and maintenance costs, and cost effectiveness (i.e., cost per ton of pollutant reduced by that measure or technology) associated with such measure or control. A state should not reject a technologically feasible control measure or technology as being economically infeasible if such a measure or technology has been implemented at other similar sources (i.e., at sources that would be included in the same source category in the emissions inventory data collection process), unless the state provides an adequate justification that clearly explains the specific circumstances of the source or sources in the nonattainment area that make such a measure or technology economically infeasible for sources in the nonattainment area. See 40 CFR 51.1009(a)(3).

The EPA believes that it is appropriate for states to give substantial weight to cost effectiveness in evaluating the economic feasibility of an emission reduction measure or technology. The cost effectiveness of a measure is its annualized cost ($/year) divided by the emissions reduced (tons/year) which yields a cost per amount of emission reduction ($/ton). Cost effectiveness provides a relative value for each emissions reduction option that is comparable with other options and, in the case of control technologies, other facilities. In considering what level of control is reasonable, the EPA does not recommend a specific fixed dollar per ton cost threshold for economic feasibility of controls identified as potential RACM and RACT.

If a source contends that a source-specific control-level should not be established because the source cannot afford the control measure or technology that is demonstrated to be economically feasible for other sources in its source category, the source should make its claim known to the state and support the claim with information regarding the impact of imposing the identified control measure or technology on the following financial indicators, to the extent applicable:

(1) Fixed and variable production costs ($/unit)

(2) Product supply and demand elasticity

(3) Product prices (cost absorption vs. cost pass-through)

(4) Expected costs incurred by competitors

(5) Company profits

(6) Employment costs

(7) Other costs (e.g., for RACM implemented by public sector entities).[92]

c. Comments and Responses

Comment: With regard to the presumption that it is reasonable for similar sources to bear similar costs of emissions reductions, some commenters supported returning to the approach described in the General Preamble as EPA proposed, while other commenters suggested that based on its experience with industry the EPA knows that just because a technology will work at one source does not mean that it will necessarily work at a similar source due to source configuration and non-RACT reasons (e.g., enforcement proceedings) for the installation of different technology at “similar” sources.

Response: The latter commenters appear concerned that the rule would require the imposition of all controls on similar sources without allowing for consideration of whether such controls are technologically and economically feasible. This is not what EPA proposed. Instead, the EPA proposed, and is now finalizing, a requirement that the state first identify potential control measures for sources in a nonattainment area. The state should then identify which control measures are economically and technologically feasible based on its review of various factors. If the state determines that certain controls are not reasonably available based on its review of these factors, it must provide a written justification to the EPA explaining its rationale. This review should at least evaluate the feasibility of all the identified controls on similar sources to determine whether implementation of such controls in the nonattainment area at issue is Start Printed Page 58043reasonable. The EPA recognizes that there are a number of source-specific factors that the state can take into account in making these determinations. Factors such as the physical onsite configuration of a facility may determine whether a particular control device or operation can be feasibly implemented. Likewise, a state should take into account information provided by the source on particular economic factors such as those described earlier in making a case-by-case determination of the economic feasibility of a control measure.

Comment: Two commenters supported the EPA's proposal that cost-effectiveness should consider capital costs, operating costs and maintenance costs at the particular source in question.

Some commenters supported using an alternative cost effectiveness metric such as cost per microgram of air quality improvement where appropriate air quality modeling has been developed for the area and can reasonably characterize the relative importance of various precursors. Some commenters opposed the proposal's alternative cost-effectiveness metric because the approach is overly complex and the impacts are rarely uniform across an area.

Response: The EPA has decided to maintain its traditional recommendation to use a cost per ton approach for evaluating the cost effectiveness of particular control options. The EPA does not recommend the cost per microgram alternative approach because there are a number of technical and resource challenges associated with implementing it in a technically rigorous manner based on detailed air quality modeling information. The EPA believes that this policy approach would unnecessarily add complication and extra burden to the state's process for determining economic feasibility for subject sources in a nonattainment area. Moreover, the EPA believes that the flexibility described here to consider cost-effectiveness in assessing economic feasibility, when coupled with the upcoming discussion of Step 6, and with the major stationary source and comprehensive precursor demonstrations previously described will ensure that unreasonable application of measures (e.g., those that are not effective in reducing PM2.5 concentrations) will not occur.

6. Step 5: Determine the Earliest Date by Which a Control Measure or Technology Can be Implemented in Whole or in Part

a. Summary of Proposal

In this section, the proposal discussed two main issues related to the date by which control measures can be implemented. First, it proposed that when a state is determining RACM/RACT, it must consider whether a control measure can be implemented in part when full implementation of the measure within 4 years of designation is not feasible. The proposal also introduced the concept of “additional reasonable measures,” meaning those measures that can only be implemented after the fourth year but prior to the Moderate area 6-year attainment date. It was proposed that a state must identify additional reasonable measures and adopt those measures as needed for expeditious attainment.

b. Final Rule

This section remains relatively unchanged from the proposal. CAA section 189(a)(1)(C) requires that the attainment plan for a Moderate PM2.5 nonattainment area provide for the implementation of RACM and RACT no later than 4 years after designation. The agency has long interpreted the term “implemented” to mean that a control measure or technology has not only been submitted to the EPA for approval as part of a SIP but has also been built, installed and/or otherwise physically manifested, and is achieving the intended emissions reductions, and the EPA retains this definition in this rule. See 40 CFR 51.1000.

The EPA recognizes that a state may be able to implement a given control measure only partially within 4 years after designation. The EPA addressed this situation in the General Preamble, stating: “It is important to note that a State should consider the feasibility of implementing measures in part when full implementation would be infeasible.” [93] The EPA continues to interpret the RACM/RACT definition to mean that a state should not reject an otherwise technologically and economically feasible control measure or technology as RACM or RACT even if it can be only partially implemented within the statutory 4-year timeframe following designation of the area. Instead, a state must adopt as RACM and RACT that portion of a control measure or technology that can feasibly be implemented within 4 years of the effective date of designation. See 40 CFR 51.1009(a)(4)(i)(A). For instance, if paving unpaved roads is a control measure that is technologically and economically feasible in a nonattainment area but a state cannot pave all candidate roads within 4 years of designation, the state must adopt as RACM a measure that requires paving of that portion of roads that the state could feasibly accomplish within 4 years if such a measure is needed for timely attainment of the PM2.5 NAAQS in the area.

Therefore, for the purposes of meeting the RACM/RACT requirement, a state must identify those technologically and economically feasible control measures and technologies that it can implement fully or partially within 4 years of designation of its Moderate PM2.5 nonattainment area. Depending on the severity of the PM2.5 nonattainment problem in the area, some or all of these measures identified as implementable within 4 years may be needed in order to bring the area into attainment as expeditiously as practicable. These candidate measures may constitute RACM and RACT if the state determines, through its attainment demonstration that it needs to implement them to achieve timely attainment for the area.

In addition, a state must separately identify those technologically and economically feasible control measures that can only be implemented after the statutory window for implementing RACM and RACT, but before the attainment date. The statutory 4-year timing requirement for implementing RACM and RACT under CAA section 189(a)(1)(C) limits the control measures and technologies that can qualify as RACM and RACT for a Moderate PM2.5 nonattainment area. However, the statutory requirement of CAA 172(c)(6) also requires states to implement “other measures” necessary to provide for timely attainment in an area. The EPA interprets this provision to include “additional reasonable measures,” which are those measures and technologies that can be applied at sources in the nonattainment area that are otherwise technologically and economically feasible but can only be implemented in whole or in part later than 4 years after designation.[94]

Start Printed Page 58044

7. Step 6: Evaluate the Collective Impact of Potential Control Measures To Determine Whether the Area Can Attain Expeditiously or Whether it is Impracticable to Attain by the Attainment Date, and Adopt the Appropriate Set of Control Measures

a. Summary of Proposal

The proposal described the control measure requirements for two situations: The case where the state can demonstrate attainment by the attainment date; and the case where the state demonstrates the area cannot practicably attain by the attainment date. If a state determines that a Moderate nonattainment area can attain the PM2.5 NAAQS by the statutory attainment date, the state must adopt and implement any technologically and economically feasible control measures that are necessary to ensure that the area will attain the NAAQS as expeditiously as practicable. Those technologically and economically feasible measures needed for attainment that can be implemented within 4 years of the date of designation would be considered to be RACM/RACT. Those measures needed for attainment that cannot be implemented within 4 years but can be implemented no later than the attainment date would be considered to be “additional reasonable measures.” The proposal stated that, consistent with longstanding policy, this means that the state may choose to not adopt certain measures if collectively they would not advance the attainment date by 1 year.[95]

For the situation where a state determines that it is impracticable to attain by the Moderate area attainment date, the proposal included two policy options for describing what control measures must be adopted and implemented. One option would have required the state to adopt all technologically and economically feasible control measures, as stated in past guidance in the General Preamble. The other option would have required adoption of technologically and economically feasible control measures with an explicit exception for those measures that collectively are determined to be “ineffective in reducing ambient PM2.5 levels.” The proposal also reviewed the proposed options for demonstrating that a precursor does not make a significant contribution to PM2.5 levels that exceed the standard, and discussed how the final precursor policy may be an important consideration in deciding upon a control measure policy approach for Moderate areas that demonstrate they cannot practicably attain.

b. Final Rule (General)

For an area that can demonstrate that it will attain by the attainment date, the final rule maintains the same approach as described in the proposal regarding the collective evaluation of potential control measures to determine whether the area can advance the attainment date by 1 year. For an area that demonstrates that it would be impracticable to attain by the attainment date, the final rule does not include an explicit exception for those measures that collectively are determined to be “ineffective in reducing ambient PM2.5 levels.” More details are provided in sections (c) and (d) that follow.

Section 189(a)(1) of the CAA establishes a requirement that the attainment plan for a Moderate PM2.5 nonattainment area must demonstrate either that an area can attain the relevant NAAQS by the applicable attainment date, or that it is impracticable for the area to do so. As noted previously, for Moderate PM2.5 nonattainment areas, the “applicable attainment date” is as expeditious as practicable, but no later than the end of the sixth calendar year after designation as nonattainment. A complete discussion of the requirements for attainment demonstration modeling is presented in Section IV.E of this preamble. However, one of the key features of attainment demonstration modeling and related analysis is that they provide a means of synthesizing the effects of emissions reductions from all existing and potential new control measures identified for sources in a given nonattainment area on overall air quality in that area. States will use the results of their analyses to identify the appropriate combination of reasonable control measures for sources in their Moderate PM2.5 nonattainment area and any other control measures needed on sources outside the nonattainment area to ensure expeditious attainment of the relevant NAAQS in the area and to meet the statutory requirements of CAA sections 189(a)(1)(B) and 172(c)(6) as explained later.[96]

Section 188 establishes the attainment dates for Moderate and Serious PM10 nonattainment areas, and this rule also applies such dates to Moderate and Serious PM2.5 nonattainment areas. As described in Sections IV.D and IV.E of this preamble, in the case of a Moderate PM2.5 nonattainment area for which a state can demonstrate attainment by the end of the sixth calendar year following designation, the state must follow a two-step process for determining the appropriate attainment date for the area. First, the state must demonstrate through air quality modeling that the area can attain the relevant NAAQS by the latest statutory attainment date and determine which control measures and technologies are needed for the area to attain by that date. Second, the state must determine whether implementing other reasonable controls (i.e., those not needed for attainment by the latest possible date but that are technologically and economically feasible) can cumulatively advance the attainment date for the area by at least 1 year. In the event that a state determines that the area can attain the relevant NAAQS earlier through the application of other measures, the state must propose the earlier date as part of the attainment plan submission for the area. When the EPA takes action to approve the different elements of the attainment plan for the area, one of the elements that the agency will take action on will be the state's proposed attainment date for the area. If the EPA approves an attainment date for the area that is earlier than the latest date allowed by statute, then the applicable attainment date for the area will be the approved date. See 40 CFR 51.1004(a)(1)(i). If the area ultimately needs additional time to attain the relevant NAAQS, the state may request an attainment date extension for the Moderate nonattainment area under section 188 as long as certain conditions are met, as described in Section IV.J of this preamble.

c. Final Rule—Step 6 (Attainment Case): If the State Can Demonstrate Attainment in the Area by the Statutory Attainment Date for a Moderate Area, Then the State Must Implement Those Control Measures Needed for Expeditious Attainment of the NAAQS in the Area

If a state determines that a Moderate nonattainment area can attain the PM2.5 NAAQS by the statutory attainment date, the state must adopt and Start Printed Page 58045implement any technologically and economically feasible control measures that are necessary to ensure that the area will attain the NAAQS as expeditiously as practicable. The EPA will consider any such measures that can be implemented within 4 years of designation of the area to fulfill the RACM and RACT requirements for the area. In addition, the EPA will consider any such measures that can only be implemented between 4 years and the sixth calendar year after designation to meet the requirements of CAA section 172(c)(6) as “additional reasonable measures” for the area and necessary to demonstrate timely attainment under CAA section 189(a)(1)(B).

For this type of situation, the state may reject any otherwise technologically or economically feasible measures that are not needed to demonstrate attainment or that will not advance the attainment date by at least 1 year. That is, for a Moderate area that can demonstrate attainment by the statutory Moderate area attainment date, the EPA defines as “reasonable” only those technologically and economically feasible measures that are necessary for expeditious attainment of the NAAQS, as the CAA does not require a state to adopt measures that are not needed for expeditious attainment in a Moderate PM2.5 nonattainment area. Thus, a state may exclude those otherwise reasonably available measures that, if adopted and considered collectively, would not advance the attainment date for the area by at least 1 year, so long as the state can demonstrate attainment as expeditiously as practicable and no later than the statutory Moderate area attainment date. The EPA maintains that identifying a complete set of measures that qualify as RACM/RACT and additional reasonable measures but that are not necessary for attainment within 6 years is imperative to adequately demonstrate that such measures will not collectively advance the attainment date for a Moderate area by at least 1 year. The EPA will require a robust analysis and explanation by the state when such determinations are made. See 40 CFR 51.1009(a)(4)(i).

d. Final Rule—Step 6 (Impracticability Case): If the State Cannot Demonstrate Attainment by the Statutory Attainment Date for a Moderate Area, Then the State Must Adopt All Reasonably Available Control Measures

Section 189(a)(1)(B) of the CAA anticipates that not all Moderate nonattainment areas will be able to demonstrate attainment by the attainment date, and it incorporates the concept of an “impracticability demonstration” for such areas.[97] Commenters on this issue stated that nowhere in the statute is there an explicit exception for those measures that collectively are determined to be “ineffective in reducing ambient PM2.5 levels.” Further, they suggested that such an approach would enable the most polluted areas to exempt sources that individually are small by some arbitrary test when in other cleaner areas such sources would be required to reduce emissions because they collectively would advance attainment. Other commenters emphasized that sources located in such Moderate areas should still be subject to the regular review process for determining whether potential control measures are not technologically or economically feasible.

After considering comments on the two options described in the proposal, the EPA has decided to keep the policy in this final rule consistent with past guidance in the General Preamble. This guidance stated that “the EPA believes it is reasonable for all available control measures that are technologically and economically feasible to be adopted for areas that do not demonstrate attainment [by the applicable attainment date].” [98] The EPA believes that this interpretation is compelled by the language of CAA section 189(a)(1)(C), which separately requires a state to submit a Moderate area attainment plan and meet the RACM and RACT requirement, even if the state submits a demonstration showing that with those measures it cannot attain the NAAQS by the applicable attainment date.

Under this approach, if the state had an approved precursor demonstration (as described in Section III of this preamble) showing that a particular precursor does not have a significant contribution on PM2.5 levels that exceed the standard, then it would not need to adopt control measures for that particular precursor. The state then would be required to identify potential control measures for sources in the area that emit direct PM2.5 and any remaining significant precursors. Of these potential measures, the state would determine which would be technologically feasible to implement. Then the state would identify which of the technologically feasible measures are economically feasible to implement.

Subpart 4 requires that Moderate areas that cannot or do not meet the Moderate area attainment date be reclassified as Serious nonattainment areas, in which case sources in the areas are then subject to BACM and BACT requirements. In the General Preamble, the EPA indicated that “it may be reasonable, in some limited circumstances, for states to consider the compatibility of RACM and RACT with the BACM and BACT that will ultimately be implemented under the Serious area plans for those areas.” [99] Furthermore, for such areas that do not meet the Moderate area attainment date, the EPA indicated that “in the case of RACM for area sources, EPA anticipates that any future implementation of BACM for these sources will be additive to, and hence compatible with, RACM. This is because BACM will generally consist of a more extensive implementation of the RACM measures . . . Since EPA anticipates that RACM and BACM for these sources will be compatible, the SIP's (sic) for these areas should reflect the application of available control measures to existing sources in moderate nonattainment areas as determined by the analysis described . . . for RACM.” [100] Thus, the state should assess the remaining set of technologically and economically feasible measures with regard to the compatibility of implementing RACM/RACT in the near term in a way that supports addressing BACM/BACT for such sources when the area is reclassified to Serious.

The General Preamble also provided guidance for stationary source controls in this situation: “In many instances, the installation of pollution controls representing RACT may involve substantial capital expenditures. In the event that BACT is later required for those sources, this may require controls significantly incompatible with those recently installed as RACT, largely wasting those recent expenditures. Under such circumstances, the installation of controls in the first round of SIP planning would be unreasonable.” Accordingly, SIPs for the Moderate areas that cannot practicably attain need not require major changes to the control systems for specific stack and process sources where a State reasonably demonstrates that such changes will be significantly Start Printed Page 58046incompatible with the application of BACT-level control systems. A State's demonstration should include, for example, showing what the State believes are RACT and BACT for the source, and why they are significantly incompatible.

The EPA believes that in such cases, a state should consider selecting and implementing controls that may qualify as BACM or BACT in a Moderate nonattainment area as part of their RACM and RACT analysis. Early adoption of controls that would constitute BACM or BACT could be more efficient and could further the objectives of attaining the NAAQS expeditiously to protect public health and the environment.

e. Comments and Responses

Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

8. RACM and RACT and Additional Reasonable Measures Submission Requirements

a. Summary of Proposal

The proposal described a set of submission requirements for RACM/RACT and additional reasonable measures.

b. Final Rule

The requirements in the final rule remain very similar to those that were included in the proposal. To ensure that attainment plan submissions contain the necessary supporting information to enable the EPA to review and approve a state's evaluation and selection of measures that constitute RACM and RACT in a given nonattainment area, the EPA requires under the authority of section 301(a) of the CAA that a state must submit the following information as part of its submission:

(1) A list of all sources and activities in the nonattainment area that emit direct PM2.5 or any PM2.5 precursor (for multi-state nonattainment areas, this would include source categories, sources and activities from all states which make up the area). See 40 CFR 51.1008(a)(1).

(2) For each source or activity in the nonattainment area, an inventory of direct PM2.5 emissions and emissions of all PM2.5 precursors, and a comprehensive list of potential control measures considered by the state for the nonattainment area. See 40 CFR 51.1009(a)(2). If the state submitted a precursor demonstration that was approved by the EPA, the state would not be required to submit a list of sources and potential measures to control emissions of the relevant precursor from the stationary sources addressed by the demonstration (i.e., all sources for a comprehensive precursor demonstration, or major sources for a major source precursor demonstration). See 40 CFR 51.1006(a)(1) and (2). Note that the emissions inventory would still need to include all sources of the relevant precursor. See 40 CFR 51.1008(a)(1).

(3) For each potential control measure considered by the state but eliminated from further consideration due to a determination by the state that the control measure or technology was not technologically feasible, a narrative explanation and quantitative or qualitative supporting documentation to justify the state's conclusion. See 40 CFR 51.1009(a)(3).

(4) For each technologically feasible emission control measure or technology, a determination of whether the measure is economically feasible must be included, with narrative explanation and quantitative supporting documentation to justify the state's conclusion. See 40 CFR 51.1009(a)(3). The following additional information relevant to economic feasibility should be included as necessary to justify the determination: (a) The control efficiency by pollutant; (b) the possible emissions reductions by pollutant; and, (c) the estimated cost per ton of pollutant reduced.

(5) For each technologically and economically feasible emission control measure or technology, the date by which the technology or measure could reasonably be implemented, in whole or in part. See 40 CFR 51.1009(a)(4)(i)-(ii).

Each of these elements will provide information needed by the EPA to evaluate whether the state is meeting the statutory requirements for an attainment plan, and in particular meeting the statutory requirement for states to implement RACM and RACT on sources within the nonattainment area. The EPA recognizes that the base year emissions inventory for the area that the state submits in conjunction with its attainment plan will likely contain some of the information proposed to be required under the first two items in this list. However, the EPA is finalizing a requirement for emissions inventory information specifically relevant to the RACM and RACT element of the state's attainment plan in order to ensure that the EPA or any other party can appropriately evaluate the state's RACM and RACT analysis.

c. Comments and Responses

Comment: Some commenters supported the general submission requirements because in some cases RACM/RACT demonstrations fail to provide the information necessary for the EPA to reasonably conclude that these requirements have been met and are supported by a systematic analysis.

Response: The EPA agrees with the commenters and the final rule generally tracks the proposal.

9. Criteria for Effective Regulations to Implement RACM and RACT and Additional Reasonable Measures

a. Summary of Proposal

The preamble to the proposed rule described the four main criteria for effective control measure regulations: Such regulations must be quantifiable, enforceable, replicable and accountable.

b. Final Rule

The guidance in this preamble to the final rule remains very similar to what was proposed. After a state has identified a particular control measure as RACM or RACT or additional reasonable measure for a particular nonattainment area, it must then implement that measure through a legally enforceable mechanism that will be included in the SIP (e.g., a state rule that the EPA will approve as a part of the federally enforceable SIP for the state). The EPA is proposing that in order for the EPA to be able to approve any such measure as part of the SIP, the state would have to provide information to meet the following four criteria. These criteria are similar to the criteria finalized as part of the remanded 2007 PM2.5 Implementation Rule.

First, the base year emissions from the source or group of sources to which the control measure applies and the future year projected emissions from those sources once controlled must be quantifiable so that the projected emissions reductions from the sources can be attributed to the specific measures being implemented. It is important that the emissions from the source category in question are accurately represented in the base year inventory so that emissions reductions are properly calculated. In particular, it is especially important to ensure that both the filterable and condensable components of direct PM2.5 emissions are accurately represented in the base year.

Second, the control measures must be enforceable. This means that they must specify clear, unambiguous and measurable requirements. The measurable requirements for larger emitting facilities must include periodic source testing, monitoring or other viable means to establish whether the Start Printed Page 58047affected source meets the applicable emission limit. Additionally, to verify the continued performance of the control measure, specific emissions monitoring programs appropriate for the type of control measure employed and the level of emissions must be included to verify the continued performance of the control measure. The control measures and monitoring program must also have been adopted according to proper legal procedures. Note that if measures are found to be technically and economically feasible for reducing condensable PM2.5 emissions as well as filterable PM2.5 emissions from a source, the state will need to adopt a new emission limit for the source that accounts for both the filterable and condensable portions, and includes requirements for ensuring compliance using condensable PM2.5 source test methods updated in 2011.[101]

In response to a comment on this criterion, the EPA clarifies that an enforceable regulation for a CAA program must be enforceable by the EPA, the state, and citizens. By taking action to approve emissions limitations and related provisions into the SIP, the EPA thereby makes those emission limitations a federally enforceable component of the SIP that the state, the EPA, and citizens can enforce thereafter in the event of a violation. SIP provisions that effectively preclude enforcement of violations by the EPA or citizens, whether through impermissible exemptions or other SIP provisions that function to bar effective enforcement, are not acceptable.

Third, the results of application of the control measures must be replicable. This means that where a rule contains procedures for interpreting, changing or determining compliance with the rule, the procedures are sufficiently specific and objective so that two independent entities applying the procedures would obtain the same result.

Fourth, the control measures must be accountable. This means, for example, that source-specific emission limits must be permanent and must reflect the assumptions used in the attainment plan for the area, including the modeling conducted in conjunction with the attainment demonstration. It also means that the attainment plan must establish requirements to track emissions changes at sources and provide for corrective action if emissions reductions are not achieved according to the plan.

c. Comments and Responses

Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

10. Determination of RACM and RACT and Additional Reasonable Measures in Multi-State Nonattainment Areas

a. Summary of Proposal

The proposal included several proposed recommendations about the development of control measures by states with multi-state nonattainment areas.

b. Final Rule

The guidance in the final preamble remains very similar to what was proposed. States in multi-state nonattainment areas will need to consult with each other on appropriate control measures for the shared nonattainment area. The agency anticipates that states could decide upon RACM and RACT and additional reasonable measures that differ from state to state in a shared nonattainment area, based upon each state's determination of the most effective strategies given the relevant mixture of sources and potential controls in the respective states' portions of a shared nonattainment area. As long as each state can adequately demonstrate that its chosen attainment strategy, including its selection and adoption of RACM and RACT and additional reasonable measures, will provide for meeting RFP requirements and for attainment of the NAAQS as expeditiously as practicable for the nonattainment area at issue, the EPA anticipates being able to approve individual state plans that may elect to control a different mix of sources or to implement different controls, under the proper circumstances. Nevertheless, in evaluating RACM and RACT and additional reasonable measures for a particular nonattainment area, states must consider potential reasonable control measures developed for other areas or other states, and particularly for other portions of an interstate nonattainment area. In addition, states in multi-state nonattainment areas must evaluate whether the reasonable measures each state may have identified as not being necessary for attainment could collectively advance the attainment date for the area by at least 1 year. The EPA may consider such measures in assessing the approvability of each state's individual attainment plan for a multistate nonattainment area.

c. Comments and Responses

Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

11. Environmental Justice Considerations in Developing the Attainment Plan Control Strategy for a Moderate PM2.5 Nonattainment Area

a. Summary of Proposal

The proposal provided guidance about environmental justice considerations in developing the attainment plan control strategy for a Moderate area.

b. Final Rule

The guidance remains very similar to what was proposed. Current air quality data indicate that the more severe PM2.5 nonattainment areas contain a high population of people with low socio-economic status, who are among the most at-risk for adverse health effects from exposure to PM2.5. As part of its EJ2020 Action Agenda, the EPA is committed to making progress on improving air quality in communities with high particulate pollution. The EPA, therefore, strongly urges states to consider environmental justice concerns with respect to any control measures they have identified as potential RACM or RACT or additional reasonable measures in an area, particularly to the extent that control measures that a state may be considering are otherwise approximately equal (in terms of technological and economic feasibility) but unequal with respect to their direct or indirect impacts on overburdened populations.[102] In such cases, the EPA encourages the state to prioritize imposition of the control measures that will result in the least possible burden and greatest degree of health protection for overburdened populations in the nonattainment area. Section XI of this preamble discusses possible approaches for states to address environmental justice concerns associated with implementation of the PM2.5 NAAQS in their SIP development process and attainment plans.

Start Printed Page 58048

c. Comments and Responses

Any comments received on this section are addressed in the Response to Comments document found in the docket for this action.

E. Modeling for Attainment Demonstrations

1. Demonstrations for Moderate Areas

a. Summary of Proposal

Section 189(a) of the CAA generally requires a state with a designated Moderate nonattainment area to submit an attainment plan for such area. Section 189(a)(1)(B) of the CAA requires the state to submit an attainment demonstration including air quality modeling to establish either: (i) That the area will attain the relevant NAAQS by the applicable attainment date; or (ii) that it is impracticable for the area to attain the relevant NAAQS by the applicable attainment date. For Moderate nonattainment areas, the attainment date is as expeditiously as practicable, but no later than the end of the sixth calendar year after designation as nonattainment. The EPA therefore proposed to require all Moderate nonattainment areas to submit either an attainment demonstration which includes air quality modeling which establishes that the area will attain the PM2.5 NAAQS by the applicable attainment date, or an impracticability demonstration which documents that the area will not attain the NAAQS by the applicable attainment date. The EPA proposed that the impracticability demonstration must also include air quality modeling, but also asked for comments on an alternative option that would not require air quality modeling as part of an impracticability demonstration. The EPA also proposed to allow states to fulfill the statutory modeling requirement through either locally generated photochemical and/or dispersion modeling or, with proper justification, appropriate regional or national modeling.

An attainment demonstration is a plan that provides an explanation of how a state will attain the PM2.5 NAAQS by the applicable attainment date in a particular nonattainment area.[103] The EPA proposed that the demonstration must contain: (i) Technical analyses such as base year and future year modeling of emissions which identifies sources and quantifies their emissions that are contributing to violations of the PM2.5 NAAQS; and (ii) analyses of future year emissions reductions and air quality improvement resulting from existing (i.e., already-adopted or “on the books”) national, regional and local programs, and potential new local measures needed for attainment, including RACM and RACT controls for the area.

The EPA further proposed that each state with a Moderate nonattainment area must submit an attainment plan with an attainment demonstration that includes analyses supporting the state's determination of its proposed attainment date. In all cases, the state must show that the area will attain the NAAQS as expeditiously as practicable, but not later than the sixth calendar year after designation. In order to establish that the attainment date is as expeditious as practicable, the state must explain why the control measures adopted in the attainment plan provide for the most expeditious attainment and, in particular, must explain why any cumulative group of reasonable and available control measures that the state elected not to adopt will not collectively advance the attainment date by at least 1 year.

b. Final Rule. As required by CAA section 189(a)(1)(B), the EPA is finalizing a requirement for states with Moderate nonattainment areas to submit a demonstration to establish either: (i) That the area will attain the relevant NAAQS by the applicable attainment date; or (ii) that it is impracticable for the area to attain the relevant NAAQS by the applicable attainment date.

As proposed, attainment demonstrations must include analyses (including air quality modeling) supporting the state's determination of its proposed attainment date. In all cases, the state must show that the area will attain the NAAQS as expeditiously as practicable, but not later than the sixth calendar year after designation. The demonstration must include implementation of all measures identified as RACT/RACM plus additional reasonable measures, as necessary, for expeditious attainment. In order to establish that the attainment date is as expeditious as practicable, the state must explain why the control measures adopted in the attainment plan provide for the most expeditious attainment and, in particular, must explain why the cumulative group of reasonable and available control measures that the state elected not to adopt will not collectively advance the attainment date by at least 1 year. See 40 CFR 51.1009(a)(4).

The EPA is not finalizing a regulatory requirement for air quality modeling to be included as part of an impracticability demonstration. See 40 CFR 51.1009(a)(4). Since all nonattainment areas will have modeling requirements associated with their attainment demonstration, the EPA believes it is likely that modeling will be submitted in support of impracticability demonstrations. However, it may be possible in some cases to support an impracticability demonstration with ambient PM2.5 data and other relevant non-modeling information. For example, the ambient data in a nonattainment area may be so far above the NAAQS, and the reasonable and available controls (i.e. RACM/RACT and additional reasonable measures) so limited, that it is clearly impossible (and thus also impracticable) for the area to attain by the Moderate area attainment date.[104] In order to support this type of demonstration, the state must show that, even if all reasonable controls (i.e. RACM or RACT and additional reasonable measures) were implemented, the state could not attain the NAAQS within the statutory timeframe for a Moderate area.

The EPA continues to assume that in most cases photochemical grid modeling will be required to demonstrate attainment with the PM2.5 NAAQS. However, the EPA recognizes that more simplistic modeling techniques (such as dispersion, receptor, and/or box models) may suffice to demonstrate that an area will attain the NAAQS, especially in areas that are dominated by primary PM2.5 emissions (e.g. residential wood smoke).

c. Comments and Responses. Comment: Some commenters supported the EPA's proposal to require modeling to demonstrate that attainment is not practicable. The commenters stated that such an interpretation flows logically from the Act's requirement in section 189(a)(1)(B) that attainment demonstrations be supported by modeling. One commenter supported the alternative approach described in the proposal in which air quality modeling would not be required for a Moderate area impracticability demonstration.

Response: After further consideration of this issue, the EPA has determined that modeling need not be a regulatory requirement to support an impracticability demonstration. We note that CAA section 189(a)(1)(B)(i) includes the parenthetical “including air quality modeling” which clearly Start Printed Page 58049makes modeling a statutory requirement for moderate area attainment demonstrations. However, the same parenthetical statement is absent from CAA section 189(a)(1)(B)(ii), which addresses an impracticability demonstration. While we believe that most impracticability demonstrations will indeed be supported by air quality modeling, there are cases where a modeling demonstration may not be needed. In addition, the EPA believes the burden of proof for an impracticability demonstration is logically lower than for an attainment demonstration because submission of an impracticability demonstration also requires reclassification to a serious nonattainment area and the accompanying more stringent regulatory requirements (e.g. BACT/BACM). The area is still required to meet RACT/RACM requirements and will also be required to submit a serious area attainment demonstration, which will necessarily need to include air quality modeling.

Comment: Some commenters agreed with the EPA that states should be afforded flexibility to fulfill the statutory modeling requirement through appropriate regional or national modeling.

Response: The EPA agrees that, where appropriate, regional and/or national scale air quality modeling could be sufficient to fulfill the statutory modeling requirement for attainment demonstration modeling. However, as with any attainment demonstration, the modeling must be shown to be appropriate for the nonattainment area, including good model performance, appropriate emissions and meteorological inputs, and consideration of emissions control strategies. It should be noted, however, that it may be difficult to fulfill other CAA requirements (such as emissions inventory, RACM, RFP, establishing motor vehicle emissions budgets for transportation conformity purposes, etc.) using regional or national modeling data. In order to fulfill those requirements, states may need more detailed data for sources in their nonattainment area compared to what is available through regional or national modeling.

Comment: Some commenters stated that, as the proposal stands, if states wish to preclude RACT/RACM for any sources in the nonattainment area, they must do modeling for the year preceding the attainment year to demonstrate early attainment; this would require modeling for 3 years, rather than 2 years.

Response: Although a RACM analysis is required, and eliminating potential control measures requires an assessment of whether the measures collectively could advance the attainment date by 1 year, EPA did not propose any specific modeling requirements for the RACM analysis. There are several components to the analysis. First, potential emissions reductions need to be assessed. Then, an assessment of whether those emissions reductions can advance attainment by at least a year needs to be completed. One way to minimize the number of future modeled years is to establish (through sensitivity modeling) a relationship between PM2.5 and PM2.5 precursor emissions reductions and PM2.5 concentrations in the nonattainment area. The established relationship can be used to estimate whether a particular set of emissions reductions will be able to advance the attainment date by at least a year. Also, in some cases, the emissions reductions identified through the RACM analysis may be relatively small (as a percentage of area-wide emissions) that a modeling analysis is not needed to show that the attainment date cannot be advanced.

2. Available Modeling Guidance for Demonstrating Attainment

a. Summary of Proposal. The EPA proposed that attainment demonstrations should be consistent with the procedures for modeling PM2.5 as described in the EPA's “Guidance on the Use of Models and Other Analyses for Demonstrating Attainment of Air Quality Goals for Ozone, PM2.5, and Regional Haze” [105] as well as the Guideline on Air Quality Models (40 CFR part 51, Appendix W).

The PM2.5 attainment demonstration modeling guidance (hereafter referenced as the “modeling guidance”) describes how states can apply air quality models to generate results needed to demonstrate attainment. Models are used to test whether control measures in an attainment plan to be adopted into a SIP are likely to result in attainment of the relevant standards. The attainment demonstration modeling guidance recommends a modeled attainment test for the annual and 24-hour PM2.5 NAAQS that uses a combination of ambient PM2.5 and PM2.5 species data and modeled PM2.5 concentrations to estimate future year air quality. In the recommended attainment test the state applies the test at each PM2.5 ambient monitor location within or near a designated nonattainment area. Models are used in a relative sense to estimate the response of measured air quality to future changes in emissions. Future air quality is estimated by multiplying recent monitored PM2.5 values by the modeled relative response (percent change) to projected future changes in emissions. If the future design value at all monitoring locations in the nonattainment area does not exceed the concentration of PM2.5 specified in the NAAQS, the area is projected to attain the NAAQS.

b. Final Rule. In the final rule, EPA is continuing to recommend that attainment demonstrations should be consistent with the procedures for modeling PM2.5 as described in the PM2.5 attainment demonstration modeling guidance and Appendix W. The modeling guidance describes how states can apply air quality models to generate results needed to demonstrate attainment. These recommendations include developing a conceptual description of the problem to be addressed; developing a modeling/analysis protocol; selecting an appropriate model to support the demonstration; selecting appropriate meteorological episodes or time periods to model; choosing an appropriate area to model with appropriate horizontal/vertical resolution; generating meteorological and air quality inputs to the air quality model; generating emissions inputs to the air quality model; and evaluating performance of the air quality model. After these steps are completed, the state can apply a model to simulate effects of future year emissions and candidate control strategies.

The EPA has updated the 2007 PM2.5 modeling guidance to include additional information related to the 2012 PM2.5 NAAQS and associated monitoring requirements.[106] The main components of the modeling guidance and the modeled attainment test have not changed. Additional information has been added to address near-road monitoring sites and other information that was not available when the guidance was first released in 2007.

The modeling guidance continues to recommend a relative attainment test for both the annual and 24-hour PM2.5 NAAQS. The EPA is not recommending a specific model for use in the attainment demonstration for the PM2.5 NAAQS. At present, there is no single model that has been extensively tested and shown to be clearly superior to other available models. The current Start Printed Page 58050modeling guideline, 40 CFR part 51, appendix W, does not identify a preferred model for use in attainment demonstrations of the NAAQS for PM2.5. Thus, states may choose from several alternatives.

The EPA has developed software to perform both the annual and 24-hour PM2.5 attainment test (including interpolating PM species data where necessary). The current software is called the Software for the Modeled Attainment Test—Community Edition (SMAT-CE).[107] The software is provided as a way to make it relatively easy for states to apply the recommended modeled attainment test(s). However, states are not required to use SMAT-CE and can develop their own post-processing software as necessary.

The modeling guidance continues to describe the opportunity for states to supplement their modeling with a “weight of evidence” demonstration. States may use other information and analyses, in addition to the modeled attainment test to estimate whether future attainment of the NAAQS in an area is likely. Other analyses may include, but are not limited to, emissions trends, ambient data trends and analyses, other modeling analyses, and documentation of other non-modeled emissions control strategies, including voluntary programs.

The application of air quality models requires a substantial effort by state and local agencies. Therefore, states should work closely with their EPA regional office in executing each step of the modeling process. By doing so, it will increase the likelihood of the EPA's approval of the state demonstration submitted at the end of the modeling and overall attainment plan development process.

c. Comments and Responses. Comment: Several commenters questioned the ability of the current most common photochemical models to accurately model how the PM2.5 precursors impact overall PM2.5 concentrations. They raise particular concerns about ammonia emissions and the ability of models to predict PM2.5 formation from ammonia precursor emissions. The commenters stated that emissions inventories necessary for such modeling, as well as the tools used to measure those emissions, remain uncertain and are sometimes inaccurate; e.g., emission rates are too often based on unreliable data, due to either lack of representative information or technical issues associated with test methods. Some commenters stated that these concerns are particularly salient here because the PM2.5 SIP Requirements Proposal requires that states account for new precursors, including VOCs and ammonia.

Response: The EPA disagrees with the commenters' assertion that emissions inventory and modeling tools are insufficient to estimate PM2.5 concentrations and the predicted change in PM2.5 due to changes in PM2.5 emissions and PM2.5 precursors. While there will always be uncertainty in emissions inventories and modeling, photochemical models of PM2.5 concentrations, including secondary formation through chemistry, have been used in the scientific and regulatory community for over 30 years. State attainment demonstration modeling has been performed by numerous states over the last 10+ years to support the 1st round of PM2.5 SIPs that were due in 2007. In addition, the EPA has used photochemical modeling of PM2.5 to support numerous regulatory rulemakings over the last decade.

The technical tools to perform photochemical modeling are well established and have been improved almost continuously over many years. New versions of the CMAQ and CAMx models with numerous science updates are released every 1 to 2 years. National emissions inventories that include primary PM2.5 and all scientific precursors (SO2, NOX, VOC and ammonia) have existed since the NEI for 2002. The NEI is released every 3 years with methodological improvements with every release.

In addition, the commenters refer to VOC and ammonia as “new precursors,” which is not accurate. VOC and ammonia have always been “scientific” PM2.5 precursors, and as such have always been inventoried and modeled with chemistry in PM2.5 photochemical models. The only thing “new” is that VOC and ammonia are now assumed to be presumptive PM2.5 precursors. However, even though the previous implementation rule did not assume that VOC and ammonia were default precursors, all photochemical modeling of PM2.5 has always included VOC and ammonia emissions and the resultant chemical formation of ammonium sulfate, ammonium nitrate, and secondary organic carbon.

The commenters were concerned that model errors in the formation of PM2.5 from ammonia sources would impose an unreasonable regulatory burden on sources of ammonia such as animal agriculture. Even though there may be general uncertainty in ammonia inventories, it is not clear how those uncertainties would lead to an unreasonable regulatory burden on any emissions sources in particular. Every modeling application in support of an attainment demonstration must be shown to adequately represent the emissions, chemistry, and PM2.5 concentrations in the nonattainment area. Ambient measurements of PM2.5 and precursors are used in a model performance evaluation to demonstrate that the modeling system is appropriate to use to determine the sensitivity of PM2.5 mass to emissions changes. In addition, all SIPs are required to undergo a public comment process where specific emissions and/or modeling concerns can be raised to the state. And then, after review of the SIP submission by EPA, all approvals or disapprovals of attainment SIPs go through a notice and comment rulemaking process. There are therefore numerous opportunities for both industry and the general public to participate in the SIP development process. States are expected to use the appropriate tools and the best information available to demonstrate how they will attain the PM2.5 NAAQS by the attainment date. The EPA believes that the appropriate tools are available to perform the modeling needed for an attainment demonstration.

3. Demonstrating Attainment at Near-Road Monitors

a. Summary of Proposal. The 2012 PM2.5 NAAQS final rule contains new requirements for operating near-road monitors in the largest metropolitan areas.[108] The first set of monitors was required to be in place by January 1, 2015. Some of the near-road monitors began operation prior to 2015. However, none of the monitors will have the requisite 3 years of monitoring data that can be used to calculate a PM2.5 design value until 2017 at the earliest. Therefore, these data were not used for the initial designations for the 2012 PM2.5 NAAQS (finalized in December 2014) and in most nonattainment areas, there will be less than 3 years' worth of data available when the initial attainment demonstrations for Moderate nonattainment areas are due in 2016. As a result of this timing, the EPA proposed that the initial set of Moderate area attainment demonstrations will not need to include projected design values for near-road monitors. But when 3 or more years' worth of complete ambient data are available at near-road monitors, Start Printed Page 58051states will need to address those monitors in their attainment demonstrations and will need to include a demonstration that those monitors will attain the NAAQS by the applicable statutory attainment date.

b. Final Rule. For the final rule, the EPA maintains the policy of not requiring the use of ambient air quality data in a modeled PM2.5 attainment demonstration unless there is at least one complete design value of data available (generally 3 complete years of data). This applies to both near-road and other PM2.5 ambient monitoring data. Some states may have installed their monitors well before the January 1, 2015 deadline and may therefore have complete data before the SIP deadline. In addition, some attainment demonstrations may be submitted after the statutory deadline. Because of the varying monitor installation dates, the use of near-road monitoring data in attainment demonstrations depends on the timing of the attainment demonstration submission relative to the installation date of the monitor(s). Ambient data with sufficient completeness to calculate a design value may not be ignored in an attainment demonstration. Such data can be addressed either in the attainment demonstration analysis of ambient monitors or as part of an unmonitored area analysis (see the next section), as appropriate.

The revised PM2.5 modeling guidance document includes procedures for applying a dispersion model or a combination of photochemical grid models and dispersion modeling to demonstrate attainment at monitors with large primary PM2.5 concentration gradients. Depending on the nature of the ambient data in a particular area, it may be appropriate to treat near-road monitors as high concentration gradient locations. However, in other cases, near-road monitors may have little or no gradient compared to other nearby monitors. Therefore, the appropriate treatment of near-road monitors in attainment demonstrations should be evaluated on a case-by-case, depending on the facts and circumstances in each nonattainment area.

c. Comments and Responses. Comment: Some commenters stated the EPA's proposal to excuse areas from having to include projected design values for near-road monitoring locations promises to undermine the likelihood of success for attainment demonstrations. The commenters stated the EPA's blanket waiver for near-road data has no rational basis and that just because such monitors were not required before January 1, 2015, does not mean that areas did not have them in place before then. The commenters stated the EPA should at least clarify that if an area has 3 years of near-road monitoring data, it should use such data in its attainment modeling. The commenters stated this would be particularly important, for example, if an area is late in preparing its demonstration.

Response: The EPA agrees there should not be a “blanket waiver” for the use of near-road monitoring data in attainment demonstrations that are due in 2016 or thereafter. The statements in the proposal referenced the fact that the near-road monitors were not required to be in place before January 1, 2015. This makes it unlikely that sufficient data from these monitors will be available to be considered in attainment demonstrations that are due in 2016. However, if complete data are available at near-road monitors during the development of the attainment demonstration, the data should be considered as appropriate (similar to any other PM2.5 monitoring data). Since the near-road PM2.5 monitoring network is relatively new, there may not be 3 years of complete data in time to be considered in the upcoming attainment demonstrations. In addition, the base modeling year of the attainment demonstration may predate the startup date of the near-road monitor(s). In this case, it may be possible to consider the near-road data in the attainment demonstration, but the recommended default projection methodology may not be applicable (since the time period of the near-road data may not correspond to the 5 year time period centered about the base modeling year, as recommended in the modeling guidance). Additionally, near-road PM2.5 monitors are only required in the 27 largest metropolitan areas of the country. Some PM2.5 nonattainment areas may not have any near-road monitoring sites. States should consult with the appropriate EPA regional office to determine the best way to treat near-road data in their attainment demonstration.

4. Demonstrating Attainment in Unmonitored Areas

a. Summary of Proposal. The 2007 PM2.5 modeling guidance describes a recommended “relative” attainment test that is based on showing attainment at ambient monitoring locations. The guidance also recommends that states conduct further analyses based on modeling results to determine whether there are unmonitored areas that merit additional analysis or investigation. In order to clarify the statutory and rule requirements of a modeled attainment demonstration, the EPA proposed four options for demonstrating attainment in unmonitored areas in an attainment demonstration.

Option 1 would require the attainment demonstration modeling to demonstrate attainment at ambient monitoring locations. There would be no requirement to specifically examine attainment in unmonitored areas. Option 2 would require modeling to demonstrate attainment at ambient monitoring locations and in unmonitored areas within the nonattainment area. Enforceable emissions reductions would be required to eliminate any potential future year NAAQS violations in all locations within the nonattainment area (including unmonitored areas). Option 3 would require modeling to demonstrate attainment at ambient monitoring locations and in unmonitored areas within the nonattainment area. However, rather than requiring states to impose additional enforceable emissions reductions in the SIP to address potential violations in unmonitored areas, states would be required to use the unmonitored area analysis results to develop an assessment of the likelihood of violations in unmonitored areas. The assessment would be used to evaluate the need for additional controls and/or could be used to inform the ambient monitoring plan (the need to add additional monitors or move existing monitors). Option 4 would require modeling to demonstrate attainment at ambient monitoring locations and recommend the analysis of unmonitored areas within the nonattainment area. This differs from Option 3 in that there would be no rule requirement to perform an unmonitored area analysis. But the submission of an unmonitored area analysis would still be recommended, especially in areas with a relatively sparse PM2.5 monitoring network or in locations where information such as modeling data, emissions inventories or non-FEM monitoring data (such as from special purpose monitors or saturation monitoring studies) may indicate potential high PM2.5 concentrations in areas that are currently unmonitored.

b. Final Rule. The EPA is finalizing proposed Option 4. This option requires states to show attainment at all current and recent monitoring locations. States will not be required to provide an unmonitored area analysis as a mandatory element of each attainment demonstration. However, an unmonitored area analysis can provide useful information about PM2.5Start Printed Page 58052concentrations and gradients in the nonattainment area and therefore the EPA recommends that all attainment demonstrations should contain an unmonitored area analysis. The EPA encourages states to use information available to them to consider what, if any, impacts may be occurring in unmonitored areas. States can evaluate the need to perform an unmonitored area analysis by using available information such as modeling data, emissions inventories, or non-FEM monitoring data (such as from special purpose monitors or saturation monitoring studies) to indicate the potential high PM2.5 concentrations in areas that are currently unmonitored. An unmonitored area analysis is strongly recommended where the state and/or the EPA has reason to believe that potential violations may be occurring in unmonitored areas, or other available information indicates that further analysis is warranted. The EPA will consider whether the state has adequately addressed all available information about potential exceedances of the NAAQS in unmonitored areas when determining whether the plan can be approved.

The EPA is requiring an attainment demonstration approach that relies primarily on existing monitoring sites and modeling to project attainment in future years. This approach to evaluating monitored and unmonitored areas is consistent with how EPA determines whether an area meets the PM2.5 NAAQS for purposes of designations and redesignations. As discussed in Section II of this preamble, the EPA promulgates designations for PM2.5 NAAQS nonattainment areas based primarily on ambient data measured at FRM and FEM monitors.[109] Although the EPA considers other information for purposes of evaluating areas with sources that contribute to those monitored violations for inclusion within the nonattainment area boundaries, the fundamental basis for designating an area as nonattainment for a PM2.5 NAAQS is the presence of one or more FRM or FEM monitors with data showing violations of the NAAQS. Similarly, determinations of attainment of the PM2.5 NAAQS for purposes of redesignation actions are based primarily on monitored data. When all FRM and FEM monitors in a nonattainment area measure attainment of the PM2.5 NAAQS, the state is eligible to submit a redesignation request for the area, assuming that it has complied with all other applicable requirements for purposes of redesignation. Specifically, the EPA's approval of a redesignation request is subject to meeting the requirements of CAA section 107(d)(3)(E). Among those requirements is that the area has attained the NAAQS. For the PM2.5 NAAQS, this determination is based on ambient data measured at the FRM and FEM monitors in the area in question.

In addition, the “relative” attainment test for PM2.5 attainment demonstrations uses FRM or FEM ambient monitoring data, combined with future year modeled percentage changes in PM2.5 concentrations to project future year design values. Since the attainment test relies on ambient monitoring data, an analysis of future year concentrations in unmonitored areas can only be accomplished by interpolating ambient data to a particular location where there is no existing monitor or recent monitoring data. Therefore, in the context of an attainment demonstration, the projection of future year PM2.5 concentrations in unmonitored locations is inherently more uncertain than projections in monitored locations due to the fact that the ambient concentrations from which these projections are developed are unknown in the unmonitored locations.

While the unmonitored area analysis is not a regulatory requirement, and states are not required to identify enforceable emissions reductions to eliminate potential violations in unmonitored areas, an unmonitored area analysis has the potential to provide additional important information about PM2.5 levels and gradients in the nonattainment area. The results of the analysis can be used to provide information to inform future monitoring plans, to examine the need for potential emissions controls, to evaluate potential environmental justice concerns, and to provide additional information to the public. The EPA believes that Option 4 provides the best balance between the regulatory requirements of the attainment demonstration and additional analyses which could provide helpful information to inform future regulatory activities.

Where information is available, states and the EPA have obligations to address potential violations in unmonitored areas, and, although we expect this to be relatively rare, attainment plans need to address air quality in unmonitored areas where information exists suggesting the potential for such violations. Where an unmonitored area analysis is performed, states should use model results and available ambient data to develop an assessment of the likelihood of violations in unmonitored areas. The nature of the assessment depends on the available information and the nature of the local PM2.5 problem, but could include, as appropriate, elements such as an evaluation of the emissions inventory (particularly for local direct PM2.5 sources), the existing ambient data for the area, and meteorological model inputs to evaluate the accuracy of the modeled violations in unmonitored areas. If potential violations are determined to be likely, additional steps could include imposition of emissions reductions at nearby emission sources or a commitment to deploy special purpose monitors and/or saturation monitors in the area (in order to further evaluate the problem). The state should document the assessment, including analyses of emissions, meteorological inputs and ambient data.

The PM2.5 modeling guidance recommends a default procedure for applying an unmonitored area analysis, which combines gridded model data with interpolated ambient data. States can apply the default recommended approach or develop their own analysis which may be more appropriate for the specific area or situation. States are expected to consult with the appropriate EPA Regional Office to evaluate available information to determine if an unmonitored area analysis is needed for a particular area and how the analysis should be performed.

c. Comments and Responses. Comment: Some commenters stated that, of the options for addressing unmonitored areas, only Option 2 is technically and legally defensible (80 FR 15382). The commenters stated the Act requires that ambient concentrations in all areas meet the applicable NAAQS and cited 42 U.S.C. 7407(a) as requiring states to assure “air quality within the entire geographic area comprising such State” will achieve the national standards and requiring “an implementation plan [to] . . . specify the manner in which national primary and secondary ambient air quality standards will be achieved and maintained”). The commenters also cited 42 U.S.C. 7410(a)(1) as requiring implementation plans to provide for implementation of the NAAQS “in each air quality control region (or portion thereof) within such State”). The commenters stated it is insufficient to suggest that an area need only show attainment at monitored locations and need only adopt controls that will address those locations.

Response: The EPA does not agree that Option 2 is the only technically and Start Printed Page 58053legally defensible option. The CAA requires states with nonattainment areas to submit an attainment demonstration as part of their PM2.5 SIP. States must show that they will attain the NAAQS by their attainment date. The CAA also requires states to use air quality modeling in their attainment demonstration. But other than those general requirements, the EPA believes states have discretion to interpret how and where to show attainment of the NAAQS through modeling in support of an attainment demonstration.

In addition, the EPA believes that a monitor based attainment demonstration satisfies the CAA requirement to show that “the entire geographic area” will attain the NAAQS. The EPA's monitoring requirements for PM2.5 are designed to ensure a robust nationwide monitoring network in both nonattainment and attainment areas. States have achieved this by maintaining their PM2.5 networks in accordance with EPA's network design criteria. Historically, these criteria provided that CBSAs have at least one PM2.5 monitoring site located in an “area-wide” location of expected maximum concentration (within the CBSA).[110] Thus, by assuring compliance with the NAAQS at the location of the expected highest area-wide concentration in the CBSA, air quality is protected throughout each CBSA. The EPA has identified recommended procedures for PM2.5 modeled attainment demonstrations. These recommendations are contained in modeling guidance. The recommended attainment test relies on the ambient monitors to provide the “anchor point” for future year air quality projections. This ensures that future year concentration predictions are grounded by “real world” measurements. Since the attainment test relies on ambient monitoring data, the projection of future year PM2.5 concentrations in unmonitored locations is inherently more uncertain than projections in monitored locations due to the fact that the ambient concentrations from which these projections are developed are unknown in the unmonitored locations. Therefore, the EPA continues to believe that for PM2.5 attainment demonstrations, modeling results in unmonitored areas are too uncertain to use in this manner. For the reasons stated earlier, in the final rule, the EPA does not believe that it is necessary to require states to submit an unmonitored area analysis and to show that any potential violations of the NAAQS in unmonitored areas have been eliminated through enforceable controls.

Comment: Several commenters supported Option 1 where only monitored grid cells are included in the attainment plan. Commenters stated that, due to their concerns related to the accuracy of air dispersion modeling tools and protocols, it is not appropriate to use air dispersion modeling to predict receptor impacts in unmonitored areas. Some commenters stated that Option 1 is the approach that most closely describes the current EPA rule.

Response: The EPA agrees that the modeling results are too uncertain in unmonitored areas to require an unmonitored area analysis as part of the attainment demonstration (for the reasons enumerated earlier). However, the EPA disagrees that Option 1 is the approach that most closely describes the attainment demonstration requirements in the 2007 PM2.5 implementation rule. An unmonitored area analysis has never been an implementation rule requirement, but was a recommended analysis in the PM2.5 modeling guidance. Therefore, the EPA believes that Option 4 is closer to the current status quo. This final rule clearly states the continued recommendation to perform an unmonitored area analysis and the benefits of doing so.

Comment: Some commenters stated that an “unmonitored area analysis” is essential since speciation monitoring is conducted at a limited number of sites. The commenters stated that, however, given the inherent uncertainty from modeling analysis in unmonitored areas, results from such analysis should only be used to inform additional actions. The commenters stated that, while modeling analysis in unmonitored areas can be used as a reference for additional studies, it should not be used for the attainment demonstration in the SIP. The commenters stated that, under any of the options, the EPA should specify the recommended level of detail for an unmonitored area analysis, especially if it is required. The commenters recommended that the analysis need not require modeled results at finer spatial scales than those specified in the modeling protocol.

Response: The EPA agrees that an unmonitored area analysis is important and continues to recommend development of unmonitored area analyses to support attainment demonstrations. The EPA also agrees that due to uncertainty, the results from such analysis should only be used to inform additional actions. As stated earlier, the PM2.5 modeling guidance contains a default recommended unmonitored area analysis technique which combines gridded modeling data and interpolated ambient data (including PM2.5 speciation data). But the exact nature of the unmonitored area analysis can be considered based on the information relevant to each nonattainment area. The EPA also agrees that where an unmonitored area analysis is conducted, it should be at the same spatial scale (model resolution) as the modeled attainment demonstration at monitoring locations. For example, if the gridded modeling analysis is performed at 4km resolution (model grids that are 4km on a side), then the unmonitored areas should be examined at the same resolution. Similarly, if near road monitors are examined with a dispersion model at a finer resolution (compared to the other monitors) as part of the attainment demonstration, the unmonitored area analysis could also examine unmonitored near-road areas at a finer resolution.

Comment: Several commenters disagreed with the proposal to require states to perform the attainment test at “recent” monitoring locations. Commenters stated that, within the EPA's description of Option 1, the proposal indicates that the attainment test required under Option 1 would also apply to locations that have “recent” FRM and/or FEM monitoring data. Commenters stated the current FRM/FEM monitoring data should be sufficient to demonstrate attainment.

Response: States must demonstrate that they will attain the PM2.5 NAAQS in the nonattainment area as expeditiously as practicable, and no later than the moderate area attainment date. The recommended attainment test in the modeling guidance uses recent ambient data that encompass a 5-year period that is dependent on the base modeling year. For example, for a base modeling year of 2014, the guidance recommends using ambient PM2.5 data from the 2012-2016 period. The guidance also recommends only using ambient data from a particular monitoring site if it has at least one complete design value period during the relevant 5-year period. With these recommendations in mind, there are numerous cases where a monitoring site may have only partial data from the relevant 5-year period or may be a new monitor that started collecting data after the 5-year period or may have been shut down before the 5-year period. The EPA agrees that it is generally not necessary to examine the modeling results where monitors were shut down before the base modeling period. These monitors will not be used to make future Start Printed Page 58054decisions relating to attainment status of the area. However, monitors that are new or were operating during the base modeling period are still relevant and can be used to provide additional information in the attainment demonstration. The data from these monitors may serve as the basis for examining potential violations in the area as part of an unmonitored area analysis. This is especially the case for new monitors, which may not have enough data to provide a robust future year concentration estimate in the attainment demonstration. But the monitoring data, combined with modeled information, can provide information about the likelihood of future violations in the area surrounding the monitor location.

5. Future Year(s) To Be Modeled in Attainment Demonstrations

a. Summary of Proposal. A state performing a modeling analysis for an attainment demonstration or impracticability analysis must select a future year for the analysis. For an attainment demonstration, a state should select the future modeling year such that all emissions control measures relied on for attainment will have been fully implemented by the beginning of that year. The EPA proposed that to demonstrate attainment, the modeling results for the nonattainment area must predict that emissions controls implemented no later than the beginning of the last calendar year preceding the attainment date will result in PM2.5 concentrations that meet the level of the standard.[111] While states should choose the future modeling year based on a number of factors, the EPA proposed the last possible year permitted under the statute as a starting point for modeling.

b. Final Rule. The EPA is finalizing the recommendation that the last possible year permitted under the statute is an appropriate starting point for modeling. See 40 CFR 51.1011(a)(6). For a state that is submitting an attainment demonstration, modeling the sixth calendar year is a logical starting point to determine if attainment by that year is likely. Even though attainment is determined by averaging 3 years' worth of ambient data, states do not have to model 2 years before the attainment date to show modeled attainment. Since the design value is an average of 3 years' worth of data, attainment can still be shown even if concentrations exceed the NAAQS in one or more of the 3 years used to determine attainment (as long as the 3 year average is less than the NAAQS). Therefore, it can be appropriate to model any of the 3 years used to determine attainment. In addition, if ambient data show attainment-level concentrations in the final statutory attainment year, a state may be eligible for up to two 1-year extensions of the attainment date, if the area meets the criteria for such extensions. Therefore, modeling attainment-level concentrations for the last year permitted by statute is acceptable.

States with Moderate areas that submit an impracticability demonstration must show that the area cannot attain the NAAQS by the end of the sixth calendar year following designation of the area. Therefore, the appropriate future modeling year for such a demonstration is also the sixth calendar year after designation.

For the reasons stated earlier, it is both acceptable, and will in fact be most efficient, for a state to begin the attainment demonstration process by modeling the last year permitted under the statute to determine future year modeled PM2.5 concentrations in the sixth year after designations. For example, since designations for the 2012 PM2.5 NAAQS were effective in March 2015, it is appropriate for states to model air quality for 2021 in the attainment demonstrations for designated nonattainment areas.

Because an area must attain “as expeditiously as practicable,” additional considerations are necessary before an attainment date can be established. For purposes of determining the attainment date that is as expeditious as practicable, the state must conduct future year modeling which takes into account expected growth and known controls that are already in effect or that are adopted and will be in effect by January 1 of the future year. For example, for a Moderate nonattainment area for the 2012 PM2.5 NAAQS, a future base case scenario for the year 2021 would project future air quality given implementation of existing federal, state and local measures. If this future base case scenario demonstrates attainment, then the state must determine if attainment can be achieved in an earlier year through the application of additional measures. Therefore, the state must conduct an analysis of RACM and RACT and additional reasonable measures to determine if, collectively, all technologically and economically feasible measures identified by the state that can be implemented by the beginning of the sixth calendar year following designations can advance the attainment date by at least 1 year (note that RACM and RACT controls must be implemented within 4 years of an area being designated nonattainment, but additional reasonable measures for an area for which a state can demonstrate attainment by the end of the sixth calendar year following designation of the area are those technologically and economically feasible measures that can be implemented by the beginning of the last year prior to the projected attainment date). Results of this analysis may indicate attainment can be achieved earlier, through implementation of all reasonable control measures (i.e., RACM and RACT and additional reasonable measures).

If, on the other hand, the future base case scenario does not demonstrate attainment, then a control case scenario is needed to examine whether the reasonable, technically and economically feasible measures identified by the state would result in attainment in the analysis year (i.e., in 2021 for purposes of this example based on the 2012 PM2.5 NAAQS). The control case scenario would add potential control measures—e.g. RACM and RACT (which must be implemented in 4 years) and additional reasonable measures, plus any measures on sources outside of the nonattainment area that the state has identified as feasible to implement by the attainment date. This modeling, along with other relevant information, would inform a judgment as to whether attainment of the relevant NAAQS is practicable by the end of the sixth year after designation or earlier. In the case of areas designated for the 2012 PM2.5 NAAQS, if the analysis does not demonstrate attainment by December 31, 2021, then the analysis could serve as the technical basis for the state to submit a demonstration that attainment by the outermost statutory attainment date for Moderate areas is impracticable. This in turn could serve as a technical basis for the Administrator to reclassify the area to Serious.[112] If the analysis does demonstrate attainment, then the remaining step is to assess whether the attainment date can be advanced by 1 year.

In conducting this assessment, the EPA believes that it is not reasonable to require states to model each and every calendar year to determine the Start Printed Page 58055appropriate attainment date. Developing and modeling future year inventories is a time-consuming and resource intensive process. Multiple emissions models are needed in order to generate year specific emissions for the various emissions sectors (e.g. mobile, non-road, non-EGU point and EGU point). In some cases it may be reasonable to model one additional interim year before the maximum statutory attainment date.[113] However, in most cases, the air quality benefits of an identified set of RACM and RACT and additional reasonable measures can be estimated through model sensitivity analyses and the development of sensitivity factors (i.e., factors to relate tons of emissions reductions in the area to PM2.5 concentration changes in the area). For example, states can model across the board percentage reductions in direct PM2.5 and/or precursor emissions (in separate model runs or using advanced modeling techniques such as DDM) to determine the impact of emissions reductions on PM2.5 concentrations in the area. This modeling can be performed with a single attainment year modeling platform, which is much less resource intensive than modeling additional future years. The identified potential emissions reductions available from RACT and RACM and additional reasonable measures can be compared to the magnitude of the modeled PM2.5 reductions from the sensitivity analyses to determine if all such controls will advance attainment by a year. The EPA strongly recommends that states discuss the selection of the future year(s) to model with their EPA Regional Office as part of the modeling protocol development process and before embarking on the modeling.

c. Comments and Responses. Comment: Some commenters disagreed with the proposal that the future year should reflect when all control measures relied on have been fully implemented by the beginning of that year and it should be no later than the beginning of the last calendar year preceding the attainment date. The commenters stated the CAA provides attainment must be achieved as expeditiously as practicable but no later than the end of the sixth calendar year (except RACT/RACM are required within 4 years) and states should be given the full period to demonstrate attainment and to require control of emissions.

Response: The proposal to require the modeling to reflect control measures that have been fully implemented no later than the beginning of the last calendar year preceding the attainment date does give nonattainment areas “the full period” to demonstrate attainment and to require control of emissions. Since the design value is an average of 3 years' worth of data, it could be argued that modeling and related emissions controls should be in place 3 years before the attainment date. However, if ambient data show attainment level concentrations in the final statutory attainment year, a state may be eligible for up to two 1-year extensions of the attainment date, if the area meets the criteria for such extensions. Therefore, modeling attainment level concentrations for the last year permitted by statute is acceptable. But in order to measure attainment level concentrations in the final year, controls must be in place for the full year (at the beginning of the year). Implementation of emissions controls at the end of the year would not be consistent with modeling attainment level or measuring attainment level concentrations during the year.

6. Attainment Year Motor Vehicle Emissions Budgets

The transportation conformity rule requires that attainment plans establish motor vehicle emissions budgets for the area's attainment year. Therefore, once an area's attainment date has been established, the state would establish motor vehicle emissions budgets for direct PM2.5 and any relevant PM2.5 precursor for the attainment year.[114] It should be noted that states that submit impracticability demonstrations for Moderate areas under CAA section 189(a)(1)(B)(ii) are not required to submit motor vehicle emissions budgets for attainment purposes because the submitted SIP does not demonstrate attainment. A motor vehicle emissions budget for the purposes of a PM2.5 attainment plan is that portion of the total allowable emissions within the nonattainment area allocated to on-road sources as defined in the submitted attainment plan. Such motor vehicle emissions budgets would be calculated using the latest planning assumptions and the latest approved motor vehicle emissions model available at the time that the attainment plan is developed, unless EPA approves the state's use of an alternative model.[115]

F. RFP Requirements

1. Background on Statutory Requirements and Existing Guidance

Reasonable further progress (RFP) is a concept included in the CAA under part D, title I to assure that states make steady, incremental progress toward attaining air quality standards in the years prior to the attainment date for a nonattainment area, rather than merely deferring implementation of control measures and therefore emissions reductions until the date by which the standards are to be attained. As discussed elsewhere in this preamble, section 172 of the CAA addresses attainment plan provisions in general. Section 172(c)(2) of the CAA requires attainment plans to provide for RFP, which is defined in CAA section 171(l) as “such annual incremental reductions in emissions of the relevant air pollutant as are required by [part D of title I] or may reasonably be required by the Administrator for the purpose of ensuring attainment of the applicable national ambient air quality standard by the applicable date.” Section 189(c) of the CAA requires that “[P]lan revisions demonstrating attainment submitted to the Administrator for approval under this subpart shall contain quantitative milestones which are to be achieved every 3 years until the area is redesignated attainment and which demonstrate reasonable further progress, as defined in CAA section 171(1), toward attainment by the applicable date.” Quantitative milestones are discussed later in Section IV.G of the preamble.

Section 172(c)(3) of the CAA requires the state plan to include “a comprehensive, accurate, current inventory of actual emissions from all sources of the relevant pollutant or pollutants in such area . . .” Section 172(c)(1) of the CAA requires the state plan to include “all reasonably available control measures as expeditiously as practicable (including such reductions in emissions from existing sources in the area as may be obtained through the adoption, at a minimum, of reasonably available control technology) . . .” Section 172(c)(9) requires the state plan to “provide for the implementation of specific measures to be undertaken if the area fails to make reasonable further progress . . . Such measures shall be Start Printed Page 58056included in the plan revision as contingency measures to take effect in any such case without further action by the State or the Administrator.” For additional background on statutory requirements and existing guidance, refer to preamble Section IV.F of the proposal for this rule.[116]

2. General Approach to RFP

a. Summary of Proposal. To satisfy the statutory requirements for RFP at CAA section 172(c)(2), the EPA proposed that a state must submit an RFP plan as part of its Moderate area attainment plan submission. The EPA proposed the following two options for developing an RFP plan.

Under the first option, the EPA proposed that the RFP analysis for any Moderate PM2.5 nonattainment area that can demonstrate attainment by the statutory attainment date must demonstrate either: (i) Generally linear progress toward attainment; or (ii) stepwise progress toward attainment. Stepwise emissions reductions would be slower than “generally linear” reductions for certain periods, and then would decline sharply (due to implementation of a new emission reduction program, or new operation of control technology on one or more stationary sources). The EPA proposed that a state must follow one primary approach for conducting the RFP analysis, but that they also have an option to conduct a secondary analysis that will provide greater flexibility in setting RFP goals with alternative emissions reductions and air quality improvement scenarios. The primary approach would be to show that nonattainment area emissions of each pollutant decline from the base year to the attainment year, either in a generally linear manner or in a stepwise manner. In the optional secondary analysis, the state could show that emissions of the various pollutants would change in a manner that would provide a change in air quality during the attainment period that is equivalent or more expeditious than the air quality change that would be estimated to occur under the primary approach. This optional analysis was referred to as an equivalency determination.

Under the second proposed option, the state would provide the control strategy implementation schedule and estimate the emissions reductions anticipated from the control measures (i.e., RACM/RACT and additional reasonable measures) for sources in the nonattainment area. The state then would employ modeling or another quantitative method to predict the overall PM2.5 concentrations in the nonattainment area for each milestone year. The milestone years would correspond to the years for which the state would be required to provide quantitative milestones pursuant to the requirement in section 189(c) of the Act.

b. Final Rule. The EPA is finalizing RFP requirements that allow the state flexibility to demonstrate RFP under CAA section 172(c)(2) using any of the general approaches included in the proposed rule. As part of its Moderate area attainment plan submission, the state must submit an RFP plan that includes three components: (1) An implementation schedule for control measures on sources in the nonattainment area, (2) RFP projected emissions for each applicable quantitative milestone year determined in Section IV.G of this preamble, based on the anticipated control measure implementation schedule; and (3) an analysis that demonstrates that this schedule of aggregate emissions reductions achieves sufficient progress toward attainment between the applicable baseline year to the attainment year. See 40 CFR 51.1012(a).

The first component of the RFP plan is the implementation schedule for all required control measures contained in the control strategy. The schedule should describe which measures will be implemented within the first 4 years following designation (and therefore would meet the statutory requirement for RACM and RACT). It should also describe the implementation schedule of additional reasonable measures (to be implemented more than 4 years following designation but before the attainment date) that have been adopted to help provide for expeditious attainment of the standard. Any Moderate area that cannot demonstrate attainment by the statutory Moderate area attainment date is required to provide an implementation schedule for all of the control measures identified as RACM/RACT and additional reasonable measures, in the same manner as an area that can demonstrate attainment.

The second component of the RFP plan is an analysis by the state identifying the RFP projected emissions by pollutant that are expected to be achieved by the control measures implemented within the nonattainment area according to the implementation schedule. The EPA requires the state to estimate these RFP projected emissions for each quantitative milestone year (i.e., for a Moderate area, at 4.5 years and 7.5 years after designation of the area) by sector on a pollutant-by-pollutant basis. These milestone year projected emissions are discussed further in Section IV.F.3 of the preamble. This information will be used by the state to show that the area is complying with quantitative milestone and RFP requirements for the area (discussed in Section IV.G of this preamble).

The final component of the RFP plan is an analysis demonstrating that the schedule of emissions changes achieves reasonable progress toward attainment between the applicable baseline year and the attainment year. This demonstration can be expressed in the form of emissions reductions only, or emissions reductions converted to air quality concentrations. This optional air quality RFP analysis is discussed later in this section.

Because the statute does not clearly establish the applicable baseline year from which to begin calculating annual emissions reductions for purposes of demonstrating RFP, the EPA is finalizing a requirement that states use the same year as the base year inventory used for developing the control strategy and associated air quality modeling demonstrating that the area will attain expeditiously.

A demonstration based on only emissions reductions must show that the implementation schedule achieves either: (i) Generally linear progress toward the projected attainment date; or (ii) stepwise progress toward the projected attainment date. For example, in one area new emission standards for mobile sources may achieve reductions in a generally linear manner over time, as a portion of the existing vehicle fleet is replaced each year with new vehicles meeting the more stringent standards. In another area, regulations to reduce emissions from certain stationary source sectors could have a single compliance date by which controls must be in place, which could result in a significant drop in emissions in a “stepwise” manner over a relatively short period.

In the first case, the EPA expects that, so long as the attainment date is as expeditious as practicable, then generally linear progress toward attainment by that date would satisfy the RFP requirement. In the second case, where progress is slower than generally linear, the state is required to submit a clear rationale and supporting information to explain why generally linear progress is not appropriate (e.g., due to the nature of the nonattainment problem, the types of sources contributing to PM2.5 levels in the area and the implementation schedule for control requirements at such sources).

Similarly, for areas that cannot demonstrate attainment within the Start Printed Page 58057Moderate area statutory deadline in CAA section 188(c)(1), the state must demonstrate either generally linear or stepwise emissions reductions toward the full amount of reductions that will be achieved by that deadline, i.e., the amount that reflects implementation of all of the control measures identified as RACM and RACT and additional reasonable measures for the entire period of the applicable attainment plan. Generally linear progress toward this full amount would meet the RFP requirement, but progress that is slower than that would require further justification.

In some circumstances, the EPA expects that a state could develop an approvable RFP plan even if emissions of one or more PM2.5 plan precursors are not decreasing. In this scenario, the state must demonstrate that the emissions reductions of direct PM2.5 combined with the aggregate emissions reductions of PM2.5 plan precursors support expeditious attainment of the applicable PM2.5 NAAQS. To accomplish this, the EPA expects that a state could use the relative air quality impacts of the different PM2.5 plan precursors identified in the attainment modeling to demonstrate that the emissions reductions of direct PM2.5 and aggregate PM2.5 plan precursors constitute an acceptable RFP plan. For example, the state could demonstrate that even if one or more PM2.5 plan precursor is not decreasing, the emissions reductions of direct PM2.5 and the remaining PM2.5 plan precursors are the dominant factors in reducing ambient PM2.5 levels and are therefore adequate to support expeditious attainment. In providing this flexibility, the EPA recognizes that control measures for certain pollutants may be more effective at reducing PM2.5 concentrations than others, and that states may be able to implement some measures more quickly than others while still achieving reasonable overall progress toward attainment.

The EPA is also providing an additional optional RFP analysis that evaluates the collective changes in emissions of multiple pollutants during the attainment period in terms of changes in air quality concentration. Under this optional approach, a state would have to show that the air quality improvement that is anticipated by milestone dates due to the identified control measures in the implementation schedule supports expeditious attainment of the PM2.5 NAAQS. For an area that can demonstrate attainment within the Moderate area statutory deadline, a state using this option could rely upon attainment demonstration modeling results that link emissions reductions with air quality improvements. For areas that cannot demonstrate attainment within the Moderate area statutory deadline, the state may have to conduct modeling or employ another quantitative method to predict the overall PM2.5 concentrations in the nonattainment area in each milestone year. The state would compare these air quality target values to certified ambient air quality monitoring data as part of the quantitative milestone report due after the area reaches each quantitative milestone date. The EPA recommends that states estimate air quality targets by establishing the relationship between modeled emissions reductions and air quality changes in the attainment plan (for the attainment year) and interpolating to the intermediate year(s) based on the same relationship.

The EPA recognizes that because atmospheric processes are complex, a specific percent change in emissions of PM2.5 precursors does not lead to an equivalent percent change in air quality, potentially creating uncertainty when determining air quality targets based upon predicted emissions reductions. Nevertheless, the EPA recognizes the importance of providing the flexibility to address different pollutants on different timetables so long as the plan can reasonably be expected to achieve the intended air quality benefits represented by the RFP analysis.

As previously noted, submission of the air quality-based RFP plan is optional. However, in certain circumstances, the applicable Regional Administrator may strongly recommend that a state or local agency submit an RFP plan with air quality targets for milestone years in order to satisfy the statutory RFP requirement. This approach could be appropriate when one or more pollutants is not decreasing over the attainment planning period or for areas that have experienced longstanding and persistent PM2.5 pollution problems despite the prior implementation of required control measures. The EPA will review each RFP plan on a case-by-case basis to determine whether it provides for such annual incremental reductions in emissions of the relevant air pollutant(s) as are necessary for the purpose of ensuring attainment by the applicable attainment date. See 40 CFR 51.1012. An additional RFP analysis will be required as part of a Serious area attainment plan if EPA reclassifies the area to Serious.

c. Comments and Responses. Comment: Some commenters generally supported the equivalency determination concept because they noted that different precursors are more or less effective in reducing atmospheric concentrations of PM2.5. Some commenters stated that, because the goal is timely attainment regardless of when controls are implemented for each precursor that is to be controlled, the EPA should allow both options, including the option for states to determine whether to approach the demonstration on a pollutant-by-pollutant basis, or overall.

Response: The final rule allows for emissions from one or more PM2.5 plan precursors to increase over the attainment planning period, as long as the emissions of direct PM2.5 and aggregate PM2.5 plan precursors decrease consistent with RFP and the state can demonstrate that the emissions increase does not delay expeditious attainment. This approach recognizes the fact that different precursors have different impacts on PM2.5 concentrations depending upon the specific atmospheric chemistry of each area. As previously noted, submission of the air quality-based RFP plan is optional but may be strongly recommend by the applicable Regional Administrator depending upon the unique circumstances of the nonattainment area.

Comment: One commenter suggested that the equivalency determination must be based on modeling of ambient concentrations, not simply on inter-pollutant equivalency ratios.

Response: The EPA recognizes the importance of modeling and notes that there are potential benefits of using modeling when providing the optional air quality analysis. Additionally, in the preamble, the EPA described when these types of tools could be useful in the development the air quality targets. Because the development of air quality targets is optional and complements the emissions reductions analysis, the EPA does not require modeling of ambient conditions for this purpose.

Comment: A few commenters supported the proposed Option 1 and the allowance for either generally linear or stepwise progress toward attainment. These commenters stated that allowing both methods is consistent with the pattern of many federal emissions reduction measures and it provides the most flexibility to states. Other commenters stated that existing guidance in the Addendum failed to recognize that, in many cases, more can be accomplished during one given year than in another. The commenters suggested the EPA provide states with the flexibility to manage their resources for rulemaking such that emissions reductions are obtained to attain Start Printed Page 58058generally linear progress averaged over the 3-year period rather than in each individual year.

Response: As stated earlier, this rule requires that the RFP analysis must demonstrate either generally linear or stepwise emissions reduction progress toward attainment. If there are significant differences between emissions reductions in different years, which make the emissions reductions no longer generally linear, then the state would have to provide a justification for the stepwise progress as discussed earlier. Therefore, the suggestion of averaging the emissions reductions to obtain generally linear progress over a 3-year period is not an acceptable way to demonstrate RFP. In this example, the state would have to submit a justification of why stepwise emissions reductions are more appropriate for their area. However, the EPA notes that if stepwise emissions reductions are achieved more rapidly than expected and consistent with the amount necessary to demonstrate RFP toward timely attainment, this would be in line with the overall principles of the CAA and would not require the aforementioned justification.

3. RFP Projected Emissions for RFP Analyses

a. Summary of Proposal. The EPA proposed that a state with a Moderate PM2.5 nonattainment area must submit RFP projected emissions for sources within the nonattainment area as part of the RFP plan. The EPA also proposed that these RFP projected emissions would, at a minimum, include projected emissions of each pollutant by different source types corresponding to the quantitative milestone dates for the area.

b. Final Rule. The EPA is finalizing that a state with a Moderate PM2.5 nonattainment area must submit RFP projected emissions for sources within the nonattainment area as part of the RFP plan. These RFP projected emissions shall, at a minimum, include projected emissions of each pollutant (i.e., direct PM2.5 and PM2.5 plan precursors) by different source types corresponding to the quantitative milestone dates for the area (quantitative milestone dates are described in greater detail in Section IV.G of this preamble). Specifically, the EPA requires that the RFP plan for any Moderate area must contain RFP projected emissions for each calendar year in which quantitative milestones for a Moderate nonattainment area must be met. As explained in Section IV.G of this preamble, a state must identify as part of the attainment plan submission for a Moderate nonattainment area quantitative milestones to be achieved every 3 years from the Moderate area attainment plan due date, or 4.5 years from the effective date of designation of the area.[117] For example, the first round of designations for the 2012 PM2.5 NAAQS became effective in April 2015; Moderate area attainment plans for these areas will thus be due 18 months later, or in October 2016. The first quantitative milestones for each of these areas will then have to be met in October 2019; the second quantitative milestones, in October 2022; and so on, until the area attains the NAAQS. Under this approach, the state will be required to submit such RFP projected emissions as part of the Moderate area attainment plan due in October 2016 that project emissions from sources in the nonattainment area for the same calendar years as those for which quantitative milestones will be due (i.e., 2019 and 2022 inventories in this example).

The transportation conformity rule requires that RFP plans establish motor vehicle emissions budgets. RFP plans would therefore be required to establish motor vehicle emissions budgets for direct PM2.5 and any relevant PM2.5 precursor as determined under the transportation conformity rule.[118] Precursors that are relevant for transportation conformity purposes would be limited to the PM2.5 plan precursors but may not include all of the PM2.5 plan precursors. For example, it is likely that many PM2.5 plans will include SO2 as a plan precursor. However, emissions of SO2 from on-road sources are usually low compared to stationary sources. The transportation conformity rule allows for the state to determine through its SIP development process if it is necessary to establish motor vehicle emissions budgets for SO2. See 40 CFR 93.102(b)(2)(v). On the other hand, if a state provides a precursor demonstration approved by the EPA which shows that VOCs do not have a significant contribution to PM2.5 levels in a particular nonattainment area, then a motor vehicle emissions budget for VOCs would not need to be established for the area for transportation conformity purposes. A motor vehicle emissions budget for the purposes of a PM2.5 RFP plan is that portion of the total allowable emissions allocated to on-road sources as defined in the submitted RFP plan for the relevant years as described earlier.[119] Such motor vehicle emissions budgets will be calculated using the latest planning assumptions and the latest approved motor vehicle emissions model available at the time that the attainment plan is developed, unless the EPA approves the state's use of an alternative model.[120]

c. Comments and Responses. Comment: Some commenters stated that since RFP is one of the general attainment plan provisions listed in CAA section 172(c), the EPA's proposal to require motor vehicle emissions budgets as part of RFP plans extends beyond just the implementation of the PM2.5 NAAQS and, as a result, this proposal should be presented within the context of a revision to the conformity rule itself and not just this PM2.5 implementation rule.

Response: The EPA disagrees with the commenters. The transportation conformity rule already states that motor vehicle emissions budgets come from control strategy SIPs.[121] Additionally, the transportation conformity rule defines control strategy SIPs as RFP plans and attainment demonstrations. It goes further to say that control strategy SIPs include the SIPs required by CAA sections 172(c), 189(a)(1)(B) and 189(b)(1)(A). The requirement in this PM2.5 SIP Requirements Rule does not amend the transportation conformity rule; it merely explains what is already required.

4. Geographic Coverage of Emission Sources for RFP

a. Summary of Proposal. The EPA proposed that the RFP demonstration to be included with a state's PM2.5 nonattainment area plan must include emissions only for sources located in the nonattainment area, and not from an area larger than the nonattainment area. This proposed policy approach differed from the remanded 2007 PM2.5 implementation rule. As explained in the proposal, the difference was due to the evolution of policy on a similar RFP issue in the ozone NAAQS implementation program that stemmed in part from a petition for reconsideration and a DC Circuit Start Printed Page 58059decision on the November 2005 Phase 2 Ozone Implementation Rule. The EPA received a similar petition for reconsideration of the 2007 PM2.5 Implementation Rule, which dealt with the EPA's interpretation of the statutory RFP requirements to allow a state to take “credit” for emissions reductions from outside the nonattainment area when addressing RFP in its attainment plan.[122] The EPA granted the petition for reconsideration on this issue in 2010, after the DC Circuit issued its decision on litigation on the Phase 2 Ozone Implementation Rule.[123 124] In light of these developments, the proposal indicated that the EPA now believes the best reading of the statute is that the CAA does not allow for a state to include emissions reductions from sources outside a nonattainment area when developing the plan to meet the CAA section 172(c)(2) RFP requirements for a PM2.5 nonattainment area.

b. Final Rule. The EPA is finalizing that the RFP demonstration to be included with a state's PM2.5 nonattainment area plan must include emissions only for sources located in the nonattainment area, and not from an area larger than the nonattainment area. Commenters disagreed with limiting the RFP demonstration to include emissions only for sources located in the nonattainment area stating that some areas are so dominated by upwind emissions and local sources over which they have no control, such as motor vehicles, that they cannot demonstrate RFP. One of these commenters noted they have provided extensive comments on this issue in connection with the EPA's proposal for the recent ozone implementation rule and incorporated by reference their prior comments. Other commenters agreed with the proposal and stated the EPA's conclusion is compelled by CAA sections 172(c)(1), 172(c)(3) and 189(d), which all focus on emissions and reductions in the area.

In the preamble to the remanded 2007 PM2.5 Implementation Rule, the EPA allowed states to incorporate reductions of NOX and SO2 emissions up to 200 km from outside the nonattainment area (and potentially for reductions of VOC or ammonia) into their RFP plan when certain conditions were met. This policy was included in the 2007 PM2.5 Implementation Rule in part to be consistent with a similar RFP policy for NOX and VOC that was included in the November 2005 Phase 2 ozone NAAQS implementation rule, which provided guidance for states on implementing the 1997 ozone NAAQS.[125] Under this policy, if a state intended to include emissions reductions from outside the nonattainment area in the RFP plan, the state would need to take on the additional accounting work associated with developing: (i) An expanded baseline emissions inventory for the entire geographic area and, (ii) a projected attainment year inventory for this expanded area outside the boundaries of the designated nonattainment area. Development of these more extensive inventories would likely have involved a substantial amount of additional time and resources. In addition, the state would have needed to provide information supporting its decision regarding how far outside the nonattainment area the RFP inventory should extend. While this “outside the nonattainment area” RFP approach was theoretically available to states in developing their PM2.5 attainment plans due in 2008, there were no states to the agency's knowledge that elected to follow this approach.

Both the Phase 2 ozone implementation rule and the 2007 PM2.5 Implementation Rule were challenged on several issues. With regard to the Phase 2 ozone implementation rule, the EPA granted a petition for reconsideration and ultimately issued a final notice of reconsideration in June 2007. In November 2008, the U.S. Court of Appeals for the DC Circuit heard oral argument concerning multiple petitions for judicial review of the Phase 2 ozone rule and the notice of reconsideration. One of the issues in that case involved whether compliance by EGUs with a regional emissions trading program could be considered to meet the RACT requirement for those sources located in a nonattainment area. In its July 2009 decision, the court emphasized that: “The RACT requirement calls for reductions in emissions from sources in the area; reductions from sources outside the nonattainment area do not satisfy the requirement. Accordingly, participation in the NOX SIP call would constitute RACT only if participation entailed at least RACT-level reductions in emissions from sources within the nonattainment area.”

In light of this court decision, the EPA has determined that the best reading of the statute is that the term “sources in the area” should be interpreted in the same manner as ozone. The term appears in CAA section 182 (requirements for ozone nonattainment areas) with regard to RFP as well as RACT. The decision on the Phase 2 ozone rule found that CAA section 182(b)(2) requires that a SIP must provide for implementation of RACT (under CAA section 172(c)) for emissions sources “in the area,” meaning in the nonattainment area. Similarly, the EPA position is that when CAA section 182(b)(1)(A)-(B) defines baseline emissions for RFP as “the total amount of actual VOC or NOX emissions from all anthropogenic sources in the area,” this also means sources in the nonattainment area.

Turning to PM2.5, the EPA has determined that the DC Circuit's interpretation of the phrase “sources in the area” should apply to RACT and RFP requirements for both the ozone NAAQS and the PM2.5 NAAQS. In particular, for PM2.5, the statutory language at CAA section 171(1) defines RFP in terms of “reductions in emissions” required in an attainment plan, which the EPA interprets as being directly linked to the baseline emissions inventory for sources located in a PM2.5 nonattainment area. The baseline emissions inventory is the foundation for the attainment plan. The emissions inventory requirement of CAA section 172(c)(3) explicitly requires that the attainment plan inventory include all sources of the relevant pollutants “in such area,” which is a clear reference to the designated nonattainment area. Given that the baseline inventory must reflect the emissions “in such area,” and that this inventory provides the starting point for a state's RFP analysis, in which the state must calculate generally linear progress in emissions reductions that will lead to attainment of the NAAQS in the area, the EPA believes it is appropriate that a state should consider only sources located within the nonattainment area when conducting its analysis to determine the annual emissions reductions necessary for demonstrating RFP.

Beyond the Court's interpretation, the EPA believes that the most appropriate approach with regard to the geographic area required to be covered for demonstrating RFP in a PM2.5 attainment plan also should be limited to the nonattainment area for two other Start Printed Page 58060reasons. First, the EPA believes that it makes policy sense for the PM2.5 implementation rule approach to be consistent with the approach finalized in the 2008 NAAQS for Ozone: SIP Requirements rule.[126] Second, a policy allowing the geographic area of the RFP plan to be larger than the nonattainment area would conflict with a key provision of subpart 4 that requires annual incremental reductions in emissions from sources within the nonattainment area. Under subpart 4, an area that fails to attain the standard by the Serious area attainment date is then subject to the provisions of CAA section 189(d). Section 189(d) of the CAA specifies that the state must submit a plan revision within 12 months which provides for “an annual reduction in PM10 or PM10 precursor emissions within the area of not less than 5 percent of the amount of such emissions as reported in the most recent inventory prepared for such area” (emphasis added). Therefore, the EPA is finalizing an RFP policy approach that is consistent with CAA section 189(d).

c. Comments and Responses. Comment: Some commenters supported the EPA's general guidance for developing the RFP demonstration. In particular, these commenters agreed with the EPA's interpretation of the CAA to require that emissions reductions for purposes of meeting the RFP requirement must come from sources within the designated nonattainment area. Thus, the commenters supported the EPA's proposal that the RFP demonstration submitted by states as a part of the attainment plan cannot take credit for emissions reductions occurring outside the nonattainment area to meet the RFP requirement. These commenters asserted that the EPA's conclusion is compelled by sections 172(c)(1), 172(c)(3) and 189(d), which all focus on emissions and reductions in the designated nonattainment area. The commenters further stated the EPA has not identified any rational way for states to pick and choose what sources and related emissions outside the designated nonattainment area would need to be included in inventories and attainment planning in order to rationally measure RFP.

Other commenters disagreed with the EPA's interpretation of the CAA on this issue and advocated that the EPA should provide an option for states to meet the RFP requirement with emissions reductions from sources outside the designated nonattainment area in addition to reductions from sources inside the area. One commenter suggested the EPA should provide this option to states and also consider alternatives to simplify the “overly complicated analysis” needed to support this option in the now superseded 2007 PM2.5 implementation rule. The comment did not address the consistency of such an interpretation of the RFP requirements with the statute.

Another commenter asserted that the EPA should interpret the statute to permit states to meet the RFP requirement through emissions reductions from sources outside the designated area based upon several practical arguments. The commenter stated that, as the PM2.5 standards become lower and reductions from sources within a designated nonattainment area become more challenging to find, it may be necessary to obtain emissions reductions from sources beyond the designated area in order to attain the NAAQS. According to the commenters, some nonattainment areas are so dominated by emissions from outside the area and from local sources over which they have no control that they cannot demonstrate RFP, even though they could demonstrate timely attainment due to reductions from sources outside the nonattainment area. The commenters thus argued that the EPA should provide states with the option to meet the RFP requirement with emissions reductions from sources outside the nonattainment area in cases where they believe it would be unreasonable or impossible to do so only with emissions reductions from within the nonattainment area.

In response to the EPA's request for comment on any potential legal basis for authorizing states to meet the RFP requirement with emissions reductions from outside the nonattainment area, the commenter suggested potential theories. The primary legal theory was that EPA should by regulation redefine the term “area” for purposes of the RFP requirement so that it would encompass geographic areas that are not part of the designated nonattainment area. Through this theory, the commenters suggested that the EPA could authorize states to meet the RFP requirement based on reductions from the “total area” affecting that nonattainment area, rather than from the actual designated nonattainment area. As an alternative theory, the commenter argued that the EPA could regulatorily redefine the emissions inventory requirement of section 172(c)(3). To support this theory, the commenter disagreed with the EPA's position that because the base year inventory required by section 172(c)(3) includes the emissions from sources within the designated nonattainment area, it supports the EPA's reading of the statute with respect to the RFP requirement. The commenter instead argued that because the emissions information used for modeling purpose includes emissions from a much broader region (not just within the nonattainment area or even just within the state), the EPA was wrong to say in the proposal that the base year inventory for sources in the area is the “foundation for the attainment plan.” Finally, the commenter argued more broadly for the EPA to alter its interpretation of the statutory language to allow for the commenter's preferred approach to RFP. In support of their preferred approach to the RFP requirement, the commenters noted that the EPA acknowledged in the proposal that “a literal interpretation is illogical” for other statutory requirements. To support this contention, the commenters point to the criteria in section 188(d) that provide the criteria for an extension of the Moderate area attainment date that require significant interpretation in order to make them appropriate for the statistical form of the current PM2.5 NAAQS rather than for the exceedance-based form of the PM10 NAAQS that existed when the CAA was amended in 1990.

Response: The final rule requires that states demonstrate that they meet the RFP requirement through emissions reductions from sources in the nonattainment area. The EPA has decided to adopt this approach for two reasons. First, it is the most consistent with the statute. It aligns with RFP as defined in CAA section 171(1) and as required in CAA section 172(c)(2) and 189(c), and is also most consistent with other related requirements for attainment plans, such as the requirements for imposition of emission controls, e.g., RACM and RACT, and with the process for designations of nonattainment areas pursuant to section 107(d). Second, this approach is more straightforward to administer because it retains a nonattainment area focus to the RFP requirement and, while the alternative approaches would require complex and potentially burdensome requirements to define the scope of the out-of-area sources that must be inventoried and accounted for in the determination of what constitutes RFP. The EPA has concluded that such emissions reductions from sources outside the nonattainment area are more properly accounted for and reflected in other elements of the attainment plan, such as the attainment demonstration Start Printed Page 58061modeling which will take into account the emissions reductions that occur outside the nonattainment area in a less burdensome fashion.

The EPA does not agree with the statutory interpretation of the RFP requirement preferred by the commenters who suggested that the EPA allow credit for emissions reductions from outside the area. Pursuant to section 171(1), the statute defines the term “reasonable further progress” to mean “such annual incremental reductions in emissions . . . as are required by this part or may reasonably be required by the Administrator for the purposes of ensuring attainment of the applicable [NAAQS] by the applicable date.” This provision plainly provides EPA with discretion to interpret this term within certain statutory parameters, i.e., “as are required by this part,” and consistent with the EPA's determination of what will be the appropriate approach for timely attainment, i.e., “for the purpose of ensuring attainment . . . by the applicable date.” Thus, for example, the EPA has authority to interpret the RFP requirement to allow states to demonstrate generally linear reductions or stepwise reductions, rather than as a specific percentage of emissions reductions each year, as appropriate methods for meeting the RFP requirement for purposes of the subpart 1 and subpart 4 provisions applicable to the PM2.5 NAAQS. It does not follow, however, that EPA is obligated to interpret the term “reasonable further progress” in other ways that the EPA considers inconsistent with other relevant statutory requirements for attainment plans or more broadly.

To the contrary, the EPA believes that interpretation of the RFP requirement to reflect reductions in emissions “as are required by this part,” properly includes consideration of the context and structure of the statute with respect to the other attainment plan requirements. As explained in the proposal for this action, the EPA has concluded that several other related requirements for attainment plans support an interpretation of the RFP requirement for purposes of PM2.5 to be limited to emissions reductions from sources located within the nonattainment area. These requirements include the emissions inventory requirement of section 172(c)(3), the RACM/RACT requirement of section 172(c)(1) and section 189(a)(1)(C), and the not less than 5 percent emission reduction requirement of section 189(d).

With respect to the inventory requirement of section 172(c)(3), the EPA explained in the proposal its view that because the emissions inventory requirement explicitly refers to a comprehensive, accurate, and current emissions inventory of emissions “from all sources of the relevant pollutant or pollutants in such area,” this statutory language supports the view that the primary focus of the attainment plan is reductions of emissions from the nonattainment area, not emissions reductions from sources elsewhere. Similarly, EPA explained in the proposal its views that the court's decision in NRDC v. EPA, 571 F.3d 1245 (D.C. Cir. 2009) supports an interpretation of the RFP requirement to apply to emissions reductions from sources within the area. Although that decision focused on the RACT requirement for ozone in particular, the reasoning of the court's decision based upon the phrase “in the area” is consistent with the EPA's longstanding approach to both RACM and RACT (or BACM and BACT for serious areas) being required for emissions sources within the nonattainment area. Given that states typically elect to demonstrate that they meet the RFP requirement through emissions reductions that result from expeditious imposition of RACM/RACT or BACM/BACT emission controls applied to sources within the area, it is logical that the separate RFP requirement should likewise be based upon the expeditious progress towards attainment achieved through those emission controls. The EPA emphasizes that the RFP requirement and the requirements of section 172(c)(6) are separate components of an attainment plan. In those unusual circumstances where a state needs to impose specific additional controls on sources outside the nonattainment area in accordance with section 172(c)(6) to reach attainment, the state is not required to alter the base year emissions inventory for sources within the area or to alter its RFP analysis. As with other emissions reductions from sources outside the area that the state may rely upon, emissions reductions from measures states may impose to meet section 172(c)(6) will be reflected in the modeled attainment demonstration and thus included and taken into account in that fashion. [See sections IV.D.1 and VI.D.2 of the preamble for additional discussion of section 172(c)(6).]

The EPA also considers this interpretation of the RFP requirement to be consistent with the comparable requirements of CAA section 189(d). Specifically, section 189(d) requires that states with nonattainment areas that fail to attain by the applicable attainment date must make a new attainment plan submission in order to achieve emissions reductions of not less than 5 percent of the most recent emissions inventory “for such area.” As discussed in Section VII.F of this rule, the EPA interprets the statute to require an area subject to section 189(d) to achieve not less than a 5 percent reduction of the most recent emissions inventory of direct PM2.5 or any PM2.5 plan precursor “for such area” (meaning from sources located within the nonattainment area). As a result, the EPA's interpretation of “in such area” and “for such area” are consistently applied for these related provisions of the CAA.

As explained in the proposal, the EPA also sees no appropriate legal or policy basis for addressing the geographic area from which emissions reductions for RFP must be achieved for PM2.5 differently than is required by CAA section 182 for ozone. Both pollutants typically result from emissions from numerous sources that mix in the atmosphere and can transport great distances. For both pollutants, the CAA provides different tools for states and the EPA to address both the regional and the local contributions to violations of the NAAQS in a given area. With respect to the local contribution, the CAA provides a specific set of requirements (including RFP) designed to assure that states are properly addressing the emissions from sources located within the nonattainment area, whereas other requirements of the CAA are designed to address contributions from greater distances, whether from within the state, from other states, or even internationally. Were EPA to interpret the RFP requirements to authorize states to meet the emissions reductions requirement from sources outside the area, this would be inconsistent with the requirements specifically designed to assure that states get necessary reductions from the local sources that contribute to the violations through the attainment plan.

One commenter recommended a potential statutory interpretation in support of an outside-the-area approach. The EPA appreciates the suggestion, but has determined that it would be too inconsistent with the structure and purpose of the attainment plan requirements of the statute. The commenter specifically suggested that EPA should redefine the term “area” to encompass not just the designated nonattainment area, but also some larger geographic area with sources of emissions that cause or contribute to the ambient air quality; and that reductions from such sources should be allowed to count towards meeting the RFP requirement in addition to reductions Start Printed Page 58062from sources in the designated nonattainment area. The EPA considers such an approach inappropriate for several reasons. First, such a reading would be inconsistent with the EPA's longstanding reading of this same term in many important places throughout the statute, including but not limited to explicit statutory references to the “area” in section 107(d)(1) (relevant to designations), section 107(d)(3) (relevant to redesignations), section 110(a)(2)(I) (relevant to the scope of all of the attainment plan requirements imposed by Part D), section 189(B)(2) (relevant to the schedule for submission of attainment plans under subpart 4), and section 189(e) (relevant to the statutory test for regulating precursors in a given “area”). Creating a different and conflicting definition of the word “area” for RFP purposes is not appropriate for common sense reasons, and it would require that the same word to be interpreted in multiple ways. Second, the EPA considers the redefinition of the term “area” inappropriate because it could be perceived as an attempt to alter the meaning of the term as the D.C. Circuit has already interpreted it in the NRDC v. EPA decision concerning the plain meaning of the term “in the area.” Third, to the extent that there are situations in which the boundaries of the nonattainment area are incorrect because they fail to include the sources that contribute violations in an adjacent area to the extreme degree posited by the commenters, the statute already provides a straightforward solution to such a situation through the initial designation and redesignation provisions of section 107(d).

Finally, the EPA acknowledges that in the prior 2007 PM2.5 implementation rule, the EPA did adopt a different interpretation of the RFP requirement for the first time that would have authorized states to meet the RFP requirement with emissions reductions from sources outside the nonattainment area within certain narrow parameters for purposes of the 1997 PM2.5 NAAQS.[127] The EPA received a petition for reconsideration on this specific issue and granted the petition to reexamine that aspect of the 2007 PM2.5 implementation rule.[128] Before the EPA proceeded with that reconsideration, however, the litigation over the 2007 PM2.5 implementation rule and the 2008 NSR revisions (addressing the PM2.5 NAAQS) proceeded with challenges on other statutory authority issues while the petition for reconsideration was still under evaluation. This litigation resulted in the court's decision in NRDC v. EPA, 706 F.3d 428 (D.C. Cir. 2013). In that decision, the court remanded the entire 2007 PM2.5 implementation rule, including the portions relevant to the RFP requirement, to the EPA for failure to comply with the statutory requirements of subpart 4. This rulemaking constitutes the EPA's response to that judicial remand and through this process the EPA is replacing the 2007 PM2.5 implementation rule, including the prior regulatory provisions and guidance related to states meeting the RFP requirements with emissions reductions from outside the designated nonattainment area. Accordingly, upon completion of this rulemaking the EPA will be interpreting the RFP requirement consistent with past practice. The EPA also notes, as a factual matter, that states have not been using this feature of the 2007 PM2.5 implementation rule.[129] Aside from the lack of a legal basis for the commenter's preferred approach to RFP, thus far the EPA's interpretation of the requirements has not posed the practical difficulties that the commenter raised.

5. Other RFP Considerations

a. Summary of Proposal. The proposal outlined the statutory requirements and existing guidance for RFP. During this discussion, the following guidance from the Addendum was referenced, “Additionally, the EPA believes that it is appropriate to require early implementation of the most cost-effective control measures . . . while phasing in the more expensive control measures.” [130] The proposal also discussed other RFP considerations, including PM2.5 nonattainment areas that are shared by more than one state or tribe.

b. Final Rule. The EPA is finalizing that, although early implementation of the most cost-effective control measures is often appropriate, states should consider both cost-effectiveness and pollution reduction effectiveness when developing implementation schedules for their control measures and may implement measures that are more effective at reducing PM2.5 earlier to provide greater public health benefits. This increased flexibility enables states to develop a more effective implementation schedules for their control measures while efficiently using their resources.

For a multi-state or multi-jurisdictional nonattainment area, the RFP plans for each state represented in the nonattainment area shall demonstrate RFP on the basis of common multi-state inventories. The states or jurisdictions within which the area is located must provide a coordinated RFP plan. Each state must ensure that the sources within its boundaries comply with enforceable emission levels and other requirements that in combination with the reductions planned in other states within the nonattainment area will provide for attainment as expeditiously as practicable and demonstrate RFP consistent with these regulations. In general, the EPA seeks to ensure that PM2.5 nonattainment areas that are shared by more than one state or tribe meet RFP requirements as a whole. States and tribes that share a nonattainment area should therefore consult with one another to develop the RFP analysis and control strategy implementation schedule for the area as a whole. Such states and tribes should work with the EPA region or regions that oversee them to confirm that their collective approach is appropriate for RFP.

The EPA's approach for states to meet the RFP requirement is designed to ensure emissions reductions will yield incremental improvements in air quality on the path to attainment, while being sufficiently flexible to accommodate the range of control strategies necessary to address the complex mixtures of pollutants comprising PM2.5 in different areas.

c. Comments and Responses. Comment: Some commenters asserted that the EPA should not “require” implementing the most cost-effective measures first since states should have the flexibility to implement the more effective but less cost-effective measure earlier, thus providing earlier and greater public health benefits.

Response: In this final rule, the EPA is providing states with the flexibility to Start Printed Page 58063implement measures that are more effective at reducing PM2.5 earlier to provide greater public health benefits, but is not requiring it. This increased flexibility is in keeping with the overall requirement of expeditious attainment of the NAAQS.

G. Quantitative Milestones

1. General Approach to Quantitative Milestones

a. Summary of the Proposal. The proposal built from the statutory language of 189(c)(1), which requires quantitative milestones that (1) demonstrate RFP, and (2) must be achieved every 3 years until the area is redesignated attainment. The proposal first addressed the issue of the starting date for counting the 3-year periods. For a Moderate area that cannot practicably attain the relevant PM2.5 NAAQS within the statutory timeframe for a Moderate area, the EPA proposed that a state must submit two sets of quantitative milestones—the first set to be achieved at year 4.5 from designation and the second set to be achieved at year 7.5 from designation. The EPA also proposed that the quantitative milestones contained in the attainment plan for a Moderate nonattainment area must be constructed such that they can be tracked, quantified and/or measured adequately in order for the state to meet its milestone reporting obligations, which come due 90 days after a given milestone date. The EPA therefore proposed to require that states select the quantitative milestones that are appropriate and quantifiable and that will provide for objective evaluation of progress toward attainment in their Moderate PM2.5 nonattainment area, whether the area can practicably attain the PM2.5 NAAQS by the statutory attainment date or not. In addition to this general proposed approach for selecting quantitative milestones for a Moderate nonattainment area, the EPA proposed a requirement that, at a minimum, states must include in all attainment plans for Moderate PM2.5 nonattainment areas a metric to confirm that all control measures identified and adopted as RACM and RACT for the area have been fully implemented within 4 years of designation.

b. Final Rule. Section 189(c) of the Act explicitly requires that quantitative milestones must be achieved every 3 years, but does not specify the starting date for counting the 3 year periods. In the General Preamble and Addendum, the agency stated that quantitative milestones must be achieved every 3 years starting from the due date for the plan submission (i.e., because the Moderate area attainment plan is due no later than 18 months after designation of the area, the first set of milestones would need to be achieved 4.5 years after the area's designation) until the area is redesignated attainment.[131] The EPA is finalizing this approach for the PM2.5 NAAQS. The EPA interprets this requirement to be the most appropriate reading of CAA section 189(c)(1) which requires “quantitative milestones which are to be achieved every 3 years until the area is redesignated attainment.” This approach is also consistent with the longstanding approach outlined in the General Preamble.[132] These timeframes for the quantitative milestones apply to all areas designated nonattainment for a PM2.5 NAAQS on or after January 15, 2015, including all areas designated nonattainment effective April 15, 2015 for the 2012 PM2.5 NAAQS.[133] See 40 CFR 51.1013(a).

For all areas designated nonattainment for the 1997 and/or 2006 PM2.5 NAAQS before January 15, 2015,[134] the EPA is establishing December 31, 2014 as the starting point for the first 3 year period for quantitative milestones under CAA section 189(c). This is because December 31, 2014, was the due date for states to submit additional SIP elements necessary to satisfy the subpart 4 Moderate area requirements for the 1997 and 2006 PM2.5 standards.[135] Establishing December 31, 2014 as the starting point for the first 3 year period under CAA section 189(c) for the 1997 and 2006 PM2.5 standards is in keeping with the EPA's historical approach to quantitative milestone dates (i.e., using the due date for the Moderate area plan submission as the starting point for the first 3 year milestone period). Thus, for any area designated nonattainment for the 1997 and/or 2006 PM2.5 NAAQS that has not yet attained these NAAQS and therefore continues to have attainment planning obligations for these NAAQS, the state must submit quantitative milestones to be achieved by December 31, 2017 (the first milestone date), at minimum. Additional milestone dates may also apply to such an area depending on the relevant attainment planning period. See 40 CFR 51.1013(a)(4).

Regardless of whether or not an attainment plan demonstrates attainment by the statutory attainment date, the EPA requires that all Moderate area PM2.5 attainment plans must define appropriate quantitative milestones to be achieved by 4.5 years and 7.5 years following designation of the area. Although it occurs after the Moderate area attainment date, the EPA is requiring Moderate area plans to contain this 7.5 year milestone, even where those plans demonstrate attainment before the milestone would arrive. Where the EPA uses its discretionary authority in CAA section 188(b)(1) to reclassify an area before the Moderate area attainment date applicable to the area, CAA section 189(b)(2) allows the state up to 4 years to submit the required Serious area attainment demonstration and related plan elements, such as quantitative milestones. For example, if the reclassification occurs 4 years after designation, the state may be allowed to submit the Serious area quantitative milestones up to 8 years after designation, well after the second milestone date (7.5 years after designation) has passed. Without the 7.5 year milestone requirement, this circumstance would undermine the purpose of the quantitative milestone requirement, which is to ensure that states will report to EPA on each nonattainment area's progress toward attainment at regular intervals, even following reclassification.[136]

A similar issue would result in the event that a Moderate area that did demonstrate attainment in the original attainment plan fails to attain by the statutory attainment date. In this case, the area would have failed to meet the attainment date which is as expeditiously as practicable but no later than the end of the sixth calendar year after designation as required by CAA section 188(c)(1). Section 188(b)(2) of the Act allows the Administrator up to Start Printed Page 580646 months to determine that a Moderate failed to attain and reclassify that area to Serious, which would be at least 6.5 years after designation. As described in Section VI.A.1 of this preamble, the Serious area would have 18 months from reclassification due to a failure to attain (8 years after designation) in order to submit an attainment plan. The EPA has therefore determined that, in order to avoid gaps of greater than 3 years in the implementation of quantitative milestones, all Moderate area attainment plans must contain quantitative milestones to be achieved 4.5 years and 7.5 years after designation and which demonstrate continued progress toward timely attainment of the relevant PM2.5 NAAQS. In the event that the area fails to attain, this will provide the EPA with appropriate tools necessary to continue to monitor the area's continued progress toward attainment while the state develops the Serious area attainment plan.

The quantitative milestones contained in the attainment plan for a Moderate nonattainment area should be constructed such that they can be tracked, quantified and/or measured adequately in order for the state to meet its milestone reporting obligations, which come due 90 days after a given milestone date. In the Addendum, the EPA suggested some possible metrics that “support and demonstrate how the overall quantitative milestones identified for an area may be met,” such as percent implementation of control strategies, percent compliance with implemented control measures, and adherence to a compliance schedule. This list was not exclusive or exhaustive but reflected the EPA's view that the purpose of the quantitative milestone requirement is to provide an objective way to determine whether the area is making the necessary progress towards attainment by the applicable attainment date.[137] The EPA interprets Section 189(c) of the Act to allow states to identify milestones that are suitable for the specific facts and circumstances of the attainment plan for a particular area, so long as they provide an objective means to measure RFP.

This rule requires that each attainment plan for a Moderate PM2.5 nonattainment area contain quantitative milestones that provide for objective evaluation of RFP toward attainment in the PM2.5 nonattainment area, whether the plan provides for attainment of the PM2.5 NAAQS by the statutory attainment date or demonstrates that attainment by such date is impracticable. For this approach, the EPA does not require that such quantitative milestones take any particular form, merely that they provide a means to evaluate progress (i.e., demonstrate RFP) meaningfully. The EPA will review each attainment plan submission on a case-by-case basis to determine whether the quantitative milestones contained in the plan are specific enough to provide an objective means for evaluating the area's progress toward attainment, consistent with the statutory requirements of CAA section 189(c). The EPA recommends that states confer with their respective EPA regional office to develop appropriate quantitative milestones. See 40 CFR 51.1013(a).

The Addendum stated that the Moderate area quantitative milestones “will be met by showing that emissions reductions scheduled to be made between the SIP due date and the attainment date for these moderate areas were actually achieved. Most of these emissions reductions will result from implementation of RACM (including RACT) as part of the moderate area SIP.” However, this rule does not specify that quantitative milestones must be expressed in terms of emissions reductions. The EPA recognizes that it is impractical to expect that a state will always be able to quantify and compare real and projected emissions reductions, and submit a report to the EPA within 90 days of a given milestone as required under CAA section 189(c)(2). Therefore, the final rule requires that, at a minimum, states must include in all attainment plans for Moderate PM2.5 nonattainment areas a milestone that all control measures identified and adopted as RACM and RACT for the area have been fully implemented within 4 years of designation. This milestone specifically derives from section 189(a)(1)(C) of the Act, that applies to all Moderate areas and thus represents a milestone that all Moderate areas must meet regardless of whether it is listed explicitly as an individual milestone. See 40 CFR 51.1013(a)(1)(iii).

For an area that submitted air quality targets with the RFP plan under the optional provision that was described in Section IV.F of this preamble, an air quality based milestone (i.e., one that is expressed in terms of an ambient PM2.5 level) is strongly recommended to be included in order to confirm that the air quality target has been met for the quantitative milestone year. If used, this milestone will be compared to the most recently certified monitored ambient air data as part of the milestone report due after the area reaches each quantitative milestone date. The EPA recognizes that certified monitored ambient air data are not available for some period after a calendar year ends. As a result, the EPA expects that this quantitative milestone may sometimes be satisfied with data that are over a year old. For example, for Moderate areas having an effective date of designations in April 2015, the first quantitative milestone date will be in October 2019 (3 years after the 18 month SIP due date), and the associated report will be due 90 days later, in January 2020. In this example, the state would likely have to rely upon certified air quality data for 2018 because data for the 2019 calendar year would not yet be fully certified. Additionally, this milestone should normally be reported in the same form as the applicable PM2.5 NAAQS. However, the EPA expects that in some circumstances, it may be appropriate to use annual averages instead of the 3 year average to help justify variations due to meteorological occurrences.

c. Comments and Responses. Comment: Some commenters stated the Act may be read to conclude that the requirement to include any quantitative milestones in a Moderate area plan does not apply to a plan demonstrating the impracticability of attaining the NAAQS by the attainment date.

Response: The EPA's longstanding interpretation of CAA section 189(c) as a requirement that applies to all PM10 nonattainment area plans, including those demonstrating that attainment by the applicable attainment date is impracticable, is consistent with the purpose and structure of subpart 4. The design of the CAA for PM nonattainment areas combines the requirements of subpart 1 and subpart 4 to support expeditious attainment of the applicable NAAQS. RFP is the prescribed tool available to a state to plan their emission reduction progress toward expeditious attainment. Quantitative milestones are a critical aspect of the CAA and the attainment plan in order for the EPA to monitor the area's RFP toward expeditious attainment and trigger the appropriate response if RFP is not maintained. The EPA thus determined that allowing an area to simply not submit any quantitative milestones would not afford the EPA the necessary tools to monitor RFP toward expeditious attainment.

2. Milestone Report Submission

a. Summary of the Proposal. Because the statute does not define the parameters of quantitative milestone demonstrations, the EPA has discretion to determine the components of the required demonstration and the form Start Printed Page 58065and manner for submission. The proposal took comment on options for doing this. The EPA proposed to require that the milestone report submission must include the following four components: (i) A certification by the Governor or Governor's designee that the state's attainment plan control strategy is being implemented as described in the applicable attainment plan, (ii) technical support sufficient to document completion statistics for appropriate milestones and to demonstrate that the quantitative milestones have been satisfied and how the emissions reductions achieved to date compare to those required or scheduled to meet RFP, (iii) as applicable, an air quality screening analysis to determine if measured air quality progress is consistent with the expected air quality improvement target correlated with the RFP emissions reductions for the previous 3 year period, and (iv) an evaluation of whether the PM2.5 NAAQS will be attained by the projected attainment date for the area. In addition, the EPA proposed that the milestone report must include a description and schedule for any remedial actions the state has taken or will take to address any failure to meet a quantitative milestone, including the implementation status of contingency measures for failing to meet RFP in the area.

The EPA also sought comment on how electronic reporting could facilitate a state's submission of the required milestone report, how it could accommodate the various narrative and data-dependent components that the EPA proposed be part of such a submission, and what particular system features might be desirable to accommodate milestone report submissions through the eSIP system.

b. Final Rule. The final rule, mirroring section 189(c)(2) of the Act, requires that each state containing a PM2.5 nonattainment area submit to EPA, within 90 days after each milestone date applicable to the area, a demonstration that all measures in the approved plan (including the RFP plan) for the area have been implemented and that the milestone has been met. This rule outlines the content required by the EPA for the quantitative milestone report. The EPA must then determine whether or not a state's demonstration is adequate within 90 days after receiving a demonstration which contains the required information and analysis. The EPA intends to promptly inform the relevant state of any determination that the state has failed to submit a timely quantitative milestone report and any determination that a submitted milestone report is not adequate.

The EPA will work with a state to assist them in meeting the reporting deadline, and expects that, because the report is to be fairly low burden and may be submitted electronically through eSIP, in most cases the state will submit it on time, especially if they have implemented the programs required to meet their milestones. If, however, a state fails to submit a milestone demonstration report by the due date or the EPA determines that a milestone was not met, the final rule requires the state to submit a SIP revision within 9 months of either the missed reporting deadline or the EPA's determination of the state's failure to meet a milestone. According to the statutory requirements of CAA section 189(c)(3), the new SIP revision must assure “that the State will achieve the next milestone (or attain the national ambient air quality standard . . . , if there is no next milestone) by the applicable date.” If a state fails to make a SIP submission to correct a failure to meet RFP expeditiously, sanctions under CAA sections 110(m) and 179(b) may apply. If a state is unable to correct a failure to meet RFP, this may be evidence that the state cannot practicably attain the NAAQS by the applicable attainment date and may serve as a basis for reclassification of the area to Serious under CAA section 188(b)(1).

As previously noted, the EPA has offered guidance about what the milestone report should contain. The Addendum says, “This report must contain technical support sufficient to document completion statistics for appropriate milestones. For example, the demonstration should graphically display RFP over the course of the relevant 3 years and indicate how the emissions reductions achieved to date compare to those required or scheduled to meet RFP and the required [quantitative] milestones. The calculations (and any assumptions made) necessary to determine the emissions reductions to date should also be submitted. The demonstration should also contain an evaluation of whether the PM10 NAAQS will be attained by the projected attainment date.” [138] This guidance is still appropriate for states demonstrating compliance with RFP and quantitative milestones for PM2.5 NAAQS. The EPA requires that the milestone report submission must include the following components. See 40 CFR 51.1013(b).

First, the report must include a certification by the Governor or Governor's designee that the SIP control strategy is being implemented consistent with the RFP plan, as described in the applicable attainment plan. Second, the report must contain technical support, including calculations, sufficient to document completion statistics for each quantitative milestone and to demonstrate that the quantitative milestones have been satisfied and how the emissions reductions achieved to date compare to those required or scheduled to meet RFP. Additionally, the report must include a discussion of whether the PM2.5 NAAQS will be attained by the projected attainment date for the area. See 40 CFR 51.1013(b). The EPA decided not to finalize the proposed requirements to include an air quality screening analysis or the description and schedule for remedial actions taken by the state to address a failure to meet a quantitative milestone. This decision was made because the remaining components of the quantitative milestone report are sufficient to enable the EPA to assess whether the nonattainment area is meeting RFP.

As stated in the Addendum, the milestone report must be submitted from the Governor or Governor's designee to the Regional Administrator of the respective EPA Regional Office serving the submitting state. The EPA will notify the state of its determination (regarding whether or not the state's report is adequate) by sending a letter to the appropriate Governor or Governor's designee. The EPA encourages states to submit milestone reports, including supporting documents, through the agency's electronic SIP (eSIP) submission system in order to simplify the process and reduce resource burden on all sides.

c. Comments and Responses. Comment: Some commenters did not support the proposal and stated that requiring this level of documentation is unnecessary and puts an excessive workload burden on states and local agencies.

Response: The EPA recognizes that there is some level of resources required to address the requirements prescribed by every rule. However, the EPA concluded that the benefit offered to the public by reviewing quantitative milestone reports while assessing whether nonattainment areas are making reasonable further progress toward attaining the PM2.5 NAAQS and the associated public health benefits outweigh the anticipated workload burden for states.

Comment: Some commenters stated that the first two components of the Start Printed Page 58066quantitative milestone report described in the proposal are sufficient to comply with the requirements of CAA section 189(c)(2). The commenters stated that the proposed air quality screening analysis is not supported by the statute and is unnecessary if the second component is fulfilled. The commenters stated that the proposed description and schedule for remedial actions the state has taken or will take to address any failure to meet a quantitative milestone is more than what is necessary to demonstrate compliance with RFP milestones and could require revisions to the SIP.

Response: After considering these comments and in an effort to simplify the rule, the EPA decided to eliminate the two proposed requirements for the quantitative milestone report as suggested by these commenters. As stated earlier, this decision was made because the EPA determined that the remaining components of the quantitative milestone report are sufficient to enable the EPA to assess whether the nonattainment area is meeting RFP.

Comment: One commenter stated that, while they would not object to filing periodic reports, as part of their milestone report, the EPA should not insist on the state actually inspecting all covered facilities and indicating that RACT or RACM has not been implemented if a small subset of facilities is found in violation.

Response: It is not the intent of the EPA to require states to physically inspect all covered sources to verify the implementation of required control measures. The intent is that, at the time of the milestone due date, all covered sources would be legally required to have implemented required control measures and the state has reasonably been assured that this occurred.

H. Contingency Measures

1. Summary of the Proposal

The Act requires Moderate PM2.5 nonattainment area plans to contain contingency measures consistent with CAA section 172(c)(9). Contingency measures are additional control measures to be implemented in the event that the EPA determines that an area failed to meet RFP requirements (including associated quantitative milestones) or failed to attain the PM2.5 primary standard by the applicable attainment date. These measures must be fully adopted rules or control measures that are ready to be implemented quickly upon failure to meet RFP or failure of the area to meet the standard by its attainment date, and such measures are required to take effect without further action by the state or the EPA. The EPA proposed and sought comment on general requirements for contingency measures for Moderate PM2.5 nonattainment areas. The EPA has longstanding interpretations of the statute with respect to the contingency measure requirement, both for PM and for other pollutants, in the General Preamble and Addendum. These documents provide guidance and recommendations for states to follow in submitting contingency measures, and the proposal did not contain any significant changes to the existing guidance and recommendations. However, the EPA sought comment on whether the guidance needed to be revised or expanded. Additionally, as discussed in the proposal, the EPA believes that the DC Circuit's decision in NRDC v. EPA does not affect the overall contingency measure requirements that were finalized in the remanded 2007 PM2.5 Implementation Rule. The EPA determined this because CAA section 172(c)(9) imposes the contingency measure requirement for attainment plans for the PM2.5 NAAQS and it is not superseded or subsumed by any specific contingency measure requirements under subpart 4. As a result, the proposal for this rule remained very similar to the final 2007 PM2.5 Implementation Rule.

2. Final Rule

Consistent with the proposal, the final rule codifies existing policies on contingency measures, but does not make significant changes to these policies. Although CAA section 172(c)(9) requires contingency measures, the provision does not specify exactly what parameters such measures must meet. The EPA is finalizing an approach to contingency measures for the PM2.5 NAAQS that is similar to the approach recommended in earlier EPA guidance. Specifically, in order for contingency measures to be approvable as part of a state's Moderate area attainment plan submission for the PM2.5 NAAQS, the state plan must meet the following general requirements (See 40 CFR 51.1014):

(1) Contingency measures must be fully adopted rules or control measures that are ready to be implemented quickly upon a determination by the Administrator of the nonattainment area's failure to meet RFP, failure to meet any quantitative milestone, failure to submit a quantitative milestone report or failure to attain the standard by the applicable attainment date.

(2) The state's attainment plan submission must contain trigger mechanisms for the contingency measures, specify a schedule for implementation, and indicate that the measures will be implemented with minimal further action by the state or by the EPA.

(3) The contingency measures shall consist of control measures that are not otherwise included in the control strategy or that achieve emissions reductions not otherwise relied upon in the control strategy for the area.

(4) Contingency measures should provide for emissions reductions approximately equivalent to 1 year's worth of reductions needed for RFP, based on the overall level of reductions needed to demonstrate attainment divided by the number of years from the base year to the attainment year, or approximately equivalent to 1 year's worth of air quality improvement or emissions reductions proportional to the overall amount of air quality improvement or emissions reductions to be achieved by the area's attainment plan.

Regarding the first two points, consistent with prior guidance, states must show that their contingency measures can be implemented with minimal further action on their part and with no additional rulemaking actions such as public hearings or legislative review. After the EPA determines that a moderate PM2.5 nonattainment area has failed to meet an RFP requirement or to attain the PM2.5 NAAQS, the EPA generally expects all actions needed to effect full implementation of the contingency measures to occur within 60 days after the EPA notifies the state of the area's failure. The EPA intends to notify the state of a failure to meet RFP or to attain the NAAQS by publication of its determination in the Federal Register. The state should ensure that the contingency measures are fully implemented as expeditiously as practicable after such notice.[139]

Regarding the third point, the EPA interprets the contingency measure requirement of CAA section 172(c)(9) to require control measures that are not otherwise included in the control strategy or that achieve emissions reductions not otherwise relied upon in the control strategy for the area. However, suitable contingency measures may be measures that were technologically and economically feasible for the area, but did not qualify as RACM or RACT or additional reasonable measures for one or more reasons. For example, a candidate contingency measure may have been deemed technologically and Start Printed Page 58067economically feasible, but it was not needed to achieve expeditious attainment in a Moderate area for which the state could demonstrate attainment by the statutory attainment date and therefore was not included as part of the attainment demonstration for the area. It is important that states make decisions concerning contingency measures in conjunction with their determination of the overall control strategy for bringing the area into expeditious attainment, and that states first must identify those control measures needed in order to demonstrate expeditious attainment of the standards; any remaining measures should then be considered as candidates for contingency measures.

As discussed in Section IV.D of this preamble, the RACM/RACT provisions in this rule require that, for Moderate areas that cannot practicably attain the NAAQS by the statutory attainment date, states must implement all control measures that they determine to be reasonable (i.e., all technologically and economically feasible measures) for sources in the area. In such cases, the contingency measures for such nonattainment areas would necessarily exceed the criteria for determining whether a measure is reasonable for purposes of RACM/RACT and additional reasonable measures. For example, contingency measures could consist of reasonable controls on sources outside the nonattainment area, early implementation of BACM/BACT on select sources inside the area, other measures identified by the state, or a combination thereof, that collectively provide approximately equivalent to 1 year's worth of emissions reductions/air quality improvement. Such contingency measures would only be triggered in the event the area fails to meet RFP; the EPA does not interpret the requirement for contingency measures for failing to attain the NAAQS by the applicable attainment date to apply to a Moderate area that a state demonstrates cannot practicably attain the NAAQS by the statutory attainment date. Rather, the EPA believes it is appropriate for the state to identify and adopt these measures in a timely way as part of the Serious area attainment plan that it will develop once the EPA reclassifies such an area. However, if a Moderate area that cannot practicably attain the NAAQS fails to meet RFP when reviewed as part of the quantitative milestone either 4.5 or 7.5 years after designation, the requirement to implement contingency measures would be triggered as required by CAA section 172(c)(9). For any Moderate PM2.5 nonattainment area, contingency measures can include measures that achieve emissions reductions on sources located outside the nonattainment area as well as from sources within the nonattainment area, provided that the measures offer reasonable assurance that the appropriate air quality impact will result within the nonattainment area.

The final rule continues to allow states to rely on federal measures (e.g. federal mobile source measures based on the incremental turnover of the motor vehicle fleet each year) and local measures already scheduled for implementation that provide emissions reductions in excess of those needed to provide for RFP or expeditious attainment. The key is that the statute requires that contingency measures provide for additional emissions reductions that are not relied on for RFP or attainment and that are not included in the RFP or attainment demonstrations as meeting part or all of the contingency measure requirements. The purpose is “to provide a cushion while the plan is being revised to meet the missed milestone.” Nothing in the statute precludes a State from implementing such measures before they are triggered. Additionally, the EPA determined that the court ruling upholding contingency measures that were previously required and implemented where they were in excess of the attainment demonstration and RFP for ozone attainment plans necessitates similar treatment for PM2.5 NAAQS.[140] The EPA has approved numerous SIPs under this interpretation, i.e., SIPs that use as contingency measures one or more federal or local measures that are in place and provide reductions that are in excess of the reductions required by the attainment demonstration or RFP plan.[141]

For these reasons, the EPA concluded that this approach is reasonable for Moderate PM2.5 nonattainment areas that can demonstrate attainment by the statutory attainment date, as the state would calculate the emissions reductions needed for RFP separately from the control strategy determination for such an area. However, crediting an area for “excess” emissions reductions to satisfy the contingency measure requirement is not allowable for Moderate areas that cannot practicably attain by the statutory attainment date. Under the EPA's approach for calculating RFP for such areas, RFP would be calculated directly from the projected emissions reductions from all control measures identified for the area (as RACM and RACT or additional reasonable measures), such that there should be no difference between emissions reductions estimated from control measures and those estimated for demonstrating RFP.

Finally, consistent with the EPA's past approach for contingency measures for PM2.5 nonattainment areas, the EPA expects that the emissions reductions from contingency measures should be approximately equivalent to 1 year's worth of emissions reductions while the state is revising its attainment plan for the area. States should explain the amount of anticipated emissions reductions to be accomplished by the contingency measures outlined in the plan. In the rare event that an area is unable to identify contingency measures to account for approximately 1 year's worth of emissions reductions, the state should provide a reasoned justification why the smaller amount of emissions reductions is appropriate. As described in Section IV.F of this preamble, the EPA requires an approach for interpreting the statutory RFP requirement that would require demonstrating RFP based on reductions from sources located inside the nonattainment area. Keeping with the historic linkage between RFP and contingency measures, the EPA is also finalizing a similar approach for calculating 1 year's worth of emissions reductions for purposes of adopting appropriate contingency measures. That is, the EPA's approach for determining the level of emissions reductions for contingency measure purposes is to calculate the annual reductions in emissions of direct PM2.5 and PM2.5 plan precursors needed from sources located inside the nonattainment area. As explained earlier, however, some or all of the contingency measures reductions can come from outside the area if they are demonstrated to produce the appropriate air quality impact within the nonattainment area.

This rule requires that states must implement contingency measures after the EPA determines that the area has either failed to meet RFP requirements, failed to meet any quantitative milestone, failed to submit a quantitative milestone report, or failed to attain the standards by the applicable attainment date. The purpose of the contingency measure provision is to ensure that corrective measures are put in place automatically at the time that the EPA makes its determination that an area has either failed to meet RFP or failed to meet the standard by its attainment date. The EPA is required to Start Printed Page 58068determine within 90 days after receiving a state's quantitative milestone demonstration, and within 6 months after the attainment date for an area, whether these requirements have been met. The additional consequences for states with areas that fail to attain the NAAQS or to meet RFP are described in section 179(d) of the CAA and discussed in Section V of this preamble.

See Section IV.A of this preamble for a discussion of the due dates for submission of contingency measures and other attainment plan elements.

3. Comments and Responses

Comment: Commenters stated that requiring contingency measures in areas with mature air pollution control programs is very challenging because they already have developed aggressive control measures to meet CAA requirements and support expeditious attainment. Commenters asserted that it would be extremely difficult to develop further control measures to meet any contingency measure requirements. Commenters objected to the proposed requirement that contingency measures must be approximately equivalent to 1 year's worth of emissions reductions because it is a departure from existing guidance which states the contingency emissions reductions “should be” approximately equal and because sometimes identifying control measures for this level of reductions is just not possible. Commenters advocated that EPA should provide a more reasonable approach to the contingency measure requirement, but did not provide specific recommendations. Other commenters stated that contingency measures should provide 1 year's worth of emissions reductions needed for RFP.

Response: The EPA acknowledges that states containing areas with more longstanding and pervasive nonattainment problems may already have implemented many control measures for purposes of attaining the NAAQS, and there may be fewer sources and measures available to meet the contingency measure requirements of the statute. However, the EPA notes that section 172(c)(9) of the CAA explicitly requires states to adopt contingency measures to apply in the event of failure to meet RFP or failure to attain the NAAQS as a required component of all attainment plans. Typically, contingency measures will be comprised of measures that a state and the EPA have determined are not required to meet RACM/RACT or other requirements, e.g., on the grounds that they are more technologically or economically challenging. As a result, such measures may not be required as RACM/RACT, but are nevertheless available for use as contingency measures. Another approach to contingency measures, if appropriate, would be to rely on control measures imposed on sources outside the boundaries of the designated nonattainment area. Such contingency measures require adequate support to establish that the reductions would have the intended impacts within the nonattainment area, but can be a source of additional measures for this purpose.

Finally, the EPA notes that its longstanding guidance is that contingency measures should provide approximately 1 year's worth of RFP, but this amount may vary based upon appropriate facts and circumstances of each unique nonattainment area. As discussed, states should explain the amount of anticipated emissions reductions to be accomplished by the contingency measures outlined in the plan. In the rare event that an area is unable to identify contingency measures to account for approximately 1 year's worth of emissions reductions, the state should provide a reasoned justification why the smaller amount of emissions reductions is appropriate.

Comment: Commenters stated that “excess” emissions reductions (i.e., emission reduction measures that are included in a modeled attainment demonstration indicating that the area will improve air quality to well below the standard) should not be used as contingency measures in the event an area actually fails to attain. Commenters asserted that the failure to attain should be considered a demonstration that excess emissions reductions do not exist. Further, the commenters stated that excess reductions do not provide the public health benefit intended by Congress. Other commenters stated that Moderate areas that cannot attain by the statutory attainment date could also have excess emissions reductions creditable as contingency measures.

Response: In keeping with longstanding practice, the final rule allows excess emissions reductions to be credited as contingency measures in plans that demonstrate attainment but not for plans that demonstrate an impracticability to attain. This allows nonattainment areas to credit emissions reductions beyond those planned to satisfy attainment plan requirements as meeting part or all of the contingency measure requirements. This allowance is further supported by the court's ruling in LEAN v. EPA, which found that emissions reductions in excess of what were needed for the attainment demonstration and RFP in ozone attainment plans are creditable for contingency measures. Because the contingency measures requirement for both ozone and PM2.5 originates in CAA section 172(c)(9), it is applicable for all areas designated nonattainment for any NAAQS. Therefore, the EPA concluded that the same approach is appropriate for Moderate PM2.5 nonattainment areas that can demonstrate attainment by the statutory attainment date. Allowing “excess” emissions reductions affords proper credit for these areas as they continue to make progress toward attainment while the new SIP is developed for the area. Additionally, in support of the overarching goal of the CAA, public health will benefit from the excess emissions reductions. However, such an allowance for a Moderate area that cannot practicably attain is not acceptable because all emissions reductions anticipated from control measures while developing the attainment plan should be accounted for in the RFP plan. With all of these reductions accounted for in the RFP plan, there are no excess reductions beyond the attainment planning period to be credited as contingency measures.

I. Attainment Dates

1. Summary of Proposal

The proposal described the CAA section 188(c)(1) requirement for Moderate areas to attain the standard as expeditiously as practicable, but no later than the end of the sixth calendar year after the “area's designation as nonattainment.” For purposes of clarity, the EPA proposed to interpret the term “area's designation” as meaning “the area's effective date of designation,” consistent with the agency's past approach for implementing the 1997 and 2006 PM2.5 NAAQS, and with its approach for implementing the NAAQS for other criteria pollutants under part D, title I of the CAA. The EPA requested comment on this interpretation. The preamble to the proposal also described the process for determining whether an area has attained the NAAQS.

2. Final Rule

The final rule maintains the requirement interpreting of CAA section 188(c)(1) to mean that the attainment date must be as expeditiously as practicable, but no later than the end of the sixth calendar after the effective date of an area's designation. See 51.1004(a)(1). Thus, as an example, for areas designated nonattainment in the first round of designations for the 2012 PM2.5 NAAQS, the effective date of designation is April 15, 2015, and the Moderate area attainment date would be as expeditious as practicable, but no Start Printed Page 58069later than December 31, 2021 (i.e., the end of the sixth calendar year after designation). Serious area attainment dates are discussed fully in Section VI.I of this preamble.

The EPA's approach to approving an attainment date for a PM2.5 nonattainment area will be different for a Moderate area that cannot practicably attain the relevant PM2.5 NAAQS by the end of the sixth calendar year after designation. Given that the agency will reclassify any such area to Serious and thereby trigger additional Serious area requirements for the area, the EPA will approve an attainment date for the area when it takes action on the Serious area attainment plan submitted for the area. In the interim, before the EPA takes action to reclassify the area, the statutory Moderate area attainment date will continue to apply to such an area. See 40 CFR 51.1000 and 51.1004(a)(1)(ii). As discussed more fully in Section VI.I of this preamble, when the EPA reclassifies the area, then the presumptive attainment date for the area will be as expeditious as practicable, but no later than the end of the tenth calendar year following designation.

Once an area has an approved attainment date and has implemented its plan, the EPA has the responsibility for determining whether the nonattainment area has attained the standard by its applicable attainment date. Section 179(c)(1) of the CAA requires the EPA to make determinations of attainment no later than 6 months following the attainment date for the area. Under CAA section 179(c)(2), the EPA must publish a notice in the Federal Register identifying those areas that failed to attain by the applicable attainment date. The statute further provides that the EPA may revise or supplement its determination of attainment for the affected areas based upon more complete information or analysis concerning the air quality for the area as of the area's attainment date.

Section 179(c)(1) of the CAA provides that the EPA is to base the attainment determination for an area upon an area's “air quality data as of the attainment date.” The EPA will make the determination of whether an area's air quality is meeting the PM2.5 NAAQS by the applicable attainment date based upon data gathered from the air quality monitoring sites that have been entered into the EPA's Air Quality System (AQS) database. The state is not required to make any special or additional submission in order for EPA to make a determination of attainment.

A Moderate PM2.5 nonattainment area's air quality status is determined in accordance with Appendix N of 40 CFR part 50. To show attainment of the current 24-hour and annual standards for PM2.5, data from the most recent 3 consecutive years prior to the area's attainment date must show that PM2.5 concentrations over the prior 3 year period are at or below the levels of the standards. A complete year of air quality data, as described in part 50, Appendix N, is comprised of all 4 calendar quarters with each quarter containing data from at least 75 percent of the scheduled sampling days.

The EPA will begin processing and analyzing data related to the attainment of Moderate PM2.5 nonattainment areas after the applicable attainment date for the affected areas. Current EPA regulations, under 40 CFR part 58, set the deadline for the state to submit air quality data into the AQS database as no later than 90 days after the end of the calendar year.

While the EPA may determine that an area's air quality data indicate that an area may be meeting the PM2.5 NAAQS for a specified period of time, this does not eliminate the state's responsibility under the Act to adopt and implement an approvable attainment plan unless the area also has been granted a clean data determination. If the EPA determines that an area has attained the standard as of its attainment date, the area will remain designated as nonattainment until the state has submitted an acceptable redesignation request and maintenance plan, and EPA has approved them.

In order for an area to be redesignated as attainment, the state must comply with the five requirements listed under section 107(d)(3)(E) of the CAA. Briefly, this section requires that:

(1) The EPA has determined that the area has attained the PM2.5 NAAQS;

(2) The EPA has fully approved the applicable state implementation plan;

(3) The improvement in air quality is due to permanent and enforceable reductions in emissions;

(4) The EPA has fully approved a maintenance plan for the area; and

(5) The state(s) containing the area or portions of the area have met all applicable requirements under CAA section 110 and part D.[142]

J. Attainment Date Extensions

1. Attainment Date Extension Criteria

a. Summary of Proposal. Subpart 4 of title I of the CAA provides the EPA with authority to grant up to two 1-year extensions of the attainment date for a Moderate area that otherwise could be found to have failed to attain the relevant PM2.5 NAAQS, if the area can meet specific statutory criteria related to monitored air quality in the area and the implementation of measures in the attainment plan. Under CAA section 188(d), a state may apply to the EPA for an extension of a Moderate area's attainment date of 1 additional year (the “Extension Year”) if “(1) the state has complied with all requirements and commitments pertaining to the area in the applicable implementation plan; and (2) no more than one exceedance of the 24-hour [NAAQS] level for PM10 has occurred in the area in the year preceding the Extension Year, and the annual mean concentration of PM10 in the area for such year is less than or equal to the standard level.” Section 188(d) of the CAA also provides for the possibility that the EPA may grant a second 1-year extension if the Moderate area meets specific criteria. The proposal took comment on two ambiguous aspects of this language that warrant further interpretation through this rule.

First, the proposal addressed the statutory language explicitly setting ambient air quality conditions for an attainment date extension in terms that relate factually to the 24-hour PM10 NAAQS that was in effect at the time of the 1990 Amendments of the CAA, which has a statistical form that is substantially different from the 24-hour PM2.5 NAAQS. The requirement in CAA section 188(d)(2) states that an extension may be granted if “no more than one exceedance of the 24-hour national ambient air quality standard level for PM10 has occurred in the area in the year preceding the Extension Year, and the annual mean concentration of PM10 in the area for such year is less than or equal to the standard level.” The proposal noted that the form of the 2006 24-hour PM2.5 NAAQS is a percentile-based form and not a “one expected exceedance” form as is the PM10 NAAQS, and therefore the statutory language requires some interpretation with regard to how it applies to the PM2.5 NAAQS.

The EPA included a proposed option and requested comment on two other alternatives. The preferred proposed approach would only require a state to demonstrate that in the year prior to the applicable attainment date for the area, a Moderate area did not exceed the level of (i.e., had clean data for) the specific PM2.5 NAAQS for which the area is designated nonattainment (the “applicable NAAQS”) and for which the Start Printed Page 58070state is seeking the extension of the attainment date. The second approach would require that a state demonstrate that in the year prior to the applicable attainment date for an area, the Moderate area did not exceed the level of the specific PM2.5 NAAQS for which the area is designated nonattainment (the applicable NAAQS), and did not exceed the most stringent level of any other PM2.5 NAAQS in effect nationally at the time the area was designated for the applicable NAAQS. The third approach would require that a state demonstrate that in the year prior to the applicable attainment date for an area, the Moderate area did not have more than one exceedance of the level of the 24-hour PM2.5 standard, and that the annual mean concentration of PM2.5 in the area for the attainment year was less than or equal to the annual standard, regardless of the NAAQS for which the state is seeking an attainment date extension.

Second, the proposal addressed how the language of CAA section 188(d)(2) should apply to the PM2.5 NAAQS to the extent that it does not specify whether the air quality criteria for an attainment date extension apply equally for a Moderate area designated nonattainment for both the 24-hour and annual standards, or for just one of the standards. In practice, most areas designated nonattainment for the PM10 NAAQS following passage of the 1990 CAA Amendments were designated nonattainment only for the 24-hour PM10 NAAQS, with a few designated for only the annual PM10 NAAQS or for both the 24-hour and the annual PM10 NAAQS. The 24-hour NAAQS has served as the “controlling” (i.e., functionally more stringent) PM10 standard, such that the agency's experience to date in granting PM10 Moderate area attainment date extension requests has been limited to extending the attainment date for the 24-hour PM10 NAAQS.[143] The situation is distinctly different for PM2.5 nonattainment areas, as the specific facts and circumstances of a particular area may warrant a nonattainment designation for either the 24-hour standard or the annual standard, but often not both. In most cases, for instance, the current nonattainment areas for PM2.5 are designated either for the 1997 annual NAAQS or for the 2006 24-hour NAAQS, but not both.[144] For example, the EPA recently promulgated designations for areas violating only the annual PM2.5 NAAQS revised in 2012, not the 24-hour NAAQS, which was retained at the level established during the 2006 p.m. NAAQS review. If a PM2.5 nonattainment area is designated only for the 24-hour or only for the annual PM2.5 NAAQS, this situation raises the question of how CAA section 188(d)(2) air quality criteria for both standards should apply to such a PM2.5 NAAQS nonattainment area if the state seeks an extension of the applicable attainment date for such area.

Regarding the “requirements and commitments” criterion, the EPA proposed to interpret this provision to mean that the state has adopted and is implementing the control measures in the SIP submission it made to address the attainment plan requirements for the applicable PM2.5 NAAQS. The proposal also described a second potential interpretation, in which the state would not be eligible for an attainment date extension unless it has adopted and submitted its Moderate area SIP and has received full approval from the EPA.

b. Final Rule. The EPA received a number of comments on the attainment date extension criteria. With respect to the criterion requiring compliance with all requirements and commitments in the applicable implementation plan, several commenters agreed with the EPA's proposed approach that the state must have adopted and submitted its Moderate area SIP but does not need to have full approval of the plan by the EPA in order to receive an extension. These commenters indicated that a state should not be penalized for a failure by the EPA to take timely action on the implementation plan. Some commenters opposed the proposed approach, stating that an area's attainment date is not predetermined as the end of the sixth calendar year after designation, but instead is to be “as expeditiously as practicable,” and no later than the end of the sixth calendar year. For this reason, the commenters stated that the actual attainment date to be extended would not be known until after approval of the SIP by the EPA.

After considering the comments received on this issue, the EPA is finalizing an approach similar to the preferred option in the proposal. This interpretation is based on the plain language of CAA section 188(d) that does not explicitly require that the state comply with all requirements pertaining to the area in the CAA, but merely requires that the state comply with all requirements in the applicable SIP.[145] In other words, the EPA believes that CAA section 188(d)(1) should be interpreted to mean that so long as the state has submitted the necessary attainment plan for the area for the applicable PM2.5 NAAQs and is implementing the control measures in the submission, the fact that the EPA has not yet acted on such submission to make it an approved part of the applicable SIP should not be a barrier to the state obtaining an extension of the attainment date under CAA section 188(d)(1). See section 51.1005(a)(1) of the CAA. For the same reason, the EPA also proposes to read this provision not to bar an extension if all or part of an area's Moderate area plan is disapproved or has been promulgated by the EPA as a FIP. In the case that the “applicable implementation plan” is a FIP (or combination of SIP and FIP), then the EPA requires the state to have implemented the control measures contained therein in order to meet the statutory criteria at CAA section 188(d)(1) for a Moderate area attainment date extension.

With respect to the air quality criterion, several commenters supported the EPA's preferred option because it would require an area to show clean data only for the specific standard for which it is seeking an extension year. Some commenters acknowledged that a literal reading of the statute may seem to require a showing of clean data for both the annual and 24-hour PM2.5 standards in order to receive an extension, but suggested that this interpretation would not make sense under the circumstance where the two standards have different attainment dates. The commenter believed it would lead to absurd results if, in order to receive an extension for one standard, an area were required to show clean data for the other standard for which the attainment date had not yet passed. On the other hand, other commenters favored the option that would require clean data for both standards in order to obtain an extension for one standard because they believed that only requiring clean data for one standard would allow the area to avoid or delay achieving additional emissions reductions.

After considering the comments on the air quality criterion, the EPA has decided to finalize the approach that would require an area to show clean data during the attainment year only for Start Printed Page 58071the specific standard for which it is seeking an extension. See 40 CFR 51.1005(a)(1). Under this approach, the EPA interprets the requirement to demonstrate that the area had “no more than one exceedance” of the 24-hour PM2.5 NAAQS to mean that the state must simply demonstrate that the area had “clean data” in the attainment year. Thus, a state seeking an attainment date extension for a Moderate nonattainment area for a 24-hour PM2.5 NAAQS would be required to demonstrate that the area had clean data with respect to the statistical form of that particular standard (i.e., for the 2006 PM2.5 NAAQS, the 98th percentile value did not exceed 35 μg/m3) in the calendar year prior to the applicable attainment date for the area. The state would not have to demonstrate that the area also had clean data for any other PM2.5 NAAQS, including any annual PM2.5 NAAQS or later revision of the 24-hour PM2.5 NAAQS. Likewise, a state seeking an attainment date extension for an annual PM2.5 NAAQS would be required to demonstrate that the area had clean data for that particular standard (i.e., for the 2012 annual PM2.5 NAAQS, the annual mean value did not exceed 12.0 μg/m3) in the calendar year prior to the applicable attainment date for the area, but would not have to demonstrate that the area had clean data for any other PM2.5 NAAQS.

The EPA believes this interpretation of CAA section 188(d)(2) is appropriate for two main reasons. First, while most PM10 nonattainment areas were designated nonattainment for either just the 24-hour PM10 NAAQS or for both the 24-hour and annual PM10 NAAQS, the majority of current PM2.5 nonattainment areas are, in contrast, designated for either the 24-hour or the annual PM2.5 NAAQS, and should arguably only need to demonstrate clean data for the NAAQS for which the area is designated nonattainment. For those few PM2.5 nonattainment areas designated for both 24-hour and annual PM2.5 NAAQS, the EPA believes it also is appropriate that a state must only demonstrate clean data for the specific NAAQS for which the state is seeking an attainment date extension because such an approach is consistent with the statute's overall approach to designating nonattainment areas and implementing control strategies for each separate PM2.5 NAAQS. Second, if an area is designated as nonattainment for both the 24-hour and annual PM2.5 standards and receives an extension for one standard while still working toward a later attainment date for the other standard, public health protection would not be delayed because the state would still be subject to the ongoing mandate to adopt and implement measures to ensure expeditious attainment of the other standard.

c. Comments and Responses. Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

2. Process for Attainment Date Extension Request Submissions

a. Summary of Proposal. The proposal recognized that CAA section 188(d) does not specify the process by which the state should submit a Moderate area attainment date extension request, nor how the EPA should evaluate and act upon such a request. The proposal described the elements that the state would be required to submit for the various options proposed regarding the CAA section 188(d) extension criteria for 1) compliance with requirements and commitments in the applicable SIP, and 2) air quality data. The proposal suggested that any Moderate area extension request should be submitted to the EPA by the attainment date for the area (i.e., by December 31 of the attainment year), and it proposed requiring the state to submit certified air quality data for the attainment year to the EPA by February 28 of the following year in order for the EPA to issue a determination within 6 months of the attainment date regarding whether the area attained or failed to attain. The proposal stated that an attainment date extension should be granted only after the agency provides notice in the Federal Register and an opportunity for the public to comment. Lastly, the proposal clarified that any 1-year extension would extend from January 1 to December 31 for the year following the year including the December 31 attainment date.

b. Final Rule. As discussed in the previous section, in order for the EPA to make a decision on whether to grant a 1-year attainment date extension, the state needs to submit sufficient information to demonstrate that it has both complied with applicable requirements and commitments in the applicable implementation plan, and that it has clean data for the attainment year. Under the final rule, a state would have to demonstrate that control measures have been submitted in the form of a SIP revision, and that RACM and RACT and additional reasonable measures for sources in the area have been implemented. The SIP revision would need to have been adopted and submitted by the state, but it would not need to have been approved by the EPA in order for the state to qualify for an extension. See 40 CFR 51.1005(a)(1)(i). The state also would need to have “clean” air quality data in the attainment year, as explained in the previous section. See 40 CFR 51.1005(a)(1)(ii)-(iii). Any decision made by the EPA to extend the attainment date for an area would be based on facts specific to the nonattainment area at issue.

Some commenters suggested that in some cases a state will not know if it should seek an extension request until after the attainment date has passed, particularly for areas that commonly have higher air quality levels in the cooler months at the end of the calendar year. The commenter recommended that states should have until February 28 of the following year to submit an extension request along with certified air quality data. Other commenters stated that there is no legal basis for requiring the certification of monitoring data by February 28th of the following year, and therefore it should not be a requirement that could potentially disqualify a state from having an extension request be approved.

The EPA considered these comments in light of the EPA's obligation under the CAA to issue a determination of attainment or failure to attain within 6 months of the original attainment date. After considering these comments, the EPA strongly recommends that a state should submit a Moderate area 1-year extension request to the appropriate EPA Regional Office by February 28 of the following year. In addition, the EPA strongly recommends that the state provide certified air quality data for the previous calendar year by this date or as close to this date as possible. The EPA understands that there may be certain situations that prevent the full certification of filter-based PM2.5 monitoring data by this date. If air quality data for the previous full calendar year has not been fully certified by February 28, the extension request should include any available preliminary data the state can provide. Submission of the necessary air quality data must occur as soon as possible after the attainment date to enable the EPA to review the state's request expeditiously and take appropriate action on the request prior to the date by which the EPA is required to make a determination that the area failed to attain by its Moderate area attainment date, i.e., within 6 months of the applicable attainment date (see the discussion of reclassification in Section V of this preamble).

As indicated in the proposal, the EPA believes that an attainment date Start Printed Page 58072extension should only be granted after the agency provides notice in the Federal Register and an opportunity for the public to comment. A notice-and-comment rulemaking allows for the EPA to adequately evaluate whether the area meets the air quality and program implementation criteria, and to consider other relevant facts and information presented by the state and the public in determining whether the extension request should be granted or denied. This process also is consistent with past practice by the EPA in granting attainment date extensions, most recently for ozone nonattainment areas.

Regarding the extension period, the EPA interprets CAA section 188(d) to authorize the EPA to stipulate that any extension would begin on January 1 and end on December 31 of the extension year, and these dates would not depend on when the state submitted its request for an extension or was granted the extension by the EPA. The EPA is finalizing this interpretation at 40 CFR 51.1005(a)(4). The EPA believes this is a reasonable approach, as the original attainment date for the area will either be the end of the sixth calendar year following designation of the area, or the end of an earlier calendar year if the state demonstrated that it could advance attainment by at least 1 year. In addition, compliance with the relevant NAAQS will be evaluated based on monitored data collected over a full calendar year (i.e., over the period beginning January 1 and ending December 31), so starting the extension year on January 1 is logical.

As noted earlier in this discussion of Moderate area attainment date extensions, CAA section 188(d) provides that a state may seek up to two 1-year extensions of the Moderate area attainment date if it meets the applicable criteria of CAA sections 188(d)(1) and 188(d)(2). The statute makes no distinction between the criteria that must be met for the first 1-year extension and the criteria for the second 1-year extension. Therefore, for a second 1-year attainment date extension request, the EPA intends to apply the same interpretations of the statutory criteria as described earlier in this section, including the recommended deadlines for the state to submit the extension request and the certified air quality data.

c. Comments and Responses. Comment: Some commenters described the situation where the EPA has approved a Moderate area attainment date that is earlier than the latest date allowed by the statute (for example, assume the approved attainment date is the end of the 5th calendar year after designation). The commenter suggested that if the area was unable to attain by its “earlier” approved attainment date, CAA section 188(d) should be interpreted in a way that would not require the state to submit a request for an attainment date extension. The commenter suggested that the state should only be required to meet the CAA section 188(d) requirements if the area is seeking an extension beyond the latest Moderate area attainment date allowed by statute (i.e. the end of the sixth calendar year after designations).

Response: The EPA does not agree with the commenter because the statute appears to address this situation clearly. Section 188(c)(1) of the CAA states that the Moderate area attainment date is “as expeditiously as practicable but no later than the end of the sixth calendar year after the area's designation as nonattainment.” If the area had provided an attainment demonstration supporting the approval of an earlier attainment date by the EPA, then that approved attainment date is then regarded as the “applicable attainment date” for that area. Section 188(d)(1) of the CAA of the statute then enables the EPA to grant a 1-year extension for the “date specified in paragraph (c)(1),” which in this case would be the earlier attainment date.

V. Reclassification of a PM2.5 Moderate Nonattainment Area to Serious

As discussed elsewhere in this preamble, subpart 4, part D of title I of the CAA establishes a two-tier classification system for areas designated nonattainment for the PM2.5 NAAQS. While all areas designated nonattainment are initially classified as Moderate, CAA section 188(b) describes two pathways by which the EPA has the authority and/or the duty to reclassify a Moderate nonattainment area to a Serious nonattainment area. Pursuant to CAA section 188(b)(1), the EPA has general discretionary authority to reclassify from Moderate to Serious any area that the Administrator determines cannot practicably attain the NAAQS by the applicable Moderate area attainment date. Pursuant to CAA section 188(b)(2), the EPA has a mandatory duty to reclassify from Moderate to Serious any area that fails to attain the NAAQS by the applicable Moderate area attainment date. Both of these pathways are more fully described in the following sections.[146]

A. Discretionary Authority

1. Summary of Proposal

The proposal provided background on the EPA's discretionary authority to reclassify a Moderate area to Serious. It proposed to interpret the statute to give EPA broad authority to reclassify based on available information, noting that the EPA could base this determination upon whatever factors are pertinent. The proposal sought comment on whether EPA should discretionarily reclassify an area without a request or submission from the affected state. The proposal also addressed the mandatory statutory timing for discretionary reclassification (i.e., within 18 months of the moderate area SIP due date), and took comment on the appropriateness of EPA acting to reclassify an area beyond 18 months after the Moderate area SIP due date, including right up to the Moderate area attainment date.

2. Final Rule

The final rule remains largely unchanged with regard to this issue. The EPA's discretionary authority to reclassify a Moderate area to Serious derives from language in section 188(b)(1) of the CAA, which provides that: “The Administrator may reclassify as a Serious PM10 nonattainment area . . . any area that the Administrator determines cannot practicably attain the [NAAQS] . . . by the attainment date . . . for Moderate Areas.” The use of this discretionary authority thus would be triggered by the EPA making a determination that the Moderate area in question cannot practicably attain by its statutory attainment date.

The CAA does not specify the basis on which the EPA may make a determination that the area cannot practicably attain by the applicable attainment date. In the General Preamble, the EPA explained that the agency could base this determination upon whatever facts are pertinent, and could do so whether or not the state in question has submitted a Moderate area attainment plan, and whether or not the state has made the demonstration contemplated in CAA section 189(a)(1)(B).[147] The EPA may make such a determination based on evaluation of the attainment plan for the Moderate area in question, or based on other facts known to the agency. As discussed earlier in this preamble, the attainment plan that a state would submit for a Moderate nonattainment area must include either a demonstration that the area will attain the NAAQS by the Start Printed Page 58073statutory Moderate area attainment date or a demonstration that attaining by the statutory Moderate area attainment date is impracticable. If the state makes and the EPA concurs with an impracticability demonstration submitted as part of the attainment plan, then the demonstration could serve as the basis for the EPA initiating a notice-and-comment rulemaking to reclassify the area to Serious.

However, the CAA does not specify the basis for the EPA's exercise of its discretionary authority and does not require the EPA to make its determination based on a submission from the state. Indeed, such a prerequisite would be illogical in the case of a state that fails to make any attainment plan submission or fails to address the issue of the need for reclassification in such submission. The EPA believes that while a Moderate area impracticability demonstration as contemplated in CAA section 189(a)(1)(B) is desirable in order to help the agency make a determination that the area cannot practicably attain by its attainment date, such a demonstration is not necessary to trigger action by the EPA to reclassify a Moderate area to Serious. The statute does not prohibit the EPA from using the weight of available evidence, including information available in the public record of a state, to make such a determination, even in the absence of a complete attainment plan submission.

Regarding the timing of discretionary reclassifications, CAA section 188(b)(1)(B) establishes timeframes by which EPA is to act if it intends to exercise its discretionary authority to reclassify areas as appropriate following the Moderate area attainment plan due date, stating that “the Administrator shall reclassify appropriate areas within 18 months after the required date for the state's submission of a SIP for the Moderate Area.” In the case of areas designated nonattainment for the 2012 PM2.5 NAAQS in the first round of designations, states will be required by statute to submit a Moderate area attainment plan within 18 months of the date of designation (April 2015), or no later than October 2016. Pursuant to CAA section 188(b)(1)(B), the EPA would then have until April 2018 (18 months following the Moderate area attainment plan submission deadline) to use its discretionary authority to reclassify any area that the EPA determines at that time cannot practicably attain by the Moderate area attainment date of December 2021.

However, as noted earlier, there may be situations in which it may be appropriate to reclassify an area at a point in time more than 18 months after the SIP due date. On this issue, the General Preamble stated that:

“. . . under the plain meaning of the terms of section 188(b)(1), EPA has general discretion to reclassify at any time before the applicable attainment date any area EPA determines cannot practically attain the standards by such date. Accordingly, CAA section 188(b)(1) is a general expression of delegated rulemaking authority. In addition, subparagraphs (A) and (B) of CAA section 188(b)(1) mandate that the EPA reclassify at specified timeframes any areas it determines appropriate for reclassification at those dates. These subparagraphs do not restrict the general authority but simply specify that, at a minimum, it must be exercised at certain times.” [148]

The EPA continues to consider this the correct interpretation of the statutory requirements concerning its authority to reclassify a Moderate nonattainment area to Serious at any time prior to the area's Moderate area attainment date, if the agency determines that the area cannot practicably attain the relevant PM2.5 NAAQS by that date. See Section VI.A.2 of this preamble for a discussion of the due dates for submission of attainment plan elements for areas that receive a discretionary reclassification.

The EPA emphasizes that a state with an area designated as nonattainment for the PM2.5 NAAQS is required to meet all Moderate area attainment plan requirements, even after the EPA reclassifies the area to Serious. Section 189(b)(1) of the CAA states clearly that “in addition to” the Moderate area attainment plan requirements, states with areas reclassified to Serious must also meet Serious area attainment plan requirements, i.e., the reclassification does not eliminate the statutory obligation to meet Moderate area attainment plan requirements.[149] Thus, the EPA believes that reclassifying Moderate areas to Serious at any time under its discretionary authority does not provide incentives to delay development and implementation of control measures by excusing states from meeting substantive Moderate area attainment plan requirements or by extending the applicable attainment date. The EPA articulated this position in the General Preamble, explaining that this interpretation:

. . . creates an incentive for the timely submittal and effective implementation of moderate area SIP requirements and facilitates the PM10 attainment objective. For example, if an area that fails to submit a timely moderate area SIP is reclassified, this does not obviate the requirement that the area submit and implement RACM consistent with the moderate area schedule. Accordingly, the area could be subject to sanctions for its delay in submitting the RACM SIP requirement . . . Further, reclassification before the applicable attainment date will ensure that additional control measures (i.e., in addition to RACM, serious areas must implement best available control measures (BACM)), are implemented sooner and will expedite the application of more stringent new source review requirements to the area . . . Similarly, where an area submits a timely moderate area SIP, EPA may not discover that the area cannot practicably attain until sometime after it begins implementing its moderate area control measures. The EPA then may want to reclassify the area in order to facilitate the development and implementation of BACM.[150]

The EPA considers this longstanding interpretation of CAA section 188(b)(1) to be the correct interpretation of the statutory requirements governing the discretionary reclassification of Moderate areas. The EPA will reclassify any area it determines cannot practicably attain by the Moderate area attainment date through notice-and-comment rulemaking. See 40 CFR 51.1002(b)(1).

3. Comments and Responses

Comment: Some commenters stated that while it may be desirable for a state or local agency to provide an impracticability demonstration to the EPA, the EPA is not prohibited from using the weight of available evidence to reclassify an area to Serious even before the Moderate area plan is due if it has a particularly challenging air quality situation. Other commenters did not agree with the EPA's interpretation of the statute, and believed that the EPA's authority should be limited to reclassification of areas that submit an impracticability demonstration.

Response: For the reasons described earlier, the EPA agrees with the first commenter and does not believe its authority is limited in the manner suggested by the second commenter.

B. Mandatory Duty

1. Summary of Proposal

The proposal provided background on the EPA's mandatory duty pursuant to CAA section 188(b)(2) to reclassify a Moderate area to Serious when the area fails to attain the standard by the attainment date. The CAA directs the EPA to reclassify an area from Moderate to Serious if the area fails to attain the relevant NAAQS by the applicable Moderate area attainment date Start Printed Page 58074(including any attainment date that had been extended by one or 2 years pursuant to CAA section 188(d)). Reclassification occurs by operation of law when the EPA determines that the area failed to attain the NAAQS by the applicable attainment date, in accordance with CAA section 188(b)(2)(A). Section 188(b)(2) of the CAA requires that “within six months following the applicable attainment date for a PM10 nonattainment area, the Administrator shall determine whether the area attained the standard by that date” and publish its determination in the Federal Register.

The EPA proposed that the date of reclassification would be the effective date of the Federal Register notice issued by the EPA that determines the area failed to attain by the attainment date. Thus, for example in the case of the 2012 PM2.5 NAAQS, assuming a Moderate PM2.5 nonattainment area fails to attain the standard by its approved attainment date of December 31, 2021, the EPA would be required to publish in the Federal Register no later than June 30, 2022 its determination that the area failed to attain the NAAQS and is therefore reclassified as Serious by operation of law. The actual date of reclassification for the area would be the effective date of the Federal Register document (e.g. in July or August 2022). To meet the requirements of CAA section 189(b)(2), the Serious area attainment plan for the area would be due within 18 months of the actual reclassification date (i.e., in early 2024).

The proposal also discussed a possible alternative option, which would be to consider the date of reclassification to Serious to be the same as the Moderate area attainment date. Applying this approach in the example earlier would yield an earlier date of reclassification of December 31, 2021, and an earlier Serious area attainment plan due date of June 30, 2023.

2. Final Rule

Several commenters supported the EPA's proposed approach to interpret the date of reclassification as the effective date of the Federal Register notice announcing the area had failed to attain the standard by the Moderate area attainment date because this approach would allow adequate time for the EPA to evaluate air quality data and any exceptional events claims before making the determination that the area failed to attain. Some commenters opposed the proposed approach and supported interpreting the date of reclassification as being the same as the missed attainment date for the Moderate area. This commenter suggested that the proposed approach could introduce additional delay because the EPA does not always issue determinations of failure to attain promptly. They also claimed that the term “reclassified by operation of law” in CAA section 188(b)(2)(A) would have no meaning (i.e., surplusage) if the proposed approach was adopted.

After taking the comments received under consideration, the EPA has decided to retain the proposed approach. The date of reclassification is the effective date of the Federal Register notice issued by the EPA that determines the area failed to attain by the attainment date. For practical reasons, the EPA does not believe that as a general matter it can be expected to make a determination on December 31 that an area failed to attain. Because the PM2.5 ambient monitoring method requires laboratory analysis of filters prior to determining the ambient mass for each day, adequate time is needed after December 31 to ensure that the filter-based measurements have been evaluated and quality-assured in an accurate manner.

Although CAA section 188(b)(2) does not explicitly address this issue, the EPA believes that this approach is a reasonable interpretation of statutory ambiguity in CAA section 188(b)(2) and preferable over the alternative approach for two additional reasons. First, the statute at CAA section 189(b)(2) gives a state 18 months from the date of reclassification of an area to submit for the EPA's approval an attainment demonstration with air quality modeling and provisions to assure timely implementation of BACM and BACT on sources in the nonattainment area. The workload associated with developing a Serious area plan can be substantial, and the EPA believes that it is reasonable to resolve the statutory ambiguity in favor of providing the state with the full 18 months from the effective date of reclassification to develop and submit a thorough, complete and accurate Serious area attainment plan that will provide for expeditious attainment of the NAAQS.

Second, the statutory attainment date for a Serious area reclassified under any circumstances is as expeditious as practicable but no later than the end of the tenth year following designation of the area, and is thus independent of the date of reclassification of the area. Allowing a state some additional amount of time beyond 18 months from the missed attainment date to develop and submit a complete Serious area attainment plan, including adopting BACM and BACT, will not change the statutory obligation on the state for the area to attain the relevant NAAQS by the applicable attainment date. On the contrary, the EPA believes that the extra time may in fact help the area timely attain the relevant NAAQS by allowing the state to develop a more effective attainment plan for the area.

Thus, the EPA interprets the CAA such that the date of reclassification for an area reclassified under the EPA's mandatory duty is to be considered the effective date of the Federal Register document announcing that the area had not attained the relevant PM2.5 NAAQS and is therefore reclassified by operation of law. The EPA intends to make determinations of whether an area attained the relevant NAAQS pursuant to CAA section 188(b)(2) by notice-and-comment rulemaking. See 40 CFR 51.1002(b)(2). Accordingly, the final rule establishes a definition of “date of reclassification” to mean the effective date of a PM2.5 area reclassification from Moderate to Serious as promulgated by the Administrator. This definition is then used, for example, to establish the due date for the Serious area SIP. (See Section VI.A.1 of this preamble for more information on mandatory reclassification area SIP due dates.)

3. Comments and Responses

Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

VI. Requirements for PM2.5 Serious Nonattainment Area Plans

Sections 189(b) and (c) of the CAA include the following requirements for Serious area attainment plan submissions: (i) An attainment demonstration (CAA section 189(b)(1)(A)); (ii) provisions for the implementation of best available control measures (BACM) no later than 4 years after reclassification of the area to Serious (CAA section 189(b)(1)(B)); (iii) quantitative milestones that will be used to evaluate compliance with the requirement to demonstrate RFP (CAA section 189(c)); and (iv) regulation of PM2.5 precursors (in general to meet attainment and control strategy requirements, and as specifically required for major stationary sources by CAA section 189(e)). Other subpart 1 requirements for attainment plans not otherwise superseded under subpart 4 also apply to Serious areas for the PM2.5 NAAQS, including: (i) a description of the expected annual incremental reductions in emissions that will demonstrate RFP (CAA section 172(c)(2)); (ii) emissions inventories (CAA section 172(c)(3)); (iii) other control measures (besides BACM and Start Printed Page 58075BACT) needed for attainment (CAA section 172(c)(6)); and (iv) contingency measures (CAA section 172(c)(9)).

Additionally, CAA section 189(b)(1) requires that “in addition” to the attainment plan requirements specific to Serious areas, states must also meet all Moderate area attainment plan requirements. The EPA interprets the statutory language of CAA section 189(b)(1) to require states with areas that are reclassified to Serious to meet Moderate area attainment plan requirements, including all areas that the EPA reclassifies through rulemaking under its discretionary authority, even if that occurs before the area has met all of its Moderate area attainment plan requirements.[151] The following section describes the EPA's final actions in this rule regarding Serious area attainment plan requirements in greater detail.

A. Plan Due Dates

The proposal discussed the statutory provisions that informed the options for the submission due dates for the various components of Serious area attainment plans. The timing of Serious area attainment plan elements is dictated by two provisions of the CAA: CAA section 189(b)(2) for certain subpart 4 elements and CAA section 172(b) for subpart 1 elements not superseded by subpart 4 requirements. Section 189(b)(2) of the CAA addresses the due dates for Serious area attainment demonstrations due under CAA section 189(b)(1)(A) and provisions for BACM and BACT implementation under CAA section 189(b)(1)(B). Specifically, section 189(b)(2) stipulates two alternative schedules for states to submit Serious area attainment demonstrations, depending upon the statutory authority governing the reclassification action. For an area reclassified to Serious by operation of law under CAA section 188(b)(2) upon a determination by the EPA that the area failed to attain the relevant NAAQS by the applicable Moderate area attainment date, a state must submit a new attainment demonstration for the area no later than 18 months after reclassification. For an area reclassified to Serious pursuant to the agency's discretionary authority provided under CAA section 188(b)(1), a state must submit a new attainment demonstration no later than 4 years after reclassification of the area.[152] For all Serious nonattainment areas, CAA section 189(b)(2) requires a state to submit within 18 months of an area's reclassification “provisions to assure that the best available control measures [BACM] for the control of PM10 shall be implemented no later than 4 years after the date the area is classified (or reclassified) as a Serious Area.”

When considering attainment plan due dates for areas that have been discretionarily reclassified, it is also important to keep in mind the requirements of CAA section 188(b)(1). Section 188(b)(1) of the CAA generally states that: “The Administrator may reclassify as a Serious PM10 nonattainment area . . . any area that the Administrator determines cannot practicably attain the [NAAQS] . . . by the attainment date . . . for Moderate Areas.” In addition, CAA section 188(b)(1)(B) provides that “the Administrator shall reclassify appropriate areas within 18 months after the required date for the state's submission of a SIP for the Moderate Area.” Since all Moderate area SIPs are due 18 months after designation, then this provision contemplates that EPA will typically exercise its discretionary reclassification authority within 3 years of the area's designation as nonattainment. Taken together with CAA section 189(b)(2), which for discretionary reclassifications requires the state to submit the attainment demonstration within 4 years of reclassification to Serious, subpart 4 contemplates that attainment plans for discretionary reclassifications will be submitted no later than 7 years after designation. However, as noted in the previous section, the EPA believes it can discretionarily reclassify an area more than 18 months after the Moderate area SIP due date under certain circumstances, meaning that the Serious area attainment demonstration for such a plan could be submitted to EPA more than 7 years after designation. (See more discussion in Section V.A of this preamble on the timing of discretionary reclassifications.)

Lastly, because some of the Serious area plan requirements noted earlier are established in subpart 1 of the Act (CAA section 172), the proposal also noted that CAA section 172(b) provides the EPA discretion to set a due date for submission of these subpart 1 attainment plan elements that is no later than 3 years after designation of the area. In the Addendum, the EPA interpreted the date of reclassification of a Moderate area to Serious to be analogous to the date of designation of the area to nonattainment. Accordingly, some of the options presented in the proposal included 3 year SIP due dates for certain plan requirements that stem from subpart 1.[153]

1. Area Reclassified to Serious After Failing To Attain the PM2.5 NAAQS

a. Summary of Proposal. The proposal noted that for an area reclassified to Serious after failing to attain the PM2.5 NAAQS by the Moderate area attainment date, CAA section 189(b)(2) requires the state to submit both the attainment demonstration for an area and provisions to ensure timely BACM and BACT implementation to the EPA within 18 months after reclassification. The EPA proposed a straightforward codification of this 18 month deadline. Assuming the effective date of the Federal Register reclassification notice is typically about 6 months after the end of the calendar year, this means that the attainment demonstration and BACM/BACT provisions would be required at about 8 years after designations. The notice also proposed that (1) in addition to BACM/BACT and the attainment demonstration, the emission inventory would also be required to be submitted within 18 months of the effective date of reclassification because it is essential for the development of BACM/BACT determinations; and (2) additional feasible measures (i.e., control measures that may be able to help the area attain by the attainment date or advance the attainment date by a year, and that may be implemented later than BACM/BACT but before the attainment date) would also be required to be submitted within 18 months of the effective date of reclassification because such measures would be identified as part of the overall control measures analysis. Regarding the SIP submission date for the remaining required plan elements (i.e., RFP, quantitative milestones and contingency measures), the proposal included two options: (1) no later than 18 months after reclassification (i.e., at about 8 years after designation, or 2 years prior to the Serious area attainment date; or (2) within 3 years after reclassification (i.e., at about 9.5 years after designation, or 6 months prior to the Serious area attainment date).

b. Final Rule. Some commenters opposed the proposed requirements for SIP elements other than BACM/BACT and the attainment demonstration to be due within 18 months of the effective date of reclassification because they favored providing states with as much time and flexibility as possible to provide their submissions. Other commenters suggested that having all Start Printed Page 58076elements—including RFP, quantitative milestones, and contingency measures—be due at the same time would be more administratively efficient for states and would allow for EPA to conduct a single coordinated review of these plans, and should therefore all be due within 18 months of the effective date of reclassification. They also indicated that the alternative would not make sense because RFP, quantitative milestones, and contingency measures are all linked to the attainment demonstration.

After taking these comments into consideration, the EPA has decided to require all Serious area plan elements to be due within 18 months of the effective date of reclassification for any area reclassified due to a failure to attain by the Moderate area attainment date. The EPA believes that the proposed alternative 3 year deadline, which would have allowed some elements to be submitted as late as 6 months prior to the attainment date, would mean that the state would be required to submit two different SIPs and would require greater state government resources to conduct the administrative and public procedures required to submit the separate plans to the EPA. This approach also would not provide the EPA with sufficient time to appropriately review and take action on the state's submission prior to the attainment date. It also is appropriate to have the RFP, quantitative milestones, and contingency measures elements be developed and submitted at the same time as the attainment demonstration because they build from the information in the attainment demonstration. The EPA also maintains that requiring states to submit all elements of an attainment plan by the same date is reasonable because it allows for a complete review of the state submission by the EPA, regulated entities, and the general public, and it also should prove to be most efficient for states and the EPA. The EPA further agrees with commenters that a program requiring two submissions rather than one can generally be expected to be less administratively efficient because it will involve separate public hearings and comment periods at the state level, and separate proposed and final approval actions in the Federal Register by the EPA. Thus, the final rule requires any area that has been reclassified to Serious as a result of a failure to attain the standard by the Moderate area attainment date to submit all the plan elements to the EPA within 18 months of reclassification: updated base year emission inventory (described in more detail in the next section); BACM/BACT determinations and adopted regulations; analysis of additional feasible measures (i.e., control measures that may be able to help the area attain by the attainment date or advance the attainment date by a year, and that may be implemented later than BACM/BACT but before the attainment date) and adopted regulations, as appropriate; attainment demonstration; RFP; quantitative milestones; and contingency measures. See 40 CFR 51.1003(b)(2)(ii).

c. Comments and Responses. Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

2. Area Reclassified to Serious Because the EPA Finds in Its Discretion That the Area Cannot Practicably Attain the NAAQS by the Statutory Moderate Area Attainment Date

a. Summary of Proposal. The proposal noted that for an area reclassified to Serious because the area cannot practicably attain the standard by the Moderate area attainment date, CAA section 189(b)(2) requires the state to submit its BACM/BACT analyses and any adopted regulations to the EPA within 18 months; and to submit the attainment demonstration within 4 years of reclassification. Similar to the proposal for mandatory reclassification areas, the notice also proposed that an updated emission inventory (required under section 172(b) of the CAA) be required to be submitted within 18 months of reclassification because it is essential for the development of BACM/BACT determinations.

The notice also discussed a potential control measure option (described in Section VI.D. of the proposal, Attainment Plan Control Strategy, at page 15410) that would closely link the BACM/BACT determinations to the attainment demonstrations (rather than consider BACM/BACT as an independent requirement). Therefore, to facilitate this linked approach to BACM/BACT, an alternative option was proposed for submission of the attainment demonstration within 18 months of reclassification, instead of within 4 years.

The proposal also addressed the remaining plan elements: additional feasible measures (i.e., control measures that may be able to help the area attain by the attainment date or advance the attainment date by a year, and that may be implemented later than BACM/BACT but before the attainment date); RFP; quantitative milestones; and contingency measures. Two SIP submission due date options were proposed for the remaining plan elements: (1) No later than 3 years after reclassification [154] ; or (2) no later than 4 years after reclassification. The proposal requested comments on all of the proposed options for the various elements of a Serious area attainment plan.

b. Final Rule. Most commenters opposed the option requiring the attainment demonstration to be due within 18 months, at the same time as the BACM/BACT submission. Some of these commenters suggested that a 4-year due date for the attainment demonstration and other elements would provide maximum flexibility to the states. While some commenters acknowledged the reasoning behind requiring submittal of the attainment demonstration and BACM/BACT at the same time if BACM/BACT is linked to the attainment demonstration, most commenters favored an approach that provided additional time for submittal of the attainment demonstration.

Some commenters stated that for an area that is reclassified to Serious because it cannot practicably attain the NAAQS by the Moderate area attainment date, CAA section 188(b)(1)(B) requires the EPA to reclassify the area within 3 years of designation (i.e. within 18 months of the Moderate area SIP due date), and then per CAA section 189(b)(2) the attainment demonstration for such area would be due 4 years later (i.e., 7 years from designation). The commenter stated that, if the EPA finalizes any discretionary reclassifications beyond 3 years after designation, then it cannot allow the area to have the full 4 years for development of the attainment demonstration because it would undermine the deadlines and schedules that Congress was plainly trying to impose.

For discretionary reclassification areas, just as for mandatory reclassification areas, the EPA is finalizing the statutory due date of 18 months for the BACT/BACM submission. However, after considering comments received on the timing options for submission of the attainment demonstration, the EPA has determined that the attainment demonstration should generally be due later than 18 months for areas subject to discretionary reclassifications. Because the statutory provision in CAA section 189(b)(2) provides up to 4 years, the EPA believes that an appropriate default due date for Start Printed Page 58077the attainment demonstration should be 4 years after reclassification for areas reclassified within 3 years of initial designation. However, after further consideration of this issue, the EPA also believes that a due date of less than 4 years should be required for areas that are reclassified closer to the Moderate area attainment date (i.e., reclassified between 4 and 6 years after initial designation). In considering what would be a reasonable submission deadline for the attainment demonstration in this situation, the EPA considered the provisions applicable to areas that fail to attain by the attainment date. Specifically, CAA section 189(b)(2) requires the attainment demonstration (and the rest of the plan) to be submitted no later than 8 years after designation. As explained further, the EPA believes this requirement provides a reasonable outer bound for submission of Serious area plans for any area that is discretionarily reclassified to Serious.

The circumstance that one of the commenters identifies, where the EPA reclassifies an area to Serious at a point in time more than 3 years after designation, raises an important timing issue that was not explicitly addressed in the proposal. The EPA was aware that it might need to reclassify an area to Serious beyond 3 years after designation (e.g., for an area that fails to submit a Moderate area attainment plan at all; or for an area that is discretionarily reclassified by the EPA because it has very high air quality values). However, the proposal did not address the issue of when the attainment demonstration and other elements should be required for submission when this circumstance occurs. The comment raises the question regarding whether, in the most extreme example, it would be reasonable for an area to be reclassified just before the Moderate area attainment date (end of the sixth calendar year after designation) and then to have until just before the Serious area attainment date (end of the tenth calendar year after designation) to submit the attainment demonstration. This situation would provide little meaningful time for the state and relevant emissions sources to implement measures to reach attainment by the attainment date, nor would it provide sufficient time for the EPA to review and take action on the plan.

The EPA maintains that the statutory authority to “reclassify as a Serious PM-10 nonattainment area . . . any area that the Administrator determines cannot practicably attain [the NAAQS] by the attainment date . . . for Moderate Areas” includes the authority to make that determination and issue a discretionary reclassification any time before the Moderate area attainment date, as long as doing so does not otherwise unreasonably frustrate the primary goals of the statute. For example, the EPA must consider the timing for submission of Serious area SIP requirements to ensure the state has sufficient time to implement an effective plan and the agency has sufficient time to review and act on the plan in advance of the outermost Serious area attainment date (i.e., the end of the tenth calendar year after initial designation as nonattainment). See CAA section 188(c)(2).

The EPA interprets the statute to provide authority to require submission of attainment plan requirements, including the attainment demonstration, by a date less than 4 years from reclassification to Serious when exercising its discretionary authority to reclassify an area to serious nonattainment pursuant to CAA section 188(b)(1). While the EPA generally prefers to give states as much time as possible to develop and submit plans, the agency concluded that allowing 4 years for submission of the attainment demonstration in all discretionary reclassification actions would potentially frustrate the goals of the statute.

To resolve this issue, EPA is finalizing a specific schedule for submission of the attainment demonstration following discretionary reclassification. As discussed earlier, the terms of the statute provide some guidance as to the appropriate schedule because, as explained earlier, a state would have until the end of the 7th calendar year to submit the attainment demonstration after a discretionary reclassification that follows the timing in CAA section 188(b)(1)(B), and a state would have until the end of the 8th calendar year after a mandatory reclassification to submit the attainment demonstration. See generally CAA sections 188(b) and 189(b).

While not dispositive, these provisions indicate that Congress believes that Serious area attainment plans should be submitted at least 2 years in advance of the outermost statutory attainment date for Serious areas to ensure expeditious attainment of the NAAQS. The EPA finds that a minimum of 2 years is appropriate because (1) it provides time for emission reduction measures adopted by the state to take effect and improve air quality; (2) it will allow the agency sufficient time to evaluate and act on the Serious area attainment demonstration; and (3) for every other NAAQS, the CAA SIP submission dates are generally 2 years or more prior to the attainment date. If for example the plan is not submitted until just before year 10, and the agency determines the plan will not lead to attainment, there will be no time to take corrective action before the attainment date to ensure attainment of the NAAQS. Such a result would not be reasonable.

Therefore, the EPA believes that a reasonable attainment demonstration due date for any discretionary reclassification to Serious would be the earlier of (1) 4 years from the date of reclassification, or (2) the end of the eighth calendar year after designation. As an example, an area that is reclassified at the end of year 5 would have 3 years rather than four years to submit the attainment demonstration and other plan elements by the end of year 8. An area that is reclassified no later than the end of year 4 would have the full four years, and any area reclassified after this point would have less than 4 years. At the outer extreme, in the unlikely event that the EPA chooses to exercise its discretion to reclassify an area in the sixth calendar year after designation (i.e., within a year of the attainment date), the area would still have 2 years to submit the attainment demonstration, which is still no less than the timeframe Congress provided for a Moderate area that is reclassified because it fails to attain. See 40 CFR 51.1003(b)(2)(i).

Lastly, this section addresses appropriate SIP submission dates for the other required plan elements. Regarding the base year emission inventory, the EPA believes it is appropriate to require the updated base year emissions inventory at the same time that the BACM/BACT submission is due (18 months) because the updated inventory will be a critical element relied on for making control measure determinations. Regarding the remaining planning elements (i.e., additional feasible measures, RFP, quantitative milestones, contingency measures, and attainment projected inventory), the proposed options allowed for the possibility of up to three separate submissions under certain policy combinations, and we believe having such an outcome would be very inefficient. Thus, the EPA has determined that the remaining elements must be submitted at the same time as the attainment demonstration (i.e., the earlier of 4 years from the date of reclassification, or the end of the eighth calendar year after designation). This approach will provide for the most efficient process and at the same time provide the states with the maximum reasonable time when they are reclassified pursuant to the EPA's Start Printed Page 58078discretionary authority in CAA section 188(b)(2).

With regard to the due date for submission of NNSR program revisions that may be required when an area is reclassified to Serious, such as revisions to meet nonattainment NSR program requirements to lower the “major stationary source” threshold from 100 tons per year (tpy) to 70 tpy (CAA section 189(b)(3)) and to address the control requirements for major stationary sources of PM2.5 precursors [CAA section 189(e)], [155] the Act does not specify a deadline for the State's submission following reclassification of a Moderate PM2.5 nonattainment area as Serious nonattainment under subpart 4. Pursuant to EPA's gap-filling authority in CAA section 301(a) and to effectuate the statutory control requirements in section 189 of the Act, the final rule requires the state to submit these nonattainment NSR SIP revisions no later than 18 months after the effective date of final reclassification. This due date is also consistent with the due date for submission of BACM and BACT provisions and the emission inventory; thus, at most, a state will have two required SIP submissions after being reclassified. See 40 CFR 51.1003(b)(2)(i) and (ii).

c. Comments and Responses. Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

B. Emissions Inventory Requirements

1. Summary of Proposal

The EPA proposed that the inventory requirements for Serious areas were the same as those for Moderate areas with some additions. In addition to the Moderate area requirements, the EPA proposed that Serious area inventory requirements would include using a major source threshold of 70 tons/year for reporting sources as point sources for both the base year inventory for the nonattainment area and the attainment projected inventory for the nonattainment area.

With regard to the due date for the attainment projected inventory for the nonattainment area, the EPA proposed two cases. In the case where the area is reclassified after failing to attain the NAAQS by the Moderate area attainment date, the attainment projected inventory for the nonattainment area was proposed to be submitted no later than 18 months after reclassification. In the case where the area is reclassified by the EPA because the area cannot practicably attain the NAAQS by the statutory attainment date, the EPA proposed that the attainment projected inventory for the nonattainment area would be due no later than 4 years after reclassification.

2. Final Rule

a. What Emissions Inventory Requirements Apply to Serious Area Attainment Plans? As with Moderate PM2.5 nonattainment areas, Congress did not create a specific emissions inventory requirement in subpart 4 that would supersede the emissions inventory requirement under subpart 1 for Serious areas. Thus, the statutory emissions inventory requirements that apply for Serious area attainment plans continue to be those of section 172(c)(3), which explicitly requires “a comprehensive, accurate, current inventory of actual emissions of the relevant pollutants” in the nonattainment area. In addition, the specific attainment plan requirements for the PM2.5 NAAQS set forth in section 189(a) and associated modeling requirements make an accurate and up-to-date emissions inventory a critical element of any viable attainment plan. Finally, the additional attainment plan requirements for the PM2.5 NAAQS for Serious areas contained in subpart 4 at section 189(b) have additional requirements that affect the emissions inventory requirements for Serious areas.[156]

As noted earlier in this preamble, states must use the best available, current emissions inventory information for attainment plan development, because complete, high quality emissions inventory data are essential for the development of an effective control strategy. To assist states in preparing complete, high quality inventories, the EPA provides guidance for developing emissions inventories in its SIP Emissions Inventory Guidance, available at https://www.epa.gov/​air-emissions-inventories/​emissions-inventory-guidance-documents. The EPA recommends that states consult this guidance while developing emissions inventories to meet requirements for Serious area attainment plans.

b. How do States Meet the Inventory Requirements for the PM2.5NAAQS for Areas Classified as Serious? As with Moderate PM2.5 nonattainment areas, neither section 172(c)(3) nor the provisions specifically applicable to attainment plans for the PM2.5 NAAQS in subpart 4 specify how states should meet statutory emissions inventory requirements for Serious PM2.5 nonattainment areas. Section 172(c)(3) requires that states submit “a comprehensive, accurate, current inventory of actual emissions from all sources of the relevant pollutant or pollutants in such area, including such periodic revisions as the Administrator may determine necessary to assure that the requirements of this part are met” (emphasis added). The EPA interprets this provision to authorize the agency to require states to revise their base year emissions inventories whenever the state is required to submit a new attainment plan because of a change in the nonattainment area's status (e.g. failure to attain by the applicable attainment date resulting in reclassification). In addition, pursuant to CAA section 301, the EPA has additional authority to promulgate regulations as necessary for the implementation of the PM2.5 NAAQS, including requirements pertaining to emissions inventories. Accordingly, this rule includes specific emissions inventory requirements that the EPA considers necessary to effectuate the attainment plan requirements of the CAA for the PM2.5 NAAQS.

Like Moderate areas, there are three key facets of the emissions inventory requirements: (i) The types of inventories required; (ii) the content of these inventories; and, (iii) the timing of submission of these inventories. The three facets are addressed in the following paragraphs.

First, the same two types of inventories required for Moderate areas are also required for Serious areas. While these inventories are the same types and names of inventories as for Moderate areas, they must be created specifically for Serious area attainment plans in accordance with the applicable Serious area requirements. The first type of inventory is called the “base year inventory for the nonattainment area,” and the second type of inventory is called the “attainment projected inventory for the nonattainment area.” See 40 CFR 51.1000. The attainment projected inventory is necessary to implement the attainment demonstration requirement of section 189(a)(1)(B), and it also may be used as part of the RFP requirement (see Section VI.F). For these reasons, this rule establishes a regulatory requirement that Serious area attainment plans must include a base year inventory for the nonattainment area and an attainment Start Printed Page 58079projected inventory for the nonattainment area.

Second, the content of the inventories will follow the content requirements for Moderate area inventories, with two exceptions needed to meet the requirements of section 189(b)(3). The first exception for Serious areas stems from the Section 189(b)(3) definition of a separate emissions threshold for major sources in Serious nonattainment areas (70 tpy potential to emit of PM10). This threshold is lower than the 100 tpy potential to emit general requirement for major sources of PM10, PM2.5 or one of its precursors that is used for Moderate area emissions inventories. Inventories for Serious area attainment plans must include these smaller sources as major stationary sources (rather than the nonmajor stationary source category that would apply for these in Moderate area plans) using the lower threshold specified in the CAA. Also as described earlier and in 40 CFR part 51, subpart A, this means that all other smaller stationary sources within the nonattainment area must be included in the base year inventory and projected attainment year inventory as nonpoint sources.

As described previously for Moderate areas, Appendix A of Table 1 of 40 CFR part 51, subpart A (the AERR) is required by this rule to define which sources must be reported as point sources for inventories associated with this rule (base year and projected attainment year inventories). To be consistent with the 70 tpy threshold finalized in this rule, this rule is also amending Table 1 of Appendix A of the AERR to include the 70 tpy threshold for PM2.5, SO2, NOX, VOC and ammonia for point sources within nonattainment areas.

The second difference between the Serious area and Moderate area inventory requirements is a minor wording difference for the year that should be chosen for the base year inventory. The year should be one of the 3 years used for reclassification (rather than designation for Moderate areas) or another technically appropriate inventory year. Another inventory year may be chosen under specific circumstances (e.g., to account for a change in sources in the nonattainment area, changes in nonattainment area boundaries, or significant time lag between designations and preparation of the inventory) with consultation from the appropriate EPA Regional Office. This requirement is intended to ensure that the inventory will represent the emissions sources whose contributions resulted in a nonattainment designation for the area.

The third facet of the Serious area inventory requirements is the timing, which is somewhat different than for Moderate areas. Section VI.A of this preamble describes the requirement that states submit the base year inventory for a Serious nonattainment area at the same time that it submits provisions to implement BACM and BACT on sources in the area (due no later than 18 months from reclassification of the area pursuant to section 189(b)(2)). This is because the base year inventory serves as the starting point for conducting a BACM and BACT determination. In contrast to the base year inventory, the attainment projected inventory is more closely related to the Serious area attainment demonstration. Thus, the attainment projected inventory is most appropriately submitted with the attainment demonstration for a given Serious area to allow effective evaluation of the attainment plan as a whole.

Consequently, this rule requires that attainment projected emissions inventories be submitted at the same time as the Serious area attainment demonstration. This requirement gives rise to two possible deadlines for Serious areas to submit the attainment projected emissions inventory for the nonattainment area. For areas that are reclassified after failing to attain the NAAQS by the applicable Moderate area attainment date, the deadline is no later than 18 months after reclassification (same time period as for Moderate areas). For areas reclassified by the EPA because the area cannot practicably attain the NAAQS by the statutory Moderate area attainment date, the deadline is the earlier of 4 years from the date of reclassification, or the end of the eighth calendar year after designation.

3. Comments and Responses

Comment: Some commenters noted that the proposal was unclear with regard to the inventory year for areas that are reclassified from Moderate to Serious, and whether the terms “reclassification” and “designation” are interchangeable in this regard.

Response: In the final rule, the EPA clarifies that for areas that are redesignated to Serious, the inventory year must be one of the 3 years used for reclassification. Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

C. Pollutants To Be Addressed in the Plan

All PM2.5 precursors are presumptively required to be addressed in any Serious area attainment plan. Section III of this preamble includes a detailed discussion about optional analyses that a state may provide to demonstrate that sources of a precursor do not significantly contribute to PM2.5 concentrations in a particular nonattainment area. These demonstrations may be conducted for all sources of a precursor in an area (i.e., comprehensive precursor demonstration), or just for major sources of the precursor (i.e., major source precursor demonstration). It also discussed a similar demonstration that may be conducted for NNSR (i.e., NNSR precursor demonstration). These demonstrations may be used to justify the exclusion of certain types of precursor sources from certain SIP requirements in Serious area plans, just as in Moderate area plans. However, the expeditious attainment demonstration is not available for Serious area plans.

As noted in Section III of this preamble, if the EPA approves a state's precursor demonstration for the Moderate area plan, the state would need to re-evaluate whether the precursor contributes significantly to PM2.5 levels that exceed the standard for the Serious area plan. The reason for this is that precursor emissions and air quality concentrations will have changed since the submission of the demonstration for the Moderate area, and precursor emissions technical information and scientific understanding of precursor emissions and interactions in the area should be better understood several years later, and the Serious area plan needs to be based on the best available information to date. If the state reevaluates a precursor for potential exclusion from one or more of the Serious area plan requirements, it should take into account factors such as increases or decreases in emissions since the last precursor demonstration; new ambient monitoring data for fine particle composition and concentrations of important gases (such as ammonia); and improved air quality modeling programs that reflect improved understanding of the role of precursors in atmospheric transformation processes. To the extent appropriate, this precursor demonstration can build off the analyses conducted for the Moderate area precursor demonstration.

If the EPA approves a comprehensive precursor demonstration for the Serious area plan, then the state would not be Start Printed Page 58080obligated to evaluate BACM/BACT measures for reducing that precursor in the nonattainment area, nor would it need to account for that precursor in the RFP plan, quantitative milestones, and contingency measures. If a major stationary source precursor demonstration is approved, then the state would not be obligated to evaluate BACM/BACT measures for reducing that precursor from major sources in the nonattainment area, nor would it need to account for emissions of that precursor from major sources in the RFP plan, quantitative milestones, and contingency measures. If a NNSR precursor demonstration is approved, then the state would not be obligated to address LAER and emission offset requirements for that precursor in the NNSR program for that nonattainment area.

D. Attainment Plan Control Strategy

1. General Approach to Designing a Control Strategy for a Serious Nonattainment Area

The statutory attainment planning requirements of subparts 1 and 4 were established to ensure that states meet the following goals of the CAA: (i) Implement measures that provide for attainment of the PM2.5 NAAQS as expeditiously as practicable, and (ii) adopt emission reduction strategies that will be effective at reducing PM2.5 levels in nonattainment areas. A state has discretion to require reductions from any source inside or outside of a PM2.5 nonattainment area (but within the state's boundaries) in order to fulfill its obligation to demonstrate attainment in a PM2.5 nonattainment area as expeditiously as practicable, in addition to having an obligation to meet the statutory requirements for specific control measures on sources located within a nonattainment area (e.g., BACM and BACT). A state may need to require emissions reductions on sources located outside of a PM2.5 nonattainment area if such reductions are needed in order to provide for expeditious attainment of the PM2.5 NAAQS.

The following sections describe the recommended approach for a state to follow in order to identify and select the complete suite of measures needed for an approvable attainment plan submission for a Serious PM2.5 nonattainment area.

2. Identification and Selection of BACM/BACT and Additional Feasible Measures

a. Summary of Proposal. The proposal provided background information on statutory requirements and existing guidance regarding Serious area control strategies, and then presented two broad approaches describing the steps for determining BACM/BACT and additional feasible measures (i.e. control measures that may be able to help the area attain by the attainment date or advance the attainment date by a year, and that may be implemented later than BACM/BACT but before the attainment date). The first approach is consistent with current guidance for PM10 NAAQS implementation in the Serious Area Addendum. Under the first approach, the emphasis of the analysis would be on the identification of feasible control measures. The analysis would be considered to be “generally independent” of whether such measures are needed for expeditious attainment of the relevant NAAQS. However, this approach also would allow the state to identify de minimis source categories before conducting any further analysis of technologically feasible or economically feasible control measures. The proposal requested comment on inclusion of an ambient impact threshold of 3 percent for determining whether a source category impact would be de minimis. This proposed threshold level was similar to the de minimis ambient levels included in the Serious Area Addendum for implementation of the PM10 NAAQS, and the state would likely need to conduct air quality modeling to demonstrate de minimis impacts below a particular threshold. The proposal noted the challenges associated with providing a nationally consistent definition of what would be a “source category.” For source categories found to be de minimis, the state would not be obligated to evaluate potential control measures. The basic analytical steps for proposed option 1 were presented as follows: (1) Update base year emissions inventory for the area; (2) evaluate source category impacts; (3) identify existing and potential control measures; (4) determine whether an available control measure or technology is technologically feasible; (5) determine whether an available control measure or technology is economically feasible; (6) determine the earliest date by which a control measure or technology can be implemented in whole or in part.

Under the second proposed option, there would be a greater emphasis on linking the control strategy evaluation process with the attainment needs for the area. Accordingly, this option would not include a “de minimis” step 2 early in the process. However, at the end of the process, the state would be able to choose to not adopt certain measures that would otherwise meet the criteria for BACM/BACT if those measures collectively would not be necessary to bring the area into attainment or to advance the attainment date by 1 year (similar to the approach that EPA uses, and has historically used, for RACM/RACT). The EPA requested comment on all aspects of these options, and indicated the agency may finalize either approach or various elements of each approach after evaluating the comments that had been received.

b. Final Rule. The EPA has considered the comments that were submitted on the two proposed options for determining BACM/BACT (and additional feasible measures), and has determined that the final rule should include aspects of each option. The following sections provide background information and guidance on the steps of the process for determining Serious area control measures for PM2.5 nonattainment areas.

i. BACM and BACT

A Serious area attainment plan must include provisions to implement BACM on sources in a Serious nonattainment area, as provided by section 189(b)(1)(B), no later than 4 years after reclassification. Under section 189(b)(2), a state has 18 months following reclassification to submit these BACM provisions.

Section 189(b)(1)(B) refers only to BACM, but the EPA has long interpreted this term to include BACT, just as the analogous term for RACM includes RACT for Moderate areas. For implementation of the PM2.5 NAAQS, the EPA finds it reasonable to maintain the same interpretation. The legislative history for the 1990 Amendments to the CAA supports this interpretation, as the EPA has explained in past guidance.[157] Additionally, the requirement for BACT for existing sources in the context of PM2.5 NAAQS implementation in nonattainment areas is separate and distinct from the requirement for BACT for new and modified sources under the Prevention of Significant Deterioration (PSD) permitting program for new stationary sources in areas designated as attainment or unclassifiable for the PM2.5 NAAQS. As described later in this section, however, the process and criteria that states have historically used to determine BACT for new and modified sources under the PSD program have also been referenced and applied to the process for determining BACT for PM10 NAAQS implementation, but these requirements Start Printed Page 58081are otherwise unrelated. Consistent with past policy, BACT determinations for PM2.5 NAAQS implementation are to follow the same process and criteria that are applied to the BACT determination process for the PSD program.

Longstanding guidance in the General Preamble and Addendum, together with past practice associated with implementing the PM10 NAAQS under subpart 4, has helped to establish a general approach for states and the EPA to determine BACM and BACT for Serious PM10 nonattainment areas. This approach has served as the basis for developing a more stringent control strategy for a Serious PM10 nonattainment area than that developed for such area when it was classified as Moderate. Indeed, as BACM and BACT are required to be implemented when a Moderate nonattainment area is reclassified as Serious due to its actual or projected inability to attain the relevant NAAQS by the Moderate area attainment date through the implementation of “reasonable” measures, it is logical that “best” control measures should represent a more stringent and potentially more costly level of control.[158] The level of stringency generally refers to the overall level of emissions reductions of a control measure or technology, or of such measures and technologies combined.

Congress first defined BACT in CAA section 169(3) for the PSD permitting program as: “an emission limitation based on the maximum degree of reduction of each pollutant . . . which the permitting authority, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such facility through application of production processes and available methods, systems, and techniques . . .”

In the Addendum, the EPA provided guidance concerning the requirements for BACM and BACT for Serious area attainment plan requirements for the PM10 NAAQS.[159] The EPA discussed in the Addendum that when Congress amended the CAA, Congress selected the same “best” terminology for PM10 nonattainment areas as it did for the language selected for the PSD program in 1977. The EPA interpreted this word choice at the time to mean that PSD BACT and PM10 nonattainment area BACM should be generally analogous in definition and implementation, but with some differences due to different end policy goals between the PSD and nonattainment area programs.[160] The EPA thus defined BACM for PM10 Serious nonattainment area planning to be the maximum degree of emission reduction achievable from a source or source category which is determined on a case-by-case basis, considering energy, economic and environmental impacts and other costs.[161]

ii. BACM/BACT “Generally Independent” of Attainment

As noted earlier, the issue of whether BACM/BACT should be considered generally independent of attainment or more closely tied to attainment for purposes of implementing the PM2.5 NAAQS was a central issue distinguishing the two proposed options for determining BACM/BACT. Some commenters suggested that the overarching requirement of the CAA is to attain the standard expeditiously, and therefore the benefits of a “generally independent” BACM/BACT requirement are not clear. On the other hand, some other commenters supported maintaining the longstanding policy from the Serious Area Addendum that the BACM/BACT requirement is generally independent of attainment, citing the emphasis on “best” control measures and the statutory provision requiring BACM/BACT well before the attainment demonstration for certain reclassified areas. For the reasons discussed later in this section, the EPA has decided to maintain the policy that BACM/BACT determinations are to be “generally independent” of attainment for purposes of implementing the PM2.5 NAAQS.

In the Serious Area Addendum, the EPA described BACM as a generally independent requirement, to be determined without regard to the specific attainment analysis (i.e., attainment demonstration) for the area.[162] The EPA established that such an interpretation is in accordance with the structural scheme of the CAA, which by its definition requires that when an area is classified as Serious, BACM are implemented in addition to RACM. Because of the two types of measures employed, the EPA found it reasonable to interpret the statute as requiring a different analysis for determining BACM, i.e., that while RACM emphasizes the attainment needs of the area, BACM has a greater emphasis on identifying measures that are feasible to implement. Keeping in mind that the overall objective of the implementation of BACM and BACT and additional feasible measures is to bring a Serious PM2.5 nonattainment area into attainment as expeditiously as practicable, the General Preamble noted that the test for BACM puts a “greater emphasis on the merits of the measure or technology alone,” rather than on “flexibility in considering other factors,” in contrast to the approach for determining RACM and RACT.[163]

The view that BACM and BACT measures are generally independent of the attainment needs of the area is also consistent with the statutorily specified submission date for BACM and BACT control measures, contrasted against the statutorily specified submission date for the attainment demonstration for Serious areas. Specifically, states with Serious nonattainment areas must submit BACM and BACT measures within 18 months of reclassification of areas to Serious, whereas they are given up to 4 years from reclassification (for areas where it is impracticable to attain by the attainment date) to submit the attainment demonstration for such areas.

Additionally, the EPA believes that interpreting the Serious PM2.5 nonattainment area BACM/BACT requirements to be “generally independent” of attainment is consistent with the structure and substance of the CAA control measure requirements for ground-level ozone nonattainment areas with more serious air quality problems. In the CAA ozone implementation requirements, an area that is reclassified to a more serious category because it failed to attain the standard or because it is impracticable to attain by the attainment date is then subject to additional specific control measure requirements that are considered to be generally independent of attainment (for example, see CAA section 182(b) through (e)). The statute includes these specific requirements in order to ensure continued progress toward attainment for these areas with Start Printed Page 58082more difficult air quality problems. The EPA believes it is appropriate to have a similar interpretation of the PM2.5 Serious area control measure requirements. In a similar manner, interpreting BACM/BACT to be generally independent of the attainment needs of a Serious PM2.5 area will ensure continued progress toward attainment for those areas with more difficult air quality problems. The EPA also believes this more rigorous “independent control measure” approach for implementing the PM2.5 standards in a manner similar to ozone is appropriate because the health effects of both standards are very significant (including premature mortality), and robust emission reduction programs are needed to bring about expeditious attainment and public health protection for citizens in these nonattainment areas.

iii. No de Minimis Source Category Analysis for PM2.5 NAAQS Implementation

Another central issue distinguishing the two proposed options for how to determine BACM/BACT was the issue of whether, before analyzing any potential BACM/BACT, the state should conduct technical analyses to identify whether there are any source categories having a de minimis contribution to PM2.5 levels in the PM2.5 nonattainment area. This de minimis analysis is part of the process described in the Serious Area Addendum for implementation of the PM10 standards. Under the proposal, for source categories found to be de minimis, the state would not be obligated to evaluate potential control measures.

As noted previously, the proposal requested comment on inclusion of an ambient impact threshold of 3 percent for determining whether a source category impact would be de minimis. This proposed threshold level was similar to the de minimis ambient levels included in the Serious Area Addendum for implementation of the PM10 NAAQS, and the state would likely need to conduct air quality modeling to demonstrate de minimis impacts below a particular threshold. The proposal noted the challenges associated with providing a nationally consistent definition of what would be a “source category.”

The EPA also proposed a similar de minimis source category concept for the RACM/RACT process for Moderate area plans, and many of the comments received on the proposed Moderate area “upfront” de minimis source category analysis are also applicable when considering whether to include a de minimis source category analysis concept for Serious areas in the final rule. A number of commenters expressed concern about the analytical resources that might be needed to conduct air quality modeling to identify whether all the sources in a particular source category have an ambient air quality contribution exceeding an air quality threshold. Some commenters suggested that a de minimis source category approach for either Moderate or Serious areas would allow the state to ignore a set of control measures that later in the control measure evaluation process could be determined to provide for a more expeditious attainment date. They believe that allowing the exemption of de minimis source categories would undermine any analysis to evaluate whether a collection of measures could advance the attainment date by a year. For example, it would be possible for a state to identify multiple de minimis source categories at the beginning of the process, and then after all potential control measures are identified, the state and the EPA would be unable to determine whether the collective reductions and air quality impact of the exempted categories could actually be sufficient to advance the attainment date. Other commenters noted that providing a source category exemption in one nonattainment area would lead to inconsistent treatment within a state or across states because it would give the exempted companies a competitive advantage over the same types of sources in other areas.

A number of commenters supported the de minimis source category concept because they believed it could result in a reduced burden in the control measure evaluation stage and help avoid regulating sources with limited impact on PM2.5 levels. Some commenters supported the de minimis concept only if controls on the source are not needed for expeditious attainment. Some commenters suggested that the EPA include an emissions-based threshold (e.g. tons per day) rather than an air quality based threshold to reduce potential analytical burden associated with de minimis source category analyses. However, in their comments they did not address the fact that the air quality impact of a specific tons per day rate could vary greatly from one pollutant to another within a particular nonattainment area, or across different nonattainment areas. One state commenter noted that the NAICS system does not provide categories for nonpoint sources, and that this issue would need to be addressed if the NAICS approach were to be included in the final rule. Other commenters suggested that the rule not have a de minimis threshold at all but include the ability for the state to propose de minimis source categories to the EPA on a case-by-case basis.

After taking the range of comments on the de minimis source category concept into consideration, the EPA has decided to not finalize a de minimis source category approach for the purposes of implementing the PM2.5 NAAQS. The EPA is persuaded by commenters who argued it is not necessary, and believes that without this concept the final rule will nevertheless provide sufficient flexibility in the Serious area control measure analysis and attainment demonstration process, due to the availability of provisions enabling states to identify sources that should not be subject to control measures, including the ability to develop precursor demonstrations to exclude certain precursors from control requirements, and to consider case-specific factors in determining technical and economic feasibility of potential control measures. If the final rule were to include an explicit step to conduct a de minimis source category analysis on the entire inventory early in the control measure identification process, the EPA believes that there is a risk that such an analysis may bring about investment of scarce time and analytical resources on analysis of categories to exclude rather than on the identification of the most beneficial control measures for reducing PM2.5 and its precursors to achieve expeditious attainment of the standard. In addition, the EPA finds merit in comments suggesting that an upfront exemption of multiple de minimis source categories in an area would undermine the ability of the state (or other interested parties) to evaluate, after the identification of potential control measures, whether the area could advance the attainment date in order to attain “as expeditiously as practicable.”

Moreover, as noted in Section IV.D of this preamble on Moderate areas, the EPA also finds that from a technical perspective, it would be very challenging to implement a de minimis source category process in a consistent manner nationally without clear guidelines describing how narrowly or how broadly a de minimis exemption could apply to a “source category,” or how the technical analysis would need to be performed. For example, should a source category consist of all industrial boilers? Or all industrial boilers that burn a particular fuel? Or all industrial boilers that burn a particular fuel and Start Printed Page 58083are within a specific size range? The NAICS codes do not provide an appropriately comprehensive approach for defining source categories for all stationary, mobile, and area sources for this purpose. It has been noted that a de minimis source category exemption process is described in the 1994 PM10 NAAQS implementation guidance (the Serious Area Addendum). In PM10 areas, however, it may have been relatively straightforward to identify what were the predominant source categories contributing to the NAAQS violations (such as direct PM2.5 emissions from dust or wood smoke), and therefore to be able to identify what categories might be considered as not predominant contributors (or de minimis). However, implementation of the PM2.5 NAAQS presents much more complex challenges. Precursors and their contribution to secondarily formed PM play a much greater role in PM2.5 nonattainment areas than in PM10 nonattainment areas. In addition, the relative impact of each precursor to local PM2.5 concentrations varies from area to area, and even within sections of the same area. To appropriately implement an approach allowing for de minimis source category impacts, the EPA believes that a nationally consistent source category definition would be needed, along with sophisticated air quality modeling to evaluate the relative impacts of precursors emitted from different “source categories.” The resources needed to conduct such analyses could be substantial, and would ultimately not help identify what control measures would be needed to solve the air quality problem. For all of these reasons, a de minimis source category concept is not included in the final rule for Serious areas.

iv. Additional Feasible Measures

While the proposed approaches and criteria for identifying appropriate control measures for a Serious area are necessarily different than for a Moderate area, it is important to note two similarities: First, that the EPA interprets the requirement under CAA section 172(c)(6) for a state to adopt “other measures” needed for attainment to apply to sources located inside and outside of any PM2.5 nonattainment area (but within the state's boundaries), whether the area is classified as Moderate or Serious; and second, similar to the RACM requirement for Moderate nonattainment areas under subpart 4, CAA section 189(b)(1)(B) requires that BACM must be implemented no later than 4 years after a Moderate area is reclassified to Serious.

Taking these two statutory provisions together, the EPA proposed that the other measures required under CAA section 172(c)(6) must include “additional feasible measures,” which would be those measures and technologies that otherwise meet the criteria for BACM/BACT but that can only be implemented in whole or in part beginning 4 years after reclassification of an area, but no later than the statutory attainment date for the area. See proposed 40 CFR 51.1000.

Some commenters agreed that an area must also consider adopting control measures that cannot be implemented within the 4-year deadline for implementation of BACM and BACT. Some commenters suggested that additional feasible measures should only be tied to expeditious attainment.

In the final rule, additional feasible measures would necessarily be implemented by sources in the nonattainment area, and a state is required to implement them if they are needed in addition to BACM and BACT to bring the area into expeditious attainment. The state must also adopt other emission reduction measures for sources within the state but outside the nonattainment area if such measures in conjunction with other control measures would enable the area to attain the standard by the attainment date, or enable the area to advance the attainment date by at least 1 year.

These “additional feasible measures” would be analogous to the “additional reasonable measures” in the RACM and RACT analysis process, which are technologically and economically feasible measures that cannot qualify as RACM or RACT because they cannot be implemented within 4 years of designation of a Moderate nonattainment area. Under the approach for determining BACM and BACT for sources in a Serious nonattainment area described later in this section, a state would identify additional feasible measures as part of the BACM and BACT determination process, just as additional reasonable measures would be identified as part of the state's RACM and RACT determination process.

The EPA recognizes that with regard to Serious areas, only a nonattainment area that is reclassified under the agency's discretionary authority might have sufficient time between the date for implementing BACM and BACT and the statutory Serious area attainment date to implement additional measures beyond BACM and BACT. BACM and BACT must be implemented no later than 4 years after reclassification of the area; areas reclassified to Serious because they cannot practicably attain the relevant NAAQS by the applicable attainment date could potentially have significantly more than 4 years between the date of reclassification and the statutory Serious area attainment date, during which time the area could continue to implement additional feasible measures to bring the area into attainment.

By way of illustration, for areas designated in the first round of designations for the 2012 PM2.5 NAAQS, the statutory Moderate area attainment date will be no later than December 31, 2021. If a state submits a Moderate area attainment plan by the statutory attainment plan due date (18 months after designation, or in this example, October 2016) and the plan demonstrates that the area cannot practicably attain the NAAQS by December 31, 2021, then the EPA has a statutory duty to reclassify such an area within 18 months of the attainment plan due date (i.e., by April 2018). The statutory Serious area attainment date would be the end of the tenth year following designation, or December 31, 2025. In such a case, the state would need to implement BACM for the area within 4 years of reclassification, or by April 2022, leaving over 3.5 years between the statutory deadline for implementing BACM and the statutory attainment date for the area. The requirement for the state to identify and adopt additional feasible measures for the area would mean that the state would need to identify those control measures and technologies that are feasible (according to the proposed BACM and BACT criteria described later in this section) and that can be implemented between April 2022 and December 2025. The EPA expects that while such a long span of time may be available only to a very few Serious nonattainment areas, it would be appropriate to require such areas to implement measures in addition to BACM and BACT if, taken together, they can provide for attainment by the attainment date or advance the attainment date for the area by at least 1 year. Accordingly the EPA has codified a definition of “additional feasible measures” and specified the conditions under which such measures would need to be included in a serious area plan submission. See 40 CFR 51.1000 and 40 CFR 51.1010(a)(4)(ii).

v. Steps of the BACM/BACT Selection Process

In addition to the regulatory decisions earlier, the EPA summarized and sought comment on further guidance for states Start Printed Page 58084to follow in selecting BACM/BACT. The guidance was primarily derived from the Addendum. This section reviews that guidance, clarifies and updates it for purposes of PM2.5, and responds to significant comments on the guidance discussion included in the proposal.

The BACM/BACT selection process for implementation of the PM2.5 NAAQS is designed to take into account the local facts and circumstances and the nature of the air pollution problem in a given nonattainment area. The following sections describe the steps of the process, including: (i) Develop a comprehensive inventory of sources and source categories of directly emitted PM2.5 and PM2.5 precursors; (ii) identify existing and potential control measures for the sources in the inventory; (iii) evaluate the technological feasibility of potential control measures; (iv) evaluate the economic feasibility of potential control measures; and (v) determine the earliest date by which a control measure or technology can be implemented in whole or in part.[164] These steps are described more fully in the following subsections.

Step 1: Develop a comprehensive inventory of sources and source categories of directly emitted PM2.5and PM2.5precursors. As with any control strategy analysis for a nonattainment area, the EPA recommends that the state begin with a current detailed emissions inventory of the various sources that emit direct PM2.5 and PM2.5 precursors in the Serious area. The inventory should identify major stationary sources (i.e., sources with the potential to emit 70 tpy of direct PM2.5 or any precursor), nonmajor stationary sources, mobile sources, and area sources. The inventory also should identify both anthropogenic and nonanthropogenic emissions sources.[165] The EPA expects the state to start with the base year emissions inventory submitted with the Moderate area attainment plan as required under CAA section 172(c)(3), and update it as necessary to reflect new source construction, facility shutdowns, growth in certain source categories, and any other relevant changes. This inventory should be the most comprehensive and accurate inventory available, and it should be consistent with the emissions inventory requirements for Serious area plans as described in Section VI.B of this preamble.

Step 2: Identify potential control measures. The state should identify potential control measures for all sources and source categories in the latest base year emission inventory for the nonattainment area. The list of existing and potential control measures should include options not previously considered as RACM/RACT for the area, as well as additional measures not previously evaluated in the RACM/RACT analysis. For purposes of identifying new measures to consider in its BACM/BACT analysis, the EPA recommends that the state obtain and evaluate a wide range of sources of information on existing and potential control measures. Other nonattainment areas in the same state, and other states across the country are important sources of information about control measures that are currently being implemented. Regional planning organizations, and state and local air quality consortiums have in the past developed summaries of control measures that should provide useful information for this process.[166]

The EPA's RBLC provides a central data base of air pollution technology information that may be highly relevant to states seeking information on stationary source control technology that may qualify as BACT for PM2.5 NAAQS implementation, and is available online at http://cfpub.epa.gov/​RBLC/​. There are also other resources available to assist states in identifying other potential control measures and control technologies for their BACM and BACT determinations. The EPA encourages states with Serious PM2.5 nonattainment areas to visit the agency's Web site to find links to other online sources of information on potential control measures for states to consider.[167]

The state must incorporate appropriate measures into the list of potential control measures for the source categories in the Serious nonattainment area. The EPA would expect the state to identify an array of existing and potential new measures at least as broad as the list identified for the same area as part of the RACM and RACT analysis, in order to ensure that the state has a sufficiently expansive and comprehensive set of potential measures to evaluate. The list of potential measures must include all measures identified as potential control measures for the nonattainment area when it was classified as Moderate or, for a given source category, one or more alternative control measures that would control emissions even more stringently than the measures included in the RACM/RACT analysis. In this way, the state will begin its BACM/BACT determination with a list of potential control options that is as complete and up-to-date as possible.

Step 3: Determine whether an available control measure or technology is technologically feasible. After developing a list of existing and potential new measures to evaluate for BACM and BACT, the state would then need to determine the technological feasibility of each identified control measure in light of a number of considerations, including each measure's individual energy and environmental impacts.[168]

(1) Stationary sources. As described under the technological feasibility criteria for the control measures analysis for Moderate area attainment plans in Section IV.D of this preamble, the EPA's prior guidance on factors to consider for judging whether a particular control technology is technologically feasible should include a source's processes and operating procedures, raw materials, physical plant layout and potential environmental impacts such as increased water pollution, waste disposal and energy requirements. For example, the EPA recognizes that the process, operating procedures and raw materials used by a source can affect the feasibility of implementing process changes that reduce emissions and can also affect the selection of add-on emission control equipment. The feasibility of modifying processes or applying control equipment also can be influenced by the physical layout of the particular plant, if the physical space available in which to implement such changes limits the choices.[169]

(2) Area and mobile sources. With respect to determining whether a given control measure might not be technologically feasible as BACM for an area or mobile source, a state may consider factors in conducting its analysis that are similar to factors the state may have considered during the RACM and RACT determination process, such as local circumstances, the condition and extent of needed infrastructure, or population size or workforce type and habits, which may Start Printed Page 58085prohibit certain potential control measures from being implementable. However, in the instance where a given control measure has been applied in another NAAQS nonattainment area (for PM2.5 or other pollutant), the state will need to provide a detailed justification for rejecting any potential BACM measure as technologically infeasible. Furthermore, if the state identifies a certain control measure for area or mobile sources that has been implemented in another nonattainment area and may qualify as BACM or BACT, the state must provide a reasoned justification if it deems it technologically infeasible to implement the same control measure to the same extent or magnitude as it was applied in the other nonattainment area.

Step 4: Determine whether an available control technology or measure is economically feasible. The fourth step of this process is to evaluate the costs of implementing each of the technologically feasible control measures and technologies in order to eliminate from further consideration any measures determined to be economically infeasible. In assessing “best” control measures and technologies, states with Serious PM2.5 nonattainment areas must identify a control strategy for the area that overall is more stringent than that identified for the area when the state considered only the “reasonableness” of potential control measures for purposes of the RACM/RACT analysis. States need to consider emission reduction measures with higher costs per ton when assessing the economic feasibility of BACM and BACT controls (and, where applicable, additional feasible measures) as compared to the economic feasibility criteria applied in their RACM and RACT analysis (and analysis for additional reasonable measures) for the same nonattainment area.

Indeed, consistent with prior guidance on evaluating costs of a potential BACM/BACT, the EPA maintains that while the economic feasibility of a control measure is as important as its technological feasibility under the RACM and RACT determination process, economic feasibility is a less significant factor in the BACM and BACT determination process. In other words, a state must apply a higher standard for eliminating a technologically feasible control measure from further consideration as BACM due to cost alone.

In the Addendum, the EPA stated that “for PM10 BACM purposes, it is reasonable for similar sources to bear similar costs of emission reduction.” [170] Additionally, the EPA indicated that “economic feasibility for PM10 BACM purposes should focus upon evidence that the control technology in question has previously been implemented at other sources in a similar source category without unreasonable economic impacts.” [171] Thus, a state may not eliminate a particular control measure from further consideration as potential BACM if similar sources have successfully implemented such a measure. That is, a state must at a minimum continue to consider as potential BACM any technologically feasible control measures or technologies implemented by similar sources.

In addition, a state may not automatically eliminate a particular control measure merely because other sources have not implemented the measure. In other words, a state must continue to consider technologically feasible measures that have not been implemented by similar sources but that can nonetheless effectively reduce emissions from the source category in question at a cost that is not cost prohibitive.

As with the EPA's approach for evaluating economic feasibility of potential reasonable measures for Moderate area attainment plans, for each technologically feasible control measure or technology, a state must evaluate the economic feasibility of the measure through consideration of the capital costs, operating and maintenance costs, and cost effectiveness (i.e., cost per ton of pollutant reduced by that measure or technology) associated with such measure or control. While the EPA is not establishing a fixed dollar per ton cost threshold for economic feasibility of controls identified as potential BACM and BACT, the cost per ton of an acceptable measure for the BACM and BACT analysis generally would be higher than it was for the RACM and RACT analysis for the same nonattainment area. In addition, if a source contends that a source-specific control level should not be established because the source cannot afford the control measure or technology that is demonstrated to be economically feasible for purposes of BACM for other sources in its source category, the source should make its claim known to the state and support the claim with information regarding the impact of imposing the identified control measure or technology on the following financial indicators,[172] to the extent applicable:

1. Fixed and variable production costs ($/unit);

2. Product supply and demand elasticity;

3. Product prices (cost absorption vs. cost pass-through);

4. Expected costs incurred by competitors;

5. Company profits;

6. Employment costs;

7. Other costs (e.g., for BACM implemented by public sector entities).

Step 5: Determine the earliest date by which a control measure or technology can be implemented in whole or in part. Section 189(b)(1)(B) of the CAA requires that Serious area attainment plans provide for the implementation of BACM no later than 4 years after reclassification of the area to Serious. As with the EPA's proposed approach to RACM and RACT, the EPA proposes the term “implement” to mean that the control measure or technology has not only been adopted into the SIP for the area but has also been built, installed and/or otherwise physically manifested and the affected sources are required to comply. The EPA thus expects a state with a Serious nonattainment area to take timely action to implement BACM and BACT in the area.

A state must identify those technologically and economically feasible control measures and technologies that it can implement fully or partially within 4 years of reclassification of its Serious PM2.5 nonattainment area. These measures will be considered BACM and BACT for the area. If a state evaluates a potential BACM or BACT measure and determines that it can be implemented only partially within 4 years after reclassification, the state must adopt the partial measure as BACM.

Where the earliest date that a measure can be implemented is beyond the 4 year mark following reclassification to Serious, the measure may still be needed as an “additional feasible measure” if the 4 year mark occurs before the Serious area attainment date. “Additional feasible measures” would be “best”-level, feasible measures that a state could implement in whole or in part on sources in the area sometime after the fourth year following reclassification and prior to the statutory attainment date for the area.

c. Comments and Responses. Any additional comments received on this section are addressed in the Response to Start Printed Page 58086Comments document found in the docket for this action.

3. BACM and BACT Submission Requirements

a. Summary of Proposal. The proposal further specified the submission requirements once a state has determined the BACT/BACM requirements in its plan. The proposal required the state to submit a list of emissions sources, an emissions inventory for such sources, and several pieces of information regarding potential control measures for these sources.

b. Final Rule. The final rule remains relatively unchanged from the proposal. To ensure that attainment plan submissions contain the necessary supporting information for EPA review and approval of the state's selected BACM and BACT and additional feasible measures as applicable, 40 CFR 51.1010(a)(1)-(5) require the state to submit the following information as part of its Serious area attainment plan submission:

(1) A list of all emissions source categories, sources and activities in the nonattainment area that emit direct PM2.5 or any PM2.5 precursor (for multi-state nonattainment areas, this would include source categories, sources and activities from all states which make up the area);

(2) For each source category, source or activity in the nonattainment area, an inventory of direct PM2.5 and all PM2.5 precursor emissions;

(3) For each source category, source or activity in the nonattainment area, a comprehensive list of potential control measures considered by the state for the nonattainment area; [173 174]

(4) For each potential control measure considered by the state but eliminated from further consideration due to a determination by the state that the control measure or technology was not technologically feasible, a narrative explanation and quantitative or qualitative supporting documentation to justify the state's conclusion;

(5) For each technologically feasible emission control measure or technology, the state must provide the following information relevant to economic feasibility: (i) The control efficiency by pollutant; (ii) the possible emissions reductions by pollutant; (iii) the estimated cost per ton of pollutant reduced; and, (iv) a determination of whether the measure is economically feasible, with narrative explanation and quantitative supporting documentation to justify the state's conclusion;

(6) For each technologically and economically feasible emission control measure or technology, the date by which the technology or measure can be implemented.

As with a Moderate area attainment plan submission, the EPA recognizes that the base year emissions inventory that the state submits for the area in conjunction with its Serious area attainment plan will likely contain the information required under the first two items in this list. However, the EPA believes that it is incumbent on the state to ensure that the information needed for the EPA to evaluate the state's BACM and BACT and additional feasible measures analysis is presented as part of that analysis and in a format that provides transparency, consistency and the ability for another party to evaluate the state's analysis effectively and to duplicate the state's results. For this reason, the EPA is requiring the state to include the base year emissions inventory information with the BACM and BACT submission and as one element of the state's attainment plan due 18 months after reclassification of the area to Serious.

c. Comments and Responses. Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

4. Criteria for Effective Regulations to Implement BACM and BACT and Additional Feasible Measures

a. Summary of Proposal. The proposal described the four main criteria for effective control measure regulations: such regulations must be quantifiable, enforceable, replicable, and accountable.

b. Final Rule. Guidance on effective control measure regulations is provided in the control strategy discussion for Moderate areas. See section IV.D.9 of this preamble, criteria for effective regulations to implement RACM and RACT and additional reasonable measures.

5. Relevance of Prior BACT, LAER and BART Determinations

a. Summary of Proposal. The preamble of the proposed rule stated that it should not be assumed that past control technology determinations would automatically be deemed to meet the Serious area control measure requirements (BACM, BACT, or additional feasible measures) for an area.

b. Final Rule. The guidance on this issue in the preamble to the final rule remains largely unchanged. The EPA believes that BACT or lowest achievable emission rate (LAER) provisions for new sources (as distinct from BACT for existing sources), or best available retrofit technology (BART) for existing sources, could potentially qualify as BACM or BACT for purposes of meeting the Serious area attainment plan requirements. However, the EPA does not believe it is appropriate for a state to assume that just because a certain control technology was determined to meet BACT, LAER, or BART criteria for a new source sometime in the past, that such a control will also automatically meet the criteria for BACM or BACT or additional feasible measures for attainment planning purposes because the regulated pollutant or source applicability may differ and the analyses may be conducted many years apart. Thus, a state may not simply rely on prior BACT, LAER or BART analyses for the purposes of showing that a source has also met BACT for the relevant PM2.5 NAAQS. Rather, the EPA expects that in Step 2 of the BACM and BACT determination process, the state would identify such measures as “existing measures” that should be further evaluated as potential BACM or BACT or additional feasible measures. At the same time, the EPA notes that the presence of previously installed control technology, and the technical and economic considerations that would be associated with upgrading to a measure that achieves greater reductions, is something that should be considered in the assessments of technological and economic feasibility of the newer measure.

c. Comments and Responses. Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

6. Multi-state Nonattainment Areas

a. Summary of Proposal. The preamble to the proposed rule provided general guidance on coordination between states in multi-state nonattainment areas to ensure they Start Printed Page 58087adopt sufficient BACM/BACT and additional feasible measures to ensure expeditious attainment of the standard.

b. Final Rule. The guidance in the final rule remains largely unchanged. States that share a multi-state Serious PM2.5 nonattainment area must consult with one another on BACM and BACT and additional feasible measures that will be required for the nonattainment area in the different states. This requirement would be consistent with the overall requirements for BACM and BACT and additional feasible measures determinations, as all states with Serious areas need to consider implementing BACM and BACT-level measures that have been implemented in other states, even if those measures incur higher costs. The EPA anticipates that states may potentially adopt controls that differ from state to state, based upon each state's determination of what qualifies as “best” given the mixture of sources and potential controls in the state portions of relevant nonattainment areas, subject to EPA approval. If the state can adequately demonstrate that its chosen BACM and BACT and additional feasible measures fully meet the EPA's proposed criteria for such measures, then the agency may consider approving individual state plans that differ in implementation of control measures.

c. Comments and Responses. Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

7. Environmental Justice Considerations for Developing the Attainment Plan Control Strategy for a Serious PM2.5 Nonattainment Area

a. Summary of Proposal. The proposal provided general guidance for ensuring that overburdened populations are appropriately protected.

b. Final Rule. The guidance in the final rule remains largely unchanged. The EPA strongly urges states to consider the environmental justice aspects of any control measures they have identified as BACM and BACT or additional feasible measures in order to provide health protection for overburdened populations. Please see Section XI of this preamble, which discusses possible approaches for states to address environmental justice concerns associated with implementation of the PM2.5 NAAQS in their SIP development process and attainment plans.

c. Comments and Responses. Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

E. Modeling for Attainment Demonstrations

1. Due Dates for Submission of Serious Area Attainment Demonstrations

a. Summary of Proposal. Section IV.E of this preamble describes the EPA's attainment demonstration and modeling requirements for Moderate area plans. The EPA proposed that the same general attainment demonstration and modeling requirements for Moderate area plans should apply to Serious area attainment demonstrations. However, Serious area plans have additional statutory requirements.

Attainment demonstrations are due 18 months after reclassification if the EPA reclassifies the area to Serious after failure of the area to attain the applicable Moderate area deadline. Alternatively, CAA section 189(b)(2) requires states with designated Serious nonattainment areas to submit attainment demonstrations no later than 4 years after reclassification of the area to Serious if the reclassification occurs before the Moderate area attainment deadline. The EPA proposed an approach for determining an appropriate attainment plan control strategy for a Serious PM2.5 nonattainment area that requires the state to submit the attainment demonstration for the area within 18 months after reclassification, regardless of when or the authority under which an area was reclassified to Serious.

b. Final Rule. The statutory attainment demonstration provisions for Serious areas are as follows: Section 189(b) of the CAA requires a state with a designated Serious nonattainment area to submit an attainment plan for such area. As discussed earlier, CAA section 189(b)(1)(A) more specifically requires the state to submit an attainment demonstration including air quality modeling to establish either: (i) That the area will attain the relevant NAAQS by the applicable attainment date, or (ii) if the state is seeking an extension of the attainment date, that it is impracticable for the area to attain the relevant NAAQS by the statutory Serious area attainment date. For Serious nonattainment areas, the attainment date is as expeditiously as practicable, but no later than the end of the tenth calendar year after designation as nonattainment. A demonstration that shows that it is impracticable for the area to attain within this timeframe must also provide for attainment of the NAAQS by the most expeditious alternative date practicable, but no later than 5 years after the maximum statutory Serious area attainment date (based on the criteria specified in CAA section 188(e)).

The EPA is not finalizing the proposed approach of requiring all Serious area attainment demonstrations to be due 18 months after reclassification. If the EPA reclassifies the area to Serious after failure of the area to attain the applicable Moderate area deadline, the attainment demonstration will be due in 18 months. States with Serious nonattainment areas that were reclassified before the Moderate area attainment deadline must submit attainment demonstrations the earlier of 4 years after reclassification of the area to Serious or the end of the eighth calendar year after initial designation. However, these areas are still required to submit BACT/BACM measures within 18 months of being reclassified as Serious. Sections VI.A and VI.D of this preamble describe more fully the EPA's approach for plan due dates and control strategy analyses for all elements of a Serious area attainment plan. Section VI.J of this preamble provides a complete discussion of the EPA's criteria for granting a Serious area attainment date extension.

c. Comments and Responses. Any comments received on this section are addressed in the Response to Comments document found in the docket for this action.

2. Attainment Demonstration Requirements for Serious Areas

a. Summary of Proposal. The proposal described the attainment demonstration and impracticability demonstration requirements for Serious nonattainment areas. The EPA proposed that a serious area plan must include an attainment demonstration that demonstrates how a state will attain the PM2.5 NAAQS by the applicable attainment date, must include analyses supporting the state's determination of its proposed attainment date, and must show that the area will attain the NAAQS as expeditiously as practicable, but not later than the tenth calendar year after designation. The proposal indicated that in order to establish that the attainment date is as expeditious as practicable, the state must explain why the control measures adopted in the attainment plan provide for the most expeditious attainment and must include all BACM and BACT controls in the analysis.

b. Final Rule. The final rule requirements for Serious area attainment demonstrations are generally unchanged from the proposal. As described in Section IV.E of this Start Printed Page 58088preamble, an attainment demonstration is a plan that demonstrates how a state will attain the PM2.5 NAAQS by the applicable attainment date. The EPA is finalizing a requirement that the demonstration for Serious areas must consist of: (i) Technical analyses such as base year and future year modeling of emissions which identify sources and quantify emissions that are contributing to violations of the PM2.5 NAAQS; and, (ii) analyses of future year projected emissions reductions and air quality improvement resulting from existing (i.e. already-adopted or “on the books”) national, regional and local programs, and potential new local measures needed for attainment, including RACM and RACT and BACM and BACT controls for the area, as well as other measures either inside the nonattainment area or outside the nonattainment area but within the state that could potentially accelerate attainment. Each state with a Serious nonattainment area must submit an attainment plan with an attainment demonstration that includes analyses supporting the state's determination of its proposed attainment date. In all cases, the state must show that the area will attain the NAAQS as expeditiously as practicable, but not later than the tenth calendar year after designation. In order to establish that the attainment date is as expeditious as practicable, the state must explain why the control measures adopted in the attainment plan provide for the most expeditious attainment and must include all BACM and BACT controls in the analysis.

A state with a Serious nonattainment area can also submit an impracticability demonstration (under CAA section 189(b)(1)(A)(ii)) as part of seeking an extension of the attainment date under CAA section 188(e). The impracticability demonstration for a Serious area would be similar to an impracticability demonstration for Moderate areas because it must show that the area will not be able to attain the PM2.5 NAAQS by the latest possible statutory attainment date, which in this case is by the end of the tenth calendar year following designation.

In order to support a Serious area impracticability demonstration, the state must show (through modeling) that attainment cannot be reached by the latest statutory Serious area attainment date, even if all RACM and RACT and BACM and BACT controls, as well as other measures either inside the nonattainment area or outside the nonattainment area but within the state (as may be necessary to meet the requirements of 172(c)(6)), were implemented before the attainment date. Moreover, in addition to the Serious area impracticability demonstration, to support an extension of the attainment date, the Serious area plan must demonstrate (again, using air quality modeling) that it provides for attainment by the most expeditious alternative date practicable employing MSM, as specified in CAA section 188(e). (MSM are discussed in more detail in Section VI.J of this preamble). As a result, the required plan in the case of a Serious area that cannot attain by the statutory attainment date is both an impracticability demonstration (to justify an extension beyond the statutory attainment date) and an attainment demonstration that serves as the basis for proposing an appropriate alternative attainment date. Note that this is different from a Moderate area impracticability demonstration, which is not required to serve as the basis for proposing a new area attainment date.

c. Comments and Responses. Any comments received on this section are addressed in the Response to Comments document found in the docket for this action.

3. Air Quality Modeling Required for Serious Area Attainment Demonstrations and Impracticability Demonstrations

a. Summary of Proposal. The EPA proposed to require air quality modeling in support of both a Serious area attainment demonstration and a Serious area impracticability demonstration.

b. Final Rule. The EPA is finalizing a requirement for states to submit air quality modeling in support of both attainment demonstrations and impracticability demonstrations for Serious PM2.5 nonattainment areas. Unlike the impracticability demonstration for Moderate areas described in CAA section 189(a)(1)(B)(ii), the impracticability demonstration for Serious areas in CAA section 189(b)(1)(A)(ii) also requires air quality modeling establishing the most expeditious alternative attainment date practicable. Therefore, air quality modeling is a required element in all attainment demonstrations for Serious areas.

Some commenters believed that both Moderate and Serious area impracticability demonstrations must include air quality modeling. The EPA does not agree and believes the statute only requires air quality modeling for Serious area impracticability demonstrations. This stems from the slightly different statutory construction in CAA section 189(b)(1)(A) compared to CAA section 189(a)(1)(B). Section 189(b)(1)(A) of the CAA specifies an air quality modeling requirement as a parenthetical, which the EPA interprets to apply to both the requirements in CAA section 189(b)(1)(A)(i) [attainment demonstrations] and CAA section 189(b)(1)(A)(ii) [impracticability demonstrations]. Additionally, the fact that a Serious area impracticability demonstration must also include an attainment demonstration with an alternative attainment date logically supports the final rule conclusion that a Serious area impracticability demonstration must include air quality modeling. Modeling is needed to demonstrate attainment and to propose an alternative attainment date for the Serious area. This differs from a Moderate area impracticability demonstration, which only serves to demonstrate that attainment cannot be reached by the Moderate area attainment date. A Moderate area impracticability demonstration does not require a demonstration of attainment or setting of an alternative future attainment date. It merely starts the process of reclassifying an area to Serious and the eventual required submission of a Serious area implementation plan.

Other than the timing of plan submissions and additional required elements of a Serious area plan (such as BACM and BACT), the relevant air quality modeling procedures and guidance for Moderate and Serious area plans are the same. See Section IV.E of this preamble for more details on the modeling requirements and guidance for all PM2.5 nonattainment areas.

c. Comments and Responses. Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

4. Attainment Demonstrations Required To Be Submitted by an Area Reclassified to Serious

a. Summary of Proposal. The proposal discussed the attainment demonstration requirements for Moderate nonattainment areas that subsequently are reclassified to Serious nonattainment. The EPA proposed that states with Moderate nonattainment areas that get reclassified to Serious nonattainment areas must first submit a Moderate area plan and then a separate Serious area plan.

b. Final Rule. The EPA is finalizing requirements for states to submit a Moderate area attainment demonstration (or impracticability demonstration) and then if reclassified to Serious nonattainment, a separate Serious area attainment demonstration. Under CAA section 189(a)(1)(B), a state with a Start Printed Page 58089Moderate nonattainment area is required to submit a demonstration that the area either will attain or cannot practicably attain the NAAQS by the statutory attainment date. Regardless of whether the state submits an attainment demonstration or an impracticability demonstration for a Moderate area, if such an area is reclassified to Serious prior to or after failing to attain the applicable NAAQS, the state is required under CAA section 189(b)(1)(A) to submit a new attainment demonstration as part of an area's Serious area attainment plan. The separate statutory requirements for Moderate and Serious nonattainment areas anticipate two separate attainment plan submissions, and the EPA's existing guidance in the General Preamble and Addendum further support this expectation. While the state is required to submit a separate Serious area attainment plan, the EPA anticipates that certain control strategies may build upon those previously adopted and implemented as part of the Moderate area plan. For example, an area dominated by wood smoke emissions may not attain the standard by the statutory Moderate area attainment date because all necessary woodstove change-outs could not occur in that timeframe, but additional woodstove change-outs could occur by the statutory Serious area attainment date.

c. Comments and Responses

Comment: Some commenters agreed with the EPA that areas seeking to be reclassified from moderate to serious must submit two separate attainment plan submissions. The commenter stated the Act promises that all areas, even the most polluted, will implement reasonably available controls and provide at least some interim health protections while preparing a serious area plan containing more protective requirements.

Response: The EPA agrees with the comment. In the final rule, an area that is reclassified to Serious must submit both Moderate and Serious area plans, and all statutory requirements for a Moderate area (including RACT and RACM) must be met by the statutory deadline.

5. Future Year(s) To Be Modeled in Attainment Demonstrations

a. Summary of proposal. A state performing a modeling analysis for an attainment demonstration or a Serious area impracticability analysis must select a future year for the analysis. The EPA proposed that for an attainment demonstration, a state should select the future modeling year such that all emissions control measures relied on for attainment will have been implemented by the beginning of that year. The EPA recommended the last year of the statutory attainment date as a starting point for Serious nonattainment area modeling demonstrations.

b. Final Rule. The EPA is finalizing a requirement that all emissions control measures relied on for attainment must have been implemented by the beginning of the attainment year. See 40 CFR 51.1011(b)(6). To demonstrate attainment, the modeling results for the nonattainment area must predict that emissions reductions implemented by the beginning of the last calendar year preceding the attainment date will result in PM2.5 concentrations that meet the level of the standard.[175]

While states should choose the future modeling year based on a number of factors, the EPA recommends the last year of the statutory attainment date as a starting point for modeling for two reasons. First, a state with a Serious area for which it submits an attainment date extension request under CAA section 188(e) must show that the area cannot practicably attain the NAAQS by the end of the tenth calendar year following designation of the area. Therefore, the appropriate future modeling year for making such a demonstration is the tenth year after designations. Even if a state does not submit (or does not intend to submit) a Serious area attainment date extension request, modeling the tenth year is a logical starting point to determine if attainment by year ten is likely. If attainment-level concentrations of PM2.5 are not expected in the tenth calendar year after designations, then the area must also, as a requirement to receive an extension of the Serious area attainment date, submit a demonstration (using air quality modeling) that provides for attainment by the most expeditious alternative date practicable, but no later than the end of the fifteenth year after designation, with the implementation of MSM (see Section VI.J of this preamble for details about MSM determinations).

Second, even though attainment of any PM2.5 NAAQS is determined by averaging 3 years of ambient data, states do not have to model 2 years before the attainment date to show modeled attainment. Since the design value is an average of the annual or 98th percentile value for 3 consecutive years, attainment can still be shown even if concentrations exceed the NAAQS in one or more of the 3 years used to determine attainment (as long as the average of the three annual values is less than the NAAQS). Therefore, it is appropriate to model any of the 3 years used to determine attainment. For these reasons, it is acceptable, and may in fact be most efficient, for a state to begin the Serious area attainment demonstration process by modeling the final year of the statutory attainment date to determine future year modeled PM2.5 concentrations in the tenth year after designations.

Because an area must attain “as expeditiously as practicable,” additional considerations are necessary before an attainment date can be established. Criteria for establishment of the Serious area attainment date are discussed in Section VI.I of this preamble. In evaluating such considerations, the question arises as to whether additional future modeling is required beyond the recommended final year modeling just discussed. For purposes of determining the attainment date that is as expeditious as practicable, the state must conduct future year modeling that takes into account growth and known controls (including any controls that were previously determined to be RACM and RACT for the area). For example, for an area designated nonattainment for the 2012 PM2.5 NAAQS in 2015 and subsequently reclassified to Serious in 2021, a future case scenario for the year 2025 (10 years after the initial nonattainment designation) would be needed to examine whether existing federal, state, and local measures (including previously identified and implemented RACT/RACM controls for the area) plus the BACM and BACT identified by the state would result in attainment. Since the EPA is finalizing the requirement that BACM and BACT must be determined independent of the attainment demonstration for the area, the future case scenario must include BACM and BACT controls in the analysis plus any additional measures on sources inside and outside of the nonattainment area (but within the state) that the state has identified as feasible to implement by the attainment date. Note that similar to RACM and RACT, BACM and BACT controls must be implemented within 4 years after reclassification to Serious nonattainment. In order to justify an extension of the attainment date beyond the end of the tenth year after designation, the state must show that attainment by that date (including the anticipated emissions reductions from Start Printed Page 58090RACM and RACT and additional reasonable measures, and BACM and BACT and additional feasible measures) would be impracticable. Any proposed attainment date after the 10 year period must include modeling of BACM and BACT controls plus the most stringent measures that are included in the implementation plan of any state and can be feasibly implemented in the area. The attainment date extension beyond 10 years can be for up to 5 additional years, but the proposed attainment date must also be shown to be as expeditious as practicable. Section VI.J of this preamble provides a complete discussion of the EPA's proposed interpretation of the statutory requirements for a Serious area attainment date extension under CAA section 188(e).

As with Moderate area attainment demonstrations, the EPA believes that it is not necessary or reasonable to require states to model each and every year to determine the appropriate attainment date for a Serious PM2.5 nonattainment area given the resource demands associated with modeling.[176] In some cases it may be reasonable to model one additional interim year before the maximum statutory attainment date. However, in most cases, the air quality benefits of an identified set of reasonable control measures, BACM and BACT and additional feasible control measures can be estimated through model sensitivity analyses and the development of sensitivity factors (factors to relate tons of emissions reductions in the area to PM2.5 concentration changes in the area). For example, states can model across the board percentage reductions in direct PM2.5 and/or precursor emissions (in separate model runs or using advanced modeling techniques such as DDM) to determine the impact of emissions reductions on PM2.5 concentrations in the area. This modeling can be performed with a single attainment year modeling platform, which is much less resource intensive than modeling multiple additional future years. The EPA strongly recommends that states discuss the selection of the future year(s) to model with their respective EPA Regional Office as part of the modeling protocol development process prior to embarking on the modeling.

c. Comments and Responses. Any comments received on this section are addressed in the Response to Comments document found in the docket for this action.

6. Attainment Year Motor Vehicle Emissions Budgets

As with Moderate areas, the transportation conformity rule requires that Serious area attainment plans establish motor vehicle emissions budgets for the area's attainment year. Therefore, once a Serious area's attainment date has been established, the state is required to establish motor vehicle emissions budgets for direct PM2.5 and any relevant PM2.5 precursor for the attainment year.[177] If a state's SIP submission demonstrates that a Serious area cannot attain by the end of the tenth calendar year after the area's designation, motor vehicle emissions budgets are not required for that tenth calendar year, but are required for the year that the state demonstrates to be the area's attainment year. A motor vehicle emissions budget for the purposes of a Serious area PM2.5 attainment plan is that portion of the total allowable emissions within the nonattainment area allocated to on-road sources as defined in the submitted attainment plan.[178] Such motor vehicle emissions budgets would be calculated using the latest planning assumptions and the latest approved motor vehicle emissions model available at the time that the attainment plan is developed, unless EPA approves the state's use of an alternative model.[179]

F. RFP Requirements

1. General Approach to RFP

a. Summary of the Proposal. The EPA generally proposed that a state must submit an RFP plan as part of any attainment plan submission for a Serious nonattainment area in order to satisfy the statutory requirements for RFP, similar to a Moderate area attainment plan. The EPA proposed that the applicable baseline year must be the same year as that represented by the latest base year inventory for the Serious area. The EPA proposed that the state must include in its RFP analysis the anticipated emissions reductions expected to be achieved through the implementation of control measures required by the control strategy explained in Section VI.D of this preamble (BACM and BACT, additional feasible measures and MSM if applicable). As with RFP plans for Moderate areas, the EPA proposed that a state must submit RFP projected emissions as part of the RFP plan for any Serious PM2.5 nonattainment area following the same guidance that applies to emissions inventories for attainment plans (see Section VI.B of this preamble for a complete discussion of emissions inventories for Serious area attainment plans). The EPA also proposed that motor vehicle emissions budgets must also be established for direct PM2.5 and any PM2.5 plan precursor using the latest planning assumptions and the latest approved motor vehicle emissions model available at the time that the Serious area attainment plan is developed.[180] It was not necessary to propose that RFP plans for Serious areas include motor vehicle emissions budgets for direct PM2.5 and any PM2.5 plan precursor because, as stated in the section of this rule that addresses RFP requirements for Moderate PM2.5 areas, the transportation conformity rule already requires that RFP plans establish motor vehicle emissions budgets. RFP plans would therefore be required to establish motor vehicle emissions budgets for direct PM2.5 and any relevant PM2.5 plan precursor. The EPA also proposed that guidance found in the Moderate nonattainment areas RFP section of the proposal should also apply to Serious nonattainment areas.

b. Final Rule. The EPA is finalizing rule provisions for Serious areas that essentially mirror the approach to Moderate areas found in Section IV.F of this preamble. The EPA is further clarifying application of those provisions by providing guidance that closely follows the Moderate area guidance regarding how to prepare an RFP plan, RFP projected emissions, geographic coverage of emission sources for RFP, and RFP requirements for multi-state nonattainment areas.

As with a Moderate area attainment plan, the EPA is finalizing that a state must submit an RFP plan as part of any Serious area attainment plan in order to satisfy the statutory requirements for RFP. The plan must contain appropriate information to demonstrate that adequate emissions reductions will be achieved through control measures in the attainment plan in order to meet the Start Printed Page 58091statutory definition of RFP. The plan must include three components: (1) An implementation schedule for control measures on sources in the nonattainment area, (2) RFP projected emissions for each applicable quantitative milestone year determined in Section VI.G of this preamble, based on the anticipated control measure implementation schedule; and (3) an analysis that demonstrates that this schedule of aggregate emissions reductions achieves sufficient progress toward attainment between the applicable baseline year to the attainment year. For additional discussion of each of the components of the RFP plan, refer to Section IV.F of this preamble. See 40 CFR 51.1012(a).

The EPA requires that the applicable baseline year must be the same year as that represented by the latest base year inventory for the Serious area. The projected attainment year may be up to the end of the tenth year following designation for a Serious area that can demonstrate attainment pursuant to CAA section 189(b)(1)(A), or up to the end of the fifteenth year following designation for a Serious area that sought an extension of the statutory attainment date pursuant to CAA section 188(e).[181] As with Moderate areas, the RFP analysis must clearly convey how the schedule for implementing the control strategy will provide for generally linear or stepwise progress towards attainment. If stepwise progress is more appropriate for the specific nonattainment area, the state is required to submit a clear rationale and supporting information to explain why generally linear progress towards attainment in the area is not appropriate (e.g., due to the nature of the nonattainment problem, the types of sources contributing to PM2.5 levels in the area, and the ability to perform timely implementation of control measures). For a Serious area, the EPA requires that the state must include in its RFP analysis the anticipated emissions reductions expected to be achieved through the implementation of control measures required by the control strategy described in Section VI.D of this preamble (BACM and BACT, additional feasible measures and MSM, if applicable). Similar to Moderate areas, the optional air quality analysis discussed in Section IV.F of this preamble is also available for use by a state preparing a Serious area RFP plan.

Additionally, the EPA requires that motor vehicle emissions budgets must also be established for direct PM2.5 and PM2.5 plan precursors using the latest planning assumptions and the latest approved motor vehicle emissions model available at the time that the Serious area attainment plan is developed.[182] See 40 CFR 51.1012(a).

Finally, similar to Moderate areas, Serious areas that are multi-state or multi-jurisdictional shall provide RFP plans for each state represented in the nonattainment area that demonstrate RFP on the basis of common multi-state inventories. The states or jurisdictions within which the area is located must provide a coordinated RFP plan. For further information, see Section IV.F.5 of this preamble. See 40 CFR 51.1012(b).

c. Comments and Responses. Any additional comments received related to RFP are addressed Section IV.F of this preamble or in the Response to Comments document found in the docket for this action.

G. Quantitative Milestones

1. Summary of the Proposal

The EPA proposed that a Serious area plan for an area that can demonstrate attainment by the statutory Serious area attainment date must also include quantitative milestones to be reached 7.5 and 10.5 years from designation, to help assess the state's progress toward attaining the PM2.5 NAAQS in the event the area fails to attain by the applicable attainment date. For a Serious area that cannot demonstrate attainment by the statutory Serious area attainment date, the EPA proposed that the state must include in the Serious area attainment plan quantitative milestones to be achieved at 7.5, 10.5 and 13.5 years from the area's date of designation.

The EPA proposed that the general approach to selecting quantitative milestones outlined in the Moderate nonattainment area section of the proposal should apply to any attainment plan for a PM2.5 nonattainment area, independent of its classification. Specifically, the EPA proposed that states be allowed to select the quantitative milestones that they identify as appropriate and quantifiable and that will provide for objective evaluation of progress toward attainment in their Serious PM2.5 nonattainment area, and that the EPA, in its attainment plan approval process, will determine if they satisfy the statutory requirements of CAA section 189(c). Additionally, the EPA proposed to require that, at a minimum, states must include in all attainment plans for Serious PM2.5 nonattainment areas a measure to confirm that some specific portion of BACM and BACT for the area has been implemented as appropriate in order to comply with the statutory requirement at CAA section 189(b)(1)(B).

2. Final Rule

The final rule provisions for Serious area quantitative milestones are similar to such provisions for Moderate areas discussed in Section IV.G of this preamble. As required for Moderate areas, Serious area attainment plans must include quantitative milestones that demonstrate RFP towards attainment to be achieved every 3 years until the area is redesignated to attainment. To account for variations in the timing of possible additional plans that may be required beyond the Serious area attainment plan (such as a plan revision under CAA section 189(d) for a Serious area that fails to attain) the EPA is also clarifying, consistent with the requirements discussed in Section IV.G of this preamble for Moderate areas, that all Serious area attainment plans must contain one additional quantitative milestone to be met in the 3-year period beyond the applicable Serious area attainment date. This will provide the EPA with appropriate tools necessary to continue to monitor the area's continued progress toward attainment in the event that the area fails to attain and develops a new attainment plan.

For an area that is discretionarily reclassified to Serious under the provisions of CAA section 188(b)(1), the Serious area plan must contain quantitative milestones to be achieved by 7.5 years from the area's date of designation as nonattainment. In this case, the 7.5 year quantitative milestone that was submitted with the Moderate area plan may still be sufficient to demonstrate RFP or may have to be adjusted to reflect the difference in actual progress from the projections of the Moderate area plan. For an area that is reclassified to Serious under CAA section 188(b)(2) due to failure to attain, the 7.5 year quantitative milestones that were submitted with the Moderate area plan are still required and would be sufficient for the EPA to evaluate the area's progress toward attaining the NAAQS while the Serious area plan is being developed. All Serious area plans must also include quantitative milestones to be achieved 10.5 years from designation, to help assess the state's progress toward attaining the Start Printed Page 58092PM2.5 NAAQS in the event the area fails to attain by the applicable attainment date. Finally, for a Serious area that cannot demonstrate attainment by the statutory Serious area attainment date, the state must include quantitative milestones to be achieved every 3 years, such that the final milestone falls within the 3 years after the applicable Serious area attainment date. For example, if a state requests an attainment date extension to 14 years after designation pursuant to CAA section 188(e), the attainment plan should contain not only the 7.5 and 10.5 year milestones, but also milestones to be achieved 13.5 and 16.5 years from designation.

The Addendum included guidance that recommended milestones “should be addressed by quantifying and comparing the annual incremental emissions reductions which result from implementation of BACM and BACT (required within 4 years after the area is reclassified as serious) and from additional measures included in the final serious area SIP to those reductions which were identified in the SIP as quantitative milestones necessary to achieve the NAAQS by the applicable attainment date.” [183] The final rule does not specify that the milestones must be expressed in terms of emissions reductions. While the EPA notes that the Addendum contains this fundamental concept, it is impractical to expect that a state will always be able to quantify and compare real and projected emissions reductions, and submit a report to the EPA within 90 days of a given milestone, as required under CAA section 189(c)(2). Therefore, the final rule requires that states selecting quantitative milestones for a Serious area plan should use the approach outlined for Moderate areas, as described in Section IV.G of this preamble. This approach applies to any attainment plan for a PM2.5 nonattainment area, independent of its classification. Specifically, the final rule requires that states be allowed to select the quantitative milestones that they identify as appropriate and quantifiable and that will provide for objective evaluation of progress toward attainment in their Serious PM2.5 nonattainment area, and that the EPA, in its attainment plan approval process, will determine if they satisfy the statutory requirements of CAA section 189(c). See 40 CFR 51.1013(a)(2).

In addition to this general approach for selecting quantitative milestones and similar to what the final rule requires for Moderate area attainment plans, the final rule requires that, at a minimum, states must ensure that the quantitative milestones for Serious PM2.5 nonattainment areas assure RFP is being met by demonstrating that BACM and BACT have been implemented, as appropriate considering the timing of the milestone report, in order to comply with the statutory requirement at CAA section 189(b)(1)(B). The agency is further finalizing a corresponding requirement for Serious PM2.5 nonattainment areas that receive an attainment date extension. For these areas, the quantitative milestone should assure that RFP is being met by demonstrating that MSM for the area has been implemented as required pursuant to CAA section 188(e). This requirement was not specifically outlined in the proposal. However, while considering the requirements that were proposed for Serious areas, the EPA determined that including this additional provision within quantitative milestones would enable the agency to better evaluate progress toward attainment in areas that receive a Serious area extension. The EPA acknowledges that the precise quantifiable metric for a quantitative milestone (e.g., 50 percent of BACM and BACT measures implemented by milestone date 7.5 years from designation) would need to be determined on a case-by-case basis, as it would depend upon the date of reclassification of the area, which quantitative milestone (i.e., 7.5 or 10.5 years from designation), and the anticipated implementation timing and nature of the BACM and BACT controls themselves. Nonetheless, the EPA believes it is appropriate to include confirmation that such control measures and technologies are implemented as a metric that any state with a Serious nonattainment area must adopt as a quantitative milestone to demonstrate RFP (and thus must demonstrate compliance with when they submit their milestone report), as it derives from a statutory provision that applies to all Serious areas and thus represents a milestone that all Serious nonattainment areas must meet.

Additional provisions discussed in the Moderate area quantitative milestones requirements in Section IV.G of the preamble also apply to Serious areas. Specifically, if a Serious area submitted the optional air quality targets with the RFP plan then an air quality based milestone (i.e., one that is expressed in terms of an ambient PM2.5 level) is strongly recommended to be included in order to confirm that the air quality target has been met for the quantitative milestone year. If used, this milestone will be compared to the most recently certified monitored ambient air data as part of the milestone report due after the area reaches each quantitative milestone date. For additional details on this optional provision, refer to Section IV.G of this preamble.

Finally, the quantitative milestone report requirements outlined in Section IV.G of this preamble apply to Serious areas as well. Specifically, the requirements associated with the timing and contents of the quantitative milestone report submission for a Moderate area also requirements in a Serious area. For additional details on these requirements, refer to Section IV.G of this preamble. See 40 CFR 51.1013(b).

3. Comments and Responses

Any additional comments received on this section are addressed in Section IV.G of this preamble or in the Response to Comments document found in the docket for this action.

H. Contingency Measures

1. Summary of the Proposal

In the proposal, the EPA proposed that the criteria for identifying and selecting contingency measures for a Serious area attainment plan should be the same as those for Moderate area plans. The EPA also proposed that, as with Moderate areas, a state may elect to rely on contingency measures that achieve emissions reductions not only from sources within the nonattainment area, but also from sources located outside the nonattainment area but within the state, provided that the measures on sources outside the designated nonattainment area are demonstrated to produce the appropriate air quality impact within the nonattainment area. As with contingency measures for Moderate area attainment plans, the EPA proposed that the emissions reductions associated with contingency measures for Serious area plans must be equal to approximately 1 year's worth of emissions reductions necessary to achieve RFP for the area, unless the state adequately demonstrates that some smaller amount of reductions is appropriate while the state is revising its attainment plan for the area. The agency also proposed options for submission deadlines for Serious area contingency measures.

2. Final Rule

As noted in Section IV.G of this preamble, all PM2.5 nonattainment areas must include in their attainment plans contingency measures consistent with Start Printed Page 58093CAA section 172(c)(9). Contingency measures are additional control measures to be implemented in the event that an area fails to meet RFP requirements, fails to meet any quantitative milestone, fails to submit a quantitative milestone report or fails to attain the PM2.5 standard by the applicable attainment date. These measures must be fully adopted rules or control measures that are ready to be implemented quickly upon a determination by the EPA that a failure occurred, and such measures are required to take effect without significant further action by the state or the EPA.

The statutory contingency measure requirement at CAA section 172(c)(9) is not superseded or subsumed by any requirement under subpart 4, nor does it apply only to Moderate area attainment plans. Thus, contingency measures are required for Serious PM2.5 nonattainment areas as part of a state's Serious area attainment plan submission. Accordingly, the final rule requires the criteria for identifying and selecting contingency measures for a Serious area attainment plan that are the same as those for Moderate area plans. Specifically, the EPA is finalizing that the following requirements must be met in order for contingency measures to be approvable as part of a state's Serious area attainment plan submission:

(1) Contingency measures must be fully adopted rules or control measures that are ready to be implemented quickly upon a determination by the Administrator of the nonattainment area's failure to meet RFP, failure to meet any quantitative milestone, failure to submit a quantitative milestone report or failure to meet the standard by the applicable attainment date.

(2) The SIP must contain trigger mechanisms for the contingency measures, specify a schedule for implementation, and indicate that the measures will be implemented without significant further action by the state or by the EPA.

(3) Contingency measures should consist of control measures that are not otherwise included in the control strategy for the SIP, or that achieve emissions reductions not otherwise relied upon in the control strategy for the area.

(4) Contingency measures should provide for emissions reductions equivalent to 1 year's share of reductions needed to demonstrate attainment (i.e., the overall needed reductions divided by the number of years from the base year to the attainment year), or approximately equivalent to 1 year's worth of air quality improvement or emissions reductions proportional to the overall amount of air quality improvement or emissions reductions to be achieved by the area's attainment plan.

The EPA is also finalizing its proposal to allow a state to rely on contingency measures that achieve emissions reductions on sources located outside the nonattainment area, but within the state provided that the measures on sources outside the designated nonattainment area are demonstrated to produce the appropriate air quality impact within the nonattainment area.

As with contingency measures for Moderate nonattainment areas, the EPA allows a state under these circumstances to rely on additional reductions from federal or local measures already scheduled for implementation as part or all of their contingency measures. The EPA could consider such measures as meeting the contingency measure requirement as long as they produce emissions reductions in excess of those required to meet other statutory nonattainment provisions (such as to meet BACM/BACT requirements) and they can be relied on to achieve a sufficient portion of the actual emissions reductions necessary to reduce emissions in the area while the state develops a new plan to bring the area into attainment.[184] As with contingency measures for Moderate area attainment plans, the EPA requires that the emissions reductions associated with contingency measures for Serious area plans should be approximately equivalent to 1 year's worth of emissions reductions necessary to achieve RFP for the area, unless the state adequately demonstrates that some smaller amount of reductions is appropriate while the state is revising its attainment plan for the area. See 40 CFR 51.1014(b)(2).

The Addendum provided guidance related specifically to the selection and implementation of contingency measures for Serious nonattainment areas. First, the guidance indicated that “for those moderate areas reclassified as serious, if all or part of the moderate area plan contingency measures become part of the required serious area control measures (i.e., BACM), then additional contingency measures must be submitted whether or not the previously submitted contingency measures had already been implemented. Further, the affected states must ensure that serious areas have adequate contingency measures considering, among other things, new information about the potential attainment shortfall for the newly reclassified serious area.” [185] The EPA continues to believe that this approach to the statutory contingency measure requirement is appropriate and is finalizing it for purposes of implementing the PM2.5 NAAQS in Serious nonattainment areas. See 40 CFR 51.1014.

With regard to the timing for implementing contingency measures, the EPA reiterates that the purpose of contingency measures is to ensure that corrective measures are put in place automatically at the time that the EPA makes a determination that an area has failed to meet RFP, failed to meet any quantitative milestone, failed to submit a quantitative milestone report or failed to meet the NAAQS by the applicable attainment date. For any nonattainment area, the EPA is required to determine within 90 days after receiving a state's RFP demonstration, and within 6 months after the attainment date for an area, whether the state has met their statutory obligations for demonstrating RFP or attaining the standard, as appropriate. As with Moderate areas, the EPA expects that contingency measures should become effective for Serious areas within 60 days of the EPA making its determination that the area failed to meet RFP or attain the NAAQS.

3. Comments and Responses

Comment: One commenter supported the proposal that contingency measures may be approved if they will result in the equivalent air quality improvement as would be obtained by implementing measures obtaining 1 year's worth of emissions reductions needed to demonstrate attainment.

Response: In the case where a state selected the optional RFP analysis that includes air quality targets, the EPA expects that an area contingency measures may be approved if they will result in approximately 1 year's worth of air quality improvement.

I. Attainment Dates

1. Summary of Proposal

Section 188(c) of the CAA states that the attainment date for a Serious area is to be the end of the tenth calendar year after designation. The EPA proposed to interpret the reference to “designation” in section 188(c) as meaning the “effective date of designation.”

2. Final Rule

As explained earlier, section 188 establishes the attainment dates for both Moderate and Serious areas. For a Start Printed Page 58094Serious area, CAA section 188(c)(2) provides that “the attainment date shall be as expeditiously as practicable but no later than the end of the tenth calendar year beginning after the area's designation as nonattainment.” [186] For example, for an area initially designated as a Moderate nonattainment area effective in April 2015 that is reclassified to Serious at some future date, the Serious area attainment date, absent any approved Serious area attainment date extension, would be no later than December 31, 2025 (the end of the tenth calendar year after designation). As discussed in Section IV.I of this preamble, the EPA interprets the references to “designation” in CAA section 188(c) as meaning “effective date of designation,” consistent with the agency's prior approach for implementing the previous PM2.5 NAAQS under subpart 1 and other NAAQS.

3. Comments and Responses

Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

J. Attainment Date Extensions

Background. Section 188(e) of the CAA provides that the EPA may grant a Serious area one attainment date extension of no more than 5 years “upon application by any state . . . if attainment by the [original Serious area attainment date] would be impracticable, the state has complied with all requirements and commitments pertaining to that area in the implementation plan, and the state demonstrates to the satisfaction of the Administrator that the plan for that area includes the most stringent measures that are included in the implementation plan of any state or are achieved in practice in any state, and can feasibly be implemented in the area.”

The statute also includes factors that the EPA may consider in determining whether to grant the extension and the length of the extension, including “the nature and extent of nonattainment, the types and numbers of sources or other emitting activities in the area (including the influence of uncontrollable natural sources and transboundary emissions from foreign countries), the population exposed to concentrations in excess of the standard, the presence and concentrations of potentially toxic substances in the mix of particulate emissions in the area, and the technological and economic feasibility of various control measures.” [187]

The proposal described the four main elements the state must submit when requesting a Serious area attainment date extension: (1) A demonstration that attainment by the statutory Serious area attainment date is impracticable; (2) a demonstration that the area is complying with all requirements and commitments in the applicable attainment plan; (3) a demonstration that the plan includes the MSM that are included in the implementation plan of any state, or are achieved in practice in any state; and (4) a demonstration of attainment by the most expeditious alternative date practicable. The proposal also included a discussion about the timing of extension request submissions, and how to interpret the second element in cases where the extension request is submitted after the state has already submitted an initial Serious area attainment plan. These topics are addressed in the following sections.

1. Demonstration That Attainment by the Statutory Serious Area Attainment Date is Impracticable

a. Summary of Proposal. The proposed rule discussed the requirements for a demonstration to show that it is impracticable for a Serious area to attain by the attainment date. This demonstration involves evaluating through air quality modeling whether all best available control measures will enable the area to attain the standard by the attainment date.

b. Final Rule. This section remains relatively unchanged from the proposal. In order to demonstrate that it is impracticable for an area to attain by the attainment date, the state would have to show that the implementation of all BACM/BACT (and additional feasible measures) will not bring the area into attainment by the statutory Serious area attainment date (i.e., by no later than the end of the tenth calendar year after designation).[188] The statutory provision for demonstrating that it is impracticable to attain by the Serious area attainment date requires that the demonstration be based on air quality modeling (see CAA section 189(b)(1)(A)). Additional guidance on this demonstration is provided in Section VI.E of this preamble.

c. Comments and Responses. Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

2. Demonstration That the Area is Complying With all Requirements and Commitments in the Applicable Implementation Plan

a. Extension Request Submitted at the Same Time as the Serious Area Attainment Plan

i. Summary of Proposal

The EPA proposed to interpret the criterion under CAA section 188(e) that requires a state to have “complied with all requirements and commitments pertaining to that area in the implementation plan” simply to mean that the state has implemented the control measures in the SIP revisions it has submitted to address the applicable requirements in CAA sections 172 and 189. For a Serious area attainment date extension request being submitted contemporaneously with the “original” Serious area attainment plan for the area, the EPA proposed to read CAA section 188(e) not to require the area to have a fully approved attainment plan that meets the CAA's requirements for Moderate areas. The EPA also proposed to read this provision not to bar an extension if all or part of an area's Moderate area plan is disapproved or has been promulgated as a FIP, provided the area has complied with all of the requirements in the applicable FIP, or in the applicable SIP and FIP.[189]

ii. Final Rule

Some commenters stated that an area should only be able to receive an extension if the Moderate area plan had been fully approved by the EPA. Other commenters agreed with the EPA's proposed approach. They suggested that if a part of the Moderate plan had been disapproved, but it was clear that the Start Printed Page 58095area could not practicably attain by the Serious area attainment date, then the area should be able to receive an extension. Other commenters suggested that an area should not be deprived an extension if the approval of all or part of the Moderate area attainment plan is delayed due to logistical reasons or the EPA's inability to take final action in a timely manner.

The final rule does not require the area to have a fully approved Moderate area plan when the attainment date extension request is submitted at the same time as the Serious area plan. An extension is allowed if the area is complying with all Moderate area requirements and commitments pertaining to that area in the state's submitted Moderate area implementation plan, but the plan does not need to be fully approved by EPA. The EPA considers this to be a reasonable interpretation of the statute because, as noted by commenters, there may be various reasons why an area may not have a fully approved Moderate area SIP by the time an extension request may be granted.

iii. Comments and Responses

Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

b. Extension Request Submitted After Submission of an “Original” Serious Area Attainment Plan

i. Summary of Proposal

For a Serious area extension request that was submitted after submission of an “original” Serious area attainment plan that contained an attainment demonstration meeting the requirements of CAA section 189(b)(1)(A)(i), the EPA proposed to read CAA section 188(e) not to require the area to have a fully approved attainment plan that meets the CAA's requirements for Serious areas, but to have a fully approved Moderate area attainment plan. The EPA stated that this proposed interpretation of this criterion would apply whether the area was reclassified to Serious under the EPA's discretionary authority (CAA section 188(b)(1)) or by operation of law upon failing to attain by the Moderate area attainment date (CAA section 188(b)(2)).

The proposal also requested comment on an “alternative interpretation” that, as pointed out by some commenters, appears to also have mistakenly required the same thing as the first option: That the state would need to have a fully approved Moderate area attainment plan in order to receive an extension.

The EPA notes that Section VI.C of this preamble, Timing of Extension Request Submission, also discusses this issue. It requested comment on whether, for areas that had already submitted Serious area attainment plans, it would be appropriate that the state must have complied with all requirements and commitments in the area's initial Serious area plan (the EPA's preferred option), or in the Moderate area plan.

ii. Final Rule

After considering the comments received on this issue, the EPA is finalizing an approach that requires that, where a Serious area attainment date extension is being submitted after the initial Serious area attainment plan has been submitted, the state would need to demonstrate that it was complying with all Serious area requirements and commitments pertaining to the area in the plan it had initially submitted. However, it would not need a fully approved Serious area attainment plan. The EPA believes the state should not be prevented from obtaining an attainment date extension in the event the EPA is unable to take final action on a submitted plan in a timely manner. The original proposal did not specify Serious area provisions implementing this approach, but commenters noted the proposed analogous provisions for Moderate areas seeking 1-year extensions, and suggested that EPA should adopt a similar approach for Serious areas. Under this approach, the state would not need a fully approved Serious area plan; it would be able to receive an extension if it had already submitted the Serious area plan but had not received EPA approval yet, and if it was complying with all Serious area requirements and commitments pertaining to the area in the state's implementation plan. The EPA also considered an alternative option wherein the state would be able to receive an extension only if it had a fully approved Serious area attainment plan. The commenters did not favor this option, nor does the EPA.

iii. Comments and Responses

Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

3. Demonstration That the Plan Includes the MSM That Are Included in the Implementation Plan of Any State, or Are Achieved in Practice in Any State

To qualify for any extension of a Serious area attainment date, CAA section 188(e) requires a state to “demonstrate to the satisfaction of the Administrator that the plan for the area includes the most stringent measures that are included in the implementation plan of any state, or are achieved in practice in any state, and can feasibly be implemented in the area.” In its prior guidance in the Addendum, the EPA interpreted the term “most stringent measures” (MSM) to mean the maximum degree of emission reduction that has been required or achieved from a source or source category in any other attainment plans or in practice in any other states and that can feasibly be implemented in the area seeking the extension, such as what LAER represents for new or modified sources under the NNSR permit program.[190]

a. Summary of Proposal. The proposal suggested that a state would need to follow a process for determining MSM for a Serious nonattainment area that is generally similar to proposed Option 2 for BACM/BACT described in Section VI.D of this preamble, which would include exemptions from MSM for sources in de minimis source categories if such measures did not collectively advance the attainment date for the area by at least 1 year. The EPA also proposed an alternative approach for determining MSM for a Serious nonattainment area that would provide for de minimis source category exemptions for MSM only for those source categories that do not contribute significantly to ambient PM2.5 concentrations in the Serious nonattainment area, an approach more closely aligned with proposed Option 1 for determining BACM/BACT.

For each approach, the proposal described a five step process for determining MSM: (1) Update the emissions inventories for the nonattainment area; (2) identify de minimis source categories through modeling; (3) identify potential MSM; (4) compare MSM to control measures already adopted in the SIP for the nonattainment area; and (5) adopt and implement any MSM that are more stringent than any measures that are already approved into the SIP. The proposal requested comment on whether the two proposed approaches are sufficiently consistent with the agency's respective proposed Start Printed Page 58096approaches to BACM/BACT determinations.

b. Final Rule. Almost all comments received on this section involved the issue of whether the rule should allow for de minimis source categories to be exempted in the process of determining MSM. A few commenters supported the identification of de minimis source categories and their exemption from the MSM requirement. These commenters were split in terms of their preference for the two de minimis approaches that were presented. Some commenters suggested that under any approach, an area could still exclude a measure from MSM based on the inability to feasibly implement the measure in the area. Some commenters stated that it would be too burdensome to require a state to evaluate whether a particular source category had a “significant” or de minimis impact on air quality, while others supported the approach. One group of commenters disagreed with the notion that a Serious area could exempt de minimis sources from the MSM requirement in the first place. They stated that de minimis exemptions would not be appropriate for MSM, for which the CAA has expansive language requiring the most stringent measures required in any SIP or achieved in practice in any state.

After considering the comments received on the de minimis source category issue, the EPA is adopting a final rule that does not include an explicit de minimis source category exemption in determining MSM. The agency's reasons for not allowing a de minimis source category or de minimis impact concept, articulated in prior sections on determining RACM/RACT (Section IV.D) and BACM/BACT (Section VI.D), apply equally here. Moreover, the EPA believes it would be particularly inappropriate to allow for a de minimis source category approach for MSM. The statute requires MSM to be implemented because the area is unable to attain the standard within 10 years of designation and has a more severe air quality problem. Congress clearly intended for such areas to more widely explore potential control measure possibilities, and a de minimis source category exclusion would be contrary to that intent.

The EPA believes the rule provides sufficient flexibility in the MSM area control measure analysis and attainment demonstration process enabling states to identify sources that should not be subject to control measures, including the ability to develop precursor demonstrations to exclude precursors from control requirements, and to consider case-specific factors in determining technological and economic feasibility of potential control measures. If the final rule were to include an explicit step to conduct a de minimis source category analysis on the entire inventory early in MSM process, the EPA also believes that there is a risk that such an analysis may bring about investment of scarce time and analytical resources on analysis of categories to exclude rather than on the identification of the most stringent control measures necessary to attain the standard. As noted in Section IV.D of this preamble on Moderate areas, and again in [serious area section] the EPA also finds that from a technical perspective, it would be very challenging to implement a de minimis source category process in a consistent manner nationally without clear guidelines describing how narrowly or how broadly a de minimis exemption could apply to a “source category,” or how the technical analysis would need to be performed. For all of these reasons, a de minimis source category concept is not included in the final rule for MSM.

Process for determining MSM. The following sections describe the process for determining MSM that is finalized in this rule: (a) Update emissions inventories; (b) identify potential MSM; (c) compare MSM to control measures already adopted in the SIP for the nonattainment area; and (d) adopt and implement any MSM that are more stringent than any measures that are already approved into the SIP. (See 40 CFR 51.1010(b)(1)-(4).)

i. Update Emissions Inventories

The first step would be for the state to update as needed the emissions inventory of direct PM2.5 and PM2.5 precursor sources and source categories in the Serious nonattainment area required under CAA section 172(c)(3) for any attainment plan submission. The EPA expects that the state would meet this inventory requirement as part of its Serious area attainment plan submission without any additional work if the state submits the Serious area attainment date extension request simultaneously with the plan itself. However, in the event the attainment date extension request is submitted after the “original” Serious area attainment plan for the area (i.e., toward the end of the Serious area attainment period), then the state must submit a more recent, complete and accurate emissions inventory that meets the same emissions inventory requirements for Moderate and Serious PM2.5 nonattainment areas pursuant to CAA section 172(c)(3), as well as an attainment projected inventory as part of the new Serious area attainment plan for the area. The inventories submitted to support a Serious area attainment plan must also include point sources meeting the lower major stationary source threshold in 40 CFR part 51, subpart A.

ii. Identify Potential MSM

The second step in determining MSM involves identifying the potentially MSM in other state implementation plans for PM2.5 or other NAAQS, or that are used in practice in other states for controlling emissions from sources similar to those listed in the emissions inventory. This information can be obtained from a number of sources, including state regulations on the books, state summaries of control measures, state permitting databases, the RACT/BACT/LAER Clearinghouse, and control measure compilations developed by regional or state/local organizations. Elsewhere in this preamble, the EPA recommends that a state identify potential measures for consideration as RACM/RACT or BACM/BACT by evaluating control measures implemented by other states to meet PM2.5 NAAQS or other NAAQS. Thus, a state seeking to identify MSM should be able to start its process using the work already undertaken for the nonattainment area's RACM and BACM determinations and to make updates to the list of potential control measures accordingly.

For each measure, the state is required to determine its technological and economic feasibility for sources in the area. States should apply more stringent criteria for determining the feasibility of potential MSM than that described for BACM and BACT in Section VI.D of this preamble. In some situations, MSM could involve increasing the coverage of measures that were already adopted and implemented as BACM and BACT (for example, changing out an even greater percentage of woodstoves in an area, if such sources were major contributors to the air quality problem in the nonattainment area).

However, because BACM and BACT represent the “best” level of control feasible for an area, in some cases it may be possible for the MSM requirement to result in no more controls and no more emissions reductions in an area than result from the implementation of BACM and BACT. Stated another way, there may be sources or categories for which no other feasible controls exist beyond what a state has already adopted as BACM or BACT. Given the strategy in the nonattainment provisions of the CAA to offset longer attainment timeframes with more stringent control requirements, the EPA therefore Start Printed Page 58097interprets the MSM provision so as to increase the potential that it will result in additional controls beyond the set of measures adopted as BACM and BACT. In the MSM analysis, in addition to identifying additional candidate MSM, the state is required to reanalyze any measures that were rejected during the state's BACM and BACT analysis for the area to see if they are now feasible for the area given the potentially longer attainment date (up to 5 years after the statutory Serious area attainment date), or given the changes that have occurred in the interim that improve the feasibility of previously rejected measures.

iii. Compare MSM to Control Measures Already Adopted in the SIP for the Nonattainment Area

The third step requires the state to compare the potential MSM that have been identified for each source type or source category against the measures, if any, already adopted into the Serious area SIP for that source category to determine if such MSM would provide any additional reductions. This comparison will be used in determining what measures to adopt in the next step.

iv. Adopt and Implement Any MSM That are More Stringent Than Any Measures That Are Already Approved Into the SIP

The fourth step requires the adoption of any MSM that are more stringent than existing measures as a regulation, and requires submission of the regulation as part of the SIP, as well as expeditious implementation of the regulation. For any measures that the state determines cannot be feasibly implemented in the area, it should provide a reasoned justification for rejecting the potential MSM.

The EPA notes that CAA section 188(e) does not identify a deadline for a state to implement MSM, whereas elsewhere the statute establishes a deadline for implementing RACM and RACT and BACM and BACT [see CAA sections 189(a)(1)(C) and 189(b)(1)(A)], respectively). However, because the clear intent of CAA section 188(e) is to minimize the length of a Serious area attainment date extension, the EPA requires that the implementation of MSM must be as expeditious as practicable but no later than 1 year prior to the alternate Serious area attainment date identified by the state in its extension request.

c. Comments and Responses. Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

4. Demonstration of Attainment by the Most Expeditious Alternative Date Practicable

Section 189(b)(1)(A) of the CAA requires that a Serious area plan demonstrate attainment, using air quality modeling, by the most expeditious date practicable after the statutory Serious area attainment date. This demonstration is the final criterion that must be met before the EPA may consider granting an extension. The agency's determination of whether the plan provides for attainment by the most expeditious date practicable would depend on whether the plan provides for implementation of BACM and BACT by the statutory implementation deadline and MSM as expeditiously as practicable. In no case would a state be able to seek an extension of a Serious area attainment date to a date more than 5 years past the statutory attainment date for Serious areas. Section VI.E of this preamble describes the EPA's proposed requirements for attainment demonstration modeling for Serious area attainment plans.

5. Apply for an Attainment Date Extension

The state would have to apply to the EPA for any extension of a Serious area attainment date. The request would have to accompany an attainment plan submission containing an attainment demonstration showing attainment by the most expeditious alternative date practicable, and the state would need to submit modeling as part of the attainment demonstration in accordance with Section VI.E of this preamble. Furthermore, the state would have to provide the public reasonable notice and a public hearing on the attainment date extension request before submitting it to the EPA, as the EPA would consider it an integral part of the attainment demonstration and part of the revised SIP submission which is subject to the requirements of the CAA and federal regulations for public notice and hearing on SIP revisions.

6. Timing of Extension Request Submission

The EPA has identified two potential Serious area attainment date extension scenarios: (1) The more straightforward scenario where the attainment date extension is included with the initial Serious area plan, and (2) the scenario where a state may prepare and fully implement a timely Serious area plan that includes a modeling analysis that demonstrates the area would attain no later than the statutory Serious area attainment date (the end of the tenth calendar year following designation), and yet the state may see as the attainment date nears that the Serious area will in fact fail to attain by its projected attainment date. While the statute provides a remedy to be instituted immediately upon failure of a Serious area to attain the standard (through contingency measures and other measures stipulated in CAA section 189(d)), the EPA also believes that the criteria of CAA section 188(e) could be applied after a state submits a Serious area attainment plan but prior to the area failing to attain (as long as the area had not already been granted a prior Serious area attainment date extension under CAA section 188(e)).

In the first scenario, there is no need to specify any further timing requirements beyond those previously described for Serious area plan submission. However, for the second scenario the final rule needs to specify a due date for the request. The EPA believes that it would be acceptable for a state to submit a Serious area attainment date extension request (as described earlier) together with a new Serious area attainment plan meeting all of the statutory requirements that apply to such plans. The state should submit the extension request and new implementation plan to EPA as early as possible, but the final rule requires that it must be submitted no later than 60 days prior to the approved attainment date for the area or, in the absence of an approved attainment date, no later than 60 days prior to the applicable statutory attainment date for Serious areas (i.e., the end of the tenth year after designation). See 40 CFR 51.1005(b)(6). The EPA believes that this deadline is necessary due to its statutory obligation to determine whether the area attained by the attainment date. In order to preserve the possibility that EPA could review and take action on the new attainment plan for the area and the accompanying attainment date extension request prior to its deadline for making the attainment determination the EPA estimates that the 60-day deadline provides the minimum amount of necessary time. The EPA notes that during this time, it would have to ascertain the status of compliance with all requirements and commitments in the Moderate and initial Serious area attainment plans for the area, evaluate the state's justification for the selection of the alternate attainment date (including modeling), and review provisions for the implementation of MSM).Start Printed Page 58098

VII. Requirements Under CAA Section 189(d) for PM2.5 Serious Areas That Fail To Attain the NAAQS by the Applicable Attainment Date

Background. In the event that a Serious area fails to attain the PM2.5 NAAQS by the applicable attainment date, CAA section 189(d) requires that “the state in which such area is located shall, after notice and opportunity for public comment, submit within 12 months after the applicable attainment date, plan revisions which provide for attainment of the . . . standard and, from the date of such submission until attainment, for an annual reduction in PM10 or PM10 precursor emissions within the area of not less than 5 percent of the amount of such emissions as reported in the most recent inventory prepared for such area.”

In addition to the requirement for the submission of control measures providing for a 5 percent reduction in emissions of certain pollutants on an annual basis, the EPA interprets CAA section 189(d) as requiring the State to submit an attainment plan that includes the same basic statutory plan elements that are required for other attainment plans. Because section 189(d) does not include a specific provision specifying a new attainment date, the EPA relies on sections 179(d)(3) and 172(a)(2) of the CAA to establish the attainment date for such plans to be as expeditiously as practicable, and no later than five years from the effective date of the EPA's determination that the area failed to attain. Pursuant to those provisions, the Administrator may also extend the attainment date to the extent the Administrator deems appropriate, for a period no greater than 10 years from the effective date of the EPA's determination that the area failed to attain, considering the severity of nonattainment and the availability and feasibility of pollution control measures. The state must submit as part of the new attainment plan a justification explaining that it represents an attainment date that is as expeditious as practicable.

A state must submit to the EPA its plan to meet the requirements of CAA section 189(d) in the form of a complete attainment plan submission that includes the following elements: (i) Base year and attainment projection year emissions inventory requirements; (ii) additional attainment plan control strategy requirements, including control measures and a demonstration that each year the area will achieve at least a 5 percent reduction in emissions of direct PM2.5 or a 5 percent reduction in emissions of a PM2.5 plan precursor based on the most recent emissions inventory for the area; (iii) attainment demonstration and modeling; (iv) RFP plan and quantitative milestones; and (v) contingency measures. A state with a Serious PM2.5 nonattainment area that fails to attain the NAAQS by the applicable Serious area attainment date must also address any statutory requirements relevant to Moderate nonattainment areas and Serious nonattainment areas under CAA sections 172 and 189 of the CAA that have not already been satisfied. These elements are discussed in more detail in the following sections.

A. Plan Due Dates

1. Summary of Proposal

The proposed rule indicated that under CAA section 189(d), the state would be required to submit the attainment plan for a Serious area that failed to attain the NAAQS by the Serious area attainment date within 12 months after the applicable attainment date.

2. Final Rule

The final rule remains unchanged from the proposal. Section 189(d) of the CAA requires a state with a Serious PM10 nonattainment area that failed to attain the NAAQS by the applicable Serious area attainment date to submit a new attainment plan submission for the area within 12 months after the missed “applicable attainment date.” The EPA finds that the most straightforward interpretation of the statutory language is that the state must submit a new attainment plan for the area—with all required elements—within 12 months after the missed applicable attainment date. Although the EPA may take up to 6 months to make a determination that the area failed to attain, the text of the statute ties the 12-month SIP due date to the missed attainment date, not to the date that the EPA determines that the area failed to attain. Because all attainment dates for implementation of the PM2.5 NAAQS under subpart 4 are expressed in terms of the end of a calendar year, the new due date for a SIP required under CAA section 189(d) also would be due on December 31—of the year following the area's Serious area attainment date. This requirement is consistent with the manner in which the CAA section 189(d) SIP submission date has been interpreted for implementation of the PM10 NAAQS in the past. The EPA recognizes that this statutory timeline is shorter than for Moderate or Serious area attainment plans, but expects that, given the prior planning history for such areas, much of the analyses to support these new attainment plan submissions will be based on updates to previous analyses, which would require less time than generating new analyses. In any event, it is clear from the face of the statute that Congress intended that states with areas that fail to attain the NAAQS by the outermost statutory attainment date for Serious areas must proceed more quickly to revise their SIPs to provide for attainment of the NAAQS.

3. Comments and Responses

Any comments received on this section are addressed in the Response to Comments document found in the docket for this action.

B. Emissions Inventory Requirements

1. Summary of Proposal

The EPA also proposed that the inventory requirements under section 189(d) for Serious areas that fail to attain by the attainment date should be the same as those for Moderate and Serious areas, but with a change to the appropriate year for the inventory. The EPA proposed that for these areas, the inventory year must be one of the 3 years from which monitored data was used to determine that the area failed to attain the PM2.5 NAAQS by the applicable Serious area attainment date. In addition, the EPA proposed an alternative approach that would allow the state to use an earlier year than one of the 3 years used to determine that the area failed to attain. As proposed, this alternative approach would require written justification that included an explanation of how the inventory modifications adequately incorporate emissions reductions projected to be achieved through the implementation of BACM and BACT, and additional feasible control measures submitted with the original Serious area attainment plan for the area, and through implementation of MSM if appropriate.

2. Final Rule

The statute requires states to use an emissions inventory that meets the requirements of section 172(c)(3). The final rule recommends using an inventory for one of the 3 years for which air quality data were used to determine that the area failed to attain in order to meet this requirement. However it also allows the state to use an earlier inventory year under certain circumstances.

As with all other attainment plan submissions required for Moderate and Serious PM2.5 nonattainment areas, a Start Printed Page 58099state must develop its submission to meet CAA section 189(d) based on “the most recent inventory prepared for such [nonattainment] area.” This inventory must meet the same requirements that would apply to any other emissions inventory submitted for a PM2.5 nonattainment area to meet the requirements of CAA section 172(c)(3), which requires “a comprehensive, accurate, current inventory of actual emissions of the relevant pollutants” in the nonattainment area. Therefore this rule requires that the inventory submitted with an attainment plan to meet CAA section 189(d) requirements must also meet the EPA's regulatory requirements for such emissions inventories as described earlier in this preamble under Section IV.B of this preamble (for Moderate area attainment plans) and Section VI.B of this preamble (for Serious area attainment plans).

One important aspect of the emissions inventory required to be submitted with an attainment plan under CAA section 189(d) is its role as the basis for calculating the emissions reductions of direct PM2.5 or any PM2.5 plan precursor necessary to satisfy the 5 percent annual reduction criterion of CAA section 189(d). For this reason, the “most recent inventory” for the area must not only meet the criteria described for a base year inventory submitted pursuant to CAA section 172(c)(3) and in Section VI.B of this preamble, but it also must fully account for emissions reductions achieved to date through the implementation of all RACM and RACT, BACM and BACT, additional reasonable and feasible measures, and MSM (as applicable) submitted with the Moderate and original Serious area attainment plans for the area. In this way, the state will calculate the additional reductions that the nonattainment area will need beyond those already required in order to fulfill the requirements of CAA section 189(d) and bring the area into attainment as expeditiously as practicable.

To ensure that the inventory is representative of the nonattainment problem in the area current at the time of the CAA section 189(d) submission, the EPA strongly recommends that the inventory year be one of the 3 years from which monitored air quality data were used to determine that the area failed to attain the PM2.5 NAAQS by the applicable Serious area attainment date. The EPA believes that associating the inventory with one of these 3 years is reasonable in light of the fact that some control measures (e.g., BACM and BACT controls and additional feasible measures) for sources in the area may not be implemented until the beginning of the attainment year. Thus, using an emissions inventory for one of those 3 years will help ensure that the inventory adequately captures the emissions reductions already achieved through the prior implementation of control measures for Moderate and Serious areas.

The EPA recognizes that the timing and resource requirements for inventory preparation may make it challenging in some cases for a state to use an inventory for a year that is one of the 3 years from which monitored data were used to determine that the area failed to attain the NAAQS by the applicable attainment date. To address such cases, the final rule allows states to use an earlier inventory year in the plan, provided that (1) the year is selected in consultation with the appropriate EPA Regional Office, and (2) the state provides a written justification for selecting the earlier year in its SIP submission. See 51.1008(c)(1). At a minimum, the inventory must adequately incorporate emissions reductions projected to be achieved through the implementation of BACM and BACT, and additional feasible control measures submitted with the original Serious area attainment plan for the area, and MSM if appropriate. Because these emissions reductions may have occurred after the inventory year the state intends to use, adjustments to the original inventory for that year would need to be made to reflect those reductions. The written justification must also include an explanation of how those reductions have been incorporated into the inventory. In considering use of an “older” inventory, the EPA recommends that states weigh the possible impact of using an older inventory that could have higher emissions than a more current inventory. The state may be obligated to achieve a larger annual emissions reduction to satisfy the 5 percent annual reduction criteria of CAA section 189(d) than would otherwise be required if a newer inventory were used with lower emissions.

3. Comments and Responses

Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

C. Pollutants To Be Addressed in the Plan

1. Summary of Proposal

The proposed rule indicated that to determine what pollutants need to be addressed in the attainment plan and 5 percent requirement in CAA section 189(d), the state could provide a demonstration to the EPA showing that a particular precursor does not significantly contribute to PM2.5 levels that exceed the standard. The proposal suggested that if the precursor demonstration is approved by the EPA, then the state would not be required to evaluate or adopt control measures for that precursor, nor would the state need to address the precursor in meeting the 5 percent annual emissions reduction requirement in section 189(d). The proposal indicated that Section III of the preamble further discussed options describing optional precursor demonstrations.

2. Final Rule

The final rule remains relatively unchanged with respect to this issue. Section 189(d) of the CAA requires states to develop a new attainment plan for an area that failed to attain by the applicable Serious area attainment date that provides for “an annual reduction in PM10 or PM10 precursor emissions within the area of not less than 5 percent of the amount of such emissions” reported in the latest emissions inventory for the area. In Section III of this preamble, the EPA describes optional approaches by which a state could demonstrate that a PM2.5 precursor does not contribute significantly to PM2.5 levels that exceed the standard in the area, and thereby would not need to adopt control measures for that precursor in the area. The EPA also interprets the CAA generally to allow a state to provide such a “precursor demonstration” for the attainment plan required under section 189(d), even if the area has previously failed to attain the relevant NAAQS by the applicable Serious area attainment date. If the state has provided a demonstration with the previous Serious area attainment plan to establish that a precursor does not significantly contribute to PM2.5 levels for purposes of the attainment plan for the area, and it seeks to maintain the status of that precursor as not significantly contributing to PM2.5 levels in the area, the state would still need to provide an updated precursor demonstration for the new section 189(d) SIP because emissions and atmospheric conditions will have changed since the previous demonstration was submitted, and the conclusions from any previous precursor demonstration may no longer be appropriate. See Section III of this preamble for more information about potential precursor demonstrations that could be conducted to show that a particular precursor does not contribute Start Printed Page 58100significantly to PM2.5 levels that exceed the standard.

3. Comments and Responses

Any comments received on this section are addressed in the Response to Comments document found in the docket for this action.

D. Attainment Plan Control Strategy

1. Background

As for other PM2.5 NAAQS attainment demonstrations, the overarching requirement for the CAA section 189(d) control strategy is that it needs to provide for attainment of the standard as expeditiously as practicable. The strategy must include any additional measures (beyond those already adopted in previous SIPs for the area as RACM/RACT, BACM/BACT, MSM (if applicable), for example) that are needed for the area to attain expeditiously. The plan must also demonstrate that the new attainment plan will at a minimum achieve an annual 5 percent reduction in emissions of direct PM2.5 or any PM2.5 plan precursor from sources in the area, based on the most recent emissions inventory for the area. However, it is important to emphasize that a CAA section 189(d) plan must require other control measures (even if beyond those sufficient to meet the annual 5 percent reduction requirement) that are needed in order to meet the overarching goal of attaining the standard as expeditiously as practicable.

2. 5 Percent Annual Reduction in Direct PM2.5 or Any PM2.5 Plan Precursor

a. Summary of Proposal. Section 189(d) of the CAA requires an “annual reduction in PM10 or PM10 precursor emissions within the area of not less than 5 percent of the amount of such emissions as reported in the most recent inventory prepared for such area.” Because the statute is ambiguous with regard to how this language should apply for the PM2.5 NAAQS, the EPA proposed two options for interpreting this provision. One option interpreted this language to require a 5 percent annual reduction in all pollutants that contribute to PM2.5, meaning direct PM2.5 and the four precursors (SO2, NOX, VOC, and ammonia), or those precursors that are necessary to control in the area. A second option interpreted the language more literally, meaning that it required a 5 percent annual reduction of either direct PM2.5 or PM2.5 precursor emissions on an annual basis, and that a state could elect to control either direct PM2.5 or PM2.5 precursor emissions in a given year. (Note that under either proposed option, a precursor still could be excluded from control requirements if the state submitted a new precursor demonstration as part of the revised CAA section 189(d) implementation plan showing that the precursor does not contribute significantly to levels that exceed the relevant PM2.5 NAAQS, and such demonstration is approved by the EPA).

b. Final Rule. One group of commenters supported the inclusion of direct PM2.5 and all precursors in the calculation of the annual emission reduction requirement because precursors typically play a significant role in PM2.5 formation, and they believed that allowing states to be able to pick and choose which pollutants to reduce would undermine efforts to attain most expeditiously. Other commenters supported the second option because they believe it follows a plain reading of the statute (i.e., it uses the word “or”), and because it would allow a state to devote resources toward achieving emissions reductions in those pollutants that are most effective in reducing PM2.5 concentrations and thus in attaining the NAAQS most expeditiously.

After considering comments on this issue, the EPA agrees that the second option is the more appropriate reading of the statute. When paired with the overarching requirement for the area to reach attainment of the NAAQS as expeditiously as practicable, and with provisions in the rule allowing a state to demonstrate that a precursor does not provide a significant contribution to PM2.5 levels, the EPA believes that such an interpretation is reasonable and would authorize states to focus emission reduction efforts on those pollutants that will be most effective for purposes of attainment in a given area. For example, interpreting the statutory provision to require emissions reductions in a specific precursor merely for purposes of meeting a 5 percent requirement, without regard to whether the reductions would be effective for purposes of attainment, could be counterproductive to reducing the emissions of other pollutants that could result in earlier attainment. This interpretation of CAA section 189(d) is also consistent with past EPA actions for an area that failed to attain the PM10 Serious area attainment date.[191]

Thus, in applying the statutory language to implementation of the PM2.5 NAAQS in the final rule, the EPA interprets an “annual reduction in PM10 or PM10 precursor emissions within the area of not less than 5 percent of the amount of such emissions” to mean that an attainment demonstration for a Serious area that failed to attain by the attainment date must include control measures providing for a 5 percent annual reduction in direct PM2.5 emissions or in the emissions of any PM2.5 plan precursor. The EPA considered whether the statutory phrase “precursor emissions” requires a 5 percent reduction of each individual plan precursor in each year, but determined that such an interpretation was unnecessarily restrictive in light of the overarching requirement for states to adopt the control measures that will result in attainment as expeditiously as practicable, and is not compelled by the wording of the 5 percent requirement in the statute. Accordingly, the final rule requires an annual reduction of either direct PM2.5 or any single PM2.5 precursor.

Because this requirement is an annual one, the final rule also authorizes the state to meet the 5 percent requirement to vary between direct PM2.5 and PM2.5 precursors, or among precursors, from year to year throughout the duration of the section 189(d) attainment plan, so long as the attainment plan provides for expeditious attainment and meets the other applicable attainment plan requirements. For example, in year 1 a state could provide for a 5 percent reduction of direct PM2.5, and in year 2 could provide for a 5 percent reduction in a precursor, and so on.

c. Comments and Responses. Comment: Some commenters suggested that a more appropriate approach would be to require a 5 percent annual reduction in PM2.5 ambient concentrations (rather than in pollutant emissions), and allow the state to meet this air quality target with any combination of emissions reductions.

Response: The EPA does not find that this approach would be consistent with the statutory language in CAA section 189(d), which clearly expresses the requirement in terms of emissions reductions (i.e., “annual reduction in PM10 or PM10 precursor emissions within the area of not less than 5 percent of the amount of such emissions as reported in the most recent inventory prepared for such area.”) Moreover, the EPA is concerned that this approach would necessitate, on an annual basis, a complex modeling analysis or at the very least some other analytical approach to translate emissions to Start Printed Page 58101ambient concentrations. The burdens of such analysis could be significant, and it is unclear what benefit would be realized from such an approach. States are already obligated to provide a modeled attainment demonstration as part of the new SIP submission to meet the requirements of section 189(d), and the 5 percent requirement is a separate requirement that the statute explicitly imposes in addition to that modeled attainment demonstration. For these reasons, the EPA is not adopting the commenter's suggested air quality approach in the final rule.

3. Calculating the 5 Percent Annual Reductions

a. Summary of Proposal. The proposed rule provided an example of how annual reductions would be tracked under this provision, and it also provided another example describing how reductions in excess of the 5 percent requirement in 1 year could be “carried forward” to help meet the requirement in a future year.

b. Final Rule. The previous section 2 explains that the EPA interprets the statute to require a 5 percent annual reduction in direct PM2.5 emissions or in the emissions of any one PM2.5 plan precursor in each year, until attainment. The requisite minimum 5 percent emissions reduction level for any pollutant must be calculated from the total emissions of the pollutant contained in the most recent inventory for the area, as described earlier in this section. The requirement for a 5 percent annual reduction in any one pollutant, calculated based on the emissions levels in the most recent inventory, must then be achieved every year between the CAA section 189(d) plan submission date and the new projected attainment date for the area.

For example, assume it is 2026, and based on monitoring data from years 2023-2025, a Serious area has failed to attain the 2012 PM2.5 NAAQS within 10 years of designation. Assume also that the most recent inventory available for an area subject to CAA section 189(d) is for the year 2023. This inventory would serve as the base inventory for determining the 5 percent emissions reduction requirement under CAA section 189(d). If the state elects to reduce direct PM2.5 emissions each year of the plan (i.e., instead of choosing to reduce a precursor), and the most recent inventory (“base inventory”) indicates that emissions of direct PM2.5 from all sources in the area are 10,000 tons/year, then the area at a minimum would need to reduce emissions of direct PM2.5 by 5 percent of the 2023 base inventory, or 500 tons, each year until the area attains the NAAQS. Thus, in the first year following submission of the CAA section 189(d) plan for the area, emissions of direct PM2.5 could not exceed 9500 tons/year; in the second year, emissions could not exceed 9000 tons/year; and so forth. Note that if the area needs emissions reductions beyond this amount (i.e., in direct PM2.5 or in PM2.5 plan precursors) in order to meet the overarching requirement of attaining the standard as expeditiously as practicable, then it must adopt and implement such control measures.[192]

Although CAA section 189(d) requires that a state develop measures that will obtain annual emissions reductions of “not less than 5 percent” from the most recent inventory, the EPA interprets this language to authorize states to maximize emissions reductions in earlier years and still meet the 5 percent per year requirement for subsequent years. The EPA notes that interpreting the statute in this way will encourage states to implement measures earlier, where possible, rather than delay implementation of measures merely to assure that the 5 percent requirement can be met in later years. Thus, using the example described earlier, the annual reduction requirement for the area would be 500 tons/year from a base year emissions level of 10,000 tons/year. The required level after year 1 would be 9500 tons/year, after year 2 the level would be 9000 tons/year, and so on. If the area reached a level of 8100 tons/year by the end of year 3, then by the end of year 4 it would only need to reduce emissions by 100 tons/year to yield an emissions level of 8000 tons/year. Thus, this approach will allow states to carry forward any emissions reductions beyond the required minimum 5 percent in a given year to the next year as a means to encourage states to achieve emissions reductions as quickly as possible, as long as those emissions reductions are realized after the Serious area attainment date.[193]

The previous example addresses a situation where the state chooses to reduce only direct PM2.5. In that example, the 5 percent annual reduction amount for any year would be 5 percent of the 2023 PM2.5 emission inventory amount of 10,000 tons. The final rule allows the state to meet its 5 percent reduction each year in terms of reducing direct PM2.5 or any PM2.5 plan precursor. Thus, if the area had a 2023 emission inventory that included 5000 tons of each of the four PM2.5 precursors, and if the state chose to meet its “5% reduction” obligation in a particular year by reducing SO2, it would need to achieve emissions reductions of 250 tons of SO2 in that year.

The EPA is also clarifying its interpretation of the statutory language under CAA section 189(d) that requires a state to submit a new attainment plan to achieve annual reductions “from the date of such submission until attainment,” to mean annual reductions beginning from the due date of such submission until the new projected attainment date for the area based on the new or additional control measures identified to achieve at least 5 percent emissions reductions annually. This clarification is intended to make clear that even if a state is late in submitting its CAA section 189(d) plan, the area must still achieve its annual 5 percent emissions reductions beginning from the date by which the state is required to make its CAA section 189(d) plan submission, not by some later date. Because attainment dates for PM2.5 nonattainment areas established under subpart 4 occur at the end of the calendar year, any CAA section 189(d) plan, which is required within 12 months of the missed attainment date for the area, would also be due by the end of the calendar year.

c. Comments and Responses. Any additional comments received on this section are addressed in the Response to Comments document found in the docket for this action.

4. Additional Guidance on CAA Section 189(d) Control Measures

The EPA believes that an appropriate starting point for a state to identify measures to provide for attainment and to meet the requisite minimum 5 percent annual emissions reductions of direct PM2.5 and PM2.5 precursors is the list of potential control measures initially required to be identified as part of the RACM and RACT determination process, the BACM and BACT determination process, or the MSM determination process (if appropriate) for the area. The EPA anticipates that a state should be able to rely on much of the work it previously undertook to develop this list of potential control measures and analyze their technological and economic feasibility, and the time required to implement them. Control measures that the state identified but did not previously adopt may be likely measures for inclusion in an attainment plan to meet the requirements of section 189(d). However, for purposes of meeting the requirements of CAA section 189(d), the Start Printed Page 58102EPA recommends that the state first identify any additional potential measures not previously identified for the area, and then analyze any new or additional measures that the state has not already adopted in a previous attainment plan for the area.

In addition, a state may include in the CAA section 189(d) plan control strategy for the area any control measures triggered as contingency measures after the area failed to attain the PM2.5 NAAQS by the applicable attainment date. In order to be included as control measures that will help the area meet its requisite minimum 5 percent reductions in direct PM2.5 emissions or in emissions of any one PM2.5 plan precursor, such measures would have to meet the same requirements as all other approvable control measures for being quantifiable, enforceable, replicable and accountable. The EPA believes that reliance on triggered contingency measures may be appropriate given the short timeline provided for in the statute for states to revise and submit their SIP revisions (12 months from the missed attainment date) and the fact that the contingency measures included in the prior attainment plan for the area under CAA section 172(c)(9) must be activated once the EPA publishes its finding of the area's failure to attain the NAAQS by the applicable attainment date. As explained previously, however, the EPA interprets the statute to require that any new 189(d) submission must meet all the statutory requirements applicable to all submissions, including the requirement to identify contingency measures. Thus, if contingency measures from the Serious area attainment plan are relied on in the new attainment demonstration as part of the control strategy, then the state must submit additional contingency measures for the CAA section 189(d) attainment plan. See 40 CFR 51.1003(c)(1)(vii).

5. Control Strategy Submission Requirements

To ensure that attainment plan submissions contain the necessary supporting information for the EPA to review and approve the state's new control strategy to achieve at least 5 percent annual reductions in emissions of direct PM2.5 or any PM2.5 plan precursor, the final rule requires that a state must submit information about the new control strategy for an area subject to section 189(d) in a manner consistent with the requirements described in section VI.D.3.

As with other PM2.5 attainment plan submissions, the EPA believes that it is incumbent on the state to ensure that the information needed for the EPA to evaluate the state's analysis of new control measures—which in the case of 189(d) plans is also needed to achieve annual 5 percent reductions—is presented separately as part of the control strategy analysis, and in a format that provides transparency, consistency and the ability for another party to evaluate the state's analysis effectively and to duplicate the state's results. For this reason, the EPA is including the CAA section 189(d) plan base year emissions inventory information as a necessary part of the control strategy submission and as one element of the state's CAA section 189(d) plan due 12 months after the missed attainment date for the area. In addition, the state must provide information as part of any attainment plan submitted to meet the requirements of CAA section 189(d) consistent with the criteria described in Section VI.D.5 of this preamble to ensure that a state adopts effective regulations to implement the control measures identified as being needed to meet those requirements. Specifically, all control measures must be quantifiable, enforceable, replicable and accountable.

E. Modeling for Attainment Demonstrations

Section 189(d) of the CAA requires a state with a Serious nonattainment area that failed to attain the relevant NAAQS by the applicable Serious area attainment date to submit a new attainment plan for such area within 12 months after the missed attainment date. The same general requirements for attainment demonstrations and modeling that apply to Moderate area plans and Serious area plans due under CAA sections 189(a) and 189(b) should also apply to CAA section 189(d) attainment plans. However, the EPA is including additional requirements in the final rule specific to plans submitted pursuant to CAA section 189(d), as described in the following sections.

1. Attainment Demonstrations for Serious Areas That Fail To Attain the NAAQS by the Applicable Attainment Date

a. Summary of Proposal. The EPA proposed attainment demonstration modeling requirements for Serious areas that fail to attain the NAAQS by the applicable attainment date. See Section VI.E of this preamble, for more details on Serious area attainment demonstrations.

b. Final Rule. The final rule requirements are unchanged from the proposal with respect to this requirement. Attainment demonstrations for Serious areas subject to CAA section 189(d) requirements must consist of: (i) Technical analyses such as base year and future year modeling of emissions that identify sources and quantify their emissions that are contributing to violations of the PM2.5 NAAQS; (ii) analyses of future year projected emissions reductions and air quality improvement resulting from national, regional and local programs already implemented as part of previous Moderate and/or Serious area attainment plans for the area (including reasonable control measures, BACM and BACT and additional feasible measures), and (iii) additional measures needed for expeditious attainment, including measures needed to achieve 5 percent emissions reductions on an annual basis. Each state with a nonattainment area subject to the requirements of CAA section 189(d) must submit an attainment plan with an attainment demonstration that includes analyses supporting the state's determination of its proposed new attainment date. In all cases, the state must show that the area will attain the NAAQS as expeditiously as practicable.

c. Comments and Responses. Any comments received on this section are addressed in the Response to Comments document found in the docket for this action.

2. Air Quality Modeling Required for Serious Areas Subject to the Requirements of CAA Section 189(d)

a. Summary of Proposal. The EPA proposed that states are required to submit air quality modeling in support of an attainment demonstration for a nonattainment area subject to the requirements of CAA section 189(d).

b. Final Rule. The final rule requirements are unchanged from the proposal with respect to this issue. States are required to submit air quality modeling in support of an attainment demonstration for a Serious nonattainment area subject to the requirements of CAA section 189(d). The modeling demonstration must show how and when the area will attain the NAAQS. Other than the timing of plan submissions and requirement to achieve 5 percent emissions reductions in direct PM2.5 or any PM2.5 plan precursor, the relevant air quality modeling procedures and guidance for all PM2.5 nonattainment area plans are the same. See Sections IV.E. and VI.E of this preamble for more details on proposed modeling requirements and guidance for Moderate and Serious PM2.5 nonattainment areas, respectively.

c. Comments and Responses. Any comments received on this section are Start Printed Page 58103addressed in the Response to Comments document found in the docket for this action.

3. Future Year(s) To Be Modeled in Attainment Demonstrations

a. Summary of Proposal. The EPA proposed that a state performing a modeling analysis for a plan submitted under CAA section 189(d) must select a future modeling year such that all emissions control measures relied on for attainment will have been implemented by the beginning of that calendar year. To demonstrate attainment, the modeling results for the nonattainment area must predict that emissions reductions implemented by the beginning of the last calendar year preceding the attainment date will result in PM2.5 concentrations that meet the level of the standard.

b. Final Rule. As discussed more fully in Section VII.I of this preamble, the EPA must establish a new attainment date for a PM2.5 nonattainment area subject to CAA section 189(d) and must do so according to the provisions of CAA sections 179(d)(3) and 172(a)(2), which require that the new attainment date must be as expeditious as practicable, but no later than 5 years from the date of publication in the Federal Register of the EPA's determination that the area failed to attain the relevant NAAQS. In addition, the EPA may extend the attainment date by up to 5 additional years (thus up to 10 years from the date of publication of the notice of finding of failure to attain by the applicable attainment date for the area) if the EPA deems it appropriate “considering the severity of nonattainment and the availability and feasibility of pollution control measures.”

For purposes of determining the attainment date that is as expeditious as practicable, the state must conduct future year modeling that takes into account emissions growth, known controls (including any controls that were previously determined to be RACM and RACT, BACM and BACT, and MSM if appropriate, for the area), the 5 percent per year emissions reductions required by CAA section 189(d), plus any other emissions controls that are needed for expeditious attainment of the NAAQS. A state performing a modeling analysis for a plan submitted under CAA section 189(d) must select a future modeling year such that all emissions control measures relied on for attainment will have been implemented by the beginning of that year. To demonstrate attainment, the modeling results for the nonattainment area must predict that emissions reductions implemented by the beginning of the last calendar year preceding the attainment date will result in PM2.5 concentrations that meet the level of the standard.[194]

For a PM2.5 nonattainment area subject to CAA section 189(d), the state must adopt any control measures necessary to demonstrate expeditious attainment within 5 years of the area failing to attain the NAAQS by the applicable Serious area attainment date.

c. Comments and Responses. Any comments received on this section are addressed in the Response to Comments document found in the docket for this action.

4. Attainment Year Motor Vehicle Emissions Budgets

As with all other PM2.5 NAAQS attainment plans, the transportation conformity rule requires that attainment plans for areas subject to CAA section 189(d) establish motor vehicle emissions budgets for the area's attainment year. Therefore, for such an area, the state would first determine the new attainment date as described in Section VII.I of this preamble. Once an area's attainment date has been established, the state would establish motor vehicle emissions budgets for direct PM2.5 and any relevant PM2.5 precursor for the attainment year.[195] A motor vehicle emissions budget for the purposes of a PM2.5 attainment plan is that portion of the total allowable emissions within the nonattainment area allocated to on-road sources as defined in the submitted attainment plan.[196] Such motor vehicle emissions budgets would be calculated using the latest planning assumptions and the latest approved motor vehicle emissions model available at the time that the attainment plan is developed, unless the EPA approves the state's use of an alternative model.[197]

F. RFP Requirements

1. Specific Requirements

a. Summary of the Proposal. The EPA proposed to determine that a state has satisfied the RFP requirement if the state submits an approvable control strategy under CAA section 189(d) that demonstrates that the state will achieve at least 5 percent reductions in direct PM2.5 or PM2.5 precursor emissions from sources in the area annually until attainment. Additionally, the EPA proposed that motor vehicle emissions budgets must also be established as part of any RFP plan for direct PM2.5 and for any relevant PM2.5 plan precursor using the latest planning assumptions and the latest approved motor vehicle emissions model available at the time that the plan is developed for a Serious area subject to 189(d).[198]

b. Final Rule. The EPA is finalizing RFP requirements for attainment plans required pursuant to CAA section 189(d) that are similar to other Serious area RFP requirements discussed in section VI.F of this preamble. The EPA is providing similar guidance regarding how to prepare an RFP analysis, RFP projected emissions, geographic coverage of emission sources for RFP, and RFP requirements for multi-state nonattainment areas.

The RFP analysis must contain appropriate information to demonstrate that the state will achieve the emissions reductions from the control strategy necessary to result in generally linear reductions in emissions and provide for expeditious attainment as discussed in Section VII.D of this preamble. As with other Serious area RFP analyses, the state may consider PM2.5 plan precursor emissions reductions in the aggregate for RFP purposes in a 189(d) area.

The state's RFP analysis must include three components: (1) An implementation schedule for control measures on sources in the nonattainment area, (2) RFP projected emissions for each applicable quantitative milestone year (discussed in Section VII.G of this preamble), based on the anticipated control measure implementation schedule; and (3) an analysis that demonstrates that this schedule of aggregate emissions reductions achieves sufficient progress toward attainment between the applicable baseline year to the attainment year. For additional discussion of each of the components of the RFP analysis, refer to Section IV.F of this preamble. See 40 CFR 51.1012(a).

In the proposal, the EPA proposed an option to require at least 5 percent Start Printed Page 58104emissions reductions in direct PM2.5 and all PM2.5 plan precursor from sources in the area annually until attainment to meet the separate RFP requirement for attainment plans. However, some commenters did not agree that EPA should consider an area meeting the 5 percent requirement under CAA section 189(d) to automatically have satisfied the RFP requirement. The EPA agrees with this comment and is therefore not finalizing an approach to the RFP requirement that is tied to the 5 percent requirement. Instead, the final RFP requirement will be tied to progress toward expeditious attainment (which the EPA recommends should be generally linear but may also be stepwise with appropriate justification), just as it is for all other types of Moderate and Serious area plans for PM2.5 as summarized in the previous paragraph. The emissions reductions that a state achieves for purposes of meeting the 5 percent requirement may also be counted towards meeting the separate RFP requirement, but the EPA does not believe that meeting the 5 percent requirement would automatically equate to meeting the RFP requirement. That determination requires the separate evaluations required for the RFP analysis.

The EPA requires that the applicable baseline year for the RFP analysis must be the same year as that represented by the latest base year inventory for the Serious area. The projected attainment date should be as expeditiously as practicable and is discussed further in Section VII.I of this preamble. The RFP analysis must clearly convey how the schedule for implementing the control strategy will provide for generally linear or stepwise progress towards attainment. If stepwise progress is more appropriate for the specific nonattainment area, the state is required to submit a clear rationale and supporting information to explain why generally linear progress towards attainment in the area is not appropriate (e.g., due to the nature of the nonattainment problem, the types of sources contributing to PM2.5 levels in the area, and the ability to perform timely implementation of control measures). Further, if a stepwise approach is needed, this does not relieve the state of the requirements of CAA section 189(d). As stated earlier, the EPA requires that a section 189(d) plan must include in its RFP analysis the anticipated emissions reductions expected to be achieved through the implementation of control measures required by the control strategy described in Section VII.D of this preamble. Further, the optional air quality analysis discussed in Section IV.F of this preamble is also available for use by a state preparing a section 189(d) plan.

Additionally, the EPA requires states to establish motor vehicle emissions budgets for direct PM2.5 and PM2.5 plan precursors using the latest planning assumptions and the latest approved motor vehicle emissions model available at the time that the 189(d) plan is developed.[199] See 40 CFR 51.1012(a).It is also important to note that if a section 189(d) area is multi-state or multi-jurisdictional, the states or jurisdictions comprising the area must provide a coordinated approach to meeting the RFP requirement for the shared area. For further information, see Section IV.F.5 of this preamble. See 40 CFR 51.1012(b).

c. Comments and Responses. Any additional comments received on RFP are addressed in the Response to Comments document found in the docket for this action.

G. Quantitative Milestones

1. Specific Requirements

a. Summary of the Proposal. The proposal indicated that quantitative milestones would need to be achieved every 3 years until the area attains the relevant NAAQS, similar to proposed requirements for Moderate area plans and other types of Serious area plans. In the proposal, the EPA stated that, at a minimum, quantitative milestones selected for an attainment plan submitted under CAA section 189(d) would need to demonstrate a reduction of at least 15 percent (i.e., 5 percent for each year in the 3-year period) in emissions of direct PM2.5 and PM2.5 plan precursors below those emissions reported in the most recent inventory for the area. The proposal identified requirements for direct PM2.5 and precursors, to be consistent with the RFP proposal. The EPA proposed that attainment plans developed pursuant to CAA section 189(d) would have to contain quantitative milestones beginning at 13.5 years or 16.5 years from designation (depending on whether the section 189(d) plan would be due before or after the 13.5 year mark), and every 3 years thereafter until the attainment date for the area.

The EPA also proposed that the requirements for quantitative milestones, described in Section VI.G of this preamble, should also apply to quantitative milestones submitted with any revised Serious area attainment plan pursuant to CAA section 189(d).

b. Final Rule. The revised attainment plan for any Serious nonattainment area that fails to attain the relevant PM2.5 NAAQS by the applicable attainment date must include quantitative milestones pursuant to CAA section 189(c). These quantitative milestones should track the progress being made in the nonattainment area in the implementation of specific control measures in the SIP, and may potentially be in the form of metrics for tracking air quality improvement or emissions reductions over time. The EPA wishes to clarify that the quantitative milestones for a section 189(d) plan are designed to track RFP, not solely to track progress in achieving the minimum 5 percent annual emission reduction requirement in this section of the CAA. The RFP discussion in the previous section noted that in some cases, the state may need to adopt additional emission reduction measures (beyond those existing or new measures that will meet the 5 percent emission reduction requirement) in order for the plan to meet the overarching requirement to attain the standard as expeditiously as practicable. Thus, the RFP plan and quantitative milestones must be designed to track progress based on the overall set of control measures needed for expeditious attainment.

The quantitative milestones need to be achieved every 3 years until the area attains the relevant NAAQS. Therefore, at a minimum, the final rule requires that quantitative milestones selected for an attainment plan submitted under CAA section 189(d) need to track progress in the implementation of control measures required to achieve RFP in emissions reductions of direct PM2.5 and/or all PM2.5 plan precursors described in the previous section. The CAA section 189(d) plan must contain quantitative milestones to be achieved every 3 years, beginning with a milestone at either 13.5 years or 16.5 years from the area's date of designation. If the attainment plan is due prior to a date 13.5 years from designation of the area, then the plan shall contain milestones to be achieved by no later than a milestone date of 13.5 years from the date of designation of the area, and every 3 years thereafter, with the final milestone being the first 3-year milestone date falling after the applicable attainment date. If the attainment plan is due later than a date 13.5 years from designation of the area, then the plan shall contain milestones to be achieved by no later than a Start Printed Page 58105milestone date of 16.5 years from the date of designation of the area, and every 3 years thereafter, with the final milestone being the first 3-year milestone date falling after the applicable attainment date. See 40 CFR 51.1013(a)(3).

The EPA is also finalizing that the requirements for quantitative milestones described in Section VI.G of this preamble shall also apply to quantitative milestones submitted with any revised attainment plan pursuant to CAA section 189(d), including but not limited to, the construction, content, reporting requirements and a quantitative milestone that specifically tracks implementation of control measures identified in the plan to attach the standard as expeditiously as practicable. See 40 CFR 51.1013(a)(3).

c. Comments and Responses. Any additional comments received on quantitative milestones are addressed in the Response to Comments document found in the docket for this action.

H. Contingency Measures

1. Summary of the Proposal

The EPA proposed that contingency measures for attainment plans under CAA section 189(d) for Serious areas that fail to attain the NAAQS by the applicable attainment date must meet the same criteria as contingency measures for a Serious area attainment plan outlined in Section VI.H of this preamble. The EPA also proposed that the contingency measures should achieve approximately 1 year's worth of emissions reductions.

2. Final Rule

All PM2.5 attainment plans, including plans for areas subject to CAA section 189(d), must contain contingency measures that are consistent with CAA section 172(c)(9). Section VI.H of this preamble describes the EPA's criteria for contingency measures for a Serious area attainment plan, and contingency measures for a section 189(d) plan must meet the same criteria. The final rule reiterates the EPA's longstanding policy that contingency measures should provide for emissions reductions approximately equivalent to 1 year's worth of reductions needed for RFP.

The statutory contingency measure requirement at CAA section 172(c)(9) is not superseded or subsumed by any requirement under subpart 4. Thus, contingency measures are required as part of a state's attainment plan submission under section 189(d). Accordingly, the final rule requires the criteria for identifying and selecting contingency measures for a section 189(d) submission that are the same as for Moderate or Serious area attainment plans.

Specifically, the EPA is finalizing that the following requirements must be met in order for contingency measures to be approvable as part of a state's attainment plan submission for purposes of section 189(d):

(1) Contingency measures must be fully adopted rules or control measures that are ready to be implemented quickly upon a determination by the Administrator of the nonattainment area's failure to meet RFP, failure to meet any quantitative milestone, failure to submit a quantitative milestone report or failure to meet the standard by the applicable attainment date.

(2) The SIP must contain trigger mechanisms for the contingency measures, specify a schedule for implementation, and indicate that the measures will be implemented without significant further action by the state or by the EPA.

(3) Contingency measures should consist of control measures that are not otherwise included in the control strategy for the SIP, or that achieve emissions reductions not otherwise relied upon in the control strategy for the area.

(4) Contingency measures should provide for emissions reductions equivalent to 1 year's share of reductions needed to demonstrate attainment (i.e., the overall needed reductions divided by the number of years from the base year to the attainment year), or approximately equivalent to 1 year's worth of air quality improvement or emissions reductions proportional to the overall amount of air quality improvement or emissions reductions to be achieved by the area's attainment plan.

The EPA is also finalizing its proposal to allow a state to rely on contingency measures that achieve emissions reductions on sources located outside the nonattainment area, but within the state provided that the measures on sources outside the designated nonattainment area are demonstrated to produce the appropriate air quality impact within the nonattainment area.

As with contingency measures for Moderate or Serious areas, the EPA allows a state under these circumstances to rely on additional reductions from federal or local measures already scheduled for implementation as part or all of their contingency measures. The EPA could consider such measures as meeting the contingency measure requirement as long as they produce emissions reductions in excess of those required to meet other statutory nonattainment provisions (e.g., such as to meet BACM/BACT requirements) and they can be relied on to achieve a sufficient portion of the actual emissions reductions necessary to reduce emissions in the area while the state develops a new plan to bring the area into attainment.[200] As with contingency measures for Moderate area or Serious area attainment plans, the EPA requires that the emissions reductions associated with contingency measures for attainment plans under section 189(d) should be approximately equivalent to 1 year's worth of emissions reductions necessary to achieve RFP for the area, unless the state adequately demonstrates that some smaller amount of reductions is appropriate while the state is revising its attainment p