This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
244
as of
09/06/2026 at 6:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2016-27688 as it appeared on Public Inspection on
11/17/2016 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2016-27688 (81 FR 83103)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).
ACTION:
Final rule.
SUMMARY:
This document makes amendments to the Federal Acquisition Regulation (FAR) in order to make editorial changes.
DATES:
Effective:
November 18, 2016.
FOR FURTHER INFORMATION CONTACT:
Ms. Hada Flowers, Regulatory Secretariat Division (MVCB), 1800 F Street NW., 2nd Floor, Washington, DC 20405, 202-501-4755. Please cite FAC 2005-92, Technical Amendments.
SUPPLEMENTARY INFORMATION:
In order to update certain elements in 48 CFR parts 2, 7, 19, 34, 42, and 52 this document makes editorial changes to the FAR.
Earned value management system
means a project management tool that effectively integrates the project scope of work with cost, schedule and performance elements for optimum project planning and control. The qualities and operating characteristics of an earned value management system are described in Electronic Industries Alliance Standard 748 (EIA-748), Earned Value Management Systems. (See OMB Circular A-11, Part 7.)
3. Amend section 7.105 by removing from paragraph (b)(11) “American National Standards Institute/Electronics Industries Alliance (ANSI/EIA) Standard-748, Earned Value Management Systems” and adding “Electronic Industries Alliance Standard 748 (EIA-748)” in its place.
Women-Owned Small Business Program sole source awards.
(a) A contracting officer shall consider a contract award to an EDWOSB concern on a sole source basis (see 6.302-5(b)(7)) before considering small business set-asides (see 19.203 and subpart 19.5) provided none of the exclusions at 19.1504 apply and—
(1) The acquisition is assigned a NAICS code in which SBA has determined that WOSB concerns are underrepresented in Federal procurement;
(2) The contracting officer does not have a reasonable expectation that offers would be received from two or more EDWOSB concerns; and
(3) The conditions in paragraph (c) of this section exist.
(b) A contracting officer shall consider a contract award to a WOSB concern (including EDWOSB concerns) eligible under the WOSB Program on a sole source basis (see 6.302-5(b)(7)) before considering small business set-asides (see 19.203 and subpart 19.5) provided none of the exclusions at 19.1504 apply and—
(1) The acquisition is assigned a NAICS code in which SBA has determined that WOSB concerns are substantially underrepresented in Federal procurement;
(2) The contracting officer does not have a reasonable expectation that offers would be received from two or more WOSB concerns (including EDWOSB concerns); and
(3) The conditions in paragraph (c) of this section exist.
(c)(1) The anticipated award price of the contract, including options, will not exceed—
(i) $6.5 million for a requirement within the NAICS codes for manufacturing; or
(ii) $4 million for a requirement within any other NAICS codes.
(2) The EDWOSB concern or WOSB concern has been determined to be a responsible contractor with respect to performance.
(3) The award can be made at a fair and reasonable price.
(d) The SBA has the right to appeal the contracting officer's decision not to make a sole source award to either an EDWOSB concern or WOSB concern eligible under the WOSB program.
PART 34—MAJOR SYSTEM ACQUISITION
5. The authority citation for 48 CFR part 34 is revised to read as follows:
7. Amend section 34.005-2 by removing from paragraph (b)(6) “ANSI/EIA Standard—748” and adding “Electronic Industries Alliance Standard 748 (EIA-748)” in its place.
8. Amend section 34.201 by removing from paragraph (b) “American National Standards Institute/Electronics Industries Alliance (ANSI/EIA) Standard—748, Earned Value Management Systems” and adding “Electronic Industries Alliance Standard 748 (EIA-748)” in its place.
a. Removing from paragraph (a) “Notice of Earned Value Management System—Pre-Award IBR” and adding “Notice of Earned Value Management System—Preaward Integrated Baseline Review” in its place; and
b. Removing from paragraph (b) “Notice of Earned Value Management System—Post-Award IBR” and adding “Notice of Earned Value Management System—Postaward Integrated Baseline Review” in its place.
( printed page 83104)
PART 42—CONTRACT ADMINISTRATION AND AUDIT SERVICES
10. The authority citation for 48 CFR part 42 continues to read as follows: