Skip to Content

Notice

Notice of Effectiveness of Exempt Wholesale Generator Status

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble February 6, 2017.
Wolf Hollow II Power, LLCEG17-19-000
Colorado Bend II Power, LLCEG17-20-000
Portal Ridge Solar C, LLCEG17-21-000
Pima Energy Storage System, LLCEG17-23-000
Portal Ridge Solar A, LLCEG17-24-000
Three Peaks Power, LLCEG17-25-000
Fluvanna Wind Energy, LLCEG17-26-000
American Falls Solar, LLCEG17-27-000
American Falls Solar II, LLCEG17-28-000
Rocksprings Val Verde Wind LLCEG17-29-000
Niles Valley Energy LLCEG17-30-000
IMG Midstream LLCEG17-31-000
SR South Loving LLCEG17-32-000
Footprint Power Salem Harbor Development LPEG17-33-000
Start Printed Page 10356

Take notice that during the month of January 2017, the status of the above-captioned entities as Exempt Wholesale Generators became effective by operation of the Commission's regulations. 18 CFR 366.7(a) (2017)

Start Signature

Dated: February 6, 2017.

Nathaniel J. Davis, Sr.,

Deputy Secretary

End Signature End Preamble

[FR Doc. 2017-02777 Filed 2-9-17; 8:45 am]

BILLING CODE 6717-01-P