This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
The irrigation assessment rates are current as of January 1, 2016.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
206
as of
07/14/2026 at 2:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2017-06829 as it appeared on Public Inspection on
04/05/2017 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2017-06829 (82 FR 16849)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Bureau of Indian Affairs, Interior.
ACTION:
Notice.
SUMMARY:
The Bureau of Indian Affairs (BIA) owns or has an interest in irrigation projects located on or associated with various Indian reservations throughout the United States. We are required to establish irrigation assessment rates to recover the costs to administer, operate, maintain, and rehabilitate these projects. We are notifying you that we have adjusted the irrigation assessment rates at several of our irrigation projects and facilities to reflect current costs of administration, operation, maintenance, and rehabilitation.
DATES:
The irrigation assessment rates are current as of January 1, 2016.
FOR FURTHER INFORMATION CONTACT:
For details about a particular BIA irrigation project or facility, please use the tables in the
SUPPLEMENTARY INFORMATION
section to contact the regional or local office where the project or facility is located.
SUPPLEMENTARY INFORMATION:
A Notice of Proposed Rate Adjustment was published in the
Federal Register
on August 5, 2016 (81 FR 51927) to propose adjustments to the irrigation assessment rates at several BIA irrigation projects. The public and interested parties were provided an opportunity to submit written comments during the 60-day period that ended October 4, 2016.
Did BIA defer or change any proposed rate increases?
Yes. For the Flathead and Duck Valley Indian Irrigation Projects the rate increase to $33.50 and $6.30, respectively, as published in the proposed notice for the 2016 rate was not implemented. The final 2016 rate will remain at the 2015 amounts of $26.00 and $5.30. All other rates are to be implemented at the respective irrigation project as published.
Did BIA receive any comments on the proposed irrigation assessment rate adjustments?
No. The BIA did not receive any comments to the proposed irrigation assessment rate adjustment.
Does this notice affect me?
This notice affects you if you own or lease land within the assessable acreage of one of our irrigation projects or if you have a carriage agreement with one of our irrigation projects.
Where can I get information on the regulatory and legal citations in this notice?
You can contact the appropriate office(s) stated in the tables for the
( printed page 16850)
irrigation project that serves you, or you can use the Internet site for the Government Printing Office at
www.gpo.gov.
What authorizes you to issue this notice?
Our authority to issue this notice is vested in the Secretary of the Interior (Secretary) by 5 U.S.C. 301 and the Act of August 14, 1914 (38 Stat. 583; 25 U.S.C. 385). The Secretary has in turn delegated this authority to the Assistant Secretary—Indian Affairs under Part 209, Chapter 8.1A, of the Department of the Interior's Departmental Manual.
Whom can I contact for further information?
The following tables are the regional and project/agency contacts for our irrigation facilities.
Project name
Project/agency contacts
Northwest Region Contacts
Stanley Speaks, Regional Director, Bureau of Indian Affairs, Northwest Regional Office, 911 NE. 11th Avenue, Portland, OR 97232-4169, Telephone: (503) 231-6702.
William T. Walker, Regional Director, Bureau of Indian Affairs, Southwest Regional Office, 1001 Indian School Road, Albuquerque, NM 87104, Telephone: (505) 563-3100.
Bryan Bowker, Regional Director, Bureau of Indian Affairs, Western Regional Office, 2600 N. Central Ave., 4th Floor Mailroom, Phoenix, AZ 85004, Telephone: (602) 379-6600.
Colorado River Irrigation Project
Kellie Youngbear Superintendent, Gary Colvin, Irrigation Project Manager, 12124 1st Avenue, Parker, AZ 85344, Telephone: (928) 669-7111.
Duck Valley Irrigation Project
Joseph McDade, Superintendent, (Project operation & management compacted to Tribes), 2719 Argent Ave., Suite 4, Gateway Plaza, Elko, NV 89801, Telephone: (775) 738-5165, (208) 759-3100, (Tribal Office).
Yuma Project, Indian Unit
Denni Shields, Superintendent, 256 South Second Avenue, Suite D, Yuma, AZ 85364, Telephone: (928) 782-1202.
San Carlos Irrigation Project, Indian Works and Joint Works
Ferris Begay, Project Manager, Clarence Begay, Irrigation Manager, 13805 N. Arizona Boulevard, Coolidge, AZ 85128, Telephone: (520) 723-6225.
Uintah Irrigation Project
Bart Stevens Superintendent, Ken Asay, Irrigation System Manager, P.O. Box 130, Fort Duchesne, UT 84026, Telephone: (435) 722-4300, (435) 722-4344.
Walker River Irrigation Project
Robert Eben, Superintendent, 311 E. Washington Street, Carson City, NV 89701, Telephone: (775) 887-3500.
( printed page 16851)
What irrigation assessments or charges are adjusted by this notice?
The rate table below contains the current rates for all irrigation projects where we recover costs of administering, operating, maintaining, and rehabilitating them. The table also contains the final rates for the 2016 calendar year and subsequent years where applicable. An asterisk immediately following the rate category notes the irrigation projects where 2016 rates are different from the 2015 rates.
Project name
Rate category
Final 2015 rate
Final 2016 rate
Final 2017 rate **
Northwest Region Rate Table
Flathead Indian Irrigation Project (See Note #1)
Basic-per acre—A
$26.00
$26.00
$26.00
Basic-per acre—B
13.00
13.00
13.00
Minimum Charge per tract
75.00
75.00
75.00
Project name
Rate category
Final 2015 rate
Final 2016 rate
Fort Hall Irrigation Project
Basic per acre *
$49.00
$52.00
Minimum Charge per tract *
35.00
37.00
Fort Hall Irrigation Project—Minor Units
Basic per acre *
27.00
31.00
Minimum Charge per tract *
35.00
37.00
Fort Hall Irrigation Project—Michaud
Basic per acre *
50.50
55.00
Pressure per acre *
72.50
83.00
Minimum Charge per tract *
35.00
37.00
Wapato Irrigation Project—Toppenish/Simcoe Units
Minimum Charge per bill *
24.00
25.00
Basic per acre *
24.00
25.00
Wapato Irrigation Project—Ahtanum Units
Minimum Charge per bill *
25.00
30.00
Basic per acre *
25.00
30.00
Wapato Irrigation Project—Satus Unit
Minimum Charge per bill
79.00
79.00
“A” Basic per acre
79.00
79.00
“B” Basic per acre
85.00
85.00
Wapato Irrigation Project—Additional Works
Minimum Charge per bill *
75.00
78.00
Basic per acre *
75.00
78.00
Wapato Irrigation Project—Water Rental
Minimum Charge
86.00
86.00
Basic per acre
86.00
86.00
Rocky Mountain Region Rate Table
Blackfeet Irrigation Project
Basic-per acre
20.00
20.00
Crow Irrigation Project—Willow Creek O&M (includes Agency, Lodge Grass #1, Lodge Grass #2, Reno, Upper Little Horn, and Forty Mile Units)
Basic-per acre *
24.80
26.00
Crow Irrigation Project—All Others (includes Bighorn, Soap Creek, and Pryor Units)
Basic-per acre *
24.80
26.00
Crow Irrigation Project—Two Leggins Unit
Basic-per acre
14.00
14.00
Crow Irrigation Two Leggins Drainage District
Basic-per acre
2.00
2.00
Fort Belknap Irrigation Project
Basic-per acre *
15.00
16.00
Fort Peck Irrigation Project
Basic-per acre
26.00
26.00
Wind River Irrigation Project—Units 2, 3 and 4
Basic-per acre *
21.00
22.50
Wind River Irrigation Project—Unit 6
Basic-per acre
21.00
21.00
Wind River Irrigation Project—LeClair District (see Note#2)
Basic-per acre *
25.70
47.00
Wind River Irrigation Project—Crow Heart Unit
Basic-per acre *
14.00
15.50
Wind River Irrigation Project—A Canal Unit
Basic-per acre *
14.00
15.50
Wind River Irrigation Project—Riverton Valley Irrigation District
Basic-per acre *
21.00
26.00
Southwest Region Rate Table
Pine River Irrigation Project
Minimum Charge per tract
50.00
50.00
Basic-per acre *
17.00
18.00
Western Region Rate Table
Colorado River Irrigation Project
Basic per acre up to 5.75 acre-feet
$54.00
$54.00
Excess Water per acre-foot over 5.75 acre-feet
17.00
17.00
Duck Valley Irrigation Project
Basic per acre
5.30
5.30
Yuma Project, Indian Unit (See Note #3)
Basic per acre up to 5.0 acre-feet *
108.50
113.00
Excess Water per acre-foot over 5.0 acre-feet
24.50
24.50
Basic per acre up to 5.0 acre-feet (Ranch 5) *
108.50
113.00
( printed page 16852)
Project name
Rate category
Final 2015 rate
Final 2016 rate
Final 2017 rate **
San Carlos Irrigation Project (Joint Works) (See Note #4)
Basic per acre *
$35.00
$30.00
$25.00.
Final 2016—2017 Construction Water Rate Schedule:
Off project construction
On project construction—gravity water
On project construction—pump water
Administrative Fee
$300.00
$300.00
$300.00.
Usage Fee
$250.00 per month
No Fee
$100.00 per acre foot.
Excess Water Rate †
$5.00 per 1,000 gal
No Charge
No Charge.
† The excess water rate applies to all water used in excess of 50,000 gallons in any one month.
Project name
Rate category
Final 2015 rate
Final 2016 rate
San Carlos Irrigation Project (Indian Works) (See Note#5)
Basic per acre *
$86.00
$81.00
Uintah Irrigation Project
Basic per acre
18.00
18.00
Minimum Bill
25.00
25.00
Walker River Irrigation Project
Basic per acre
31.00
31.00
* Notes irrigation projects where rates are adjusted.
** The requirement for a final 2017 Rate is only applicable to the Flathead and San Carlos Irrigation Projects due to their specific billing requirements.
Note #1:
Federal Register
Notice on April 29, 2016 established the 2016 rate for the Flathead Irrigation Project (81 FR 25691). This notice makes final the 2017 rate for the Flathead Irrigation Project.
Note #2: The O&M rate varies yearly based upon the budget submitted by the LeClair District.
Note #3: The O&M rate for the Yuma Project, Indian Unit has two components. The first component is the O&M rate established by the Bureau of Reclamation (BOR), the owner and operator of the Project. The BOR rate for 2016 is $110/acre. The second component is for the O&M rate established by BIA to cover administrative costs including billing and collections for the Project. The 2016 BIA rate is $3.00/acre.
Note #4:The construction water rate schedule identifies the fees assessed for use of irrigation water for non-irrigation purposes.
Federal Register
Notice on April 29, 2016 established the 2016 rate for the SCIP-JW (81 FR 25691). This notice makes final the 2017 rate for the SCIP-JW.
Note #5: The 2016 O&M rate for the San Carlos Irrigation Project—Indian Works has three components. The first component is the O&M rate established by the San Carlos Irrigation Project—Indian Works, the owner and operator of the Project; this rate is $51 per acre. The second component is for the O&M rate established by the San Carlos Irrigation Project—Joint Works and is determined to be $25.00 per acre. The third component is the O&M rate established by the San Carlos Irrigation Project Joint Control Board and is $5 per acre.
The Department of the Interior strives to strengthen its government-to-government relationship with Indian Tribes through a commitment to consultation with Indian Tribes and recognition of their right to self-governance and Tribal sovereignty. We have evaluated this notice under the Department's consultation policy and under the criteria of Executive Order 13175 and have determined there to be substantial direct effects on federally recognized Tribes because the irrigation projects are located on or associated with Indian reservations. To fulfill its consultation responsibility to Tribes and Tribal organizations, BIA communicates, coordinates, and consults on a continuing basis with these entities on issues of water delivery, water availability, and costs of administration, operation, maintenance, and rehabilitation of projects that concern them. This is accomplished at the individual irrigation project by project, agency, and regional representatives, as appropriate, in accordance with local protocol and procedures. This notice is one component of our overall coordination and consultation process to provide notice to, and request comments from, these entities when we adjust irrigation assessment rates.
Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use (Executive Order 13211)
The rate adjustments are not a significant energy action under the definition in Executive Order 13211. A Statement of Energy Effects is not required.
These rate adjustments are not a significant regulatory action and do not need to be reviewed by the Office of Management and Budget under Executive Order 12866.
Regulatory Flexibility Act
These rate adjustments are not a rule for the purposes of the Regulatory Flexibility Act because they establish “a rule of particular applicability relating to rates.” 5 U.S.C. 601(2).
Unfunded Mandates Reform Act of 1995
These rate adjustments do not impose an unfunded mandate on state, local, or tribal governments in the aggregate, or on the private sector, of more than $130 million per year. They do not have a significant or unique effect on state, local, or tribal governments or the private sector. Therefore, the Department is not required to prepare a statement containing the information required by the Unfunded Mandates Reform Act (2 U.S.C. 1531et seq.).
These rate adjustments do not effect a taking of private property or otherwise have “takings” implications under Executive Order 12630. The rate adjustments do not deprive the public, state, or local governments of rights or property.
Under the criteria in section 1 of Executive Order 13132, these rate adjustments do not have sufficient federalism implications to warrant the preparation of a federalism summary impact statement because they will not affect the States, the relationship between the national government and
( printed page 16853)
the States, or the distribution of power and responsibilities among various levels of government. A federalism summary impact statement is not required.
This notice complies with the requirements of Executive Order 12988. Specifically, in issuing this notice, the Department has taken the necessary steps to eliminate drafting errors and ambiguity, minimize potential litigation, and provide a clear legal standard for affected conduct as required by section 3 of Executive Order 12988.
Paperwork Reduction Act of 1995
These rate adjustments do not affect the collections of information which have been approved by the Office of Information and Regulatory Affairs, Office of Management and Budget, under the Paperwork Reduction Act of 1995. The OMB Control Number is 1076-0141 and expires June 30, 2019.
National Environmental Policy Act
The Department has determined that these rate adjustments do not constitute a major Federal action significantly affecting the quality of the human environment and that no detailed statement is required under the National Environmental Policy Act of 1969, 42 U.S.C. 4321-4370(d), pursuant to 43 CFR 46.210(i). In addition, the rate adjustments do not present any of the 12 extraordinary circumstances listed at 43 CFR 46.215.
Data Quality Act
In developing this notice, we did not conduct or use a study, experiment, or survey requiring peer review under the Data Quality Act (Pub. L. 106-554).