Skip to Content

Rule

Air Plan Approval; Illinois; Revised Format for Materials Incorporated by Reference

Document Details

Information about this document as published in the Federal Register.

Enhanced Content

Relevant information about this document from Regulations.gov provides additional context. This information is not part of the official Federal Register document.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble Start Printed Page 30636

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Final rule; administrative change.

SUMMARY:

The Environmental Protection Agency (EPA) is revising the format for materials that are made part of the Illinois State Implementation Plan (SIP) through the process of incorporation by reference (IBR). The regulations and materials affected by this format change have all been previously submitted by Illinois and approved by EPA as part of the SIP.

DATES:

This action is effective June 30, 2017.

ADDRESSES:

EPA has established a docket for this action under Docket ID No. EPA-R05-OAR-2016-0599. SIP materials which are incorporated by reference into 40 CFR part 52 are available for inspection at the following locations: Environmental Protection Agency, Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604 and the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/​federal-register/​cfr/​ibr-locations.html.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Christos Panos, Environmental Engineer, Attainment Planning and Maintenance Section, Air Programs Branch (AR 18J), Environmental Protection Agency, Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604, (312) 353-8328, panos.christos@epa.gov.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Throughout this document, wherever “we,” “us” or “our” is used, it is intended to refer to EPA. Information is organized as follows:

Table of Contents

I. Background

A. Description of a SIP

B. How EPA Enforces SIPs

C. How the State and EPA Update the SIP

D. How EPA Compiles the SIPs

E. How EPA Organizes the SIP Compilation

F. Where You Can Find a Copy of the SIP Compilation

G. The Format of the New Identification of Plan Section

H. When a SIP Revision Becomes Federally Enforceable

I. The Historical Record of SIP Revision Approvals

II. What EPA Is Doing in This Action

III. Incorporation by Reference

IV. Statutory and Executive Order Reviews

I. Background

A. Description of a SIP

Each state has a SIP containing, among other things, the control measures and strategies used to attain and maintain the national ambient air quality standards (NAAQS). The SIP is extensive, containing such elements as air pollution control regulations, emission inventories, monitoring networks, attainment demonstrations, and enforcement mechanisms.

B. How EPA Enforces SIPs

Each state must formally adopt the control measures and strategies to attain and maintain the NAAQS after the public has had an opportunity to comment on them. The states then submit them to EPA as SIP revision requests upon which EPA must formally act. EPA evaluates these submissions to determine whether they meet CAA requirements. If and when these control measures and strategies are approved by EPA, after notice and comment rulemaking, EPA uses the IBR process to make them part of the Federally approved SIP. IBR is a method of incorporating material into EPA regulations in the CFR by referencing the original document(s) without publishing the full text of the material. In this case, the SIP rules are identified in part 52 (Approval and Promulgation of Implementation Plans), title 40 of the Code of Federal Regulations (40 CFR part 52). These rules are approved by EPA with a specific effective date, but are not reproduced in their entirety in 40 CFR part 52. This format allows both EPA and the public to identify which regulations are contained in a given SIP and to help determine whether the state is enforcing those regulations. This format also assists EPA and the public in taking enforcement action, should a state not enforce its SIP-approved regulations.

C. How the State and EPA Update the SIP

The SIP is periodically revised as necessary to address the unique air pollution problems in the state. Therefore, EPA must periodically take action on state SIP submissions containing new and/or revised regulations and other materials; if approved, they become part of the SIP. On May 22, 1997 (62 FR 27968), EPA revised the formatting procedures of 40 CFR part 52 for incorporating by reference Federally approved SIP revisions. These procedures include: (1) A revised SIP document for each state that would use the IBR process under the provisions of title 1 CFR part 51; (2) a revised mechanism for announcing EPA approval of revisions to an applicable SIP and updating both the document that has gone through the IBR process and the CFR; and (3) a revised format of the “Identification of plan” sections for each applicable subpart in 40 CFR part 52 to reflect these revised IBR procedures. The description of the revised SIP document, IBR procedures, and “Identification of plan” format are discussed in further detail in the May 22, 1997 Federal Register document.

D. How EPA Compiles the SIPs

The Federally-approved regulations, source-specific requirements, and nonregulatory provisions (entirely or portions of) submitted by each state agency have been compiled by EPA into a “SIP compilation.” The SIP compilation contains the updated regulations, source-specific requirements, and nonregulatory provisions approved by EPA through previous rulemaking actions in the Federal Register.

E. How EPA Organizes the SIP Compilation

Each SIP compilation contains three parts. Part one contains the regulations, part two contains the source-specific requirements, and part three contains nonregulatory provisions. Each state's SIP compilation contains a table for each of the three parts that identifies each SIP-approved regulation, source-specific requirement, and nonregulatory provision. In this action, EPA is publishing the SIP compilation tables that summarize the applicable SIP requirements for Illinois and that will be codified at 40 CFR 52.720. The effective dates in the table indicate the date of the most recent revision to an approved regulation. EPA Regional Offices have the primary responsibility for updating the state SIP compilations and ensuring their accuracy.

F. Where You Can Find a Copy of the SIP Compilation

EPA Region 5 has developed and will maintain the SIP compilation for Illinois. A copy of the full text of Illinois's regulatory and source-specific SIP compilation will also be maintained at NARA.Start Printed Page 30637

G. The Format of the New Identification of Plan Section

In order to better serve the public, EPA revised the organization of the section titled “Identification of plan” at 40 CFR 52.720 and included additional information to clarify the enforceable elements of the SIP. The revised format does not affect Federal enforceability of the SIP and is consistent with the requirements of Section 110(h)(1) of the CAA concerning comprehensive SIP publication.

The revised Identification of plan section contains five subsections: (a) Purpose and scope, (b) Incorporation by reference, (c) EPA approved regulations, (d) EPA approved source specific requirements, and (e) EPA approved nonregulatory and quasi-regulatory provisions.

H. When a SIP Revision Becomes Federally Enforceable

All new requirements and revisions to the applicable SIP become Federally enforceable as of the effective date of the revisions to paragraphs (c), (d), or (e) of the applicable Identification of plan section found in each subpart of 40 CFR part 52.

I. The Historical Record of SIP Revision Approvals

To facilitate enforcement of previously approved SIP provisions and provide a smooth transition to the new SIP processing system, EPA will retain the original Identification of plan section, previously appearing in the CFR as the first or second section of part 52 for each state subpart. The original Identification of plan section will be moved to Section 52.750 of part 52 for Illinois. After an initial two-year period, EPA will review its experience with the new SIP processing system and decide whether to retain the original Identification of plan section for some further period.

II. What EPA Is Doing in This Action

We are revising the format of 40 CFR part 52 “Identification of plan” section for Illinois regarding incorporation by reference, by adding Section 52.720(c)(d) and (e), to be consistent with the format described above and in 62 FR 27968 (May 22, 1997). We are adding Section 52.720(b)(1) to further clarify that all SIP revisions listed in Section 52.720(c) and (d), regardless of inclusion in the most recent “update to the SIP compilation,” are Federally enforceable under sections 110 and 113 of the Clean Air Act (CAA) as of the effective date of the final rulemaking in which EPA approved the SIP revision. We are adding Section 52.720(b)(2) to certify that the materials provided by EPA at the addresses in paragraph (b)(3) are an exact duplicate of the official state rules/regulations. We are adding Section 52.720(b)(3) to update address and contact information. Additionally, we are removing sections 52.729 “Control strategy: Carbon monoxide”, 52.745 “Section 110(a)(2) infrastructure requirements” and 52.746 “Control strategy: Lead (Pb)” because the information within those sections is being incorporated into the tables at Section 52.720 and is, therefore, no longer necessary.

This action constitutes a recordkeeping and organizational exercise to ensure that all revisions to the state programs that have occurred are accurately reflected in 40 CFR part 52. State SIP revisions are controlled by EPA regulations at 40 CFR part 51.

EPA has determined that this action falls under the “good cause” exemption in sections 553(b)(3)(B) and 553(d)(3) of the Administrative Procedures Act (APA) which, upon finding “good cause,” authorizes agencies to dispense with public participation and allows an agency to make a rule effective immediately, thereby avoiding the 30-day delayed effective date otherwise provided for in the APA. This action simply reformats and codifies provisions which are already in effect as a matter of law in Federal and approved state programs. Under section 553(b)(3)(B) of the APA, an agency may find good cause where notice and public procedure are “impractical, unnecessary, or contrary to the public interest.” Public comment is unnecessary for this action because EPA is reformatting and codifying existing law. Immediate notice in the CFR benefits the public by removing outdated citations and making the IBR format clearer and more user-friendly.

III. Incorporation by Reference

In this rule, EPA is finalizing regulatory text that includes incorporation by reference. In accordance with requirements of 1 CFR 51.5, EPA is finalizing the incorporation by reference of the Illinois Regulations described in the amendments to 40 CFR part 52 set forth below. EPA has made, and will continue to make, these documents generally available electronically through www.regulations.gov and/or in hard copy at the appropriate EPA office (see the ADDRESSES section of this preamble for more information).

IV. Statutory and Executive Order Reviews

A. General Requirements

Under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011), this action is not a “significant regulatory action” and is therefore not subject to review by the Office of Management and Budget. This rule is not subject to Executive Order 13211, “Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use” (66 FR 28355, May 22, 2001) because it is not a significant regulatory action under Executive Order 12866. Because the agency has made a “good cause” finding that this action is not subject to notice-and-comment requirements under the Administrative Procedure Act or any other statute as indicated in the SUPPLEMENTARY INFORMATION section above, it is not subject to the regulatory flexibility provisions of the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), or to sections 202 and 205 of the Unfunded Mandates Reform Act of 1995 (UMRA) (Pub. L. 104-4). In addition, this action does not significantly or uniquely affect small governments or impose a significant intergovernmental mandate, as described in sections 203 and 204 of UMRA. This rule also does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal government and Indian tribes, or on the distribution of power and responsibilities between the Federal government and Indian tribes, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), nor will it have substantial direct effects on the states, on the relationship between the national government and the states, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). This rule also is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997), because it is not economically significant. This rule does not involve technical standards; thus the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. The rule also does not involve special consideration of environmental justice related issues as required by Executive Order 12898 (59 FR 7629, February 16, 1994). In issuing this rule, EPA has taken the necessary steps to eliminate drafting errors and ambiguity, minimize potential litigation, and provide a clear legal standard for affected conduct, as required by section 3 of Executive Order 12988 (61 FR 4729, February 7, 1996). Start Printed Page 30638EPA has complied with Executive Order 12630 (63 FR 8859, March 15, 1998) by examining the takings implications of the rule in accordance with the “Attorney General's Supplemental Guidelines for the Evaluation of Risk and Avoidance of Unanticipated Takings” issued under the executive order. This rule does not impose an information collection burden under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). EPA's compliance with these statutes and Executive Orders for the underlying rules is discussed in previous actions taken on the State's rules.

B. Submission to Congress and the Comptroller General

The Congressional Review Act (5 U.S.C. 801 et seq.), as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. Section 808 allows the issuing agency to make a rule effective sooner than otherwise provided by the CRA if the agency makes a good cause finding that notice and public procedure is impracticable, unnecessary or contrary to the public interest. This action simply codifies provisions which are already in effect as a matter of law in Federal and approved state programs. 5 U.S.C. 802(2). As stated previously, EPA has made such a good cause finding, including the reasons therefore, and established an effective of June 30, 2017. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. The changes in format to the “Identification of plan” section for Illinois are not a `major rule' as defined by 5 U.S.C. 804(2).

C. Petitions for Judicial Review

EPA has also determined that the provisions of section 307(b)(1) of the Clean Air Act pertaining to petitions for judicial review are not applicable to this action. Prior EPA rulemaking actions for each individual component of the Illinois SIP compilations had previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA sees no need in this action to reopen the 60-day period for filing such petitions for judicial review for these “Identification of plan” reorganization actions for Illinois.

Start List of Subjects

List of Subjects in 40 CFR Part 52

  • Environmental protection
  • Air pollution control
  • Carbon monoxide
  • Incorporation by reference
  • Intergovernmental relations
  • Lead
  • Nitrogen dioxide
  • Ozone
  • Particulate matter
  • Reporting and recordkeeping requirements
  • Sulfur dioxide
  • Volatile organic compounds
End List of Subjects Start Signature

Dated: June 5, 2017.

Robert A. Kaplan,

Acting Regional Administrator, Region 5.

End Signature

Part 52 of chapter I, title 40 of the Code of Federal Regulations, is amended as follows:

Start Part

PART 52—APROVAL AND PROMULGATION OF IMPLEMENTION PLANS

End Part Start Amendment Part

1. The authority citation for part 52 continues to read as follows:

End Amendment Part Start Authority

Authority: 42 U.S.C. 7401 et seq.

End Authority

Subpart O—Illinois

[Redesignated as § 52.750 and amended]
Start Amendment Part

2. Section 52.720 is redesignated as § 52.750 and the section heading and paragraph (a) are revised to read as follows:

End Amendment Part
Original identification of plan section.

(a) This section identified the original “Air Quality Implementation Plan for the State of Illinois” and all revisions submitted by Illinois that were Federally-approved prior to June 1, 2017.

* * * * *
Start Amendment Part

3. A new § 52.720 is added to read as follows:

End Amendment Part
Identification of plan.

(a) Purpose and scope. This section sets forth the applicable State implementation plan for the State of Illinois under section 110 of the Clean Air Act, 42 U.S.C. 7401-7671q and 40 CFR part 51 to meet national ambient air quality standards.

(b) Incorporation by reference.

(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to December 31, 2016, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Entries in paragraphs (c) and (d) of this section with the EPA approval dates after December 31, 2016, have been approved by EPA for inclusion in the State implementation plan and for incorporation by reference into the plan as it is contained in this section, and will be considered by the Director of the Federal Register for approval in the next update to the SIP compilation.

(2) EPA Region 5 certifies that the materials provided by EPA at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated state rules/regulations which have been approved as part of the state implementation plan as of the dates referenced in paragraph (b)(1).

(3) Copies of the materials incorporated by reference into the SIP may be inspected at the Region 5 EPA Office at 77 West Jackson Boulevard, Chicago, IL 60604. To obtain the material, please contact the person identified in the FOR FURTHER INFORMATION CONTACT section of this preamble. You may also inspect the material with an EPA approval date prior to June 1, 2017, at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, go to: http://www.archives.gov/​federal-register/​cfr/​ibr-locations.html.

(c) EPA approved regulations. Start Printed Page 30639

EPA-Approved Illinois Regulations and Statutes

Illinois citationTitle/subjectState effective dateEPA approval dateComments
Title 35 of the Illinois Administrative Code
Subtitle A: General Provisions
Chapter I: Pollution Control Board
Part 106: Procedural Regulations
Subpart E: Alternative Opacity Procedures
106.501Scope and Applicability07/13/8812/29/92, 57 FR 61834
106.502Joint or Single Petition07/13/8812/29/92, 57 FR 61834
106.503Request to Agency to Join as Co-Petitioner07/13/8812/29/92, 57 FR 61834
106.504Contents of Petition07/13/8812/29/92, 57 FR 61834
106.505Response and Reply07/13/8812/29/92, 57 FR 61834
106.506Notice and Conduct of Hearing06/05/9012/29/92, 57 FR 61834
106.507Opinions and Orders07/13/8812/29/92, 57 FR 61834
Subpart J: Culpability Determinations
106.930Applicability07/11/9407/13/95, 60 FR 36060
106.931Petition for Review07/11/9407/13/95, 60 FR 36060
106.932Response and Reply07/11/9407/13/95, 60 FR 36060
106.933Notice and Hearing07/11/9407/13/95, 60 FR 36060
106.934Opinion and Order07/11/9407/13/95, 60 FR 36060
Subtitle B: Air Pollution
Chapter I: Pollution Control Board
Subchapter a: Permits and General Provisions
Part 201: Permits and General Provisions
Subpart A: Definitions
201.102Definitions04/14/7205/31/72, 37 FR 10862Approved as Rule 101.
Subpart B: General Provisions
201.121Existence of Permit No Defense04/14/7205/31/72, 37 FR 10862Approved as Rule 103(h).
201.122Proof of Emissions04/14/7205/31/72, 37 FR 10862Approved as Rule 108.
201.123Burden of Persuasion Regarding Exceptions04/14/7205/31/72, 37 FR 10862Approved as Rule 111.
201.124Annual Report04/14/7205/31/72, 37 FR 10862Approved as Rule 112.
201.125Severability04/14/7205/31/72, 37 FR 10862Approved as Rule 113.
201.126Repealer04/14/7205/31/72, 37 FR 10862Approved as Rule 114.
Subpart C: Prohibitions
201.141Prohibition of Air Pollution04/14/7205/31/72, 37 FR 10862Approved as Rule 102.
201.142Construction Permit Required04/14/7205/31/72, 37 FR 10862Approved as Rule 103(a)(1).
201.143Operating Permits for New Sources04/14/7205/31/72, 37 FR 10862Approved as Rule 103(b)(1).
201.144Operating Permits for Existing Sources04/14/7205/31/72, 37 FR 10862Approved as Rule 103(b)(2).
201.146Exemptions From State Permit Requirements12/23/1303/13/15, 80 FR 13248
201.147Former Permits04/14/7205/31/72, 37 FR 10862Approved as Rule 103(j).
201.148Operation Without Compliance Program and Project Completion Schedule04/14/7205/31/72, 37 FR 10862Approved as Rule 104(a).
201.149Operation During Malfunction, Breakdown or Startups04/14/7205/31/72, 37 FR 10862Approved as Rule 105(a).
201.150Circumvention04/14/7205/31/72, 37 FR 10862Approved as Rule 109.
201.151Design of Effluent Exhaust Systems04/14/7205/31/72, 37 FR 10862Approved as Rule 110.
Subpart D: Permit Applications and Review Process
201.152Contents of Application for Construction Permit06/23/9801/03/00, 65 FR 14
201.156Conditions04/14/7205/31/72, 37 FR 10862Approved as Rule 103(a)(6).
201.157Contents of Application for Operating Permit06/23/9801/03/00, 65 FR 14
201.158Incomplete Applications06/23/9801/03/00, 65 FR 14
201.159Signatures06/23/9801/03/00, 65 FR 14
201.160Standards for Issuance06/23/9801/03/00, 65 FR 14
Start Printed Page 30640
201.161Conditions04/14/7205/31/72, 37 FR 10862Approved as Rule 103(b)(7).
201.162Duration12/01/1004/07/14, 79 FR 18997
201.163Joint Construction and Operating Permits06/23/9801/03/00, 65 FR 14
201.164Design Criteria06/23/9801/03/00, 65 FR 14
201.165Hearings04/14/7205/31/72, 37 FR 10862Approved as Rule 103(e).
201.166Revocation04/14/7205/31/72, 37 FR 10862Approved as Rule 103(f).
201.167Revisions to Permits04/14/7205/31/72, 37 FR 10862Approved as Rule 103(g).
201.168Appeals From Conditions04/14/7205/31/72, 37 FR 10862Approved as Rule 103(k).
Subpart F: CAAPP Permits
201.207Applicability06/23/9801/03/00, 65 FR 14
Subpart H: Compliance Programs and Project Completion Schedules
201.241Contents of Compliance Program04/14/7205/31/72, 37 FR 10862Approved as Rule 104(b)(1).
201.242Contents of Project Completion Schedule04/14/7205/31/72, 37 FR 10862Approved as Rule 104(b)(2, 3).
201.243Standards for Approval04/14/7205/31/72, 37 FR 10862Approved as Rule 104(c).
201.244Revisions04/14/7205/31/72, 37 FR 10862Approved as Rule 104(d).
201.245Effects of Approval04/14/7205/31/72, 37 FR 10862Approved as Rule 104(e).
201.246Records and Reports04/14/7205/31/72, 37 FR 10862Approved as Rule 104(f).
Subpart I: Malfunctions, Breakdowns or Startups
201.261Contents of Request for Permission To Operate During a Malfunction, Breakdown or Startup04/14/7205/31/72, 37 FR 10862Approved as Rule 105(b).
201.262Standards for Granting Permission To Operate During a Malfunction, Breakdown or Startup04/14/7205/31/72, 37 FR 10862Approved as Rule 105(c).
201.263Records and Reports04/14/7205/31/72, 37 FR 10862Approved as Rule 105(d).
201.264Continued Operation or Startup Prior to Granting of Operating Permit04/14/7205/31/72, 37 FR 10862Approved as Rule 105(e).
201.265Effect of Granting of Permission To Operate During a Malfunction, Breakdown or Startup04/14/7205/31/72, 37 FR 10862Approved as Rule 105(f).
Subpart J: Monitoring and Testing
201.281Permit Monitoring Equipment Requirements02/03/8904/06/93, 58 FR 17780
201.282Testing04/14/7205/31/72, 37 FR 10862Approved as Rule 106(b).
201.283Records and Reports04/14/7205/31/72, 37 FR 10862Approved as Rule 106(c).
Subpart K: Records and Reports
201.301Records04/14/7205/31/72, 37 FR 10862Approved as Rule 107(a).
201.302Reports12/23/1303/13/15, 80 FR 13248
Subpart L: Continuous Monitoring
201.401Continuous Monitoring Requirements02/03/8904/06/93, 58 FR 17780
201.402Alternative Monitoring02/03/8904/06/93, 58 FR 17780
201.403Exempt Sources02/03/8904/06/93, 58 FR 17780
201.404Monitoring System Malfunction02/03/8904/06/93, 58 FR 17780
201.405Excess Emission Reporting02/03/8904/06/93, 58 FR 17780
201.406Data Reduction02/03/8904/06/93, 58 FR 17780
201.407Retention of Information02/03/8904/06/93, 58 FR 17780
201.408Compliance Schedules02/03/8904/06/93, 58 FR 17780
Part 203: Major Stationary Sources Construction and Modification
Subpart A: General Provisions
203.101Definitions04/30/9309/27/95, 60 FR 49778
203.103Actual Construction03/22/8812/17/92, 57 FR 59928
203.104Actual Emissions03/22/8812/17/92, 57 FR 59928
203.107Allowable Emissions04/30/9309/27/95, 60 FR 49778
203.110Available Growth Margin04/30/9309/27/95, 60 FR 49778
203.112Building, Structure and Facility04/30/9309/27/95, 60 FR 49778
203.113Commence03/22/8812/17/92, 57 FR 59928
203.116Construction03/22/8812/17/92, 57 FR 59928
Start Printed Page 30641
203.117Dispersion Enhancement Techniques03/22/8812/17/92, 57 FR 59928
203.119Emission Baseline07/22/8312/17/92, 57 FR 59928
203.121Emission Offset04/30/9309/27/95, 60 FR 49778
203.122Emissions Unit04/30/9309/27/95, 60 FR 49778
203.123Federally Enforceable04/30/9309/27/95, 60 FR 49778
203.124Fugitive Emissions03/22/8812/17/92, 57 FR 59928
203.125Installation03/22/8812/17/92, 57 FR 59928
203.126Lowest Achievable Emission Rate04/30/9309/27/95, 60 FR 49778
203.127Nonattainment Area03/22/8812/17/92, 57 FR 59928
203.128Potential To Emit04/30/9309/27/95, 60 FR 49778
203.131Reasonable Further Progress03/22/8812/17/92, 57 FR 59928
203.134Secondary Emissions03/22/8812/17/92, 57 FR 59928
203.136Stationary Source03/22/8812/17/92, 57 FR 59928
203.150Public Participation04/30/9309/27/95, 60 FR 49778
Subpart B: Major Stationary Sources in Nonattainment Areas
203.201Prohibition04/30/9309/27/95, 60 FR 49778
203.202Coordination With Permit Requirement and Application Pursuant to 35 Ill. Adm. Code 20103/22/8812/17/92, 57 FR 59928
203.203Construction Permit Requirement and Application04/30/9309/27/95, 60 FR 49778
203.205Effect of Permits03/22/8812/17/92, 57 FR 59928
203.206Major Stationary Source03/10/9805/13/03, 68 FR 25504
203.207Major Modification of a Source03/10/9805/13/03, 68 FR 25504
203.208Net Emission Determination04/30/9309/27/95, 60 FR 49778
203.209Significant Emissions Determination04/30/9309/27/95, 60 FR 49778
203.210Relaxation of a Source-Specific Limitation03/22/8812/17/92, 57 FR 59928
203.211Permit Exemption Based on Fugitive Emissions03/22/8812/17/92, 57 FR 59928
Subpart C: Requirements for Major Stationary Sources in Nonattainment Areas
203.301Lowest Achievable Emission Rate03/10/9805/13/03, 68 FR 25504
203.302Maintenance of Reasonable Further Progress and Emission Offsets04/30/9309/27/95, 60 FR 49778
203.303Baseline and Emission Offsets Determination04/30/9309/27/95, 60 FR 49778
203.305Compliance by Existing Sources03/22/8812/17/92, 57 FR 59928
203.306Analysis of Alternatives04/30/9309/27/95, 60 FR 49778
Subpart F: Operation of a Major Stationary Source or Major Modification
203.601Lowest Achievable Emission Rate Compliance Requirement03/22/8812/17/92, 57 FR 59928
203.602Emission Offset Maintenance Requirement03/22/8812/17/92, 57 FR 59928
Subpart G: General Maintenance of Emission Offsets
203.701General Maintenance of Emission Offsets03/22/8812/17/92, 57 FR 59928
Subpart H: Offsets for Emission Increases From Rocket Engines and Motor Firing
203.801Offsetting by Alternative or Innovative Means05/14/9309/27/95, 60 FR 49778
Subchapter b: Alternative Reduction Program
Part 205: Emissions Reduction Market System
Subpart A: General Provisions
205.100Severability11/25/9710/15/01, 66 FR 52343
205.110Purpose11/25/9710/15/01, 66 FR 52343
205.120Abbreviations and Acronyms06/13/0507/07/08, 73 FR 38328
205.130Definitions06/13/0507/07/08, 73 FR 38328
205.150Emissions Management Periods06/13/0507/07/08, 73 FR 38328Except 150(e).
Subpart B: Applicability
205.200Participating Source06/13/0507/07/08, 73 FR 38328
205.205Exempt Source06/13/0507/07/08, 73 FR 38328
Start Printed Page 30642
205.210New Participating Source06/13/0507/07/08, 73 FR 38328
205.220Insignificant Emission Units06/13/0507/07/08, 73 FR 38328
205.225Startup, Malfunction or Breakdown11/25/9710/15/01, 66 FR 52343
Subpart C: Operational Implementation
205.300Seasonal Emissions Component of the Annual Emissions Report06/13/0507/07/08, 73 FR 38328
205.310ERMS Applications06/13/0507/07/08, 73 FR 38328
205.315CAAPP Permits for ERMS Sources06/13/0507/07/08, 73 FR 38328
205.316Federally Enforceable State Operating Permits for ERMS Sources06/13/0507/07/08, 73 FR 38328
205.318Certification for Exempt CAAPP Sources06/13/0507/07/08, 73 FR 38328
205.320Baseline Emissions06/13/0507/07/08, 73 FR 38328
205.330Emissions Determination Methods06/13/0507/07/08, 73 FR 38328
205.335Sampling, Testing, Monitoring and Recordkeeping Practices06/13/0507/07/08, 73 FR 38328
205.337Changes in Emissions Determination Methods and Sampling, Testing, Monitoring and Recordkeeping Practices06/13/0507/07/08, 73 FR 38328
Subpart D: Seasonal Emissions Management
205.400Seasonal Emissions Allotment06/13/0507/07/08, 73 FR 38328
205.405Exclusions From Further Reductions06/13/0507/07/08, 73 FR 38328
205.410Participating Source Shutdowns06/13/0507/07/08, 73 FR 38328
Subpart E: Alternative ATU Generation
205.500Emissions Reduction Generator06/13/0507/07/08, 73 FR 38328
205.510Inter-Sector Transaction06/13/0507/07/08, 73 FR 38328
Subpart F: Market Transactions
205.600ERMS Database11/25/9710/15/01, 66 FR 52343
205.610Application for Transaction Account06/13/0507/07/08, 73 FR 38328
205.620Account Officer11/25/9710/15/01, 66 FR 52343
205.630ATU Transaction Procedures11/25/9710/15/01, 66 FR 52343
Subpart G: Performance Accountability
205.700Compliance Accounting06/13/0507/07/08, 73 FR 38328
205.710Alternative Compliance Market Account (ACMA)11/25/9710/15/01, 66 FR 52343
205.720Emissions Excursion Compensation11/25/9710/15/01, 66 FR 52343
205.730Excursion Reporting06/13/0507/07/08, 73 FR 38328
205.740Enforcement Authority11/25/9710/15/01, 66 FR 52343
205.750Emergency Conditions06/13/0507/07/08, 73 FR 38328
205.760Market System Review Procedures06/13/0507/07/08, 73 FR 38328
Subchapter c: Emission Standards and Limitations for Stationary Sources
Part 211: Definitions and General Provisions
Subpart A: General Provisions
211.101Incorporations by Reference01/28/1310/06/14, 79 FR 60070
211.102Abbreviations and Conversion Factors09/14/1003/23/12, 77 FR 16940
Subpart B: Definitions
211.121Other Definitions09/27/9309/09/94, 59 FR 46562
211.130Accelacota09/27/9309/09/94, 59 FR 46562
211.150Accumulator09/27/9309/09/94, 59 FR 46562
211.170Acid Gases09/27/9309/09/94, 59 FR 46562
211.200Acrylonitrile Butadiene Styrene (ABS) Welding09/14/1003/23/12, 77 FR 16940
211.210Actual Heat Input09/27/9309/09/94, 59 FR 46562
211.230Adhesive09/27/9309/09/94, 59 FR 46562
211.233Adhesion Primer09/14/1003/23/12, 77 FR 16940
211.235Adhesive Primer09/14/1003/23/12, 77 FR 16940
Start Printed Page 30643
211.240Adhesion Promoter05/09/9507/25/96, 61 FR 38577
211.250Aeration09/27/9309/09/94, 59 FR 46562
211.260Aerosol Adhesive and Adhesive Primer09/14/1003/23/12, 77 FR 16940
211.270Aerosol Can Filling Line01/18/9410/21/96, 61 FR 54556
211.290Afterburner09/27/9309/09/94, 59 FR 46562
211.310Air Contaminant09/27/9309/09/94, 59 FR 46562
211.330Air Dried Coatings09/27/9309/09/94, 59 FR 46562
211.350Air Oxidation Process09/27/9309/09/94, 59 FR 46562
211.370Air Pollutant09/27/9309/09/94, 59 FR 46562
211.390Air Pollution09/27/9309/09/94, 59 FR 46562
211.410Air Pollution Control Equipment09/27/9309/09/94, 59 FR 46562
211.430Air Suspension Coater/Dryer09/27/9309/09/94, 59 FR 46562
211.450Airless Spray09/27/9309/09/94, 59 FR 46562
211.470Air Assisted Airless Spray09/27/9309/09/94, 59 FR 46562
211.474Alcohol05/09/9511/08/95, 60 FR 56238
211.481Ammunition Sealant09/14/1003/23/12, 77 FR 16940
211.490Annual Grain Through Put09/27/9309/09/94, 59 FR 46562
211.492Antifoulant Coating09/14/1003/23/12, 77 FR 16940
211.493Antifouling Sealer/Tie Coat07/27/1103/23/12, 77 FR 16940
211.495Anti-Glare/Safety Coating05/09/9507/25/96, 61 FR 38577
211.510Application Area09/27/9309/09/94, 59 FR 46562
211.530Architectural Coating09/27/9309/09/94, 59 FR 46562
211.540Architectural Structure09/14/1003/23/12, 77 FR 16940
211.550As Applied09/27/9309/09/94, 59 FR 46562
211.560As-Applied Fountain Solution05/09/9511/08/95, 60 FR 56238
211.570Asphalt09/27/9309/09/94, 59 FR 46562
211.590Asphalt Prime Coat09/27/9309/09/94, 59 FR 46562
211.610Automobile09/27/9309/09/94, 59 FR 46562
211.630Automobile or Light Duty Truck Assembly Source or Automobile or Light Duty Truck Manufacturing Plant09/27/9309/09/94, 59 FR 46562
211.650Automobile or Light Duty Truck Refinishing09/27/9309/09/94, 59 FR 46562
211.660Automotive/Transportation Plastic Parts05/09/9510/26/95, 60 FR 54807
211.670Baked Coatings05/09/9510/26/95, 60 FR 54807
211.685Basecoat/Clearcoat System05/09/9507/25/96, 61 FR 38577
211.690Batch Loading09/27/9309/09/94, 59 FR 46562
211.695Batch Operation05/22/9504/02/96, 61 FR 14484
211.696Batch Process Train05/22/9504/02/96, 61 FR 14484
211.710Bead Dipping09/27/9309/09/94, 59 FR 46562
211.715Bedliner09/14/1003/23/12, 77 FR 16940
211.730Binders09/27/9309/09/94, 59 FR 46562
211.735Black Coating09/14/1003/23/12, 77 FR 16940
211.740Brakehorsepower (rated-bhp)09/25/0706/26/09, 74 FR 30466
211.750British Thermal Unit09/27/9309/09/94, 59 FR 46562
211.770Brush or Wipe Coating09/27/9309/09/94, 59 FR 46562
211.790Bulk Gasoline Plant09/27/9309/09/94, 59 FR 46562
211.810Bulk Gasoline Terminal09/27/9309/09/94, 59 FR 46562
211.820Business Machine Plastic Parts09/14/1003/23/12, 77 FR 16940
211.825Camouflage Coating09/14/1003/23/12, 77 FR 16940
211.830Can09/27/9309/09/94, 59 FR 46562
211.850Can Coating09/27/9309/09/94, 59 FR 46562
211.870Can Coating Line09/27/9309/09/94, 59 FR 46562
211.880Cap Sealant09/14/1003/23/12, 77 FR 16940
211.890Capture09/27/9309/09/94, 59 FR 46562
211.910Capture Device09/27/9309/09/94, 59 FR 46562
211.930Capture Efficiency09/27/9309/09/94, 59 FR 46562
211.950Capture System09/27/9309/09/94, 59 FR 46562
211.954Cavity Wax09/14/1003/23/12, 77 FR 16940
211.955Cement03/15/0111/08/01, 66 FR 56449
211.960Cement Kiln03/15/0111/08/01, 66 FR 56449
211.965Ceramic Tile Installation Adhesive09/14/1003/23/12, 77 FR 16940
211.970Certified Investigation09/27/9309/09/94, 59 FR 46562
211.980Chemical Manufacturing Process Unit05/09/9503/23/98, 63 FR 13784
211.990Choke Loading09/27/9309/09/94, 59 FR 46562
211.1000Class II Finish06/25/1003/23/12, 77 FR 16940
211.1010Clean Air Act09/27/9309/09/94, 59 FR 46562
211.1050Cleaning and Separating Operation09/27/9309/09/94, 59 FR 46562
211.1070Cleaning Materials01/18/9410/21/96, 61 FR 54556
211.1090Clear Coating09/27/9309/09/94, 59 FR 46562
211.1110Clear Topcoat09/27/9309/09/94, 59 FR 46562
Start Printed Page 30644
211.1120Clinker03/15/0111/08/01, 66 FR 56449
211.1128Closed Molding09/14/1003/23/12, 77 FR 16940
211.1130Closed Purge System09/27/9309/09/94, 59 FR 46562
211.1150Closed Vent System09/27/9309/09/94, 59 FR 46562
211.1170Coal Refuse09/27/9309/09/94, 59 FR 46562
211.1190Coating09/27/9309/09/94, 59 FR 46562
211.1210Coating Applicator09/27/9309/09/94, 59 FR 46562
211.1230Coating Line09/27/9309/09/94, 59 FR 46562
211.1250Coating Plant09/27/9309/09/94, 59 FR 46562
211.1270Coil Coating09/27/9309/09/94, 59 FR 46562
211.1290Coil Coating Line09/27/9309/09/94, 59 FR 46562
211.1310Cold Cleaning09/27/9309/09/94, 59 FR 46562
211.1330Complete Combustion09/27/9309/09/94, 59 FR 46562
211.1350Component09/27/9309/09/94, 59 FR 46562
211.1370Concrete Curing Compounds09/27/9309/09/94, 59 FR 46562
211.1390Concentrated Nitric Acid Manufacturing Process09/27/9309/09/94, 59 FR 46562
211.1410Condensate09/27/9309/09/94, 59 FR 46562
211.1430Condensible PM 1009/27/9309/09/94, 59 FR 46562
211.1455Contact Adhesive09/14/1003/23/12, 77 FR 16940
211.1467Continuous Coater02/02/9805/19/98, 63 FR 27489
211.1470Continuous Process09/27/9309/09/94, 59 FR 46562
211.1490Control Device09/27/9309/09/94, 59 FR 46562
211.1510Control Device Efficiency09/27/9309/09/94, 59 FR 46562
211.1520Conventional Air Spray02/02/9805/19/98, 63 FR 27489
211.1530Conventional Soybean Crushing Source09/27/9309/09/94, 59 FR 46562
211.1550Conveyorized Degreasing09/27/9309/09/94, 59 FR 46562
211.1560Cove Base09/14/1003/23/12, 77 FR 16940
211.1565Cove Base Installation Adhesive09/14/1003/23/12, 77 FR 16940
211.1570Crude Oil09/27/9309/09/94, 59 FR 46562
211.1590Crude Oil Gathering09/27/9309/09/94, 59 FR 46562
211.1610Crushing09/27/9309/09/94, 59 FR 46562
211.1630Custody Transfer09/27/9309/09/94, 59 FR 46562
211.1650Cutback Asphalt09/27/9309/09/94, 59 FR 46562
211.1655Cyanoacrylate Adhesive09/14/1003/23/12, 77 FR 16940
211.1670Daily Weighted Average VOM Content09/27/9309/09/94, 59 FR 46562
211.1690Day09/27/9309/09/94, 59 FR 46562
211.1700Deadener09/14/1003/23/12, 77 FR 16940
211.1710Degreaser09/27/9309/09/94, 59 FR 46562
211.1730Delivery Vessel09/27/9309/09/94, 59 FR 46562
211.1740Diesel Engine09/25/0706/26/09, 74 FR 30466
211.1745Digital Printing06/25/1003/23/12, 77 FR 16940
211.1750Dip Coating09/27/9309/09/94, 59 FR 46562
211.1770Distillate Fuel Oil09/27/9309/09/94, 59 FR 46562
211.1780Distillation Unit05/09/9503/23/98, 63 FR 13784
211.1790Drum09/27/9309/09/94, 59 FR 46562
211.1810Dry Cleaning Operation or Dry Cleaning Facility09/27/9309/09/94, 59 FR 46562
211.1830Dump Pit Area09/27/9309/09/94, 59 FR 46562
211.1850Effective Grate Area09/27/9309/09/94, 59 FR 46562
211.1870Effluent Water Separator09/27/9309/09/94, 59 FR 46562
211.1872Ejection Cartridge Sealant09/14/1003/23/12, 77 FR 16940
211.1875Elastomeric Materials05/09/9507/25/96, 61 FR 38577
211.1876Electric Dissipating Coating09/14/1003/23/12, 77 FR 16940
211.1877Electric-Insulating Varnish09/14/1003/23/12, 77 FR 16940
211.1878Electrical Apparatus Component06/25/1003/23/12, 77 FR 16940
211.1880Electrical Switchgear Compartment Coating09/14/1003/23/12, 77 FR 16940
211.1882Electrodeposition Primer (EDP)09/14/1003/23/12, 77 FR 16940
211.1883Electromagnetic Interference/Radio Frequency Interference (EMI/RFI) Shielding Coatings09/14/1003/23/12, 77 FR 16940
211.1885Electronic Component06/25/1003/23/12, 77 FR 16940
211.1890Electrostatic Bell or Disc Spray09/27/9309/09/94, 59 FR 46562
211.1900Electrostatic Prep Coat05/09/9510/26/95, 60 FR 54807
211.1910Electrostatic Spray09/27/9309/09/94, 59 FR 46562
211.1920Emergency or Standby Unit09/25/0706/26/09, 74 FR 30466
211.1930Emission Rate09/27/9309/09/94, 59 FR 46562
211.1950Emission Unit09/27/9309/09/94, 59 FR 46562
211.1970Enamel09/27/9309/09/94, 59 FR 46562
211.1990Enclose09/27/9309/09/94, 59 FR 46562
Start Printed Page 30645
211.2010End Sealing Compound Coat09/27/9309/09/94, 59 FR 46562
211.2030Enhanced Under-the-Cup Fill01/18/9410/21/96, 61 FR 54556
211.2040Etching Filler09/14/1003/23/12, 77 FR 16940
211.2050Ethanol Blend Gasoline09/27/9309/09/94, 59 FR 46562
211.2055Ethylene Propylenediene Monomer (DPDM) Roof Membrane09/14/1003/23/12, 77 FR 16940
211.2070Excess Air09/27/9309/09/94, 59 FR 46562
211.2090Excessive Release09/27/9309/09/94, 59 FR 46562
211.2130Existing Grain Handling Operation09/27/9309/09/94, 59 FR 46562
211.2150Exterior Base Coat09/27/9309/09/94, 59 FR 46562
211.2170Exterior End Coat09/27/9309/09/94, 59 FR 46562
211.2190External Floating Roof09/27/9309/09/94, 59 FR 46562
211.2200Extreme High-Gloss Coating07/27/1103/23/12, 77 FR 16940
211.2210Extreme Performance Coating09/14/1003/23/12, 77 FR 16940
211.2230Fabric Coating09/27/9309/09/94, 59 FR 46562
211.2250Fabric Coating Line09/27/9309/09/94, 59 FR 46562
211.2270Federally Enforceable Limitations and Conditions09/27/9309/09/94, 59 FR 46562
211.2285Feed Mill06/17/9702/17/00, 65 FR 8064
211.2300Fill11/15/9408/08/96, 61 FR 41338
211.2310Final Repair Coat09/14/1003/23/12, 77 FR 16940
211.2320Finish Primer Surfacer09/14/1003/23/12, 77 FR 16940
211.2330Firebox09/27/9309/09/94, 59 FR 46562
211.2350Fixed Roof Tank09/27/9309/09/94, 59 FR 46562
211.2358Flat Wood Paneling07/27/1103/23/12, 77 FR 16940
211.2359Flat Wood Paneling Coating Line06/25/1003/23/12, 77 FR 16940
211.2360Flexible Coating09/14/1003/23/12, 77 FR 16940
211.2365Flexible Operation Unit05/09/9503/23/98, 63 FR 13784
211.2368Flexible Packaging06/25/1003/23/12, 77 FR 16940
211.2369Flexible Vinyl09/14/1003/23/12, 77 FR 16940
211.2370Flexographic Printing09/27/9309/09/94, 59 FR 46562
211.2390Flexographic Printing Line09/27/9309/09/94, 59 FR 46562
211.2410Floating Roof09/27/9309/09/94, 59 FR 46562
211.2415Fog Coat09/14/1003/23/12, 77 FR 16940
211.2430Fountain Solution09/27/9309/09/94, 59 FR 46562
211.2450Freeboard Height09/27/9309/09/94, 59 FR 46562
211.2470Fuel Combustion Emission Unit or Fuel Combustion Emission Source09/27/9309/09/94, 59 FR 46562
211.2490Fugitive Particulate Matter09/27/9309/09/94, 59 FR 46562
211.2510Full Operating Flowrate09/27/9309/09/94, 59 FR 46562
211.2525Gasket/Gasket Sealing Material09/14/1003/23/12, 77 FR 16940
211.2530Gas Service09/27/9309/09/94, 59 FR 46562
211.2550Gas/Gas Method09/27/9309/09/94, 59 FR 46562
211.2570Gasoline09/27/9309/09/94, 59 FR 46562
211.2590Gasoline Dispensing Operation or Gasoline Dispensing Facility09/27/9309/09/94, 59 FR 46562
211.2610Gel Coat01/18/9410/21/96, 61 FR 54556
211.2615General Work Surface06/25/1003/23/12, 77 FR 16940
211.2622Glass Bonding Primer09/14/1003/23/12, 77 FR 16940
211.2630Gloss Reducers05/09/9510/26/95, 60 FR 54807
211.2650Grain09/27/9309/09/94, 59 FR 46562
211.2670Grain Drying Operation09/27/9309/09/94, 59 FR 46562
211.2690Grain Handling and Conditioning Operation09/27/9309/09/94, 59 FR 46562
211.2710Grain Handling Operation09/27/9309/09/94, 59 FR 46562
211.2730Green Tire Spraying09/27/9309/09/94, 59 FR 46562
211.2750Green Tires09/27/9309/09/94, 59 FR 46562
211.2770Gross Heating Value09/27/9309/09/94, 59 FR 46562
211.2790Gross Vehicle Weight Rating09/27/9309/09/94, 59 FR 46562
211.2800Hardwood Plywood07/27/1103/23/12, 77 FR 16940
211.2810Heated Airless Spray09/27/9309/09/94, 59 FR 46562
211.2825Heat-Resistant Coating09/14/1003/23/12, 77 FR 16940
211.2830Heatset06/25/1003/23/12, 77 FR 16940
211.2840Heatset Web Letterpress Printing Line06/25/1003/23/12, 77 FR 16940
211.2850Heatset Web Offset Lithographic Printing Line05/09/9511/08/95, 60 FR 56238
211.2870Heavy Liquid01/28/1310/06/14, 79 FR 60070
211.2890Heavy Metals09/27/9309/09/94, 59 FR 46562
211.2910Heavy Off Highway Vehicle Products09/27/9309/09/94, 59 FR 46562
211.2930Heavy Off Highway Vehicle Products Coating09/27/9309/09/94, 59 FR 46562
211.2950Heavy Off Highway Vehicle Products Coating Line09/27/9309/09/94, 59 FR 46562
Start Printed Page 30646
211.2955High Bake Coating09/14/1003/23/12, 77 FR 16940
211.2956High Build Primer Surfacer09/14/1003/23/12, 77 FR 16940
211.2958High Gloss Coating09/14/1003/23/12, 77 FR 16940
211.2960High-Performance Architectural Coating09/14/1003/23/12, 77 FR 16940
211.2965High Precision Optic06/25/1003/23/12, 77 FR 16940
211.2970High Temperature Aluminum Coating09/27/9309/09/94, 59 FR 46562
211.2980High Temperature Coating09/14/1003/23/12, 77 FR 16940
211.2990High Volume Low Pressure (HVLP) Spray09/27/9309/09/94, 59 FR 46562
211.3010Hood09/27/9309/09/94, 59 FR 46562
211.3030Hot Well09/27/9309/09/94, 59 FR 46562
211.3050Housekeeping Practices09/27/9309/09/94, 59 FR 46562
211.3070Incinerator09/27/9309/09/94, 59 FR 46562
211.3090Indirect Heat Transfer09/27/9309/09/94, 59 FR 46562
211.3095Indoor Floor Covering Installation Adhesive09/14/1003/23/12, 77 FR 16940
211.3110Ink09/27/9309/09/94, 59 FR 46562
211.3120In-Line Repair09/14/1003/23/12, 77 FR 16940
211.3130In-Process Tank09/27/9309/09/94, 59 FR 46562
211.3150In-Situ Sampling Systems09/27/9309/09/94, 59 FR 46562
211.3170Interior Body Spray Coat09/27/9309/09/94, 59 FR 46562
211.3190Internal Floating Roof09/27/9309/09/94, 59 FR 46562
211.3210Internal Transferring Area09/27/9309/09/94, 59 FR 46562
211.3215Janitorial Cleaning06/25/1003/23/12, 77 FR 16940
211.3230Lacquers09/27/9309/09/94, 59 FR 46562
211.3240Laminate09/14/1003/23/12, 77 FR 16940
211.3250Large Appliance09/27/9309/09/94, 59 FR 46562
211.3270Large Appliance Coating09/27/9309/09/94, 59 FR 46562
211.3290Large Appliance Coating Line09/27/9309/09/94, 59 FR 46562
211.3300Lean-Burn Engine09/25/0706/26/09, 74 FR 30466
211.3305Letterpress Printing Line06/25/1003/23/12, 77 FR 16940
211.3310Light Liquid09/27/9309/09/94, 59 FR 46562
211.3330Light Duty Truck09/27/9309/09/94, 59 FR 46562
211.3350Light Oil09/27/9309/09/94, 59 FR 46562
211.3370Liquid/Gas Method09/27/9309/09/94, 59 FR 46562
211.3390Liquid Mounted Seal09/27/9309/09/94, 59 FR 46562
211.3410Liquid Service09/27/9309/09/94, 59 FR 46562
211.3430Liquids Dripping09/27/9309/09/94, 59 FR 46562
211.3450Lithographic Printing Line09/27/9309/09/94, 59 FR 46562
211.3470Load Out Area09/27/9309/09/94, 59 FR 46562
211.3480Loading Event10/25/9404/03/95, 60 FR 16801
211.3483Long Dry Kiln03/15/0111/08/01, 66 FR 56449
211.3485Long Wet Kiln03/15/0111/08/01, 66 FR 56449
211.3487Low-NOX Burner03/15/0111/08/01, 66 FR 56449
211.3490Low Solvent Coating09/27/9309/09/94, 59 FR 46562
211.3505Lubricating Wax/Compound09/14/1003/23/12, 77 FR 16940
211.3510Magnet Wire09/27/9309/09/94, 59 FR 46562
211.3530Magnet Wire Coating09/27/9309/09/94, 59 FR 46562
211.3550Magnet Wire Coating Line09/27/9309/09/94, 59 FR 46562
211.3555Maintenance Cleaning06/25/1003/23/12, 77 FR 16940
211.3570Major Dump Pit09/27/9309/09/94, 59 FR 46562
211.3590Major Metropolitan Area (MMA)09/27/9309/09/94, 59 FR 46562
211.3610Major Population Area (MPA)09/27/9309/09/94, 59 FR 46562
211.3630Manufacturing Process09/27/9309/09/94, 59 FR 46562
211.3650Marine Terminal10/25/9404/03/95, 60 FR 16801
211.3660Marine Vessel10/25/9404/03/95, 60 FR 16801
211.3665Mask Coating09/14/1003/23/12, 77 FR 16940
211.3670Material Recovery Section09/27/9309/09/94, 59 FR 46562
211.3690Maximum Theoretical Emissions09/27/9309/09/94, 59 FR 46562
211.3695Maximum True Vapor Pressure11/15/9408/08/96, 61 FR 41338
211.3705Medical Device06/25/1003/23/12, 77 FR 16940
211.3707Medical Device and Pharmaceutical Manufacturing06/25/1003/23/12, 77 FR 16940
211.3710Metal Furniture09/27/9309/09/94, 59 FR 46562
211.3730Metal Furniture Coating09/27/9309/09/94, 59 FR 46562
211.3750Metal Furniture Coating Line09/27/9309/09/94, 59 FR 46562
211.3760Metallic Coating09/14/1003/23/12, 77 FR 16940
211.3770Metallic Shoe Type Seal09/27/9309/09/94, 59 FR 46562
211.3775Metal to Urethane/Rubber Molding or Casting Adhesive09/14/1003/23/12, 77 FR 16940
211.3780Mid-Kiln Firing03/15/0111/08/01, 66 FR 56449
211.3785Military Specification Coating09/14/1003/23/12, 77 FR 16940
Start Printed Page 30647
211.3790Miscellaneous Fabricated Product Manufacturing Process09/27/9309/09/94, 59 FR 46562
211.3810Miscellaneous Formulation Manufacturing Process09/27/9309/09/94, 59 FR 46562
211.3820Miscellaneous Industrial Adhesive Application Operation09/14/1003/23/12, 77 FR 16940
211.3830Miscellaneous Metal Parts and Products09/27/9309/09/94, 59 FR 46562
211.3850Miscellaneous Metal Parts and Products Coating09/27/9309/09/94, 59 FR 46562
211.3870Miscellaneous Metal Parts or Products Coating Line09/27/9309/09/94, 59 FR 46562
211.3890Miscellaneous Organic Chemical Manufacturing Process09/27/9309/09/94, 59 FR 46562
211.3910Mixing Operation09/27/9309/09/94, 59 FR 46562
211.3915Mobile Equipment05/09/9507/25/96, 61 FR 38577
211.3925Mold Seal Coating09/14/1003/23/12, 77 FR 16940
211.3930Monitor09/27/9309/09/94, 59 FR 46562
211.3950Monomer01/18/9410/21/96, 61 FR 54556
211.3960Motor Vehicles05/09/9507/25/96, 61 FR 38577
211.3961Motor Vehicle Adhesive09/14/1003/23/12, 77 FR 16940
211.3965Motor Vehicle Refinishing05/09/9507/25/96, 61 FR 38577
211.3966Motor Vehicle Weatherstrip Adhesive09/14/1003/23/12, 77 FR 16940
211.3967Mouth Waterproofing Sealant09/14/1003/23/12, 77 FR 16940
211.3968Multi-Colored Coating09/14/1003/23/12, 77 FR 16940
211.3969Multi-Component Coating09/14/1003/23/12, 77 FR 16940
211.3970Multiple Package Coating09/27/9309/09/94, 59 FR 46562
211.3975Multipurpose Construction Adhesive09/14/1003/23/12, 77 FR 16940
211.3985Natural Finish Hardwood Plywood Panel07/27/1103/23/12, 77 FR 16940
211.3990New Grain Drying Operation09/27/9309/09/94, 59 FR 46562
211.4010New Grain Handling Operation09/27/9309/09/94, 59 FR 46562
211.4030No Detectable Volatile Organic Material Emissions09/27/9309/09/94, 59 FR 46562
211.4050Non-Contact Process Water Cooling Tower01/18/9410/21/96, 61 FR 54556
211.4052Non-Convertible Coating09/14/1003/23/12, 77 FR 16940
211.4055Non-Flexible Coating05/09/9510/26/95, 60 FR 54807
211.4065Non-Heatset06/25/1003/23/12, 77 FR 16940
211.4067NOX Trading Program04/17/0111/08/01, 66 FR 56449
211.4070Offset09/27/9309/09/94, 59 FR 46562
211.4080One-Component Coating09/14/1003/23/12, 77 FR 16940
211.4090One Hundred Percent Acid09/27/9309/09/94, 59 FR 46562
211.4110One Turn Storage Space09/27/9309/09/94, 59 FR 46562
211.4130Opacity09/27/9309/09/94, 59 FR 46562
211.4150Opaque Stains09/27/9309/09/94, 59 FR 46562
211.4170Open Top Vapor Degreasing09/27/9309/09/94, 59 FR 46562
211.4190Open Ended Valve09/27/9309/09/94, 59 FR 46562
211.4210Operator of a Gasoline Dispensing Operation or Operator of a Gasoline Dispensing Facility09/27/9309/09/94, 59 FR 46562
211.4220Optical Coating09/14/1003/23/12, 77 FR 16940
211.4230Organic Compound09/27/9309/09/94, 59 FR 46562
211.4250Organic Material and Organic Materials10/19/9503/21/96, 61 FR 11550
211.4260Organic Solvent10/19/9503/21/96, 61 FR 11550
211.4270Organic Vapor09/27/9309/09/94, 59 FR 46562
211.4285Outdoor Floor Covering Installation Adhesive09/14/1003/23/12, 77 FR 16940
211.4290Oven09/27/9309/09/94, 59 FR 46562
211.4310Overall Control09/27/9309/09/94, 59 FR 46562
211.4330Overvarnish09/27/9309/09/94, 59 FR 46562
211.4350Owner of a Gasoline Dispensing Operation or Owner of a Gasoline Dispensing Facility09/27/9309/09/94, 59 FR 46562
211.4370Owner or Operator09/27/9309/09/94, 59 FR 46562
211.4390Packaging Rotogravure Printing09/27/9309/09/94, 59 FR 46562
211.4410Packaging Rotogravure Printing Line09/27/9309/09/94, 59 FR 46562
211.4430Pail09/27/9309/09/94, 59 FR 46562
211.4450Paint Manufacturing Source or Paint Manufacturing Plant09/27/9309/09/94, 59 FR 46562
211.4455Pan-Backing Coating09/14/1003/23/12, 77 FR 16940
211.4460Panel07/27/1103/23/12, 77 FR 16940
211.4470Paper Coating09/27/9309/09/94, 59 FR 46562
211.4490Paper Coating Line09/27/9309/09/94, 59 FR 46562
211.4510Particulate Matter09/27/9309/09/94, 59 FR 46562
Start Printed Page 30648
211.4530Parts per Million (Volume) or Ppm (VOL)09/27/9309/09/94, 59 FR 46562
211.4540Perimeter Bonded Sheet Flooring09/14/1003/23/12, 77 FR 16940
211.4550Person09/27/9309/09/94, 59 FR 46562
211.4590Petroleum09/27/9309/09/94, 59 FR 46562
211.4610Petroleum Liquid10/19/9503/21/96, 61 FR 11550
211.4630Petroleum Refinery09/27/9309/09/94, 59 FR 46562
211.4650Pharmaceutical09/27/9309/09/94, 59 FR 46562
211.4670Pharmaceutical Coating Operation09/27/9309/09/94, 59 FR 46562
211.4690Photochemically Reactive Material09/27/9309/09/94, 59 FR 46562
211.4710Pigmented Coatings09/27/9309/09/94, 59 FR 46562
211.4730Plant09/27/9309/09/94, 59 FR 46562
211.4735Plastic09/14/1003/23/12, 77 FR 16940
211.4740Plastic Part05/09/9510/26/95, 60 FR 54807
211.4750Plasticizers09/27/9309/09/94, 59 FR 46562
211.4760Plastic Solvent Welding Adhesive09/14/1003/23/12, 77 FR 16940
211.4765Plastic Solvent Welding Adhesive Primer09/14/1003/23/12, 77 FR 16940
211.4768Pleasure Craft09/14/1003/23/12, 77 FR 16940
211.4769Pleasure Craft Surface Coating09/14/1003/23/12, 77 FR 16940
211.4770PM 1009/27/9309/09/94, 59 FR 46562
211.4790Pneumatic Rubber Tire Manufacture09/27/9309/09/94, 59 FR 46562
211.4810Polybasic Organic Acid Partial Oxidation Manufacturing Process09/27/9309/09/94, 59 FR 46562
211.4830Polyester Resin Material(s)01/18/9410/21/96, 61 FR 54556
211.4850Polyester Resin Products Manufacturing Process01/18/9410/21/96, 61 FR 54556
211.4870Polystyrene Plant09/27/9309/09/94, 59 FR 46562
211.4890Polystyrene Resin09/27/9309/09/94, 59 FR 46562
211.4895Polyvinyl Chloride Plastic (PVC Plastic)09/14/1003/23/12, 77 FR 16940
211.4900Porous Material09/14/1003/23/12, 77 FR 16940
211.4910Portable Grain Handling Equipment09/27/9309/09/94, 59 FR 46562
211.4930Portland Cement Manufacturing Process Emission Source09/27/9309/09/94, 59 FR 46562
211.4950Portland Cement Process or Portland Cement Manufacturing Plant09/27/9309/09/94, 59 FR 46562
211.4970Potential To Emit01/18/9410/21/96, 61 FR 54556
211.4990Power Driven Fastener Coating09/27/9309/09/94, 59 FR 46562
211.5010Precoat05/09/9507/25/96, 61 FR 38577
211.5012Prefabricated Architectural Coating09/14/1003/23/12, 77 FR 16940
211.5015Preheater Kiln03/15/0111/08/01, 66 FR 56449
211.5020Preheater/Precalciner Kiln03/15/0111/08/01, 66 FR 56449
211.5030Pressure Release09/27/9309/09/94, 59 FR 46562
211.5050Pressure Tank09/27/9309/09/94, 59 FR 46562
211.5060Pressure/Vacuum Relief Valve09/21/9401/27/95, 60 FR 5318
211.5061Pretreatment Coating09/14/1003/23/12, 77 FR 16940
211.5062Pretreatment Wash Primer09/14/1003/23/12, 77 FR 16940
211.5065Primary Product05/09/9503/23/98, 63 FR 13784
211.5070Prime Coat09/27/9309/09/94, 59 FR 46562
211.5075Primer Sealant09/14/1003/23/12, 77 FR 16940
211.5080Primer Sealer05/09/9507/25/96, 61 FR 38577
211.5090Primer Surfacer Coat09/14/1003/23/12, 77 FR 16940
211.5110Primer Surfacer Operation09/27/9309/09/94, 59 FR 46562
211.5130Primers09/27/9309/09/94, 59 FR 46562
211.5140Printed Interior Panel07/27/1103/23/12, 77 FR 16940
211.5150Printing09/27/9309/09/94, 59 FR 46562
211.5170Printing Line09/27/9309/09/94, 59 FR 46562
211.5185Process Emission Source09/27/9309/09/94, 59 FR 46562
211.5190Process Emission Unit09/27/9309/09/94, 59 FR 46562
211.5210Process Unit09/27/9309/09/94, 59 FR 46562
211.5230Process Unit Shutdown09/27/9309/09/94, 59 FR 46562
211.5245Process Vent05/22/9504/02/96, 61 FR 14484
211.5250Process Weight Rate09/27/9309/09/94, 59 FR 46562
211.5270Production Equipment Exhaust System09/27/9309/09/94, 59 FR 46562
211.5310Publication Rotogravure Printing Line09/27/9309/09/94, 59 FR 46562
211.5330Purged Process Fluid09/27/9309/09/94, 59 FR 46562
211.5335Radiation Effect Coating06/25/1003/23/12, 77 FR 16940
211.5350Reactor09/27/9309/09/94, 59 FR 46562
211.5370Reasonably Available Control Technology (RACT)09/27/9309/09/94, 59 FR 46562
211.5390Reclamation System01/18/9410/21/96, 61 FR 54556
211.5400Red Coating09/14/1003/23/12, 77 FR 16940
Start Printed Page 30649
211.5410Refiner09/27/9309/09/94, 59 FR 46562
211.5430Refinery Fuel Gas09/27/9309/09/94, 59 FR 46562
211.5450Refinery Fuel Gas System09/27/9309/09/94, 59 FR 46562
211.5470Refinery Unit or Refinery Process Unit09/27/9309/09/94, 59 FR 46562
211.5480Reflective Argent Coating05/09/9510/26/95, 60 FR 54807
211.5490Refrigerated Condenser09/27/9309/09/94, 59 FR 46562
211.5500Regulated Air Pollutant12/07/9304/05/95, 60 FR 17229
211.5510Reid Vapor Pressure01/28/1310/06/14, 79 FR 60070
211.5520Reinforced Plastic Composite09/14/1003/23/12, 77 FR 16940
211.5530Repair01/18/9410/21/96, 61 FR 54556
211.5535Repair Cleaning06/25/1003/23/12, 77 FR 16940
211.5550Repair Coat09/14/1003/23/12, 77 FR 16940
211.5570Repaired09/27/9309/09/94, 59 FR 46562
211.5585Research and Development Operation06/25/1003/23/12, 77 FR 16940
211.5590Residual Fuel Oil09/27/9309/09/94, 59 FR 46562
211.5600Resist Coat05/09/9510/26/95, 60 FR 54807
211.5610Restricted Area09/27/9309/09/94, 59 FR 46562
211.5630Retail Outlet09/27/9309/09/94, 59 FR 46562
211.5640Rich-Burn Engine09/25/0706/26/09, 74 FR 30466
211.5650Ringelmann Chart09/27/9309/09/94, 59 FR 46562
211.5670Roadway09/27/9309/09/94, 59 FR 46562
211.5690Roll Coater09/27/9309/09/94, 59 FR 46562
211.5710Roll Coating09/27/9309/09/94, 59 FR 46562
211.5730Roll Printer09/27/9309/09/94, 59 FR 46562
211.5750Roll Printing09/27/9309/09/94, 59 FR 46562
211.5770Rotogravure Printing09/27/9309/09/94, 59 FR 46562
211.5790Rotogravure Printing Line09/27/9309/09/94, 59 FR 46562
211.5800Rubber09/14/1003/23/12, 77 FR 16940
211.5810Safety Relief Valve09/27/9309/09/94, 59 FR 46562
211.5830Sandblasting09/27/9309/09/94, 59 FR 46562
211.5850Sanding Sealers09/27/9309/09/94, 59 FR 46562
211.5860Scientific Instrument06/25/1003/23/12, 77 FR 16940
211.5870Screening09/27/9309/09/94, 59 FR 46562
211.5875Screen Printing06/25/1003/23/12, 77 FR 16940
211.5885Screen Reclamation06/25/1003/23/12, 77 FR 16940
211.5890Sealer09/14/1003/23/12, 77 FR 16940
211.5910Semi Transparent Stains09/27/9309/09/94, 59 FR 46562
211.5930Sensor09/27/9309/09/94, 59 FR 46562
211.5950Set of Safety Relief Valves09/27/9309/09/94, 59 FR 46562
211.5970Sheet Basecoat09/27/9309/09/94, 59 FR 46562
211.5980Sheet-Fed05/09/9511/08/95, 60 FR 56238
211.5985Sheet Rubber Lining Installation09/14/1003/23/12, 77 FR 16940
211.5987Shock-Free Coating09/14/1003/23/12, 77 FR 16940
211.5990Shotblasting09/27/9309/09/94, 59 FR 46562
211.6010Side Seam Spray Coat09/27/9309/09/94, 59 FR 46562
211.6012Silicone-Release Coating09/14/1003/23/12, 77 FR 16940
211.6015Single-Ply Roof Membrane09/14/1003/23/12, 77 FR 16940
211.6017Single-Ply Roof Membrane Adhesive Primer09/14/1003/23/12, 77 FR 16940
211.6020Single-Ply Roof Membrane Installation and Repair Adhesive09/14/1003/23/12, 77 FR 16940
211.6025Single Unit Operation05/22/9504/02/96, 61 FR 14484
211.6030Smoke09/27/9309/09/94, 59 FR 46562
211.6050Smokeless Flare09/27/9309/09/94, 59 FR 46562
211.6060Soft Coat05/09/9510/26/95, 60 FR 54807
211.6063Solar-Absorbent Coating09/14/1003/23/12, 77 FR 16940
211.6065Solids Turnover Ratio (RT)09/14/1003/23/12, 77 FR 16940
211.6070Solvent09/27/9309/09/94, 59 FR 46562
211.6090Solvent Cleaning09/27/9309/09/94, 59 FR 46562
211.6110Solvent Recovery System01/18/9410/21/96, 61 FR 54556
211.6130Source04/17/0111/08/01, 66 FR 56449
211.6140Specialty Coatings05/09/9510/26/95, 60 FR 54807
211.6145Specialty Coatings for Motor Vehicles05/09/9507/25/96, 61 FR 38577
211.6150Specialty High Gloss Catalyzed Coating09/27/9309/09/94, 59 FR 46562
211.6170Specialty Leather01/18/9410/21/96, 61 FR 54556
211.6190Specialty Soybean Crushing Source09/27/9309/09/94, 59 FR 46562
211.6210Splash Loading09/27/9309/09/94, 59 FR 46562
211.6230Stack09/27/9309/09/94, 59 FR 46562
211.6250Stain Coating01/18/9410/21/96, 61 FR 54556
211.6270Standard Conditions09/27/9309/09/94, 59 FR 46562
211.6290Standard Cubic Foot (Scf)09/27/9309/09/94, 59 FR 46562
Start Printed Page 30650
211.6310Start Up09/27/9309/09/94, 59 FR 46562
211.6330Stationary Emission Source09/27/9309/09/94, 59 FR 46562
211.6350Stationary Emission Unit09/27/9309/09/94, 59 FR 46562
211.6370Stationary Source09/27/9309/09/94, 59 FR 46562
211.6390Stationary Storage Tank09/27/9309/09/94, 59 FR 46562
211.6400Stencil Coat09/14/1003/23/12, 77 FR 16940
211.6405Sterilization Indicating Ink06/25/1003/23/12, 77 FR 16940
211.6410Storage Tank or Storage Vessel09/27/9309/09/94, 59 FR 46562
211.6420Strippable Spray Booth Coating02/02/9805/19/98, 63 FR 27489
211.6425Stripping06/25/1003/23/12, 77 FR 16940
211.6427Structural Glazing09/14/1003/23/12, 77 FR 16940
211.6430Styrene Devolatilizer Unit09/27/9309/09/94, 59 FR 46562
211.6450Styrene Recovery Unit09/27/9309/09/94, 59 FR 46562
211.6460Subfloor09/14/1003/23/12, 77 FR 16940
211.6470Submerged Loading Pipe09/27/9309/09/94, 59 FR 46562
211.6490Substrate09/27/9309/09/94, 59 FR 46562
211.6510Sulfuric Acid Mist09/27/9309/09/94, 59 FR 46562
211.6530Surface Condenser09/27/9309/09/94, 59 FR 46562
211.6535Surface Preparation06/25/1003/23/12, 77 FR 16940
211.6540Surface Preparation Materials05/09/9507/25/96, 61 FR 38577
211.6550Synthetic Organic Chemical or Polymer Manufacturing Plant09/27/9309/09/94, 59 FR 46562
211.6570Tablet Coating Operation09/27/9309/09/94, 59 FR 46562
211.6580Texture Coat05/09/9510/26/95, 60 FR 54807
211.6585Thin Metal Laminating Adhesive09/14/1003/23/12, 77 FR 16940
211.6587Thin Particleboard07/27/1103/23/12, 77 FR 16940
211.6590Thirty Day Rolling Average09/27/9309/09/94, 59 FR 46562
211.6610Three Piece Can09/27/9309/09/94, 59 FR 46562
211.6620Three or Four Stage Coating System05/09/9507/25/96, 61 FR 38577
211.6630Through-the-Valve Fill01/18/9410/21/96, 61 FR 54556
211.6635Tileboard07/27/1103/23/12, 77 FR 16940
211.6640Tire Repair09/14/1003/23/12, 77 FR 16940
211.6650Tooling Resin01/18/9410/21/96, 61 FR 54556
211.6670Topcoat09/14/1003/23/12, 77 FR 16940
211.6690Topcoat Operation09/14/1003/23/12, 77 FR 16940
211.6695Topcoat System05/09/9507/25/96, 61 FR 38577
211.6710Touch-Up01/18/9410/21/96, 61 FR 54556
211.6720Touch-Up Coating09/14/1003/23/12, 77 FR 16940
211.6730Transfer Efficiency09/27/9309/09/94, 59 FR 46562
211.6740Translucent Coating09/14/1003/23/12, 77 FR 16940
211.6750Tread End Cementing09/27/9309/09/94, 59 FR 46562
211.6770True Vapor Pressure09/27/9309/09/94, 59 FR 46562
211.6780Trunk Interior Coating09/14/1003/23/12, 77 FR 16940
211.6790Turnaround09/27/9309/09/94, 59 FR 46562
211.6810Two Piece Can09/27/9309/09/94, 59 FR 46562
211.6825Underbody Coating09/14/1003/23/12, 77 FR 16940
211.6830Under-the-Cup Fill01/18/9410/21/96, 61 FR 54556
211.6850Undertread Cementing09/27/9309/09/94, 59 FR 46562
211.6860Uniform Finish Blender05/09/9507/25/96, 61 FR 38577
211.6870Unregulated Safety Relief Valve09/27/9309/09/94, 59 FR 46562
211.6880Vacuum Metallizing05/09/9510/26/95, 60 FR 54807
211.6885Vacuum Metalizing Coating09/14/1003/23/12, 77 FR 16940
211.6890Vacuum Producing System09/27/9309/09/94, 59 FR 46562
211.6910Vacuum Service09/27/9309/09/94, 59 FR 46562
211.6930Valves Not Externally Regulated09/27/9309/09/94, 59 FR 46562
211.6950Vapor Balance System09/27/9309/09/94, 59 FR 46562
211.6970Vapor Collection System10/25/9404/03/95, 60 FR 16801
211.6990Vapor Control System10/25/9404/03/95, 60 FR 16801
211.7010Vapor Mounted Primary Seal09/27/9309/09/94, 59 FR 46562
211.7030Vapor Recovery System09/27/9309/09/94, 59 FR 46562
211.7050Vapor-Suppressed Polyester Resin01/18/9410/21/96, 61 FR 54556
211.7070Vinyl Coating09/27/9309/09/94, 59 FR 46562
211.7090Vinyl Coating Line09/27/9309/09/94, 59 FR 46562
211.7110Volatile Organic Liquid (VOL)09/27/9309/09/94, 59 FR 46562
211.7130Volatile Organic Material Content (VOMC)09/27/9309/09/94, 59 FR 46562
211.7150Volatile Organic Material (VOM) or Volatile Organic Compound (VOC)03/24/1512/28/16, 81 FR 95475
211.7170Volatile Petroleum Liquid09/27/9309/09/94, 59 FR 46562
211.7190Wash Coat09/27/9309/09/94, 59 FR 46562
211.7200Washoff Operations02/02/9805/19/98, 63 FR 27489
Start Printed Page 30651
211.7210Wastewater (Oil/Water) Separator09/27/9309/09/94, 59 FR 46562
211.7220Waterproof Resorcinol Glue09/14/1003/23/12, 77 FR 16940
211.7230Weak Nitric Acid Manufacturing Process09/27/9309/09/94, 59 FR 46562
211.7240Weatherstrip Adhesive09/14/1003/23/12, 77 FR 16940
211.7250Web09/27/9309/09/94, 59 FR 46562
211.7270Wholesale Purchase Consumer09/27/9309/09/94, 59 FR 46562
211.7290Wood Furniture06/25/1003/23/12, 77 FR 16940
211.7310Wood Furniture Coating09/27/9309/09/94, 59 FR 46562
211.7330Wood Furniture Coating Line09/27/9309/09/94, 59 FR 46562
211.7350Woodworking09/27/9309/09/94, 59 FR 46562
Part 212: Visible and Particulate Matter Emissions
Subpart A: General
212.107Measurement Method for Visible Emissions05/22/9603/11/98, 63 FR 11842
212.108Measurement Methods for PM-10 Emissions and Condensible PM-10 Emissions05/22/9603/11/98, 63 FR 11842
212.109Measurement Methods for Opacity05/22/9603/11/98, 63 FR 11842
212.110Measurement Methods for Particulate Matter05/22/9603/11/98, 63 FR 11842
212.111Abbreviations and Units10/04/9110/21/93, 58 FR 54291
212.113Incorporations by Reference05/22/9607/14/99, 64 FR 37847
Subpart B: Visible Emissions
212.121Opacity Standards07/13/8812/29/92, 57 FR 61834
212.122Visible Emissions Limitations for Certain Emission Units for Which Construction or Modification Commenced on or After April 14, 197207/13/8812/29/92, 57 FR 61834
212.123Visible Emissions Limitations for All Other Emission Units07/13/8812/29/92, 57 FR 61834
212.124Exceptions07/13/8812/29/92, 57 FR 61834
212.125Determination of Violations07/13/8812/29/92, 57 FR 61834
212.126Adjusted Opacity Standards Procedures07/13/8812/29/92, 57 FR 61834
Subpart D: Particulate Matter Emissions From Incinerators
212.181Limitations for Incinerators06/04/8011/27/81, 46 FR 57893
212.182Aqueous Waste Incinerators06/04/8011/27/81, 46 FR 57893
212.183Certain Wood Waste Incinerators06/04/8011/27/81, 46 FR 57893
212.184Explosive Waste Incinerators06/04/8011/27/81, 46 FR 57893
212.185Continuous Automatic Stoking Animal Pathological Waste Incinerators12/30/8609/15/93, 58 FR 48312
Subpart E: Particulate Matter Emissions From Fuel Combustion Emission Units
212.201Emission Units for Which Construction or Modification Commenced Prior to April 14, 1972, Using Solid Fuel Exclusively Located in the Chicago Area07/09/8612/29/92, 57 FR 61834
212.202Emission Units for Which Construction or Modification Commenced Prior to April 14, 1972, Using Solid Fuel Exclusively Located Outside the Chicago Area07/09/8612/29/92, 57 FR 61834
212.203Controlled Emission Units for Which Construction or Modification Commenced Prior to April 14, 1972, Using Solid Fuel Exclusively07/09/8612/29/92, 57 FR 61834
212.204Emission Units for Which Construction or Modification Commenced on or After April 14, 1972, Using Solid Fuel Exclusively07/09/8612/29/92, 57 FR 61834
212.205Coal-Fired Industrial Boilers for Which Construction or Modification Commenced Prior to April 14, 1972, Equipped With Flue Gas Desulfurization Systems10/19/8102/22/84, 49 FR 6490
212.206Emission Units Using Liquid Fuel Exclusively04/14/7205/31/72, 37 FR 10842
212.207Emission Units Using More Than One Type of Fuel04/14/7205/31/72, 37 FR 10842
Start Printed Page 30652
212.208Aggregation of Emission Units for Which Construction or Modification Commenced Prior to April 14, 197204/14/7205/31/72, 37 FR 10842
212.210Emissions Limitations for Certain Fuel Combustion Emission Units Located in the Vicinity of Granite City05/22/9607/14/99, 64 FR 37847
Subpart K: Fugitive Particulate Matter
212.301Fugitive Particulate Matter10/26/7902/21/80, 45 FR 11472
212.302Geographical Areas of Application05/22/9607/14/99, 64 FR 37847
212.304Storage Piles10/26/7904/26/82, 47 FR 17814
212.305Conveyor Loading Operations10/26/7904/26/82, 47 FR 17814
212.306Traffic Areas10/26/7902/21/80, 45 FR 11472
212.307Materials Collected by Pollution Control Equipment10/26/7902/21/80, 45 FR 11472
212.308Spraying or Choke-Feeding Required10/26/7902/21/80, 45 FR 11472
212.309Operating Program05/22/9607/14/99, 64 FR 37847
212.310Minimum Operating Program10/26/7902/21/80, 45 FR 11472
212.312Amendment to Operating Program10/26/7902/21/80, 45 FR 11472
212.313Emission Standard for Particulate Collection Equipment10/26/7902/21/80, 45 FR 11472
212.314Exception for Excess Wind Speed10/26/7902/21/80, 45 FR 11472
212.315Covering for Vehicles10/26/7902/21/80, 45 FR 11472
212.316Emissions Limitations for Emission Units in Certain Areas05/22/9607/14/99, 64 FR 37847
Subpart L: Particulate Matter Emissions From Process Emission Units
212.321Process Emission Units for Which Construction or Modification Commenced on or After April 14, 197209/28/7902/21/80, 45 FR 11472
212.322Process Emission Units for Which Construction or Modification Commenced Prior to April 14, 197209/28/7902/21/80, 45 FR 11472
212.323Stock Piles09/28/7902/21/80, 45 FR 11472
212.324Process Emission Units in Certain Areas05/22/9603/11/98, 63 FR 11842
Subpart N: Food Manufacturing
212.361Corn Wet Milling Processes09/28/7902/21/80, 45 FR 11472
212.362Emission Units in Certain Areas05/22/9603/11/98, 63 FR 11842
Subpart O: Petroleum Refining, Petrochemical and Chemical Manufacturing
212.381Catalyst Regenerators of Fluidized Catalytic Converters09/28/7902/21/80, 45 FR 11472
Subpart Q: Stone, Clay, Glass and Concrete Manufacturing
212.421Portland Cement Processes for Which Construction or Modification Commenced on or After April 14, 197204/14/7205/31/72, 37 FR 10842
212.422Portland Cement Manufacturing Processes09/28/7902/21/80, 45 FR 11472
212.423Emission Limits for the Portland Cement Manufacturing Plant Located in LaSalle County, South of the Illinois River10/04/9110/21/93, 58 FR 54291
212.424Fugitive Particulate Matter Control for the Portland Cement Manufacturing Plant and Associated Quarry Operations Located in LaSalle County, South of the Illinois River05/15/9201/12/93, 58 FR 3844
212.425Emission Units in Certain Areas05/22/9603/11/98, 63 FR 11842
Subpart R: Primary and Fabricated Metal Products and Machinery Manufacture
212.441Steel Manufacturing Processes09/28/7902/21/80, 45 FR 11472
212.442Beehive Coke Ovens09/28/7902/21/80, 45 FR 11472
212.443Coke Plants05/15/9201/12/93, 58 FR 3844
212.444Sinter Processes09/28/7909/03/81, 46 FR 44172
212.445Blast Furnace Cast Houses05/15/9201/12/93, 58 FR 3844
212.446Basic Oxygen Furnaces05/22/9603/11/98, 63 FR 11842
Start Printed Page 30653
212.447Hot Metal Desulfurization Not Located in the BOF09/28/7909/03/81, 46 FR 44172
212.448Electric Arc Furnaces09/28/7909/03/81, 46 FR 44172
212.449Argon-Oxygen Decarburization Vessels09/28/7909/03/81, 46 FR 44172
212.450Liquid Steel Charging09/28/7909/03/81, 46 FR 44172
212.451Hot Scarfing Machines09/28/7909/03/81, 46 FR 44172
212.455Highlines on Steel Mills10/26/7902/21/80, 45 FR 11472
212.456Certain Small Foundries09/28/7902/21/80, 45 FR 11472
212.457Certain Small Iron-Melting Air Furnaces09/28/7907/12/82, 47 FR 30057
212.458Emission Units in Certain Areas05/22/9603/11/98, 63 FR 11842
Subpart S: Agriculture
212.461Grain-Handling and Drying in General09/28/7902/21/80, 45 FR 11472
212.462Grain-Handling Operations09/28/7902/21/80, 45 FR 11472
212.463Grain Drying Operations09/28/7902/21/80, 45 FR 11472
212.464Sources in Certain Areas05/22/9603/11/98, 63 FR 11842
Subpart T: Construction and Wood Products
212.681Grinding, Woodworking, Sandblasting and Shotblasting04/14/7205/31/72, 37 FR 10842
Subpart U: Additional Control Measures
212.700Applicability07/11/9407/13/95, 60 FR 36060
212.701Contingency Measure Plans, Submittal and Compliance Date07/11/9407/13/95, 60 FR 36060
212.702Determination of Contributing Sources07/11/9407/13/95, 60 FR 36060
212.703Contingency Measure Plan Elements07/11/9407/13/95, 60 FR 36060
212.704Implementation07/11/9407/13/95, 60 FR 36060
212.705Alternative Implementation07/11/9407/13/95, 60 FR 36060
212.Appendix C:Past Compliance Dates04/14/7205/31/72, 37 FR 10842Approved as Rules 202(e), 203(c), 203(d)(3)(A) & (B), 203(d)(5)(L) & (M), 203(d)(8)(J), 203(f)(3) Preamble, 203(f)(3)(F) Preamble, and 203(i).
Part 214: Sulfur Limitations
Subpart A: General Provisions
214.101Measurement Methods01/15/9106/26/92, 57 FR 28617
214.102Abbreviations and Units12/05/8801/28/94, 59 FR 4001
214.104Incorporations by Reference01/15/9101/28/94, 59 FR 4001
Subpart B: New Fuel Combustion Emission Sources
214.121Large Sources04/14/7205/31/72, 37 FR 10842Approved as Rule 204(a).
214.122Small Sources04/14/7205/31/72, 37 FR 10842Approved as Rule 204(b).
Subpart C: Existing Solid Fuel Combustion Emission Sources
214.141Sources Located in Metropolitan Areas03/28/8309/03/92, 57 FR 40333thru (a).
214.141Sources Located in Metropolitan Areas05/20/8609/02/92, 57 FR 40126(b), (c), and (d).
214.142Small Sources Located Outside Metropolitan Areas04/14/7205/31/72, 37 FR 10842Approved as Rule 204(c)(1)(B).
214.143Large Sources Located Outside Metropolitan Areas02/03/7902/21/80, 45 FR 11472
Subpart D: Existing Liquid or Mixed Fuel Combustion Emission Sources
214.161Liquid Fuel Burned Exclusively04/14/7205/31/72, 37 FR 10842Approved as Rule 204(c)(2).
214.162Combination of Fuels04/14/7205/31/72, 37 FR 10842Approved as Rule 204(d).
Subpart E: Aggregation of Sources Outside Metropolitan Areas
214.181Dispersion Enhancement Techniques02/03/7902/21/80, 45 FR 11472
214.182Prohibition02/03/7902/21/80, 45 FR 11472Approved as Rule 204(e) (intro).
214.183General Formula02/03/7902/21/80, 45 FR 11472Approved as Rule 204(e)(1).
Start Printed Page 30654
214.184Special Formula02/03/7902/21/80, 45 FR 11472Approved as Rule 204(e)(2).
214.185Alternative Emission Rate02/03/7902/21/80, 45 FR 11472Approved as Rule 204(e)(3).
214.186New Operating Permits02/03/7902/21/80, 45 FR 11472Approved as Rule 204(e)(4).
Subpart F: Alternative Standards for Sources Inside Metropolitan Areas
214.201Alternative Standards for Sources in Metropolitan Areas03/28/8309/03/92, 57 FR 40333
214.202Dispersion Enhancement Techniques03/28/8309/03/92, 57 FR 40333
Subpart K: Process Emission Sources
214.301General Limitation02/03/7902/21/80, 45 FR 11472Approved as Rule 204(f)(1)(A).
214.302Exception for Air Pollution Control Equipment04/14/7205/31/72, 37 FR 10842Approved as Rule 204(f)(1)(C).
214.303Use of Sulfuric Acid02/03/7902/21/80, 45 FR 11472Approved as Rule 204(f)(2)(B).
Subpart O: Petroleum Refining, Petrochemical and Chemical Manufacturing
214.381Sulfuric Acid Manufacturing02/03/7902/21/80, 45 FR 11472Only (a) and (b). Approved as Rule 204(f)(1)(B) and (f)(2)(A).
214.382Petroleum and Petrochemical Processes12/05/8801/28/94, 59 FR 4001
214.383Chemical Manufacturing02/03/7902/21/80, 45 FR 11472Approved as Rule 204(f)(1)(E).
Subpart X: Utilities
214.560Scope05/20/8609/02/92, 57 FR 40126
214.561E. D. Edwards Electric Generating Station07/11/0311/10/08, 73 FR 66555
214.Appendix C:Compliance Dates04/14/7205/31/72, 37 FR 10842Approved as Rule 204(e)(1).
Part 215: Organic Material Emission Standards and Limitations
Subpart A: General Provisions
215.101Clean-Up and Disposal Operations07/28/7902/21/80, 45 FR 11472
215.102Testing Methods05/14/9108/18/92, 57 FR 37100
215.104Definitions01/28/1310/06/14, 79 FR 60070
215.105Incorporation by Reference01/28/1310/06/14, 79 FR 60070
215.108Measurement of Vapor Pressures05/14/9108/18/92, 57 FR 37100
215.109Monitoring for Negligibly-Reactive Compounds06/19/9801/15/99, 64 FR 2581
Subpart B: Organic Emissions From Storage and Loading Operations
215.121Storage Containers07/28/7902/21/80, 45 FR 11472
215.122Loading Operations07/28/7902/21/80, 45 FR 11472
215.123Petroleum Liquid Storage Tanks07/28/7902/21/80, 45 FR 11472
215.124External Floating Roofs01/21/8306/29/90, 55 FR 26814
215.125Compliance Dates and Geographical Areas01/21/8306/29/90, 55 FR 26814
215.126Compliance Plan01/21/8306/29/90, 55 FR 26814
Subpart C: Organic Emissions From Miscellaneous Equipment
215.141Separation Operations07/28/7902/21/80, 45 FR 11472
215.142Pumps and Compressors07/28/7902/21/80, 45 FR 11472
215.143Vapor Blowdown07/28/7902/21/80, 45 FR 11472
215.144Safety Relief Valves07/28/7902/21/80, 45 FR 11472
Subpart E: Solvent Cleaning
215.181Solvent Cleaning in General07/28/7902/21/80, 45 FR 11472
215.182Cold Cleaning07/28/7902/21/80, 45 FR 11472
215.183Open Top Vapor Degreasing07/28/7902/21/80, 45 FR 11472
215.184Conveyorized Degreasing07/28/7902/21/80, 45 FR 11472
Subpart F: Coating Operations
215.202Compliance Schedules07/28/7902/21/80, 45 FR 11472
215.204Emission Limitations for Manufacturing Plants06/19/9801/15/99, 64 FR 2581
215.205Alternative Emission Limitations06/19/9801/15/99, 64 FR 2581
215.206Exemptions From Emission Limitations06/19/9801/15/99, 64 FR 2581
215.207Compliance by Aggregation of Emission Units06/19/9801/15/99, 64 FR 2581
Start Printed Page 30655
215.208Testing Methods for Volatile Organic Material Content07/28/7902/21/80, 45 FR 11472
215.209Exemption From General Rule on Use of Organic Material07/28/7902/21/80, 45 FR 11472
215.211Compliance Dates and Geographical Areas06/19/9801/15/99, 64 FR 2581
215.212Compliance Plan06/19/9801/15/99, 64 FR 2581
215.213Special Requirements for Compliance Plan07/28/7902/21/80, 45 FR 11472
215.215DMI Emissions Limitations07/28/7902/21/80, 45 FR 11472
Subpart H: Special Limitations for Sources in Major Urbanized Areas Which Are Nonattainment for Ozone
215.240Applicability06/29/8706/29/90, 55 FR 26814
215.241External Floating Roofs06/29/8706/29/90, 55 FR 26814
215.249Compliance Dates06/29/8706/29/90, 55 FR 26814
Subpart K: Use of Organic Material
215.301Use of Organic Material07/28/7902/21/80, 45 FR 11472
215.302Alternative Standard07/28/7902/21/80, 45 FR 11472
215.303Fuel Combustion Emission Sources07/28/7902/21/80, 45 FR 11472
215.304Operations With Compliance Program07/28/7902/21/80, 45 FR 11472
Subpart P: Printing and Publishing
215.408Heatset Web Offset Lithographic Printing09/30/8706/29/90, 55 FR 26814
Subpart Q: Leaks From Synthetic Organic Chemical and Polymer Manufacturing Equipment
215.420Applicability12/14/8706/29/90, 55 FR 26814
215.421General Requirements12/14/8706/29/90, 55 FR 26814
215.422Inspection Program Plan for Leaks08/28/8506/29/90, 55 FR 26814
215.423Inspection Program for Leaks08/28/8506/29/90, 55 FR 26814
215.424Repairing Leaks08/28/8506/29/90, 55 FR 26814
215.425Recordkeeping for Leaks08/28/8506/29/90, 55 FR 26814
215.426Reporting for Leaks08/28/8506/29/90, 55 FR 26814
215.427Alternative Program for Leaks08/28/8506/29/90, 55 FR 26814
215.428Compliance Dates12/14/8706/29/90, 55 FR 26814
215.429Compliance Plan12/14/8706/29/90, 55 FR 26814
215.430General Requirements12/14/8706/29/90, 55 FR 26814
215.431Inspection Program Plan for Leaks12/14/8706/29/90, 55 FR 26814
215.433Repairing Leaks12/14/8706/29/90, 55 FR 26814
215.434Recordkeeping for Leaks12/14/8706/29/90, 55 FR 26814
215.435Report for Leaks12/14/8706/29/90, 55 FR 26814
215.437Open-Ended Valves12/14/8706/29/90, 55 FR 26814
215.438Compliance Plan12/14/8706/29/90, 55 FR 26814
Subpart R: Petroleum Refining and Related Industries; Asphalt Materials
215.441Petroleum Refinery Waste Gas Disposal07/28/7902/21/80, 45 FR 11472
215.442Vacuum Producing Systems07/28/7902/21/80, 45 FR 11472
215.443Wastewater (Oil/Water) Separator07/28/7902/21/80, 45 FR 11472
215.444Process Unit Turnarounds07/28/7902/21/80, 45 FR 11472
215.445Leaks: General Requirements01/21/8311/27/87, 52 FR 45333
215.446Monitoring Program Plan for Leaks01/21/8311/27/87, 52 FR 45333
215.447Monitoring Program for Leaks01/21/8311/27/87, 52 FR 45333
215.448Recordkeeping for Leaks01/21/8311/27/87, 52 FR 45333
215.449Reporting for Leaks01/21/8311/27/87, 52 FR 45333
215.450Alternative Program for Leaks01/21/8311/27/87, 52 FR 45333
215.451Sealing Device Requirements01/21/8311/27/87, 52 FR 45333
215.453Compliance Dates and Geographical Areas01/21/8306/29/90, 55 FR 26814
Subpart S: Rubber and Miscellaneous Plastic Products
215.461Manufacture of Pneumatic Rubber Tires01/21/8311/27/87, 52 FR 45333
215.462Green Tire Spraying Operations01/21/8311/27/87, 52 FR 45333
215.463Alternative Emission Reduction Systems01/21/8311/27/87, 52 FR 45333
215.464Emissions Testing01/21/8311/27/87, 52 FR 45333
215.465Compliance Dates and Geographical Areas01/21/8306/29/90, 55 FR 26814
215.466Compliance Plan01/21/8306/29/90, 55 FR 26814
Start Printed Page 30656
Subpart T: Pharmaceutical Manufacturing
215.480Applicability of Subpart T05/14/9108/18/92, 57 FR 37100
215.481Control of Reactors, Distillation Units, Crystallizers, Centrifuges and Vacuum Dryers05/14/9108/18/92, 57 FR 37100
215.482Control of Air Dryers, Production Equipment Exhaust Systems and Filters05/14/9108/18/92, 57 FR 37100
215.483Material Storage and Transfer05/14/9108/18/92, 57 FR 37100
215.484In-Process Tanks05/14/9108/18/92, 57 FR 37100
215.485Leaks05/14/9108/18/92, 57 FR 37100
215.486Other Emission Sources05/14/9108/18/92, 57 FR 37100
215.487Testing05/14/9108/18/92, 57 FR 37100
215.488Monitors for Air Pollution Control Equipment05/14/9108/18/92, 57 FR 37100
215.489Recordkeeping (Renumbered)05/14/9108/18/92, 57 FR 37100
215.490Compliance Schedule (Renumbered)05/14/9108/18/92, 57 FR 37100
Subpart V: Air Oxidation Processes
215.520Applicability12/14/8706/29/90, 55 FR 26814
215.521Definitions12/14/8706/29/90, 55 FR 26814
215.525Emission Limitations for Air Oxidation Processes12/14/8706/29/90, 55 FR 26814
215.526Testing and Monitoring12/14/8706/29/90, 55 FR 26814
215.527Compliance Date12/14/8706/29/90, 55 FR 26814
Subpart W: Agriculture
215.541Pesticide Exception07/28/7902/21/80, 45 FR 11472
Subpart X: Construction
215.561Architectural Coatings07/28/7902/21/80, 45 FR 11472
215.562Paving Operations07/28/7902/21/80, 45 FR 11472
215.563Cutback Asphalt07/28/7902/21/80, 45 FR 11472
Subpart Y: Gasoline Distribution
215.581Bulk Gasoline Plants07/28/7902/21/80, 45 FR 11472
215.582Bulk Gasoline Terminals06/29/8706/29/90, 55 FR 26814
215.583Gasoline Dispensing Facilities—Storage Tank Filling Operations06/29/8706/29/90, 55 FR 26814
215.584Gasoline Delivery Vessels06/29/8706/29/90, 55 FR 26814
Subpart Z: Dry Cleaners
215.607Standards for Petroleum Solvent Dry Cleaners04/03/8706/29/90, 55 FR 26814
215.608Operating Practices for Petroleum Solvent Dry Cleaners04/03/8706/29/90, 55 FR 26814
215.609Program for Inspection and Repair of Leaks04/03/8706/29/90, 55 FR 26814
215.610Testing and Monitoring04/03/8706/29/90, 55 FR 26814
215.611Exemption for Petroleum Solvent Dry Cleaners04/03/8706/29/90, 55 FR 26814
215.612Compliance Dates and Geographical Areas04/03/8706/29/90, 55 FR 26814
215.613Compliance Plan04/03/8706/29/90, 55 FR 26814
Subpart BB: Polystyrene Plants
215.875Applicability of Subpart BB09/30/8706/29/90, 55 FR 26814
215.877Emissions Limitation at Polystyrene Plants09/30/8706/29/90, 55 FR 26814
215.879Compliance Date09/30/8706/29/90, 55 FR 26814
215.881Compliance Plan09/30/8706/29/90, 55 FR 26814
215.883Special Requirements for Compliance Plan09/30/8706/29/90, 55 FR 26814
215.886Emissions Testing09/30/8706/29/90, 55 FR 26814
215.Appendix C:Past Compliance Dates07/28/7902/21/80, 45 FR 11472Approved as Rules 104(a), 104(g), 104(h), 205(j), and 205(m).
Start Printed Page 30657
Part 216: Carbon Monoxide Emissions
Subpart A: General Provisions
216.101Measurement Methods07/28/7902/21/80, 45 FR 11472Approved as Rule 206(f).
Subpart B: Fuel Combustion Emission Sources
216.121Fuel Combustion Emission Sources07/28/7902/21/80, 45 FR 11472Approved as Rule 206(a).
Subpart C: Incinerators
216.141Incinerators07/28/7902/21/80, 45 FR 11472Approved as Rule 206(b).
216.142Exceptions07/28/7902/21/80, 45 FR 11472Approved as Rule 206(b)(1,2).
Subpart N: Petroleum Refining and Chemical Manufacture
216.361Petroleum and Petrochemical Processes07/28/7902/21/80, 45 FR 11472Approved as Rule 206(c).
216.362Polybasic Organic Acid Partial Oxidation Manufacturing Processes07/28/7902/21/80, 45 FR 11472Approved as Rule 206(h).
Subpart O: Primary and Fabricated Metal Products
216.381Cupolas07/28/7902/21/80, 45 FR 11472Approved as Rule 206(e).
216.382Exception, General Motor's Ferrous Foundry in Vermilion County11/13/9208/04/94, 59 FR 39686
216.Appendix C:Compliance Dates07/28/7902/21/80, 45 FR 11472Approved as Rule 206(g).
Part 217: Nitrogen Oxides Emissions
Subpart A: General Provisions
217.101Measurement Methods09/25/0706/26/09, 74 FR 30466
217.102Abbreviations and Units09/25/0706/26/09, 74 FR 30466
217.104Incorporations by Reference09/25/0706/26/09, 74 FR 30466
Subpart B: New Fuel Combustion Emission Sources
217.121New Emission Sources04/14/7205/31/72, 37 FR 10862Approved as Rule 207(a)(1)-(4), 207(a)(5)(A).
Subpart C: Existing Fuel Combustion Emission Sources
217.141Existing Emission Sources in Major Metropolitan Areas04/14/7205/31/72, 37 FR 10862Approved as Rule 207(b) and (c).
Subpart K: Process Emission Sources
217.301Industrial Processes04/14/7205/31/72, 37 FR 10862Approved as Rule 207(e).
Subpart O: Chemical Manufacture
217.381Nitric Acid Manufacturing Processes04/14/7205/31/72, 37 FR 10862Approved as Rule 207(d).
Subpart Q: Stationary Reciprocating Internal Combustion Engines and Turbines
217.386Applicability09/25/0706/26/09, 74 FR 30466
217.388Control and Maintenance Requirements09/25/0706/26/09, 74 FR 30466
217.390Emissions Averaging Plans09/25/0706/26/09, 74 FR 30466
217.392Compliance09/25/0706/26/09, 74 FR 30466
217.394Testing and Monitoring09/25/0706/26/09, 74 FR 30466
217.396Recordkeeping and Reporting09/25/0706/26/09, 74 FR 30466
Subpart T: Cement Kilns
217.400Applicability03/15/0111/08/01, 66 FR 56449
217.402Control Requirements03/15/0111/08/01, 66 FR 56449
217.404Testing03/15/0111/08/01, 66 FR 56449
217.406Monitoring03/15/0111/08/01, 66 FR 56449
217.408Reporting03/15/0111/08/01, 66 FR 56449
217.410Recordkeeping03/15/0111/08/01, 66 FR 56449
Start Printed Page 30658
Subpart U: NO X Control and Trading Program for Specified NO X Generating Units
217.450Purpose04/17/0111/08/01, 66 FR 56449
217.452Severability04/17/0111/08/01, 66 FR 56449
217.454Applicability04/17/0111/08/01, 66 FR 56449
217.456Compliance Requirements04/17/0111/08/01, 66 FR 56449
217.458Permitting Requirements04/17/0111/08/01, 66 FR 56449
217.460Subpart U NOX Trading Budget04/17/0111/08/01, 66 FR 56449
217.462Methodology for Obtaining NOX Allocations04/17/0111/08/01, 66 FR 56449
217.464Methodology for Determining NOX Allowances From the New Source Set-Aside04/17/0111/08/01, 66 FR 56449
217.466NOX Allocations Procedure for Subpart U Budget Units04/17/0111/08/01, 66 FR 56449
217.468New Source Set-Asides for “New” Budget Units04/17/0111/08/01, 66 FR 56449
217.470Early Reduction Credits (ERCS) for Budget Units04/17/0111/08/01, 66 FR 56449
217.472Low-Emitter Requirements04/17/0111/08/01, 66 FR 56449
217.474Opt-In Units04/17/0111/08/01, 66 FR 56449
217.476Opt-In Process04/17/0111/08/01, 66 FR 56449
217.478Opt-In Budget Units: Withdrawal From NOX Trading Program04/17/0111/08/01, 66 FR 56449
217.480Opt-In Units: Change in Regulatory Status04/17/0111/08/01, 66 FR 56449
217.482Allowance Allocations To Opt-In Budget Units04/17/0111/08/01, 66 FR 56449
Subpart V: Electric Power Generation
217.521Lake of Egypt Power Plant04/13/7806/18/01, 66 FR 32769
217.700Purpose04/17/0106/18/01, 66 FR 32769
217.702Severability04/17/0106/18/01, 66 FR 32769
217.704Applicability04/17/0106/18/01, 66 FR 32769
217.706Emission Limitations04/17/0106/18/01, 66 FR 32769
217.708NOX Averaging04/17/0106/18/01, 66 FR 32769
217.710Monitoring04/17/0106/18/01, 66 FR 32769
217.712Reporting and Recordkeeping04/17/0106/18/01, 66 FR 32769
Subpart W: NO X Trading Program for Electrical Generating Units
217.750Purpose12/26/0011/08/01, 66 FR 56454
217.751Sunset Provisions11/02/0903/01/10, 75 FR 9103
217.752Severability12/26/0011/08/01, 66 FR 56454
217.754Applicability12/26/0011/08/01, 66 FR 56454
217.756Compliance Requirements12/26/0011/08/01, 66 FR 56454Except (d)(3).
217.758Permitting Requirements12/26/0011/08/01, 66 FR 56454
217.760NOx Trading Budget12/26/0011/08/01, 66 FR 56454
217.762Methodology for Calculating NOX Allocations for Budget Electrical Generating Units (EGUs)12/26/0011/08/01, 66 FR 56454
217.764NOX Allocations for Budget EGUs12/26/0011/08/01, 66 FR 56454
217.768New Source Set-Asides for “New” Budget EGUs12/26/0011/08/01, 66 FR 56454
217.770Early Reduction Credits for Budget EGUs12/26/0011/08/01, 66 FR 56454
217.774Opt-In Units12/26/0011/08/01, 66 FR 56454
217.776Opt-In Process12/26/0011/08/01, 66 FR 56454
217.778Budget Opt-In Units: Withdrawal From NOX Trading Program12/26/0011/08/01, 66 FR 56454
217.780Opt-In Units: Change in Regulatory Status12/26/0011/08/01, 66 FR 56454
217.782Allowance Allocations to Budget Opt-In Units12/26/0011/08/01, 66 FR 56454
217.Appendix C:Compliance Dates04/14/7205/31/72, 37 FR 10862
217.Appendix G:Existing Reciprocating Internal Combustion Engines Affected by the NOX Sip Call09/25/0706/26/09, 74 FR 30466
Part 218: Organic Material Emission Standards and Limitations for the Chicago Area
Subpart A: General Provisions
218.100Introduction09/27/9309/09/94, 59 FR 46562
218.101Savings Clause10/25/9404/03/95, 60 FR 16801
218.102Abbreviations and Conversion Factors09/27/9309/09/94, 59 FR 46562
218.103Applicability09/27/9309/09/94, 59 FR 46562
218.104Definitions09/27/9309/09/94, 59 FR 46562
Start Printed Page 30659
218.105Test Methods and Procedures07/27/1103/23/12, 77 FR 16940
218.106Compliance Dates09/14/1003/23/12, 77 FR 16940
218.107Operation of Afterburners09/27/9309/09/94, 59 FR 46562
218.108Exemptions, Variations, and Alternative Means of Control or Compliance Determinations01/24/9410/21/96, 61 FR 54556
218.109Vapor Pressure of Volatile Organic Liquids09/27/9309/09/94, 59 FR 46562
218.110Vapor Pressure of Organic Material or Solvent09/27/9309/09/94, 59 FR 46562
218.111Vapor Pressure of Volatile Organic Material09/27/9309/09/94, 59 FR 46562
218.112Incorporations by Reference12/23/1303/13/15, 80 FR 13248
218.114Compliance With Permit Conditions01/24/9410/21/96, 61 FR 54556
Subpart B: Organic Emissions From Storage and Loading Operations
218.119Applicability for VOL11/15/9408/08/96, 61 FR 41338
218.120Control Requirements for Storage Containers of VOL11/15/9408/08/96, 61 FR 41338
218.121Storage Containers09/27/9309/09/94, 59 FR 46562
218.122Loading Operations09/27/9309/09/94, 59 FR 46562
218.123Petroleum Liquid Storage Tanks09/27/9309/09/94, 59 FR 46562
218.124External Floating Roofs09/27/9309/09/94, 59 FR 46562
218.125Compliance Dates11/15/9408/08/96, 61 FR 41338
218.127Testing VOL Operations11/15/9408/08/96, 61 FR 41338
218.128Monitoring VOL Operations01/28/1310/06/14, 79 FR 60070
218.129Recordkeeping and Reporting for VOL Operations11/15/9408/08/96, 61 FR 41338
Subpart C: Organic Emissions From Miscellaneous Equipment
218.141Separation Operations09/27/9309/09/94, 59 FR 46562
218.142Pumps and Compressors08/16/9109/09/94, 59 FR 46562
218.143Vapor Blowdown09/27/9309/09/94, 59 FR 46562
218.144Safety Relief Valves09/27/9309/09/94, 59 FR 46562
Subpart E: Solvent Cleaning
218.181Solvent Cleaning Degreasing Operations06/25/1003/23/12, 77 FR 16940
218.182Cold Cleaning06/09/9711/26/97, 62 FR 62951
218.183Open Top Vapor Degreasing09/27/9309/09/94, 59 FR 46562
218.184Conveyorized Degreasing09/27/9309/09/94, 59 FR 46562
218.186Test Methods09/27/9309/09/94, 59 FR 46562
218.187Other Industrial Solvent Cleaning Operations07/27/1103/23/12, 77 FR 16940
Subpart F: Coating Operations
218.204Emission Limitations07/27/1103/23/12, 77 FR 16940
218.205Daily-Weighted Average Limitations09/14/1003/23/12, 77 FR 16940
218.206Solids Basis Calculation09/27/9309/09/94, 59 FR 46562
218.207Alternative Emission Limitations07/27/1103/23/12, 77 FR 16940
218.208Exemptions From Emission Limitations10/25/1104/19/13, 78 FR 23495
218.209Exemption From General Rule on Use of Organic Material09/27/9309/09/94, 59 FR 46562
218.210Compliance Schedule06/25/1003/23/12, 77 FR 16940
218.211Recordkeeping and Reporting07/27/1103/23/12, 77 FR 16940
218.212Cross-Line Averaging To Establish Compliance for Coating Lines09/14/1003/23/12, 77 FR 16940
218.213Recordkeeping and Reporting for Cross-Line Averaging Participating Coating Lines05/09/9502/13/96, 61 FR 5511
218.214Changing Compliance Methods05/09/9502/13/96, 61 FR 5511
218.215Wood Furniture Coating Averaging Approach02/02/9805/19/98, 63 FR 27489
218.216Wood Furniture Coating Add-On Control Use02/02/9805/19/98, 63 FR 27489
218.217Wood Furniture Coating and Flat Wood Paneling Coating Work Practice Standards07/27/1103/23/12, 77 FR 16940
218.218Work Practice Standards for Paper Coatings, Metal Furniture Coatings, and Large Appliance Coatings03/23/1003/23/12, 77 FR 16940
Start Printed Page 30660
218.219Work Practice Standards for Automobile and Light-Duty Truck Assembly Coatings and Miscellaneous Metal and Plastic Parts Coatings09/14/1003/23/12, 77 FR 16940
Subpart G: Use of Organic Material
218.301Use of Organic Material09/27/9309/09/94, 59 FR 46562
218.302Alternative Standard09/27/9309/09/94, 59 FR 46562
218.303Fuel Combustion Emission Units09/27/9309/09/94, 59 FR 46562
218.304Operations With Compliance Program09/27/9309/09/94, 59 FR 46562
Subpart H: Printing and Publishing
218.401Flexographic and Rotogravure Printing07/27/1103/23/12, 77 FR 16940
218.402Applicability07/27/1103/23/12, 77 FR 16940
218.403Compliance Schedule06/25/1003/23/12, 77 FR 16940
218.404Recordkeeping and Reporting07/27/1103/23/12, 77 FR 16940
218.405Lithographic Printing: Applicability06/25/1003/23/12, 77 FR 16940
218.407Emission Limitations and Control Requirements for Lithographic Printing Lines06/25/1003/23/12, 77 FR 16940
218.409Testing for Lithographic Printing on and After March 15, 199607/27/1103/23/12, 77 FR 16940
218.410Monitoring Requirements for Lithographic Printing06/25/1003/23/12, 77 FR 16940
218.411Recordkeeping and Reporting for Lithographic Printing07/27/1103/23/12, 77 FR 16940
218.412Letterpress Printing Lines: Applicability06/25/1003/23/12, 77 FR 16940
218.413Emission Limitations and Control Requirements for Letterpress Printing Lines06/25/1003/23/12, 77 FR 16940
218.415Testing for Letterpress Printing Lines07/27/1103/23/12, 77 FR 16940
218.416Monitoring Requirements for Letterpress Printing Lines06/25/1003/23/12, 77 FR 16940
218.417Recordkeeping and Reporting for Letterpress Printing Lines07/27/1103/23/12, 77 FR 16940
Subpart Q: Synthetic Organic Chemical and Polymer Manufacturing Plant
218.421General Requirements09/27/9309/09/94, 59 FR 46562
218.422Inspection Program Plan for Leaks09/27/9309/09/94, 59 FR 46562
218.423Inspection Program for Leaks09/27/9309/09/94, 59 FR 46562
218.424Repairing Leaks09/27/9309/09/94, 59 FR 46562
218.425Recordkeeping for Leaks09/27/9309/09/94, 59 FR 46562
218.426Report for Leaks09/27/9309/09/94, 59 FR 46562
218.427Alternative Program for Leaks09/27/9309/09/94, 59 FR 46562
218.428Open-Ended Valves09/27/9309/09/94, 59 FR 46562
218.429Standards for Control Devices09/27/9309/09/94, 59 FR 46562
218.431Applicability05/09/9503/23/98, 63 FR 13784
218.432Control Requirements05/09/9503/23/98, 63 FR 13784
218.433Performance and Testing Requirements05/09/9503/23/98, 63 FR 13784
218.434Monitoring Requirements05/09/9503/23/98, 63 FR 13784
218.435Recordkeeping and Reporting Requirements05/09/9503/23/98, 63 FR 13784
218.436Compliance Date05/09/9503/23/98, 63 FR 13784
Subpart R: Petroleum Refining and Related Industries; Asphalt Materials
218.441Petroleum Refinery Waste Gas Disposal09/27/9309/09/94, 59 FR 46562
218.442Vacuum Producing Systems08/16/9109/09/94, 59 FR 46562
218.443Wastewater (Oil/Water) Separator09/27/9309/09/94, 59 FR 46562
218.444Process Unit Turnarounds08/16/9109/09/94, 59 FR 46562
218.445Leaks: General Requirements09/27/9309/09/94, 59 FR 46562
218.446Monitoring Program Plan for Leaks09/27/9309/09/94, 59 FR 46562
218.447Monitoring Program for Leaks09/27/9309/09/94, 59 FR 46562
218.448Recordkeeping for Leaks08/16/9109/09/94, 59 FR 46562
218.449Reporting for Leaks09/27/9309/09/94, 59 FR 46562
218.450Alternative Program for Leaks09/27/9309/09/94, 59 FR 46562
218.451Sealing Device Requirements08/16/9109/09/94, 59 FR 46562
218.452Compliance Schedule for Leaks09/27/9309/09/94, 59 FR 46562
Start Printed Page 30661
Subpart S: Rubber and Miscellaneous Plastic Products
218.461Manufacture of Pneumatic Rubber Tires09/27/9309/09/94, 59 FR 46562
218.462Green Tire Spraying Operations09/27/9309/09/94, 59 FR 46562
218.463Alternative Emission Reduction Systems09/27/9309/09/94, 59 FR 46562
218.464Emission Testing09/27/9309/09/94, 59 FR 46562
Subpart T: Pharmaceutical Manufacturing
218.480Applicability08/26/0811/03/10, 75 FR 67623
218.481Control of Reactors, Distillation Units, Crystallizers, Centrifuges and Vacuum Dryers09/27/9309/09/94, 59 FR 46562
218.482Control of Air Dryers, Production Equipment Exhaust Systems and Filters09/27/9309/09/94, 59 FR 46562
218.483Material Storage and Transfer09/27/9309/09/94, 59 FR 46562
218.484In-Process Tanks08/16/9109/09/94, 59 FR 46562
218.485Leaks09/27/9309/09/94, 59 FR 46562
218.486Other Emission Units09/27/9309/09/94, 59 FR 46562
218.487Testing09/27/9309/09/94, 59 FR 46562
218.488Monitoring for Air Pollution Control Equipment08/16/9109/09/94, 59 FR 46562
218.489Recordkeeping for Air Pollution Control Equipment09/27/9309/09/94, 59 FR 46562
Subpart V: Batch Operations and Air Oxidation Processes
218.500Applicability for Batch Operations05/22/9504/02/96, 61 FR 14484
218.501Control Requirements for Batch Operations05/22/9504/02/96, 61 FR 14484
218.502Determination of Uncontrolled Total Annual Mass Emissions and Average Flow Rate Values for Batch Operations05/22/9504/02/96, 61 FR 14484
218.503Performance and Testing Requirements for Batch Operations05/22/9504/02/96, 61 FR 14484
218.504Monitoring Requirements for Batch Operations05/22/9504/02/96, 61 FR 14484
218.505Reporting and Recordkeeping for Batch Operations05/22/9504/02/96, 61 FR 14484
218.506Compliance Date05/22/9504/02/96, 61 FR 14484
218.520Emission Limitations for Air Oxidation Processes11/15/9409/27/95, 60 FR 49770
218.522Savings Clause11/15/9409/27/95, 60 FR 49770
218.523Compliance11/15/9409/27/95, 60 FR 49770
218.524Determination of Applicability11/15/9409/27/95, 60 FR 49770
218.525Emission Limitations for Air Oxidation Processes11/15/9409/27/95, 60 FR 49770
218.526Testing and Monitoring08/16/9109/09/94, 59 FR 46562
Subpart W: Agriculture
218.541Pesticide Exception09/27/9309/09/94, 59 FR 46562
Subpart X: Construction
218.561Architectural Coatings08/16/9109/09/94, 59 FR 46562
218.562Paving Operations09/27/9309/09/94, 59 FR 46562
218.563Cutback Asphalt08/16/9109/09/94, 59 FR 46562
Subpart Y: Gasoline Distribution
218.581Bulk Gasoline Plants09/27/9309/09/94, 59 FR 46562
218.582Bulk Gasoline Terminals09/27/9309/09/94, 59 FR 46562
218.583Gasoline Dispensing Operations—Storage Tank Filling Operations12/23/1303/13/15, 80 FR 13248
218.584Gasoline Delivery Vessels09/27/9309/09/94, 59 FR 46562
218.586Gasoline Dispensing Operations—Motor Vehicle Fueling Operations12/23/1303/13/15, 80 FR 13248
Subpart Z: Dry Cleaners
218.607Standards for Petroleum Solvent Dry Cleaners08/16/9109/09/94, 59 FR 46562
Start Printed Page 30662
218.608Operating Practices for Petroleum Solvent Dry Cleaners09/27/9309/09/94, 59 FR 46562
218.609Program for Inspection and Repair of Leaks09/27/9309/09/94, 59 FR 46562
218.610Testing and Monitoring09/27/9309/09/94, 59 FR 46562
218.611Applicability for Petroleum Solvent Dry Cleaners01/24/9410/21/96, 61 FR 54556
Subpart AA: Paint and Ink Manufacturing
218.620Applicability01/24/9410/21/96, 61 FR 54556
218.621Exemption for Waterbase Material and Heatset Offset Ink09/27/9309/09/94, 59 FR 46562
218.624Open Top Mills, Tanks, Vats or Vessels09/27/9309/09/94, 59 FR 46562
218.625Grinding Mills08/16/9109/09/94, 59 FR 46562
218.626Storage Tanks08/16/9109/09/94, 59 FR 46562
218.628Leaks09/27/9309/09/94, 59 FR 46562
218.630Clean Up08/16/9109/09/94, 59 FR 46562
218.636Compliance Schedule09/27/9309/09/94, 59 FR 46562
218.637Recordkeeping and Reporting09/27/9309/09/94, 59 FR 46562
Subpart BB: Polystyrene Plants
218.640Applicability09/27/9309/09/94, 59 FR 46562
218.642Emissions Limitation at Polystyrene Plants09/27/9309/09/94, 59 FR 46562
218.644Emissions Testing09/27/9309/09/94, 59 FR 46562
Subpart CC: Polyester Resin Product Manufacturing Process
218.660Applicability01/24/9410/21/96, 61 FR 54556
218.666Control Requirements01/24/9410/21/96, 61 FR 54556
218.667Compliance Schedule01/24/9410/21/96, 61 FR 54556
218.668Testing01/24/9410/21/96, 61 FR 54556
218.670Recordkeeping and Reporting for Exempt Emission Units01/24/9410/21/96, 61 FR 54556
218.672Recordkeeping and Reporting for Subject Emission Units01/24/9410/21/96, 61 FR 54556
Subpart DD: Aerosol Can Fillings
218.680Applicability01/24/9410/21/96, 61 FR 54556
218.686Control Requirements05/09/9503/12/97, 62 FR 11327
218.688Testing01/24/9410/21/96, 61 FR 54556
218.690Recordkeeping and Reporting for Exempt Emission Units01/24/9410/21/96, 61 FR 54556
218.692Recordkeeping and Reporting for Subject Emission Units01/24/9410/21/96, 61 FR 54556
Subpart GG: Marine Terminals
218.760Applicability10/25/9404/03/95, 60 FR 16801
218.762Control Requirements10/25/9404/03/95, 60 FR 16801
218.764Compliance Certification10/25/9404/03/95, 60 FR 16801
218.766Leaks10/25/9404/03/95, 60 FR 16801
218.768Testing and Monitoring10/25/9404/03/95, 60 FR 16801
218.770Recordkeeping and Reporting10/25/9404/03/95, 60 FR 16801
Subpart HH: Motor Vehicle Refinishing
218.780Emission Limitations05/09/9507/25/96, 61 FR 38577
218.782Alternative Control Requirements05/09/9507/25/96, 61 FR 38577
218.784Equipment Specifications01/28/1310/06/14, 79 FR 60070
218.786Surface Preparation Materials05/09/9507/25/96, 61 FR 38577
218.787Work Practices05/09/9507/25/96, 61 FR 38577
218.788Testing05/09/9507/25/96, 61 FR 38577
218.789Monitoring and Recordkeeping for Control Devices05/09/9507/25/96, 61 FR 38577
218.790General Recordkeeping and Reporting05/09/9507/25/96, 61 FR 38577
218.791Compliance Date05/09/9507/25/96, 61 FR 38577
Start Printed Page 30663
Subpart II: Fiberglass Boat Manufacturing Materials
218.890Applicability09/14/1003/23/12, 77 FR 16940
218.891Emission Limitations and Control Requirements07/27/1103/23/12, 77 FR 16940
218.892Testing Requirements07/27/1103/23/12, 77 FR 16940
218.894Recordkeeping and Reporting Requirements07/27/1103/23/12, 77 FR 16940
Subpart JJ: Miscellaneous Industrial Adhesives
218.900Applicability09/14/1003/23/12, 77 FR 16940
218.901Emission Limitations and Control Requirements07/27/1103/23/12, 77 FR 16940
218.902Testing Requirements07/27/1103/23/12, 77 FR 16940
218.903Monitoring Requirements07/27/1103/23/12, 77 FR 16940
218.904Recordkeeping and Reporting Requirements07/27/1103/23/12, 77 FR 16940
Subpart PP: Miscellaneous Fabricated Product Manufacturing Processes
218.920Applicability01/24/9410/21/96, 61 FR 54556
218.926Control Requirements01/24/9410/21/96, 61 FR 54556
218.927Compliance Schedule09/27/9310/21/96, 61 FR 54556
218.928Testing09/27/9310/21/96, 61 FR 54556
218.929Cementable and Dress or Performance Shoe Leather04/08/0305/24/04, 69 FR 29446
Subpart QQ: Miscellaneous Formulation Manufacturing Processes
218.940Applicability07/16/9806/18/99, 64 FR 32810
218.946Control Requirements01/24/9410/21/96, 61 FR 54556
218.947Compliance Schedule09/27/9309/09/94, 59 FR 46562
218.948Testing09/27/9309/09/94, 59 FR 46562
Subpart RR: Miscellaneous Organic Chemical Manufacturing Processes
218.960Applicability01/24/9410/21/96, 61 FR 54556
218.966Control Requirements05/09/9503/12/97, 62 FR 11327
218.967Compliance Schedule09/27/9310/21/96, 61 FR 54556
218.968Testing09/27/9310/21/96, 61 FR 54556
Subpart TT: Other Emission Units
218.980Applicability05/09/9503/12/97, 62 FR 11327
218.986Control Requirements01/24/9410/21/96, 61 FR 54556
218.987Compliance Schedule09/27/9310/21/96, 61 FR 54556
218.988Testing09/27/9310/21/96, 61 FR 54556
Subpart UU: Recordkeeping and Reporting
218.990Exempt Emission Units09/27/9310/21/96, 61 FR 54556
218.991Subject Emission Units01/24/9410/21/96, 61 FR 54556
218.Appendix A:List of Chemicals Defining Synthetic Organic Chemical and Polymer Manufacturing09/27/9309/09/94, 59 FR 46562
218.Appendix B:VOM Measurement Techniques for Capture Efficiency09/27/9309/09/94, 59 FR 46562
218.Appendix C:Reference Test Methods for Air Oxidation Processes09/27/9309/09/94, 59 FR 46562
218.Appendix D:Coefficients for the Total Resource Effectiveness Index (TRE) Equation09/27/9309/09/94, 59 FR 46562
218.Appendix E:List of Affected Marine Terminals10/25/9404/03/95, 60 FR 16801
218.Appendix G:TRE Index Measurements for SOCMI Reactors and Distillation Units05/09/9503/23/98, 63 FR 13784
218.Appendix H:Baseline VOM Content Limitations for Subpart F, Section 218.212 Cross-Line Averaging05/09/9502/13/96, 61 FR 5511
Part 219: Organic Material Emission Standards and Limitations for the Metro East Area
Subpart A: General Provisions
219.100Introduction09/27/9309/09/94, 59 FR 46562
Start Printed Page 30664
219.101Savings Clause10/25/9404/03/95, 60 FR 16801
219.102Abbreviations and Conversion Factors09/27/9309/09/94, 59 FR 46562
219.103Applicability08/16/9109/09/94, 59 FR 46562
219.104Definitions09/27/9309/09/94, 59 FR 46562
219.105Test Methods and Procedures12/23/1303/13/15, 80 FR 13248
219.106Compliance Dates09/14/1003/23/12, 77 FR 16940
219.107Operation of Afterburners09/27/9309/09/94, 59 FR 46562
219.108Exemptions, Variations, and Alternative Means of Control or Compliance Determinations08/16/9109/09/94, 59 FR 46562
219.109Vapor Pressure of Volatile Organic Liquids09/27/9309/09/94, 59 FR 46562
219.110Vapor Pressure of Organic Material or Solvent09/27/9309/09/94, 59 FR 46562
219.111Vapor Pressure of Volatile Organic Material09/27/9309/09/94, 59 FR 46562
219.112Incorporations by Reference12/23/1303/13/15, 80 FR 13248
Subpart B: Organic Emissions From Storage and Loading Operations
219.119Applicability for VOL11/15/9408/08/96, 61 FR 41338
219.120Control Requirements for Storage Containers of VOL11/15/9408/08/96, 61 FR 41338
219.121Storage Containers of VPL09/27/9309/09/94, 59 FR 46562
219.122Loading Operations09/27/9309/09/94, 59 FR 46562
219.123Petroleum Liquid Storage Tanks09/27/9309/09/94, 59 FR 46562
219.124External Floating Roofs09/27/9309/09/94, 59 FR 46562
219.125Compliance Dates11/15/9408/08/96, 61 FR 41338
219.127Testing VOL Operations11/15/9408/08/96, 61 FR 41338
219.128Monitoring VOL Operations01/28/1310/06/14, 79 FR 60070
219.129Recordkeeping and Reporting for VOL Operations11/15/9408/08/96, 61 FR 41338
Subpart C: Organic Emissions From Miscellaneous Equipment
219.141Separation Operations09/27/9309/09/94, 59 FR 46562
219.142Pumps and Compressors08/16/9109/09/94, 59 FR 46562
219.143Vapor Blowdown09/27/9309/09/94, 59 FR 46562
219.144Safety Relief Valves09/27/9309/09/94, 59 FR 46562
Subpart E: Solvent Cleaning
219.181Solvent Cleaning Degreasing Operations06/25/1003/23/12, 77 FR 16940
219.182Cold Cleaning06/09/9711/26/97, 62 FR 62951
219.183Open Top Vapor Degreasing09/27/9309/09/94, 59 FR 46562
219.184Conveyorized Degreasing09/27/9309/09/94, 59 FR 46562
219.186Test Methods09/27/9309/09/94, 59 FR 46562
219.187Other Industrial Solvent Cleaning Operations07/27/1103/23/12, 77 FR 16940
Subpart F: Coating Operations
219.204Emission Limitations07/27/1103/23/12, 77 FR 16940
219.205Daily-Weighted Average Limitations09/14/1003/23/12, 77 FR 16940
219.206Solids Basis Calculation09/27/9309/09/94, 59 FR 46562
219.207Alternative Emission Limitations07/27/1103/23/12, 77 FR 16940
219.208Exemptions From Emission Limitations10/25/1104/19/13, 78 FR 23495
219.209Exemption From General Rule on Use of Organic Material09/27/9309/09/94, 59 FR 46562
219.210Compliance Schedule09/14/1003/23/12, 77 FR 16940
219.211Recordkeeping and Reporting07/27/1103/23/12, 77 FR 16940
219.212Cross-Line Averaging To Establish Compliance for Coating Lines09/14/1003/23/12, 77 FR 16940
219.213Recordkeeping and Reporting for Cross-Line Averaging Participating Coating Lines05/09/9502/13/96, 61 FR 5511
219.214Changing Compliance Methods05/09/9502/13/96, 61 FR 5511
219.215Wood Furniture Coating Averaging Approach02/02/9805/19/98, 63 FR 27489
219.216Wood Furniture Coating Add-On Control Use02/02/9805/19/98, 63 FR 27489
219.217Wood Furniture Coating and Flat Wood Paneling Coating Work Practice Standards07/27/1103/23/12, 77 FR 16940
219.218Work Practice Standards for Paper Coatings, Metal Furniture Coatings, and Large Appliance Coatings03/23/1003/23/12, 77 FR 16940
Start Printed Page 30665
219.219Work Practice Standards for Automobile and Light-Duty Truck Assembly Coatings and Miscellaneous Metal and Plastic Parts Coatings09/14/1003/23/12, 77 FR 16940
Subpart G: Use of Organic Material
219.301Use of Organic Material09/27/9309/09/94, 59 FR 46562
219.302Alternative Standard09/27/9309/09/94, 59 FR 46562
219.303Fuel Combustion Emission Units09/27/9309/09/94, 59 FR 46562
219.304Operations With Compliance Program09/27/9309/09/94, 59 FR 46562
Subpart H: Printing and Publishing
219.401Flexographic and Rotogravure Printing07/27/1103/23/12, 77 FR 16940
219.402Applicability06/25/1003/23/12, 77 FR 16940
219.403Compliance Schedule06/25/1003/23/12, 77 FR 16940
219.404Recordkeeping and Reporting07/27/1103/23/12, 77 FR 16940
219.405Lithographic Printing: Applicability06/25/1003/23/12, 77 FR 16940
219.407Emission Limitations and Control Requirements for Lithographic Printing Lines06/25/1003/23/12, 77 FR 16940
219.409Testing for Lithographic Printing07/27/1103/23/12, 77 FR 16940
219.410Monitoring Requirements for Lithographic Printing06/25/1003/23/12, 77 FR 16940
219.411Recordkeeping and Reporting for Lithographic Printing07/27/1103/23/12, 77 FR 16940
219.412Letterpress Printing Lines: Applicability06/25/1003/23/12, 77 FR 16940
219.413Emission Limitations and Control Requirements for Letterpress Printing Lines06/25/1003/23/12, 77 FR 16940
219.415Testing for Letterpress Printing Lines07/27/1103/23/12, 77 FR 16940
219.416Monitoring Requirements for Letterpress Printing Lines06/25/1003/23/12, 77 FR 16940
219.417Recordkeeping and Reporting for Letterpress Printing Lines07/27/1103/23/12, 77 FR 16940
Subpart Q: Synthetic Organic Chemical and Polymer Manufacturing Plant
219.421General Requirements09/27/9309/09/94, 59 FR 46562
219.422Inspection Program Plan for Leaks09/27/9309/09/94, 59 FR 46562
219.423Inspection Program for Leaks09/27/9309/09/94, 59 FR 46562
219.424Repairing Leaks09/27/9309/09/94, 59 FR 46562
219.425Recordkeeping for Leaks09/27/9309/09/94, 59 FR 46562
219.426Report for Leaks09/27/9309/09/94, 59 FR 46562
219.427Alternative Program for Leaks09/27/9309/09/94, 59 FR 46562
219.428Open-Ended Valves09/27/9309/09/94, 59 FR 46562
219.429Standards for Control Devices09/27/9309/09/94, 59 FR 46562
219.431Applicability05/09/9503/23/98, 63 FR 13784
219.432Control Requirements05/09/9503/23/98, 63 FR 13784
219.433Performance and Testing Requirements05/09/9503/23/98, 63 FR 13784
219.434Monitoring Requirements05/09/9503/23/98, 63 FR 13784
219.435Recordkeeping and Reporting Requirements05/09/9503/23/98, 63 FR 13784
219.436Compliance Date05/09/9503/23/98, 63 FR 13784
Subpart R: Petroleum Refining and Related Industries; Asphalt Materials
219.441Petroleum Refinery Waste Gas Disposal09/27/9309/09/94, 59 FR 46562
219.442Vacuum Producing Systems08/16/9109/09/94, 59 FR 46562
219.443Wastewater (Oil/Water) Separator09/27/9309/09/94, 59 FR 46562
219.444Process Unit Turnarounds08/16/9109/09/94, 59 FR 46562
219.445Leaks: General Requirements09/27/9309/09/94, 59 FR 46562
219.446Monitoring Program Plan for Leaks09/27/9309/09/94, 59 FR 46562
219.447Monitoring Program for Leaks09/27/9309/09/94, 59 FR 46562
219.448Recordkeeping for Leaks08/16/9109/09/94, 59 FR 46562
219.449Reporting for Leaks09/27/9309/09/94, 59 FR 46562
219.450Alternative Program for Leaks09/27/9309/09/94, 59 FR 46562
219.451Sealing Device Requirements08/16/9109/09/94, 59 FR 46562
219.452Compliance Schedule for Leaks09/27/9309/09/94, 59 FR 46562
Subpart S: Rubber and Miscellaneous Plastic Products
219.461Manufacture of Pneumatic Rubber Tires09/27/9309/09/94, 59 FR 46562
Start Printed Page 30666
219.462Green Tire Spraying Operations09/27/9309/09/94, 59 FR 46562
219.463Alternative Emission Reduction Systems09/27/9309/09/94, 59 FR 46562
219.464Emission Testing09/27/9309/09/94, 59 FR 46562
Subpart T: Pharmaceutical Manufacturing
219.480Applicability05/09/9503/12/97, 62 FR 11327
219.481Control of Reactors, Distillation Units, Crystallizers, Centrifuges and Vacuum Dryers09/27/9309/09/94, 59 FR 46562
219.482Control of Air Dryers, Production Equipment Exhaust Systems and Filters09/27/9309/09/94, 59 FR 46562
219.483Material Storage and Transfer09/27/9309/09/94, 59 FR 46562
219.484In-Process Tanks08/16/9109/09/94, 59 FR 46562
219.485Leaks09/27/9309/09/94, 59 FR 46562
219.486Other Emission Units09/27/9309/09/94, 59 FR 46562
219.487Testing09/27/9309/09/94, 59 FR 46562
219.488Monitoring for Air Pollution Control Equipment08/16/9109/09/94, 59 FR 46562
219.489Recordkeeping for Air Pollution Control Equipment09/27/9309/09/94, 59 FR 46562
Subpart V: Batch Operations and Air Oxidation Processes
219.500Applicability for Batch Operations05/22/9504/02/96, 61 FR 14484
219.501Control Requirements for Batch Operations05/22/9504/02/96, 61 FR 14484
219.502Determination of Uncontrolled Total Annual Mass Emissions and Actual Weighted Average Flow Rate Values for Batch Operations05/22/9504/02/96, 61 FR 14484
219.503Performance and Testing Requirements for Batch Operations05/22/9504/02/96, 61 FR 14484
219.504Monitoring Requirements for Batch Operations05/22/9504/02/96, 61 FR 14484
219.505Reporting and Recordkeeping for Batch Operations05/22/9504/02/96, 61 FR 14484
219.506Compliance Date05/22/9504/02/96, 61 FR 14484
219.520Emission Limitations for Air Oxidation Processes11/15/9409/27/95, 60 FR 49770
219.522Savings Clause11/15/9409/27/95, 60 FR 49770
219.523Compliance11/15/9409/27/95, 60 FR 49770
219.524Determination of Applicability11/15/9409/27/95, 60 FR 49770
219.526Testing and Monitoring08/16/9109/09/94, 59 FR 46562
Subpart W: Agriculture
219.541Pesticide Exception09/27/9309/09/94, 59 FR 46562
Subpart X: Construction
219.561Architectural Coatings08/16/9109/09/94, 59 FR 46562
219.562Paving Operations09/27/9309/09/94, 59 FR 46562
219.563Cutback Asphalt08/16/9109/09/94, 59 FR 46562
Subpart Y: Gasoline Distribution
219.581Bulk Gasoline Plants09/27/9309/09/94, 59 FR 46562
219.582Bulk Gasoline Terminals09/27/9309/09/94, 59 FR 46562
219.583Gasoline Dispensing Operations—Storage Tank Filling Operations12/23/1303/13/15, 80 FR 13248
219.584Gasoline Delivery Vessels09/27/9309/09/94, 59 FR 46562
Subpart Z: Dry Cleaners
219.607Standards for Petroleum Solvent Dry Cleaners08/16/9109/09/94, 59 FR 46562
219.608Operating Practices for Petroleum Solvent Dry Cleaners09/27/9309/09/94, 59 FR 46562
219.609Program for Inspection and Repair of Leaks09/27/9309/09/94, 59 FR 46562
219.610Testing and Monitoring09/27/9309/09/94, 59 FR 46562
219.611Exemption for Petroleum Solvent Dry Cleaners09/27/9309/09/94, 59 FR 46562
Start Printed Page 30667
Subpart AA: Paint and Ink Manufacturing
219.620Applicability09/27/9309/09/94, 59 FR 46562
219.621Exemption for Waterbase Material and Heatset-Offset Ink09/27/9309/09/94, 59 FR 46562
219.623Permit Conditions09/27/9309/09/94, 59 FR 46562
219.624Open-Top Mills, Tanks, Vats or Vessels09/27/9309/09/94, 59 FR 46562
219.625Grinding Mills08/16/9109/09/94, 59 FR 46562
219.626Storage Tanks08/16/9109/09/94, 59 FR 46562
219.628Leaks09/27/9309/09/94, 59 FR 46562
219.630Clean Up08/16/9109/09/94, 59 FR 46562
219.636Compliance Schedule09/27/9309/09/94, 59 FR 46562
219.637Recordkeeping and Reporting09/27/9309/09/94, 59 FR 46562
Subpart BB: Polystyrene Plants
219.640Applicability09/27/9309/09/94, 59 FR 46562
219.642Emissions Limitation at Polystyrene Plants09/27/9309/09/94, 59 FR 46562
219.644Emissions Testing09/27/9309/09/94, 59 FR 46562
Subpart GG: Marine Terminals
219.760Applicability10/25/9404/03/95, 60 FR 16801
219.762Control Requirements10/25/9404/03/95, 60 FR 16801
219.764Compliance Certification10/25/9404/03/95, 60 FR 16801
219.766Leaks10/25/9404/03/95, 60 FR 16801
219.768Testing and Monitoring10/25/9404/03/95, 60 FR 16801
219.770Recordkeeping and Reporting10/25/9404/03/95, 60 FR 16801
Subpart HH: Motor Vehicle Refinishing
219.780Emission Limitations05/09/9507/25/96, 61 FR 38577
219.782Alternative Control Requirements05/09/9507/25/96, 61 FR 38577
219.784Equipment Specifications01/28/1310/06/14, 79 FR 60070
219.786Surface Preparation Materials05/09/9507/25/96, 61 FR 38577
219.787Work Practices05/09/9507/25/96, 61 FR 38577
219.788Testing05/09/9507/25/96, 61 FR 38577
219.789Monitoring and Recordkeeping for Control Devices05/09/9507/25/96, 61 FR 38577
219.791Compliance Date05/09/9507/25/96, 61 FR 38577
Subpart II: Fiberglass Boat Manufacturing Materials
219.890Applicability09/14/1003/23/12, 77 FR 16940
219.891Emission Limitations and Control Requirements07/27/1103/23/12, 77 FR 16940
219.892Testing and Monitoring Requirements07/27/1103/23/12, 77 FR 16940
219.894Recordkeeping and Reporting Requirements07/27/1103/23/12, 77 FR 16940
Subpart JJ: Miscellaneous Industrial Adhesives
219.900Applicability09/14/1003/23/12, 77 FR 16940
219.901Emission Limitations and Control Requirements07/27/1103/23/12, 77 FR 16940
219.902Testing Requirements07/27/1103/23/12, 77 FR 16940
219.903Monitoring Requirements07/27/1103/23/12, 77 FR 16940
219.904Recordkeeping and Reporting Requirements07/27/1103/23/12, 77 FR 16940
Subpart PP: Miscellaneous Fabricated Product Manufacturing Processes
219.920Applicability09/27/9305/07/96, 61 FR 20455
219.923Permit Conditions09/27/9305/07/96, 61 FR 20455
219.926Control Requirements05/09/9505/07/96, 61 FR 20455
219.927Compliance Schedule09/27/9305/07/96, 61 FR 20455
219.928Testing09/27/9305/07/96, 61 FR 20455
Subpart QQ: Miscellaneous Formulation Manufacturing Processes
219.940Applicability09/27/9305/07/96, 61 FR 20455
219.943Permit Conditions09/27/9305/07/96, 61 FR 20455
219.946Control Requirements05/09/9505/07/96, 61 FR 20455
Start Printed Page 30668
219.947Compliance Schedule09/27/9305/07/96, 61 FR 20455
219.948Testing09/27/9305/07/96, 61 FR 20455
Subpart RR: Miscellaneous Organic Chemical Manufacturing Processes
219.960Applicability09/27/9305/07/96, 61 FR 20455
219.963Permit Conditions09/27/9305/07/96, 61 FR 20455
219.966Control Requirements05/09/9505/07/96, 61 FR 20455
219.967Compliance Schedule09/27/9305/07/96, 61 FR 20455
219.968Testing09/27/9305/07/96, 61 FR 20455
Subpart TT: Other Emission Units
219.980Applicability05/09/9503/12/97, 62 FR 11327
219.983Permit Conditions09/27/9305/07/96, 61 FR 20455
219.986Control Requirements05/09/9505/07/96, 61 FR 20455
219.987Compliance Schedule09/27/9305/07/96, 61 FR 20455
219.988Testing09/27/9305/07/96, 61 FR 20455
Subpart UU: Recordkeeping and Reporting
219.990Exempt Emission Units09/27/9305/07/96, 61 FR 20455
219.991Subject Emission Units09/27/9305/07/96, 61 FR 20455
219.Appendix A:List of Chemicals Defining Synthetic Organic Chemical and Polymer Manufacturing09/27/9309/09/94, 59 FR 46562
219.Appendix B:VOM Measurement Techniques for Capture Efficiency (Repealed)09/27/9309/09/94, 59 FR 46562
219.Appendix C:Reference Methods and Procedures09/27/9309/09/94, 59 FR 46562
219.Appendix D:Coefficients for the Total Resource Effectiveness Index (TRE) Equation09/27/9309/09/94, 59 FR 46562
219.Appendix E:List of Affected Marine Terminals02/15/9604/03/95, 60 FR 16801
219.Appendix G:TRE Index Measurements for SOCMI Reactors and Distillation Units05/09/9503/23/98, 63 FR 13784
219.Appendix H:Baseline VOM Content Limitations for Subpart F, Section 219.212 Cross-Line Averaging05/09/9502/13/96, 61 FR 5511
Part 223: Standards and Limitations for Organic Material Emissions for Area Sources
Subpart A: General Provisions
223.100Severability06/08/0905/06/13, 78 FR 26258
223.105Abbreviations and Acronyms06/08/0905/06/13, 78 FR 26258
223.120Incorporations by Reference06/08/0905/06/13, 78 FR 26258
Subpart B: Consumer and Commercial Products
223.200Purpose06/08/0905/06/13, 78 FR 26258
223.201Applicability05/04/1205/06/13, 78 FR 26258
223.203Definitions for Subpart B05/04/1205/06/13, 78 FR 26258
223.205Standards05/04/1205/06/13, 78 FR 26258
223.206Diluted Products06/08/0905/06/13, 78 FR 26258
223.207Products Registered Under FIFRA05/04/1205/06/13, 78 FR 26258
223.208Requirements for Aerosol Adhesives05/04/1205/06/13, 78 FR 26258
223.209Requirements for Floor Wax Strippers06/08/0905/06/13, 78 FR 26258
223.210Products Containing Ozone-Depleting Compounds06/08/0905/06/13, 78 FR 26258
223.211Requirements for Adhesive Removers, Aerosol Adhesives, Contact Adhesives, Electrical Cleaners, Electronic Cleaners, Footwear or Leather Care Products, General Purpose Degreasers, and Graffiti Removers05/04/1205/06/13, 78 FR 26258
223.220Requirements for Charcoal Lighter Material06/08/0905/06/13, 78 FR 26258
223.230Exemptions06/08/0905/06/13, 78 FR 26258
223.240Innovative Product Exemption06/08/0905/06/13, 78 FR 26258
223.245Alternative Compliance Plans06/08/0905/06/13, 78 FR 26258
223.250Product Dating06/08/0905/06/13, 78 FR 26258
223.255Additional Product Dating Requirements06/08/0905/06/13, 78 FR 26258
223.260Most Restrictive Limit06/08/0905/06/13, 78 FR 26258
Start Printed Page 30669
223.265Additional Labeling Requirements for Aerosol Adhesives, Adhesive Removers, Electronic Cleaners, Electrical Cleaners, Energized Electrical Cleaners, and Contact Adhesives06/08/0905/06/13, 78 FR 26258
223.270Reporting Requirements06/08/0905/06/13, 78 FR 26258
223.275Special Recordkeeping Requirements for Consumer Products That Contain Perchloroethylene or Methylene Chloride06/08/0905/06/13, 78 FR 26258
223.280Calculating Illinois Sales06/08/0905/06/13, 78 FR 26258
223.285Test Methods06/08/0905/06/13, 78 FR 26258
Subpart C: Architectural and Industrial Maintenance Coatings
223.300Purpose06/08/0905/06/13, 78 FR 26258
223.305Applicability05/04/1205/06/13, 78 FR 26258
223.307Definitions for Subpart C06/08/0905/06/13, 78 FR 26258
223.310Standards06/08/0905/06/13, 78 FR 26258
223.320Container Labeling Requirements06/08/0905/06/13, 78 FR 26258
223.330Reporting Requirements06/08/0905/06/13, 78 FR 26258
223.340Compliance Provisions and Test Methods06/08/0905/06/13, 78 FR 26258
223.350Alternative Test Methods06/08/0905/06/13, 78 FR 26258
223.360Methacrylate Traffic Coating Markings06/08/0905/06/13, 78 FR 26258
223.370Test Methods06/08/0905/06/13, 78 FR 26258
Part 225: Control of Emissions From Large Combustion Sources
Subpart A: General Provisions
225.120Abbreviations and Acronyms08/31/0710/16/07, 72 FR 58528
225.130Definitions08/31/0710/16/07, 72 FR 58528
225.140Incorporations by Reference08/31/0710/16/07, 72 FR 58528
225.150Commence Commercial Operation08/31/0710/16/07, 72 FR 58528
Subpart B: Control of Mercury Emissions From Coal-Fired Electric Generating Units
225.233Multi-Pollutant Standard (MPS)06/26/0907/06/12, 77 FR 39943Only (a), (b), (e), and (g).
225.291Combined Pollutant Standard: Purpose06/26/0907/06/12, 77 FR 39943
225.292Applicability of the Combined Pollutant Standard06/26/0907/06/12, 77 FR 39943
225.293Combined Pollutant Standard: Notice of Intent06/26/0907/06/12, 77 FR 39943
225.295Combined Pollutant Standard: Emissions Standards for NOX and SO206/26/0907/06/12, 77 FR 39943
225.296Combined Pollutant Standard: Control Technology Requirements for NOX, SO2, and PM Emissions06/26/0907/06/12, 77 FR 39943Except (d).
Subpart C: Clean Air Act Interstate Rule (CAIR) SO 2 Trading Program
225.300Purpose08/31/0710/16/07, 72 FR 58528
225.305Applicability08/31/0710/16/07, 72 FR 58528
225.310Compliance Requirements08/31/0710/16/07, 72 FR 58528
225.315Appeal Procedures08/31/0710/16/07, 72 FR 58528
225.320Permit Requirements08/31/0710/16/07, 72 FR 58528
225.325Trading Program08/31/0710/16/07, 72 FR 58528
Subpart D: CAIR NO X Annual Trading Program
225.400Purpose08/31/0710/16/07, 72 FR 58528
225.405Applicability08/31/0710/16/07, 72 FR 58528
225.410Compliance Requirements08/31/0710/16/07, 72 FR 58528
225.415Appeal Procedures08/31/0710/16/07, 72 FR 58528
225.420Permit Requirements08/31/0710/16/07, 72 FR 58528
225.425Annual Trading Budget08/31/0710/16/07, 72 FR 58528
225.430Timing for Annual Allocations08/31/0710/16/07, 72 FR 58528
225.435Methodology for Calculating Annual Allocations08/31/0710/16/07, 72 FR 58528
225.440Annual Allocations08/31/0710/16/07, 72 FR 58528
225.445New Unit Set-Aside (NUSA)08/31/0710/16/07, 72 FR 58528
225.450Monitoring, Recordkeeping and Reporting Requirements for Gross Electrical Output and Useful Thermal Energy08/31/0710/16/07, 72 FR 58528
Start Printed Page 30670
225.455Clean Air Set-Aside (CASA)08/31/0710/16/07, 72 FR 58528
225.460Energy Efficiency and Conservation, Renewable Energy, and Clean Technology Projects08/31/0710/16/07, 72 FR 58528
225.465Clean Air Set-Aside (CASA) Allowances08/31/0710/16/07, 72 FR 58528
225.470Clean Air Set-Aside (CASA) Applications08/31/0710/16/07, 72 FR 58528
225.475Agency Action on Clean Air Set-Aside (CASA) Applications08/31/0710/16/07, 72 FR 58528
225.480Compliance Supplement Pool08/31/0710/16/07, 72 FR 58528
Subpart E: CAIR NO X Ozone Season Trading Program
225.500Purpose08/31/0710/16/07, 72 FR 58528
225.505Applicability08/31/0710/16/07, 72 FR 58528
225.510Compliance Requirements08/31/0710/16/07, 72 FR 58528
225.515Appeal Procedures08/31/0710/16/07, 72 FR 58528
225.520Permit Requirements08/31/0710/16/07, 72 FR 58528
225.525Ozone Season Trading Budget08/31/0710/16/07, 72 FR 58528
225.530Timing for Ozone Season Allocations08/31/0710/16/07, 72 FR 58528
225.535Methodology for Calculating Ozone Season Allocations08/31/0710/16/07, 72 FR 58528
225.540Ozone Season Allocations08/31/0710/16/07, 72 FR 58528
225.545New Unit Set-Aside (NUSA)08/31/0710/16/07, 72 FR 58528
225.550Monitoring, Recordkeeping and Reporting Requirements for Gross Electrical Output and Useful Thermal Energy08/31/0710/16/07, 72 FR 58528
225.555Clean Air Set-Aside (CASA)08/31/0710/16/07, 72 FR 58528
225.560Energy Efficiency and Conservation, Renewable Energy, and Clean Technology Projects08/31/0710/16/07, 72 FR 58528
225.565Clean Air Set-Aside (CASA) Allowances08/31/0710/16/07, 72 FR 58528
225.570Clean Air Set-Aside (CASA) Applications08/31/0710/16/07, 72 FR 58528
225.575Agency Action on Clean Air Set-Aside (CASA) Applications08/31/0710/16/07, 72 FR 58528
225.Appendix A:Specified EGUs for Purposes of the CPS (Midwest Generation's Coal-Fired Boilers as of July 1, 2006)06/26/0907/06/12, 77 FR 39943
Subchapter i: Open Burning
Part 237: Open Burning
Subpart A: General Provisions
237.101Definitions09/07/7105/31/72, 37 FR 10862Approved as Rule 401.
237.102Prohibitions09/07/7105/31/72, 37 FR 10862Approved as Rule 402.
237.103Explosive Wastes09/07/7105/31/72, 37 FR 10862Approved as Rule 405.
237.110Local Enforcement09/07/7105/31/72, 37 FR 10862Approved as Rule 406.
237.120Exemptions09/07/7105/31/72, 37 FR 10862Approved as Rule 403.
Subpart B: Permits
237.201Permits09/07/7105/31/72, 37 FR 10862Approved as Rule 404.
Subchapter k: Emission Standards and Limitations for Mobile Sources
Part 240: Mobile Sources
Subpart A: Definitions and General Provisions
240.101Preamble12/20/9408/13/14, 79 FR 47377
240.102Definitions02/01/1208/13/14, 79 FR 47377
240.103Prohibitions04/14/7208/13/14, 79 FR 47377
240.104Inspection02/01/1208/13/14, 79 FR 47377
240.105Penalties02/01/1208/13/14, 79 FR 47377
240.106Determination of Violation02/01/1208/13/14, 79 FR 47377
240.107Incorporations by Reference03/18/1108/13/14, 79 FR 47377
Subpart B: Emissions
240.121Smoke Emissions02/01/1208/13/14, 79 FR 47377
Start Printed Page 30671
240.122Diesel Engine Emissions Standards for Locomotives04/07/9208/13/14, 79 FR 47377
240.123Liquid Petroleum Gas Fuel Systems02/01/1208/13/14, 79 FR 47377
Subpart C: Smoke Opacity Standards and Test Procedures for Diesel-Powered Heavy Duty Vehicles
240.140Applicability02/26/0108/13/14, 79 FR 47377
240.141Smoke Opacity Standards and Test Procedures for Diesel-Powered Heavy Duty Vehicles02/26/0108/13/14, 79 FR 47377
Subpart D: Steady-State Idle Mode Test Emission Standards
240.151Applicability02/01/1208/13/14, 79 FR 47377
240.152Steady-State Idle Mode Vehicle Exhaust Emission Standards03/18/1108/13/14, 79 FR 47377
240.153Compliance Determination03/18/1108/13/14, 79 FR 47377
Subpart F: Evaporative Test Standards
240.171Applicability02/01/1208/13/14, 79 FR 47377
240.172Evaporative System Integrity Test Standards07/13/9808/13/14, 79 FR 47377
Subpart G: On-Road Remote Sensing Test Emission Standards
240.181Applicability03/18/1108/13/14, 79 FR 47377
240.182On-Road Remote Sensing Emission Standards03/18/1108/13/14, 79 FR 47377
240.183Compliance Determination07/13/9808/13/14, 79 FR 47377
Subpart H: On-Board Diagnostic Test Standards
240.191Applicability03/18/1108/13/14, 79 FR 47377
240.192On-Board Diagnostic Test Standards12/18/0108/13/14, 79 FR 47377
240.193Compliance Determination12/18/0108/13/14, 79 FR 47377
Subpart I: Visual Inspection Test Standards
240.201Applicability02/01/1208/13/14, 79 FR 47377
240.202Visual Inspection Test Standards02/01/1208/13/14, 79 FR 47377
240.203Compliance Determination02/01/1208/13/14, 79 FR 47377
240.Appendix A:Rule Into Section Table02/01/1208/13/14, 79 FR 47377
240.Appendix B:Section Into Rule Table02/01/1208/13/14, 79 FR 47377
Part 241: Clean Fuel Fleet Program
Subpart A: General Provisions
241.101Other Definitions09/11/9503/19/96, 61 FR 11139
241.102Definitions09/11/9503/19/96, 61 FR 11139
241.103Abbreviations09/11/9503/19/96, 61 FR 11139
241.104Incorporations by Reference09/11/9503/19/96, 61 FR 11139
Subpart B: General Requirements
241.110Applicability09/11/9503/19/96, 61 FR 11139
241.111Exemptions09/11/9503/19/96, 61 FR 11139
241.112Registration of Fleet Owners or Operators09/11/9503/19/96, 61 FR 11139
241.113Control Requirements11/25/9702/17/99, 64 FR 7788
241.114Conversions09/11/9503/19/96, 61 FR 11139
241.115Operating Requirements09/11/9503/19/96, 61 FR 11139
Subpart C: Credits
241.130Clean Fuel Fleet Credit Program11/25/9702/17/99, 64 FR 7788
241.131Credit Provisions09/11/9503/19/96, 61 FR 11139
Subpart D: Recordkeeping and Reporting
241.140Reporting Requirements11/25/9702/17/99, 64 FR 7788
241.141Recordkeeping Requirements09/11/9503/19/96, 61 FR 11139
241.142Report of Credit Activities09/11/9503/19/96, 61 FR 11139
Start Printed Page 30672
241.Appendix A:Emission Standards for Clean Fuel Vehicles09/11/9503/19/96, 61 FR 11139
241.Appendix B:Credit Values11/25/9702/17/99, 64 FR 7788
Subchapter l: Air Quality Standards and Episodes
Part 243: Air Quality Standards
Subpart A: General Provisions
243.101Definitions07/29/1305/20/15, 80 FR 28835
243.102Scope07/29/1305/20/15, 80 FR 28835
243.103Applicability07/29/1305/20/15, 80 FR 28835
243.104Nondegradation10/25/1105/23/13, 78 FR 30770
243.105Air Quality Monitoring Data Influenced by Exceptional Events07/29/1305/20/15, 80 FR 28835
243.106Monitoring04/14/7202/21/80, 45 FR 11472
243.107Reference Conditions11/27/1306/10/16, 81 FR 37517
243.108Incorporation by Reference06/09/1406/10/16, 81 FR 37517
Subpart B: Standards and Measurement Methods
243.120PM10 and PM2.511/27/1306/10/16, 81 FR 37517
243.122Sulfur Oxides (Sulfur Dioxide), and11/27/1306/10/16, 81 FR 37517
243.123Carbon Monoxide07/29/1305/20/15, 80 FR 28835
243.124Nitrogen Oxides (Nitrogen Dioxide as Indicator)07/29/1305/20/15, 80 FR 28835
243.125Ozone07/29/1305/20/15, 80 FR 28835
243.126Lead, and07/29/1305/20/15, 80 FR 28835
243.TABLE ASchedule of Exceptional Event Flagging and Documentation Submission for New or Revised NAAQS11/27/1306/10/16, 81 FR 37517
Part 244: Episodes
Subpart A: Definitions and General Provisions
244.101Definitions05/15/9201/12/93, 58 FR 3844
244.102Responsibility of the Agency08/18/7202/21/80, 45 FR 11472Approved as Rule 402.
244.103Determination of Required Actions08/18/7202/21/80, 45 FR 11472Approved as Rule 402.
244.104Determination of Atmospheric Conditions08/18/7202/21/80, 45 FR 11472Approved as Rule 402.
244.105Determination of Expected Contaminant Emissions08/18/7202/21/80, 45 FR 11472Approved as Rule 402.
244.106Monitoring05/15/9201/12/93, 58 FR 3844
244.107Determination of Areas Affected05/15/9201/12/93, 58 FR 3844
244.108Failure To Comply With Episode Requirements08/18/7202/21/80, 45 FR 11472Approved as Rule 402.
244.109Sealing of Offenders08/18/7202/21/80, 45 FR 11472Approved as Rule 402.
Subpart B: Local Agency Responsibilities
244.121Local Agency Responsibilities05/15/9201/12/93, 58 FR 3844
Subpart C: Episode Action Plans
244.141Requirement for Plans08/18/7202/21/80, 45 FR 11472Approved as Rule 404.
244.142Facilities for Which Action Plans Are Required08/18/7202/21/80, 45 FR 11472Approved as Rule 404.
244.143Submission of Plans08/18/7202/21/80, 45 FR 11472Approved as Rule 404.
244.144Contents of Plans08/18/7202/21/80, 45 FR 11472Approved as Rule 404.
244.145Processing Procedures08/18/7202/21/80, 45 FR 11472Approved as Rule 404.
Subpart D: Episode Stages
244.161Advisory, Alert and Emergency Levels05/15/9201/12/93, 58 FR 3844
244.162Criteria for Declaring an Advisory05/15/9201/12/93, 58 FR 3844
244.163Criteria for Declaring a Yellow Alert05/15/9201/12/93, 58 FR 3844
244.164Criteria for Declaring a Red Alert08/18/7202/21/80, 45 FR 11472Approved as Rule 405(e).
244.165Criteria for Declaring an Emergency08/18/7202/21/80, 45 FR 11472Approved as Rule 405(e).
244.166Criteria for Terminating Advisory, Alert and Emergency05/15/9201/12/93, 58 FR 3844
244.167Episode Stage Notification05/15/9201/12/93, 58 FR 3844
Start Printed Page 30673
244.168Contents of Episode Stage Notification05/15/9201/12/93, 58 FR 3844
244.169Actions During Episode Stages05/15/9201/12/93, 58 FR 3844
244.Appendix D:Required Emission Reduction Actions05/15/9201/12/93, 58 FR 3844
Chapter II: Environmental Protection Agency
Part 252: Public Participation in the Air Pollution Permit Program for Major Sources in Nonattainment Areas
Subpart A: Introduction
252.101Purpose06/01/8409/25/85, 50 FR 38803
252.102Applicability06/01/8409/25/85, 50 FR 38803
252.103Definitions06/01/8409/25/85, 50 FR 38803
Subpart B: Procedures for Public Review
252.201Notice and Opportunity To Comment06/01/8409/25/85, 50 FR 38803
252.202Draft Permit and Denial Letter06/01/8409/25/85, 50 FR 38803
252.203Availability of Documents06/01/8409/25/85, 50 FR 38803
252.204Opportunity for Public Hearing06/01/8409/25/85, 50 FR 38803
Part 254: Annual Emissions Report
Subpart A: General Provisions
254.101Purpose07/17/0105/15/02, 67 FR 34614
254.102Applicability04/20/1207/03/13, 67 FR 40013
254.103Definitions07/17/0105/15/02, 67 FR 34614
254.120Applicable Pollutants for Annual Emissions Reporting07/17/0105/15/02, 67 FR 34614
254.132Failure To File a Complete Report07/17/0105/15/02, 67 FR 34614
254.133Voluntary Submittal of Data05/14/9305/15/02, 67 FR 34614
254.134Retention of Records07/17/0105/15/02, 67 FR 34614
254.135Reporting of Errors07/17/0105/15/02, 67 FR 34614
254.136Confidentiality and Trade Secret Protection07/17/0105/15/02, 67 FR 34614
254.137Reporting Schedule07/17/0105/15/02, 67 FR 34614
254.138Issuance of Source Inventory Report07/17/0105/15/02, 67 FR 34614
Subpart B: Reporting Requirements for Large Sources
254.203Contents of Subpart B Annual Emissions Report07/17/0105/15/02, 67 FR 34614
254.204Complete Reports07/17/0105/15/02, 67 FR 34614
Subpart C: Reporting Requirements for Other Sources
254.303Contents of Subpart C Annual Emissions Report07/17/0105/15/02, 67 FR 34614
254.306Complete Reports07/17/0105/15/02, 67 FR 34614
Subpart E: Seasonal Emissions Report Under ERMS
254.501Contents of a Seasonal Emissions Report07/17/0105/15/02, 67 FR 34614
Part 255: General Conformity: Criteria and Procedures
255.100Purpose03/06/9712/23/97, 62 FR 67000
255.110Federal Requirement03/06/9712/23/97, 62 FR 67000
255.120Applicability03/06/9712/23/97, 62 FR 67000
255.140Definitions03/06/9712/23/97, 62 FR 67000
255.150Abbreviations03/06/9712/23/97, 62 FR 67000
255.160Incorporations by Reference03/06/9712/23/97, 62 FR 67000
255.170Activities Exempt From Conformity Analysis03/06/9712/23/97, 62 FR 67000
255.180Conformity Analysis03/06/9712/23/97, 62 FR 67000
255.190Reporting Requirements03/06/9712/23/97, 62 FR 67000
255.200Public Participation03/06/9712/23/97, 62 FR 67000
255.210Frequency of Conformity Determinations03/06/9712/23/97, 62 FR 67000
255.220Criteria for Determining Conformity of General Federal Actions03/06/9712/23/97, 62 FR 67000
255.230Procedures for Conformity Determinations of General Federal Actions03/06/9712/23/97, 62 FR 67000
Start Printed Page 30674
255.240Mitigation of Air Quality Impacts03/06/9712/23/97, 62 FR 67000
Part 276: Procedures To Be Followed in the Performance of Inspections of Motor Vehicle Emissions
Subpart A: General Provisions
276.101Purpose and Applicability06/28/1108/13/14, 79 FR 47377
276.102Definitions01/30/1208/13/14, 79 FR 47377
276.103Abbreviations06/28/1108/13/14, 79 FR 47377
276.104Incorporations by Reference01/30/1208/13/14, 79 FR 47377
276.105Sunset Provisions01/30/1208/13/14, 79 FR 47377
Subpart B: Vehicle Emissions Inspection Procedures
276.201General Description of Vehicle Emissions Inspection Procedures01/30/1208/13/14, 79 FR 47377
276.202Pollutants To Be Tested—Exhaust Test09/28/9808/13/14, 79 FR 47377
276.203Dilution—Steady-State Idle Exhaust Test and Transient Loaded Mode Exhaust Test06/28/1108/13/14, 79 FR 47377
276.204Steady-State Idle Exhaust Emissions Test Procedures06/28/1108/13/14, 79 FR 47377
276.205Evaporative System Integrity Test Procedures06/28/1108/13/14, 79 FR 47377
276.206Engine and Fuel Type Modifications06/14/9608/13/14, 79 FR 47377
276.208On-Road Remote Sensing Test Procedures09/28/9808/13/14, 79 FR 47377
276.209On-Board Diagnostic Test Procedures06/28/1108/13/14, 79 FR 47377
276.210Visual Inspection Test Procedures01/30/1208/13/14, 79 FR 47377276.210
Subpart C: Sticker or Certificate Issuance, Display, and Possession
276.301General Requirements06/28/1108/13/14, 79 FR 47377
276.302Determination of Affected Counties01/30/1208/13/14, 79 FR 47377
276.303Emissions Inspection Sticker or Certificate Design and Content06/28/1108/13/14, 79 FR 47377
Subpart D: Waiver and Economic Hardship Extension Requirements
276.401Waiver Requirements06/28/1108/13/14, 79 FR 47377
276.403Denial or Issuance of Waiver01/30/1208/13/14, 79 FR 47377
276.404Economic Hardship Extension Requirements01/30/1208/13/14, 79 FR 47377
276.405Outside of Affected Counties Annual Exemption Requirements01/30/1208/13/14, 79 FR 47377
Subpart E: Test Equipment Specifications
276.501General Requirements06/28/1108/13/14, 79 FR 47377
276.502Steady-State Idle Exhaust Test Analysis Systems Functional Requirements06/28/1108/13/14, 79 FR 47377
276.503Steady-State Idle Exhaust Test Analysis Systems Performance Criteria06/28/1108/13/14, 79 FR 47377
276.504Evaporative System Integrity Test Functional Requirements and Performance Criteria06/28/1108/13/14, 79 FR 47377
276.507On-Road Remote Sensing Test Systems Functional Requirements and Performance Criteria06/28/1108/13/14, 79 FR 47377
276.508On-Board Diagnostic Test Systems Functional Requirements and Performance Criteria06/28/1108/13/14, 79 FR 47377
Subpart F: Equipment Maintenance and Calibration
276.601Steady-State Idle Test Equipment Maintenance09/28/9808/13/14, 79 FR 47377
276.602Steady-State Idle Test Equipment Calibration06/28/1108/13/14, 79 FR 47377
276.603Evaporative System Integrity Test Maintenance and Calibration09/28/9808/13/14, 79 FR 47377
276.604Record Keeping06/28/1108/13/14, 79 FR 47377
276.606On-Road Remote Sensing Test Systems Maintenance and Calibration09/28/9808/13/14, 79 FR 47377
276.607On-Board Diagnostic Test Systems Maintenance and Calibration09/28/9808/13/14, 79 FR 47377
Start Printed Page 30675
Subpart G: Fleet Self-Testing Requirements
276.701General Requirements06/28/1108/13/14, 79 FR 47377
276.702Fleet Inspection Permit06/28/1108/13/14, 79 FR 47377
276.703Fleet Inspection Permittee Operating Requirements06/28/1108/13/14, 79 FR 47377
276.704Private Official Inspection Station Auditing and Surveillance06/28/1108/13/14, 79 FR 47377
276.705Fleet Vehicle Inspection Procedures (Renumbered)06/14/9608/13/14, 79 FR 47377
Subpart H: Grievance Procedure
276.801General Requirements06/14/9608/13/14, 79 FR 47377
276.802Procedure for Filing Grievance06/28/1108/13/14, 79 FR 47377
276.803Agency Investigation06/28/1108/13/14, 79 FR 47377
276.804Review of Agency's Determination06/14/9608/13/14, 79 FR 47377
Subpart I: Notices
276.901General Requirements06/28/1108/13/14, 79 FR 47377
276.902Vehicle Emissions Test Notice06/28/1108/13/14, 79 FR 47377
Subpart J: Reciprocity With Other Jurisdictions
276.1001Requirements for Vehicles Registered in Affected Counties and Located in Other Jurisdictions Requiring Vehicle Emissions Inspection06/28/1108/13/14, 79 FR 47377
276.1002Requirements for Vehicles Registered in Other Jurisdictions Requiring Vehicle Emissions Inspection and Located in an Affected County06/28/1108/13/14, 79 FR 47377
Subpart K: Repair Facility Performance Reporting
276.1101Requirements for Collecting and Reporting Data Pertaining to the Repair of Vehicles That Failed or Were Rejected From an Emissions Inspection06/28/1108/13/14, 79 FR 47377
Part 283: General Procedures for Emissions Tests Averaging
Subpart A: Introduction
283.110Purpose09/11/0005/09/03, 68 FR 24885
283.120Applicability09/11/0005/09/03, 68 FR 24885
283.130Definitions09/11/0005/09/03, 68 FR 24885
Subpart B: Procedures for Averaging of Test Results
283.210Criteria for Averaging Tests09/11/0005/09/03, 68 FR 24885
283.220Test Plan Requirements09/11/0005/09/03, 68 FR 24885
283.230Changes to the Test Plan09/11/0005/09/03, 68 FR 24885
283.240Averaging Procedure09/11/0005/09/03, 68 FR 24885
283.250Compliance Determination09/11/0005/09/03, 68 FR 24885
State Statutes
20 ILCS 605/46.13aCivil Administrative Code09/21/9208/30/93, 58 FR 45448Subsection 46.13(a) [Approved Under Public Act 87-1177].
415 ILCS 5/9Illinois Environmental Protection Act06/21/9605/29/02, 67 FR 37323Section 9(f) [Approved Under Public Act 89-491].
415 ILCS 5/9.1Illinois Environmental Protection Act09/17/9112/17/92, 57 FR 59928(Ch. 111 1/2, par. 1009.1) par. 1009.1(a), (b), (c), (d) and (f). [Approved Under Public Act 87-555].
415 ILCS 5/9.9Illinois Environmental Protection Act07/01/0111/08/2001, 66 FR 56454Section 9.9(f) [Approved Under Public Act 92-0012].
415 ILCS 5/39.5Illinois Environmental Protection Act09/26/9208/30/93, 58 FR 45448Subsection 20 [Approved Under Public Act 87-1213].
Start Printed Page 30676
625 ILCS 5/13BIllinois Vehicle Code01/18/9407/25/96, 61 FR 38582625 ILCS 5/13B [Approved Under Public Act 88-533].

(d) EPA approved state source-specific requirements.

EPA-Approved Illinois Source-Specific Requirements

Name of sourceOrder/permit No.State effective dateEPA approval dateComments
Alumax Incorporated, Morris, ILPCB AS 92-1309/01/199402/01/1996, 61 FR 3575
Argonne National LaboratoryPCB AS 03-412/18/200307/28/2004, 69 FR 44967
Bema Film Systems, Incorporated, DuPage CoPCB AS 00-1101/18/200111/30/2001, 66 FR 59702
Central Can Company (CCC), Chicago, ILPCB AS 94-1808/06/98, eff. 7/01/9103/18/1999, 64 FR 13346
Chase Products Company, Broadview (Cook Co.)PCB AS 94-405/16/199606/09/1997, 62 FR 31341
City Water, Light & Power, City of Springfield909004606/23/201107/06/2012, 77 FR 39943Joint Construction and Operating Permit.
CP-D Acquisition Company, LLC. (formerly Cromwell-Phoenix, Inc)PCB AS 03-0511/20/200310/29/2008, 73 FR 64213
Ford Motor CompanyPCB, AS 02-0311/21/200203/22/2004, 69 FR 13239
Ford Motor Company Chicago Assembly PlantPCB, AS 05-509/01/200509/06/2006, 71 FR 52464
Greif Packaging, LLC, Naperville, DuPage CoPCB AS 2011-0104/05/201210/22/2012, 77 FR 64422
IL Power Company's Baldwin Power StationPCB 79-709/08/198304/18/1990, 55 FR 14419Emission limits within Paragraph 1 of Final Order.
IPH/Ameren EnergyPCB 14-1011/21/201312/21/2015, 80 FR 79261Certificate of Acceptance, filed with the Illinois Pollution Control Board Clerk's Office 12/20/13.
Kincaid Generation, LLC905002206/24/201107/06/2012, 77 FR 39943Joint Construction and Operating Permit.
Laclede Steel Sulfur dioxide plan9307003011/18/9304/20/1994, 59 FR 18752FESOP for boilers and reheat furnaces.
Leisure Properties LLC/D/B/A Crownline Boats, West Frankfort, IllinoisPCB AS 04-0107/22/200404/20/2012, 77 FR 23622Effective date identified in error as 07/22/02 in the document heading. Due to ownership change, the Board transferred the adjusted standard to Leisure Properties LLC D/B/A Crownline Boats by Board order AS04-l, effective 10/07/10.
Louis Berkman Company, d/b/a/ the Swenson Spreader Company's Lindenwood, Ogle CoPCB, AS 97-505/07/199805/27/2004, 69 FR 30224
LTV Steel Company, Inc.9812009105/14/199907/14/1999, 64 FR 37847Federally Enforceable State Operating Permit.
Midwest Generation, LLCPCB 12-12108/23/201207/20/2015, 80 FR 42726Certificate of Acceptance, dated 08/24/12, filed with the Illinois Pollution Control Board Clerk's Office 08/27/12.
Midwest Generation, LLCPCB 13-2404/04/201307/20/2015, 80 FR 42726Certificate of Acceptance, dated 05/16/13, filed with the Illinois Pollution Control Board Clerk's Office 05/17/13.
National Steel Corporation, Granite City Division9501000510/21/199703/11/1998, 63 FR 11842Joint Construction and Operating Permit.
Quantum Chemical Corporation, Morris, Aux Sable Township, Grundy CoPCB AS 92-1410/07/199304/03/1995, 60 FR 16803adjusted standard.
Reynolds Metals Company's McCook Sheet and Plate Plant in McCook, IL (in Cook Co.)PCB AS 91-809/21/199501/21/1997, 62 FR 2916
Start Printed Page 30677
Royal Fiberglass Products, d/b/a Viking PoolsPCB AS 09-1409/05/201307/14/2014, 79 FR 40673
Solar Corporation, Libertyville, ILPCB AS 94-207/20/199502/23/1998, 63 FR 8855
Sun Chemical Corporation, Northlake, ILPCB AS 99-405/20/199909/13/1999, 64 FR 49400
Vonco Products, Incorporated, Lake CoPCB AS 00-1201/18/200111/30/2001, 66 FR 59704

(e) EPA approved nonregulatory and quasi-regulatory provisions.

EPA-Approved Illinois Nonregulatory and Quasi-Regulatory Provisions

Name of SIP provisionApplicable geographic or nonattainment areaState submittal dateEPA approval dateComments
Air quality surveillance networkState-wide12/20/7903/04/1981, 46 FR 15137
Coal banChicago Area10/22/7303/02/1976, 41 FR 8956
Compliance schedulesState-wide03/13/73, 04/03/73, 05/03/73, 06/15/73, and 08/07/7303/02/1976, 41 FR 8956
Regional haze planStatewide6/24/1107/06/2012, 77 FR 39943
Small business stationary source technical and environmental compliance assistance programState-wide11/12/9208/30/1993, 58 FR 45451
Total Suspended Particulate Control Strategy analysisState-wide10/01/8109/30/1982, 47 FR 43054
Transportation control planChicago Area04/17/7303/02/1976, 41 FR 8956
Transportation control planChicago Area04/30/8001/27/1981, 46 FR 8472
Transportation control planChicago Area08/20/80 and 03/20/8111/16/1981, 46 FR 56196
Transportation control planPeoria Area10/15/8011/16/1981, 46 FR 56196
Transportation control planSt. Louis Area04/01/8111/16/1981, 46 FR 56196
Transportation control plansChicago and St. Louis areas12/03/8210/04/1990, 55 FR 40658
Attainment and Maintenance Plans
Carbon monoxide attainment demonstrationChicago Area05/04/8310/04/1990, 55 FR 40658
Lead (1978) attainment and maintenance planGranite City area09/30/8307/24/1984, 49 FR 29790
Lead (2008)—Clean Data DeterminationChicago AreaN/A08/25/2015, 80 FR 51131
Ozone (1-hour) attainment demonstrationChicago area12/26/0011/13/2001, 66 FR 56904
Ozone (1-hour) attainment demonstrationSt. Louis area11/15/99, 02/10/00, 04/13/01, and 04/30/016/26/2001, 66 FR 33996EPA is disapproving the request for an exemption from the NOX NSR and certain NOX conformity requirements for Madison, Monroe, and St. Clair Counties.
Ozone (1-hour) attainment plan revisionChicago severe nonattainment area04/11/0309/15/2003, 68 FR 53887
Ozone (1-hour) redesignation and maintenance planJersey County11/12/9303/14/1995, 60 FR 13634
Ozone (1-hour) redesignation and maintenance planSt. Louis Area12/30/0205/12/2003, 68 FR 25542
Ozone (1-hour revoked) finding of attainmentChicago area01/30/0712/30/2008, 73 FR 79652
Start Printed Page 30678
Ozone (8-hour, 1997) Determination of AttainmentChicago areaN/A07/08/2011, 76 FR 40262Correction to codification published on 03/12/10 at 75 FR 12088.
Ozone (8-hour, 1997) Determination of AttainmentSt. Louis areaN/A06/09/2011, 76 FR 33647
Ozone (8-hour, 1997) maintenance plan revisionChicago area03/28/1410/06/2014, 79 FR 60073Revised VOC and NOX Motor Vehicle Emissions Budgets (MVEB) for the year 2025.
Ozone (8-hour, 1997) redesignation and maintenance planChicago area07/23/09, and 09/16/1108/13/2012, 77 FR 48062
Ozone (8-hour, 1997) redesignation and maintenance planSt. Louis area05/26/10, and 09/16/1106/12/2012, 77 FR 34819
Ozone (8-hour, 2008) Determination of AttainmentSt. Louis areaN/A06/27/2016, 81 FR 41444determination that the area attained by the 07/20/2016 attainment date.
PM10 maintenance planGranite City area03/19/96, and 10/15/9603/11/1998, 47 FR 11842
PM10 maintenance planLake Calumet (Southeast Chicago), Cook County08/02/05, as supplemented on 09/08/0509/22/2005, 70 FR 55545
PM10 maintenance planLaSalle County06/02/95, and 01/09/9608/08/1996, 61 FR 41342
PM10 maintenance planLyons Township (McCook), Cook County08/02/0509/22/2005, 70 FR 55541
PM2.5 (1997)—Clean Data DeterminationSt. Louis areaN/A05/23/2011, 76 FR 29652
PM2.5 (1997)—Determination of AttainmentChicago areaN/A11/27/2009, 74 FR 62243
PM2.5 (1997)—Determination of AttainmentSt. Louis areaN/A06/27/2012, 77 FR 38184
PM2.5 (1997)—maintenance plan and motor vehicle emissions budgetsChicago area10/15/10, supplemented on 09/16/11, and 05/06/1310/02/2013, 78 FR 60704
Sulfur dioxide control strategyCincinnati, Pekin and Elm Grove Townships in Tazewell County and Logan and Limestone Townships in Peoria County03/24/83 and 05/03/8308/08/1984, 49 FR 31685Correction to codification published on 02/09/94 at 59 FR 5955.
Sulfur dioxide maintenance planPeoria and Hollis Townships in Peoria County and Groveland Township in Tazewell County11/10/9460 FR 17001, 4/4/1995
Emission Inventories
Emission inventory—1990 (1-hour ozone)Chicago and St. Louis areas11/12/9303/14/1995, 60 FR 13631
Emission inventories—2002 (NOX, primary PM2.5, SO2, ammonia, and VOC)Chicago area10/15/10, supplemented on 05/06/1310/02/2013, 78 FR 60704
Emissions inventory—2002 (1997 8-hour ozone)St. Louis area05/26/10, supplemented on 09/16/1106/12/2012, 77 FR 34819
Emissions inventory—2002 (1997 8-hour ozone)Chicago area06/21/06, supplemented on 09/16/1108/13/2012, 77 FR 48062
Emission inventory—2011 (2008 8-hour ozone)Chicago and St. Louis areas09/03/1403/07/2016, 81 FR 11671
Moderate Area & Above Ozone Requirements
15 percent rate-of-progress and 3 percent contingency plansChicago and St. Louis areas11/15/9312/18/1997, 62 FR 66279
Negative declaration—Natural gas/gasoline processing plantsState-wide11/14/8511/24/1986, 51 FR 42221
Negative declaration—Aerospace manufacturing and rework industryChicago and St. Louis areas10/11/9602/11/1997, 62 FR 6127
Start Printed Page 30679
Negative declaration—Industrial cleaning solvents categorySt. Louis area10/02/9801/06/1999, 64 FR 756
Negative declaration—Industrial cleaning solvents categoryChicago area12/23/9902/07/2001, 66 FR 9206
Negative declaration—Industrial wastewater categoryChicago area12/23/9904/27/2001, 66 FR 21096
Negative declaration—Industrial wastewater categorySt. Louis area10/02/9801/06/1999, 64 FR 756
Negative declaration—Shipbuilding and ship repair industryChicago and St. Louis areas10/11/9602/11/1997, 62 FR 6126
NOX RACT waiver (1997 8-hour ozone)Chicago and St. Louis areas07/29/1002/22/2011, 76 FR 9655
NOX waiver—RACT, NSR, vehicle I/M, and general conformityChicago severe nonattainment area07/13/9401/26/1996, 61 FR 2428does not cover the exemption of NOX transportation conformity requirements.
NOX waiver—transportation conformity requirementsChicago severe nonattainment area06/20/9502/12/1996, 61 FR 5291
Photochemical assessment ambient monitoring system (PAMS)11/04/9302/25/1994, 59 FR 9091
Post-1996 Rate Of Progress PlanChicago area12/18/97, 12/17/99, 01/14/00, 01/21/00, and 02/17/0012/18/2000, 65 FR 78961Includes Contingency measure plan and Transportation Control Measures (TCMs).
Transportation control measures as part of the 15 percent rate-of-progress and 3 percent contingency plansSt. Louis area11/15/9312/18/1997, 62 FR 66279Work trip reductions; transit improvements; and traffic flow improvements.
Vehicle miles traveled (VMT) SIP and, transportation control measures (TCMs) as part of the 15 percent rate-of-progress planChicago area07/14/199409/21/1995, 60 FR 48896
Section 110(a)(2) Infrastructure Requirements
1997 8-hour Ozone NAAQS Infrastructure RequirementsStatewide12/12/077/13/2011, 76 FR 41075CAA elements 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(ii), (E) through (H), (J) except for prevention of significant deterioration (PSD), and (K) through (M) have been approved. CAA elements 110(a)(2)(C) and (J) with respect to PSD have been disapproved.
1997 PM2.5 NAAQS Infrastructure RequirementsStatewide12/12/077/13/2011, 76 FR 41075CAA elements 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(ii), (E) through (H), (J) except for prevention of significant deterioration (PSD), and (K) through (M) have been approved. CAA elements 110(a)(2)(C) and (J) with respect to PSD have been disapproved.
2006 24-hour PM2.5 NAAQS Infrastructure RequirementsStatewide08/09/11, supplemented on 08/25/11, and 06/27/128/26/2015, 80 FR 51730CAA elements 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(i)(II) with respect to visibility protection, (E)(i), (E)(iii), (F) through (H), (J) except for prevention of significant deterioration (PSD), and (K) through (M) have been approved. CAA elements 110(a)(2)(E)(ii), (D)(ii) and the PSD portions of (C), (D)(i)(II), and (J) have been disapproved.
Start Printed Page 30680
2008 Lead NAAQS Infrastructure RequirementsStatewide12/31/127/16/2014, 79 FR 41439CAA elements 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(i)(I), (D)(i)(II) with respect to visibility protection, (E)(i), (E)(iii), (F) through (H), (J) except for prevention of significant deterioration (PSD), and (K) through (M) have been approved. CAA elements 110(a)(2)(D)(ii) and the PSD portions of (C), (D)(i)(II), and (J) have been disapproved.
2008 Ozone NAAQS Infrastructure RequirementsStatewide12/31/128/26/2015, 80 FR 51730CAA elements 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(i)(II) with respect to visibility protection, (E)(i), (E)(iii), (F) through (H), (J) except for prevention of significant deterioration (PSD), and (K) through (M) have been approved. CAA elements 110(a)(2)(D)(ii), (E)(ii), and the PSD portions of (C), (D)(i)(II), and (J) have been disapproved.
2010 NO2 NAAQS Infrastructure RequirementsStatewide12/31/125/22/2015, 80 FR 29535CAA elements 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(i)(I), (D)(i)(II) with respect to visibility protection, (E)(i), (E)(iii), (F) through (H), (J) except for prevention of significant deterioration (PSD), and (K) through (M) have been approved. CAA elements 110(a)(2)(D)(ii) and the PSD portions of (C), (D)(i)(II), and (J) have been disapproved.
2010 SO2 NAAQS Infrastructure RequirementsStatewide12/31/125/22/2015, 80 FR 29535CAA elements 110(a)(2)(A), (B), (C) with respect to enforcement, (D)(i)(II) with respect to visibility protection, (E)(i), (E)(iii), (F) through (H), (J) except for prevention of significant deterioration (PSD), and (K) through (M) have been approved. CAA elements 110(a)(2)(D)(ii) and the PSD portions of (C), (D)(i)(II), and (J) have been disapproved.
[Removed and reserved]
Start Amendment Part

4. Remove and reserve § 52.729.

End Amendment Part
[Removed and reserved]
Start Amendment Part

5. Remove and reserve § 52.745.

End Amendment Part
[Removed and reserved]
Start Amendment Part

6. Remove and reserve § 52.746.

End Amendment Part End Supplemental Information

[FR Doc. 2017-13659 Filed 6-29-17; 8:45 am]

BILLING CODE 6560-50-P