Skip to Content

Notice

Availability of a Draft Integrated Feasibility Report (Feasibility Report/Environmental Impact Statement), Aliso Creek Mainstem Ecosystem Restoration Study, Orange County, California

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Enhanced Content

Relevant information about this document from Regulations.gov provides additional context. This information is not part of the official Federal Register document.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Department of the Army, U.S. Army Corps of Engineers, DoD.

ACTION:

Notice; extension of comment period.

SUMMARY:

The comment period for the Availability of a Draft Integrated Feasibility Report (Feasibility Report/Environmental Impact Statement), Aliso Creek Mainstem Ecosystem Restoration Study, Orange County, CA published in the Federal Register on Friday, September 29, 2017 and required comments be submitted by November 13, 2017. The comment period has been extended to November 28, 2017.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Ms. Deborah Lamb, U.S. Army Corps of Engineers, Los Angeles District, phone number (213) 452-3798.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

None.

Start Signature

Brenda S. Bowen,

Army Federal Register Liaison Officer.

End Signature End Supplemental Information

[FR Doc. 2017-23154 Filed 10-24-17; 8:45 am]

BILLING CODE 3720-58-P