Skip to Content

Notice

Notice of Meeting; Jordan Cove Energy Project, LP; Pacific Connector Gas Pipeline, LP

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

The environmental staff of the Federal Energy Regulatory Commission (Commission) along with representatives of the U.S. Forest Service, Bureau of Land Management, and the U.S. Army Corps of Engineers will meet with representatives of the Karuk Tribe to discuss the proposed Jordan Cove LNG and Pacific Connector Pipeline Projects. The meeting will be held at the location and time listed below:

Karuk Tribe—Headway Building, 64236 Second Avenue, Happy Camp, CA 96039, Phone: (530) 493-5322, Wednesday, July 18, 2018, 3:30 p.m. PDT

Members of the public and intervenors in the referenced proceeding may attend and observe this meeting; however, participation will be limited to tribal representatives and agency personnel. If tribal representatives decide to disclose information about a specific location which could create a risk or harm to an archeological site or Native American cultural resource, the public will be excused for that portion of the meeting. A summary of the meeting will be entered into the Commission's administrative record.

If you plan to attend this meeting, please contact Mr. John Peconom, Environmental Project Manager at (202) 502-6352 or John.Peconom@ferc.gov.

Start Signature

Dated: July 10, 2018.

Nathaniel J. Davis, Sr.,

Deputy Secretary.

End Signature End Preamble

[FR Doc. 2018-15127 Filed 7-13-18; 8:45 am]

BILLING CODE 6717-01-P