This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Proposed Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Comments must be received on or before December 14, 2018.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Air Plan Approval; Texas; Reasonably Available Control Technology
Public Comments
Enhanced Content - Public Comments
Comments are no longer being accepted.
See DATES for details.
3 comments have
been received at Regulations.gov.
Agencies review all submissions and may choose to redact, or withhold,
certain submissions (or portions thereof). Submitted comments may not be
available to be read until the agency has approved them.
Docket Title
Document ID
Comments
TX208 Texas Dallas-Fort Worth 2008 Eight-Hour Ozone Standard Nonattainment Area Reasonably Available Control Technology Update SIP Revision and Agreed Order with TXI Operations, LP, TCEQ Project Nos 2017-001-SIP-NR and 2018-010-SIP-NR, submitted to EPA August 21, 2018 (TX-413, SIP)
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
TX208 Texas Dallas-Fort Worth 2008 Eight-Hour Ozone Standard Nonattainment Area Reasonably Available Control Technology Update SIP Revision and Agreed Order with TXI Operations, LP, TCEQ Project Nos 2017-001-SIP-NR and 2018-010-SIP-NR, submitted to EPA August 21, 2018 (TX-413, SIP)
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
167
as of
10/05/2026 at 12:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2018-24658 as it appeared on Public Inspection on
11/13/2018 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2018-24658 (83 FR 56770)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Proposed rule.
SUMMARY:
The Environmental Protection Agency (EPA) is proposing to convert its September 22, 2017 conditional approval of revisions to the Texas State Implementation Plan (SIP), addressing Oxides of Nitrogen (NOX) Reasonably Available Control Technology (RACT) for the TXI Operations, LP (Texas Industries, Inc., TXI) cement manufacturing plant in Ellis County, to full approval. The August 21, 2018 SIP submittal satisfies Texas' commitment which was the basis for our conditional approval of NOX
RACT for this plant. Final approval of this SIP submittal will convert our earlier conditional approval to full approval. We are taking this action in accordance with the Clean Air Act (CAA, the Act) requirements.
( printed page 56771)
DATES:
Comments must be received on or before December 14, 2018.
ADDRESSES:
Submit your comments, identified by Docket No. EPA-R06-OAR-2018-0675 at
http://www.regulations.gov
or via email to
shar.alan@epa.gov. Follow the online instructions for submitting comments. Once submitted, comments cannot be edited or removed from
Regulations.gov. The EPA may publish any comment received to its public docket. Do not submit electronically any information you consider to be Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Multimedia submissions (audio, video, etc.) must be accompanied by a written comment. The written comment is considered the official comment and should include discussion of all points you wish to make. The EPA will generally not consider comments or comment contents located outside of the primary submission (
i.e.
on the web, cloud, or other file sharing system). For additional submission methods, please contact Mr. Alan Shar, (214) 665-6691,
shar.alan@epa.gov. For the full EPA public comment policy, information about CBI or multimedia submissions, and general guidance on making effective comments, please visit
http://www2.epa.gov/dockets/commenting-epa-dockets.
Docket:
The index to the docket for this action is available electronically at
www.regulations.gov
and in hard copy at the EPA Region 6, 1445 Ross Avenue, Suite 700, Dallas, Texas. While all documents in the docket are listed in the index, some information may be publicly available only at the hard copy location (
e.g.,
copyrighted material), and some may not be publicly available at either location (
e.g.,
CBI).
FOR FURTHER INFORMATION CONTACT:
Mr. Alan Shar (6MM-AA), (214) 665-6691,
shar.alan@epa.gov. To inspect the hard copy materials, please schedule an appointment with Alan Shar.
SUPPLEMENTARY INFORMATION:
Throughout this document “we,” “us,” and “our” refer to EPA.
Outline
I. Background
A. RACT and the RACT Requirements Relevant for This Action
B. Conditional Approval
II. Evaluation
III. Proposed Action
IV. Incorporation by Reference
V. Statutory and Executive Order Reviews
I. Background
As a part of its July 10, 2015 Dallas Fort Worth (DFW) SIP submittal, TCEQ conducted RACT analyses to demonstrate that the RACT requirements for affected NOX
sources in the DFW 2008 8-Hour Ozone nonattainment area have been satisfied, relying on the NOX
RACT rules EPA had previously approved for the DFW area for its classification as Serious for the 1997 8-Hour Ozone standard. See March 27, 2015 (80 FR 16292), and 40 CFR 51.1112. The RACT analysis is contained in Appendix F of the TCEQ July 10, 2015 SIP submittal as a component of the DFW 2008 8-Hour Ozone attainment demonstration plan. On September 22, 2017, we conditionally approved NOX
RACT for the TXI cement manufacturing plant in Ellis County, and fully approved NOX
RACT for all other affected sources in the ten county DFW 2008 8-Hour Ozone nonattainment area.
On August 21, 2018 TCEQ submitted a revision to Texas SIP addressing NOX
RACT for the TXI cement manufacturing plant in Ellis County as a part of its DFW 2008 8-Hour Ozone National Ambient Air Quality Standards (NAAQS) SIP update. The August 21, 2018 SIP submittal contains both an Agreed Order (AO) concerning TXI and a SIP narrative for DFW NOX
RACT.
A. RACT and the RACT Requirements Relevant for This Action
Section 172(c)(1) of the Clean Air Act (CAA, Act) requires that SIPs for nonattainment areas “provide for the implementation of all reasonably available control measures as expeditiously as practicable (including such reductions in emissions from existing sources in the area as may be obtained through the adoption, at a minimum, of reasonably available control technology) and shall provide for attainment of the primary National Ambient Air Quality Standards (NAAQS).” The EPA has defined RACT as the lowest emissions limitation that a particular source is capable of meeting by the application of control technology that is reasonably available, considering technological and economic feasibility.[1]
Section 182(b)(2) of the Act requires states to submit a SIP revision and implement RACT for major stationary sources in moderate and above ozone nonattainment areas. For a Moderate, Serious, or Severe area, a major stationary source is one that emits, or has the potential to emit, 100, 50, or 25 tons per year (tpy) or more of VOCs or NOX
, respectively.[2]
The DFW area was classified as Serious on December 20, 2010 (75 FR 79302). Ellis County is one of the ten Counties constituting the DFW 2008 8-Hour Ozone nonattainment area. Thus, per section 182(c) of the CAA, a major stationary source in the DFW area, is one which emits, or has the potential to emit, 50 tpy or more of VOCs or NOX
. The TXI cement manufacturing plant in Ellis County is a major source of NOX, and subject to RACT.
The terms “TXI Operations, LP”, “TXI”, “Martin Marietta”, and “MM” are used interchangeably in this action.[3]
The EPA provides states with guidance concerning what types of controls could constitute RACT for a given source category through the issuance of Control Technique Guidelines (CTG) and Alternative Control Techniques (ACT) documents.[4]
B. Conditional Approval
Under section 110(k)(4) of the Act, the Administrator may approve a plan revision based on a commitment of the State to adopt specific enforceable measures by a date certain, but not later than 1 year after the date of approval of the plan revision. Any such conditional approval shall be treated as a disapproval, if the State fails to comply with such commitment.
The EPA conditionally approved NOX
RACT for the TXI cement manufacturing plant in Ellis County on September 22, 2017 (82 FR 44320), with an effective date of October 23, 2017.[5]
The RACT determination action was based on the State's written commitment to EPA that through an AO or rulemaking action, between TCEQ and TXI, certain conditions of their air permit, concerning the NOX
emission limitation of 1.95 lb/ton of clinker produced from kiln #5, would be incorporated into a forthcoming revision to the Texas SIP.[6]
This SIP revision was necessary so that the emission limit relied upon to implement NOX
RACT would be part of the Texas SIP. The forthcoming revision to the Texas SIP was to be submitted to EPA no later than one year from the effective date of final conditional approval of the NOX
RACT for kiln #5, or no later than October 23, 2018. See section 110(k)(4) of the CAA.
The August 21, 2018 SIP submittal was provided to fulfil TCEQ's written commitment to EPA. RACT for the TXI
( printed page 56772)
cement kiln #5 is fulfilled by an AO [7]
which is included in the SIP submittal and will become part of the SIP, if EPA finalizes this proposed approval. The scope of this rulemaking action is strictly limited to evaluating the SIP revision, including the AO, and whether it meets the requirements of the conditional approval. The AO includes incorporation of certain TXI's New Source Review (NSR) SIP permit conditions (Specific Conditions 3.A(1)-(3) of NSR Permit 1360A(PSDTX632M1)) such that the AO stands on its own and insures the necessary requirements will become a part of the Texas SIP. No further RACT review or determination is being conducted here. Comments concerning the area's ozone attainment demonstration plan, or review of NOX
RACT are beyond the scope of this rulemaking action.
II. Evaluation
As a part of our July 19, 2017 proposal (82 FR 33026) and September 22, 2017 final (82 FR 44320) rulemaking actions we, among other things, determined the NOX
emission limitations and control requirements in Appendix F meet RACT for each cement manufacturing plant in Ellis County, including the TXI cement manufacturing plant in Ellis County.[8]
As a part of our RACT determination at 82 FR 44320, we found that emission limitations and control requirements for the TXI plant contained in certain terms of TXI's air permit, including the NOX
emission limitation of 1.95 lb/ton of clinker are consistent with our guidance and ACT documents, and meet the lowest emission limitation through application of control techniques that are reasonably available considering technological and economic feasibility. The air permit, however, is not part of the SIP. Therefore, our approval was
conditioned
on certain terms of the permit being approved by EPA as a source-specific SIP revision. TCEQ committed to address the referenced terms of TXI's air permit through rule revision or an AO in a SIP revision, and submit that SIP to the EPA as a revision to its NOX
RACT SIP no later than October 23, 2018. See section 110(k)(4) of the Act (conditional approval). As stated above, the August 21, 2018 SIP submittal satisfies that commitment.
The August 21, 2018 SIP submittal consists of an AO which states that the kiln #5 NOX
CEMS is subject to the provisions in 30 TAC section 117.3140(b), 40 CFR 60.13, 40 CFR 60 Appendix B, Performance Specification 2, and is subject to audits in accordance with section 5.1 of Appendix F Quality Assurance Procedures.[9]
The kiln #5 stack exhaust flow rate is subject under the AO to 30 TAC section 117.3142(a)(2), which requires monitoring with a flow meter subject to 40 CFR part 60 Appendix B, Performance Specification 6 or 40 CFR part 75 Appendix A.[10]
Pursuant to the AO, the TXI must monitor and record clinker production rates, in tons per hour, tons per day, daily summed on a 30-day rolling basis, and monthly summed on a 12-month rolling basis. Hourly and daily clinker production rates may be based on the previous month's feed-to-clinker ratio multiplied by the measured hourly/daily kiln feed rate, as specified in 40 CFR 60 subpart F section 60.63(b). Records in units of lb NOX
/ton of clinker produced are maintained on a 30-day rolling average basis.[11]
The AO also requires that the NOX
emission limit is 1.95 lb NOX
/ton of clinker for kiln #5, on a 30-day rolling average basis. Furthermore, this limit of 1.95 lb NOX
per ton of clinker cannot be revised to be less stringent without an approved revised RACT determination in accordance with the State and Federal requirements for SIP revisions.[12]
The AO states that the Company shall make records available upon request by the TCEQ or any other air pollution control agency with jurisdiction over the Company.[13]
In addition, Special Conditions outlined in Part II, Item #2, subparagraphs 1, 2, and 3 of the AO shall be incorporated in Company's NSR permit 1360A (PSDTX632M1) as they concern the NOX
RACT limit, averaging periods, and NOX
CEMS provisions for kiln #5, respectively. These provisions will provide for consistency between the TCEQ air permit and the federally enforceable NOX
RACT SIP requirements for kiln #5.
The AO has gone through public notice and comment at the State level, and it adopts
specific enforceable measures
in conformance with section 110(k)(4) of the Act.
We find that the submitted AO meets the conditions for full approval and includes all the required provisions to meet the NOX
RACT requirements that EPA approved in the September 22, 2017 final action.
III. Proposed Action
We are proposing to find TCEQ's August 21, 2018 SIP submittal satisfies its obligation under the September 22, 2017 (82 FR 44320) conditional approval, and to convert the September 22, 2017 (82 FR 44320) rulemaking to full approval. We are proposing to approve the August 21, 2018 SIP submittal, including approval of the AO as a source-specific NOX
RACT revision to the SIP.
IV. Incorporation by Reference
In this action, we are proposing to include in a final rule regulatory text that includes incorporation by reference. In accordance with the requirements of 1 CFR 51.5, we are proposing to incorporate by reference revisions to Texas' regulations, as described in the Proposed Action section above. The EPA has made, and will continue to make, these documents generally available electronically through
www.regulations.gov
and in hard copy at the EPA Region 6 office.
V. Statutory and Executive Order Reviews
Under the Act, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the Act. Accordingly, this action merely proposes to approve state law as meeting Federal requirements and does not impose additional requirements beyond those imposed by state law. For that reason, this action:
Is not a “significant regulatory action” subject to review by the Office of Management and Budget underExecutive Order 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);
Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501et seq.);
Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601et seq.);
Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described
( printed page 56773)
in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);
Is not subject to requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the Act; and
Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, underExecutive Order 12898 (59 FR 7629, February 16, 1994).
In addition, the SIP is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the proposed rule does not have tribal implications and will not impose substantial direct costs on tribal governments or preempt tribal law as specified by Executive Order 13175 (65 FR 67249, November 9, 2000).
3 comments have been received at Regulations.gov.
Agencies review all submissions and may choose to redact, or withhold, certain submissions (or portions thereof). Submitted comments may not be available to be read until the agency has approved them.