This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Endangered and Threatened Wildlife and Plants; Capitol Boulevard Infrastructure Improvements Habitat Conservation Plan and Environmental Assessment for the Olympia Subspecies of the Mazama Pocket Gopher, Thurston County, Washington
To ensure consideration, please submit written comments by January 25, 2019.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Endangered and Threatened Wildlife and Plants; Capitol Boulevard Infrastructure Improvements Habitat Conservation Plan and Environmental Assessment for the Olympia Subspecies of the Mazama Pocket Gopher, Thurston County, Washington
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
164
as of
10/12/2026 at 10:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2018-27887 as it appeared on Public Inspection on
12/21/2018 at 8:45 am.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2018-27887 (83 FR 66292)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Fish and Wildlife Service, Interior.
ACTION:
Notice of availability; request for comments.
SUMMARY:
We, the U.S. Fish and Wildlife Service (Service), received an application from the City of Tumwater Public Works Department for an incidental take permit (ITP) pursuant to the Endangered Species Act. The application includes a habitat conservation plan (HCP), which describes the actions the applicant will take to minimize and mitigate the impacts of the taking of the threatened Olympia subspecies of the Mazama pocket gopher that may occur incidental to the otherwise lawful activities during construction of safety and infrastructure improvements at the intersection of Capitol Boulevard and Tumwater Boulevard in Tumwater, Washington.
( printed page 66293)
We also announce the availability of a draft environmental assessment addressing the HCP and proposed permit. We invite the public to review and comment on the documents.
DATES:
To ensure consideration, please submit written comments by January 25, 2019.
ADDRESSES:
To request further information or submit written comments, please use one of the following methods:
Internet:
You may view or download copies of the HCP and draft EA and obtain additional information on the internet at
http://www.fws.gov/wafwo/.
Email: wfwocomments@fws.gov.
Include “City of Tumwater Capitol Boulevard Safety and Infrastructure Improvements HCP/EA” in the subject line of the message.
U.S. Mail:
Public Comments Processing, Attn: FWS-R1-ES-2018-N089; U.S. Fish and Wildlife Service, Washington Fish and Wildlife Office, 510 Desmond Drive SE, Suite 102, Lacey, WA 98503.
In-Person Drop-off, Viewing, or Pickup:
Call 360-753-5823 to make an appointment (necessary for viewing or picking up documents only) during regular business hours at the above address.
FOR FURTHER INFORMATION CONTACT:
Tim Romanski, Conservation Planning and Hydropower Branch Manager, Washington Fish and Wildlife Office (see ADDRESSES); telephone: 360-753-5823. If you use a telecommunications device for the deaf, please call the Federal Relay Service at 800-877-8339.
SUPPLEMENTARY INFORMATION:
The Service received an application from the City of Tumwater Public Works Department for an ITP, pursuant to the section 10(a)(1)(B) of the ESA. The applicant has requested a 5-year permit term that would authorize “take” of the threatened Olympia subspecies of the Mazama pocket gopher (Thomomys mazama pugetensis, hereafter Olympia pocket gopher) incidental to construction of safety and infrastructure improvements in Thurston County, Washington. The application includes a HCP that describes the actions the applicant will take to minimize and mitigate the impacts of the taking on the covered species.
Background
Section 9 of the Endangered Species Act (ESA; 16 U.S.C. 1531et seq.) prohibits “take” of fish and wildlife species listed as endangered or threatened. Under the ESA, the term “take” means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct (16 U.S.C. 1532(19)). The term “harm,” as defined in our regulations, includes significant habitat modification or degradation that results in death or injury to listed species by significantly impairing essential behavioral patterns, including breeding, feeding, or sheltering (50 CFR 17.3). The term “harass” is defined in our regulations as to carry out actions that create the likelihood of injury to listed species to such an extent as to significantly disrupt normal behavioral patterns, which include, but are not limited to, breeding, feeding, or sheltering (50 CFR 17.3).
Section 10(a)(1)(B) of the ESA contains provisions that authorize the Service to issue permits to non-Federal entities for the take of endangered and threatened species caused by otherwise lawful activities, provided the following criteria are met: (1) The taking will be incidental; (2) the applicant will, to the maximum extent practicable, minimize and mitigate the impact of such taking; (3) the applicant will ensure that adequate funding for the plan will be provided; (4) the taking will not appreciably reduce the likelihood of the survival and recovery of the species in the wild; and (5) the applicant will carry out any other measures that the Service may require as being necessary or appropriate for the purposes of the HCP. Regulations governing permits for endangered and threatened species are found in 50 CFR 17.22 and 17.32, respectively.
Proposed Action
The Service proposes to issue the requested 5-year ITP based on the applicant's commitment to implement the HCP, if permit issuance criteria are met. Covered activities include construction of needed safety and infrastructure improvements. The area covered under HCP consists of a 3-acre project development site located at the intersection of Capitol Boulevard and Tumwater Boulevard in Thurston County, Washington. Take of the Olympia pocket gopher would occur on approximately 0.8 acres of occupied habitat and will be offset by permanent management of 0.8 acres of occupied habitat for the covered species at the Deschutes Corridor Conservation Site.
Public Comments
You may submit your comments and materials by one of the methods listed in
ADDRESSES
. We specifically request information, views, and suggestions from interested parties regarding our proposed Federal action, including the adequacy of the HCP pursuant to the requirements for permits at 50 CFR parts 13 and 17 and the adequacy of the draft EA pursuant to the requirements of NEPA.
Public Availability of Comments
All comments and materials we receive become part of the public record associated with this action. Before including your address, phone number, email address, or other personally identifiable information in your comments, you should be aware that your entire comment—including your personally identifiable information—may be made publicly available at any time. While you can ask us in your comment to withhold your personally identifiable information from public review, we cannot guarantee that we will be able to do so. All submissions from organizations or businesses, and from individuals identifying themselves as representatives or officials of organizations or businesses, will be made available for public disclosure in their entirety. Comments and materials we receive will be available for public inspection by appointment, during normal business hours, at our Washington Fish and Wildlife Office (see
ADDRESSES
).
Next Steps
After public review and completion of the EA, we will determine whether the proposed action warrants a finding of no significant impact or whether an environmental impact statement should be prepared. We will evaluate the permit application, associated documents, and any comments received, to determine whether the permit application meets the requirements of section 10(a)(1)(B) of the ESA. We will also evaluate whether issuance of the requested section 10(a)(1)(B) permit would comply with section 7 of the ESA by conducting an intra-Service section 7 consultation under section 7(a)(2) of the ESA on anticipated ITP actions. The final NEPA and permit determinations will not be completed until after the end of the 30-day comment period and will fully consider all comments received during the comment period. If we determine that all requirements are met, we will issue an ITP under section 10(a)(1)(B) of the ESA to the applicant for the take of the covered species, incidental to otherwise lawful covered activities.
Authority
We provide this notice in accordance with the requirements of section 10 of the ESA and NEPA and their
( printed page 66294)
implementing regulations (50 CFR 17.22 and 40 CFR 1506.6, respectively).
Theresa E. Rabot,
Deputy Regional Director, Pacific Region, U.S. Fish and Wildlife Service.