Skip to Content

Notice

Projects Approved for Consumptive Uses of Water

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Susquehanna River Basin Commission.

ACTION:

Notice.

SUMMARY:

This notice lists the projects approved by rule by the Susquehanna River Basin Commission during the period set forth in DATES.

DATES:

April 1-30, 2019.

ADDRESSES:

Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110-1788.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Jason E. Oyler, General Counsel and Secretary to the Commission, telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436; email: joyler@srbc.net. Regular mail inquiries may be sent to the above address.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

This notice lists the projects, described below, receiving approval for the consumptive use of water pursuant to the Commission's approval by rule process set forth in 18 CFR 806.22(e) and § 806.22 (f) for the time period specified above:

Approvals by Rule Issued Under 18 CFR 806.22(e)

1. Sunoco Pipeline, L.P.; ABR-201904002; Shirley Township, Huntingdon County, Pa.; Consumptive Use of Up to 0.200 mgd; Approval Date: April 29, 2019.

2. Sunoco Pipeline, L.P.; ABR-201904003; Woodbury Township, Blair County, Pa.; Consumptive Use of Up to 0.200 mgd; Approval Date: April 29, 2019.Start Printed Page 21892

Approvals by Rule Issued Under 18 CFR 806.22(f)

1. Pennsylvania General Energy Company, L.L.C.; Pad ID: SGL 75 Pad F; ABR-201403005.R1; McHenry Township, Lycoming County, Pa.; Consumptive Use of Up to 3.0000 mgd; Approval Date: April 1, 2019.

2. Chesapeake Appalachia, L.L.C.; Pad ID: TA, ABR-201403011.R1; Colley Township, Sullivan County, Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: April 1, 2019.

3. Chesapeake Appalachia, L.L.C.; Pad ID: Garrison, ABR-201403012.R1; Washington Township, Wyoming County, Pa.; Consumptive Use of Up to 7.5000 mgd; Approval Date: April 1, 2019.

4. Chief Oil & Gas, LLC; Pad ID: Herbert Drilling Pad, ABR-201404001.R1; Harford and Lenox Townships, Susquehanna County, Pa.; Consumptive Use of Up to 2.5000 mgd; Approval Date: April 16, 2019.

5. JKLM Energy, LLC; PAD ID: Greisemer 171, ABR-201904001; Hector Township, Potter County, Pa.; Consumptive Use of Up to 3.0000 mgd; Approval Date: April 22, 2019.

6. Chief Oil & Gas, LLC; Pad ID: I. Harvey Drilling Pad, ABR-201404006.R1; Elkland Township, Sullivan County, Pa.; Consumptive Use of Up to 2.5000 mgd; Approval Date: April 29, 2019.

7. Pennsylvania General Energy Company, L.L.C.; Pad ID: SGL 75 Pad A; ABR-201404007.R1; McHenry Township, Lycoming County, Pa.; Consumptive Use of Up to 3.0000 mgd; Approval Date: April 29, 2019.

Start Authority

Authority: Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 806 and 808.

End Authority Start Signature

Dated: May 9, 2019.

Jason E. Oyler,

General Counsel and Secretary to the Commission.

End Signature End Supplemental Information

[FR Doc. 2019-10035 Filed 5-14-19; 8:45 am]

BILLING CODE 7040-01-P