Rule

Natural Gas Pipelines; Project Cost and Annual Limits

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble Start Printed Page 15713

AGENCY:

Federal Energy Regulatory Commission, Energy.

ACTION:

Final rule.

SUMMARY:

Pursuant to the authority delegated by the Commission's regulations, the Director of the Office of Energy Projects (OEP) computes and publishes the project cost and annual limits for natural gas pipelines blanket construction certificates for each calendar year.

DATES:

This final rule is effective March 19, 2020 and establishes cost limits applicable from January 1, 2020 through December 31, 2020.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Richard W. Foley, Chief, Certificates Branch 1 Division of Pipeline Certificates, (202) 502-8955.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Section 157.208(d) of the Commission's Regulations provides for project cost limits applicable to construction, acquisition, operation and miscellaneous rearrangement of facilities (Table I) authorized under the blanket certificate procedure (Order No. 234, 19 FERC ¶ 61,216). Section 157.215(a) specifies the calendar year dollar limit which may be expended on underground storage testing and development (Table II) authorized under the blanket certificate. Section 157.208(d) requires that the “limits specified in Tables I and II shall be adjusted each calendar year to reflect the 'GDP implicit price deflator' published by the Department of Commerce for the previous calendar year.”

Pursuant to § 375.308(x)(1) of the Commission's Regulations, the authority for the publication of such cost limits, as adjusted for inflation, is delegated to the Director of the Office of Energy Projects. The cost limits for calendar year 2020, as published in Table I of § 157.208(d) and Table II of § 157.215(a), are hereby issued.

Effective Date

This final rule is effective March 19, 2020. The provisions of 5 U.S.C. 804 regarding Congressional review of final rules does not apply to the final rule because the rule concerns agency procedure and practice and will not substantially affect the rights or obligations of non-agency parties. The final rule merely updates amounts published in the Code of Federal Regulations to reflect the Department of Commerce's latest annual determination of the Gross Domestic Product (GDP) implicit price deflator, a mathematical updating required by the Commission's existing regulations.

Start List of Subjects

List of Subjects in 18 CFR Part 157

  • Administrative practice and procedure
  • Natural gas
  • Reporting and recordkeeping requirements
End List of Subjects Start Signature

Issued: March 10, 2020.

Terry L. Turpin,

Director, Office of Energy Projects.

End Signature

Accordingly, 18 CFR part 157 is amended as follows:

Start Part

PART 157—[AMENDED]

End Part Start Amendment Part

1. The authority citation for part 157 continues to read as follows:

End Amendment Part Start Authority

Authority: 15 U.S.C. 717-717w, 3301-3432; 42 U.S.C. 7101-7352.

End Authority Start Amendment Part

2. In § 157.208(d), Table I is amended by adding an entry for “2020” at the end of the table to read as follows:

End Amendment Part
Construction, acquisition, operation, replacement, and miscellaneous rearrangement of facilities.
* * * * *

(d) * * *

Table I to Part 157

YearLimit
Auto. proj. cost limit (Col.1)Prior notice proj. cost limit (Col.2)
*         *         *         *         *         *         *
2020$12,500,000$35,200,000
* * * * *
Start Amendment Part

3. In § 157.215(a)(5), Table II is amended by adding an entry for “2020” at the end of the table to read as follows:

End Amendment Part
Underground storage testing and development.

(a) * * *

(5) * * *

Start Printed Page 15714

Table II to Part 157

YearLimit
*    *    *    *    *
2020$6,700,000
* * * * *