Skip to Content

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We’ve made big changes to make the eCFR easier to use. Be sure to leave feedback using the 'Help' button on the bottom right of each page!

Rule

Land Uses; Special Uses; Procedures for Operating Plans and Agreements for Powerline Facility Maintenance and Vegetation Management Within and Abutting the Linear Boundary of a Special Use Authorization for a Powerline Facility; Correction

Document Details

Information about this document as published in the Federal Register.

Document Statistics
Document page views are updated periodically throughout the day and are cumulative counts for this document including its time on Public Inspection. Counts are subject to sampling, reprocessing and revision (up or down) throughout the day.
Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Forest Service, USDA.

Start Printed Page 48476

ACTION:

Final rule; correction.

SUMMARY:

The U.S. Department of Agriculture is correcting a final rule that appeared in the Federal Register on July 10, 2020. The final rule amends existing special use regulations to implement section 512 of the Federal Land Policy and Management Act, as added by section 211 of division O, Consolidated Appropriations Act, 2018 (hereinafter “section 512”). Section 512 governs the development and approval of operating plans and agreements for maintenance and vegetation management of electric transmission and distribution line facilities (powerline facilities) on National Forest System (NFS) lands inside the linear boundary of special use authorizations for powerline facilities and on abutting NFS lands to remove or prune hazard trees.

DATES:

Effective August 10, 2020.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Reggie Woodruff, Energy Program Manager, Lands and Realty Management, 202-205-1196 or reginal.woodruff@usda.gov.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

In FR doc. 2020-13999 appearing on pages 41387-41394 in the Federal Register of Friday, July 10, 2020, the following corrections are made:

[Corrected]
Start Amendment Part

1. On page 41392, in the first column, in § 251.51, in amendment 2, the instruction is corrected to read as follows:

End Amendment Part Start Amendment Part

2. Amend § 251.51 by:

End Amendment Part Start Amendment Part

a. Adding in alphabetical order the definition of “Hazard tree”;

End Amendment Part Start Amendment Part

b. Revising the definition of “Linear right-of-way”; and

End Amendment Part Start Amendment Part

c. Adding in alphabetical order the definitions of “Maintenance,” “Maximum operating sag,” “Minimum vegetation clearance distance,” “Operating plan or agreement for a powerline facility,” “Owner or operator,” “Powerline facility,” and “Vegetation Management”.

End Amendment Part

The additions and revision read as follows:

Start Amendment Part

2. On page 41392, in the second column, in § 251.51, the definition for “Linear right-of-way” is corrected to read as follows:

End Amendment Part

Linear right-of-way—an authorized right-of-way for a linear facility, such as a road, trail, pipeline, powerline facility, fence, water transmission facility, or fiber optic cable, whose linear boundary is delineated by its legal description.

Start Amendment Part

3. On page 41394, in the first column, in § 251.56, paragraph (h)(5)(viii)(B) is corrected to read as follows:

End Amendment Part
[Corrected]

(h) * * *

(5) * * *

(viii) * * *

(B) Emergency vegetation management. Emergency vegetation management does not require prior written approval from the authorized officer. The owner or operator shall notify the authorized officer in writing of the location and quantity of the emergency vegetation management within 24 hours of initiating the response;

Start Signature

James E. Hubbard,

Under Secretary, Natural Resources and Environment.

End Signature End Supplemental Information

[FR Doc. 2020-17462 Filed 8-7-20; 8:45 am]

BILLING CODE 3411-15-P