This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Financial Support for Transmission and Distribution Lines To Pump Stations 15, 16, 17, 18, and 19 in Connection With the TransCanada Keystone XL Pipeline
The Administrator of the Rural Utilities Service signed the Record of Decision on November 13, 2020.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
301
as of
08/12/2026 at 6:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2020-28334 as it appeared on Public Inspection on
12/22/2020 at 8:45 am.
It was viewed
0
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2020-28334 (85 FR 83883)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Rural Utilities Service, USDA.
ACTION:
Notice of Availability of a Record of Decision.
SUMMARY:
In accordance with the National Environmental Policy Act of 1969, the Rural Utilities Service (RUS) has prepared a Record of Decision. This Record of Decision (ROD) is for the construction of transmission and distribution lines and associated facilities to service five pump stations for the TransCanada XL Keystone Pipeline in South Dakota. By this notice, the RUS is announcing the availability of the Record of Decision.
DATES:
The Administrator of the Rural Utilities Service signed the Record of Decision on November 13, 2020.
TransCanada Keystone XL Pipeline LP (Keystone) filed its original Presidential Permit application with the Department of State in 2008. An Environmental Impact Statement for the proposed pipeline project was finalized in August 2011 (2011 EIS). The U.S. Department of State served as the Lead Federal Agency. In April 2012, Keystone proposed a new pipeline route in Nebraska to avoid the Sand Hills region of Nebraska, and in May 2012 applied for a second Presidential Permit. The Department of State evaluated the new proposed pipeline route as well as two
( printed page 83884)
alternative routes in its 2014 Supplemental Environmental Impact Statement (SEIS). The proposed alternative of the 2014 SEIS encompassed RUS's action area. The Secretary of State issued the Presidential Permit in March 2017.
In 2019, the Department of State supplemented the 2014 SEIS with the 2019 SEIS to evaluate impacts of the proposed Mainline Alternative Route in Nebraska, a route modification to the 2014 SEIS preferred alternative. The 2019 SEIS also updated greenhouse gas and climate change analysis, revised the methodology for the accidental release analysis, updated the market analysis, evaluated new information related to cultural resources, and included an impact analysis specifically related to electrical power infrastructure. RUS, along with The U.S. Department of the Interior's Bureau of Land Management, U.S. Army Corps of Engineers, and the Western Area Power Administration (WAPA), has served as a Cooperating Agency in the 2011 EIS and the 2014 and 2019 SEISs.
RUS has considered a proposal from Grand Electric Cooperative, Inc. to provide distribution and transmission lines to supply power to pump stations 15, 16, 17, and a proposal from West Central Electric Cooperative, Inc. to provide distribution and transmission lines to supply power to pump stations 18 and 19. Pump stations 15-19 are located entirely within the State of South Dakota. The substations will be built by the cooperatives and/or WAPA and financed by Keystone. WAPA will provide for the interconnections for the transmission facilities for Pump Stations7, 18 and 19.
RUS has adopted the 2014 and 2019 SEISs, and the Record of Decision to support its financing decisions for transmission and distribution lines to supply pump stations in South Dakota. RUS's actions related to providing financing for transmission and distribution for Pump Stations 15-19, were evaluated as connected actions related to TransCanada Keystone Pipeline, LP to proposal construct, operate, maintain, and (eventually) decommission the Keystone XL Pipeline in South Dakota. The Record of Decision was signed on November 13, 2020.