This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
1,285
as of
10/17/2026 at 10:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2021-22146 as it appeared on Public Inspection on
11/03/2021 at 8:45 am.
It was viewed
27
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2021-22146 (86 FR 61040)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).
ACTION:
Final rule.
SUMMARY:
DoD, GSA, and NASA are issuing a final rule amending the Federal Acquisition Regulation (FAR) to implement a section of the William M. (Mac) Thornberry National Defense Authorization Act for Fiscal Year 2021 that modified the Small Business Act maximum award price for manufacturing contracts to $7 million.
DATES:
Effective December 6, 2021.
FOR FURTHER INFORMATION CONTACT:
Mr. Michael O. Jackson, Procurement Analyst, at 202-208-4949 or by email at
michaelo.jackson@gsa.gov,
for clarification of content. For information pertaining to status or publication schedules, contact the Regulatory Secretariat Division at 202-501-4755 or
GSARegSec@gsa.gov.
Please cite FAC 2022-01, FAR Case 2021-007.
SUPPLEMENTARY INFORMATION:
( printed page 61041)
I. Background
DoD, GSA, and NASA are amending the FAR to implement section 864 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2021 (Pub. L. 116-283, January 1, 2021). Section 864 amends the Small Business Act to modify the maximum award price for manufacturing contracts to $7 million for the 8(a), Women-Owned Small Business (WOSB), Historically Underutilized Business Zone (HUBZone), and Service-Disabled Veteran-Owned Small Business (SDVOSB) programs.
The maximum award price for manufacturing contracts at FAR 19.804-6(c)(2), 19.805-1(a)(2), 19.1306(a)(2)(i), 19.1406(a)(2)(i), and 19.1506(c)(1)(i) is subject to the inflationary adjustment required by 41 U.S.C. 1908. Section 1908 requires an adjustment every five years (on October 1 of each year evenly divisible by five) of statutory acquisition-related thresholds for inflation, using the Consumer Price Index for all urban consumers, except for the Construction Wage Rate Requirements statute (Davis-Bacon Act), Service Contract Labor Standards statute (Service Contract Act), and trade agreements thresholds (see FAR 1.109).
FAR case 2019-013 (85 FR 62485), effective on October 1, 2020, made inflationary adjustments to, amongst others, the following: Increased the $7 million threshold at FAR 19.804-6(c)(2), 19.805-1(a)(2), and 19.1306(a)(2)(i) to $7.5 million; increased the $6.5 million threshold at FAR 19.1406(a)(2)(i) to $7 million; and increased the $6.5 million threshold at FAR 19.1506(c)(1)(i) to $7 million.
This final rule will harmonize the maximum award price threshold for manufacturing contracts amongst the socioeconomic programs by changing the current FAR maximum award price threshold for the 8(a) sole source, 8(a) competitive, and HUBZone sole source programs from $7.5 million to the statutory amount of $7 million. The maximum award price threshold for the WOSB and SDVOSB programs remains unchanged at the current threshold of $7 million, which is consistent with section 864 of the NDAA for FY 2021.
II. Publication of This Final Rule for Public Comment Is Not Required by Statute
The statute that applies to the publication of the FAR is 41 U.S.C. 1707. Subsection (a)(1) of 41 U.S.C. 1707 requires that a procurement policy, regulation, procedure, or form (including an amendment or modification thereof) must be published for public comment if it relates to the expenditure of appropriated funds and has either a significant effect beyond the internal operating procedures of the agency issuing the policy, regulation, procedure, or form, or has a significant cost or administrative impact on contractors or offerors. This final rule is not required to be published for public comment because the rule will not have a significant cost or administrative impact on contractors or offerors. A search of the Federal Procurement Data System revealed that there were no contracts awarded for 8(a) sole source, 8(a) competitive, or HUBZone sole source manufacturing contracts in the range of $7 million to $7.5 million between the date of the increase in the threshold to $7.5 million (October 1, 2020) and April 2021.
III. Applicability to Contracts at or Below the Simplified Acquisition Threshold (SAT) and for Commercial Items, Including Commercially Available Off-the-Shelf (COTS) Items
This rule does not create new solicitation provisions or contract clauses or impact any existing provisions or clauses. This rule merely modifies a threshold in accordance with statute. This rule does not impose any new requirements on contracts at or below the SAT or for commercial items, including COTS items, except for the changes in the thresholds themselves.
IV. Executive Orders 12866 and 13563
Executive Orders (E.O.s) 12866 and 13563 direct agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). E.O. 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility. This is not a significant regulatory action and, therefore, was not subject to review under section 6(b) of E.O. 12866, Regulatory Planning and Review, dated September 30, 1993.
V. Congressional Review Act
As required by the Congressional Review Act (5 U.S.C. 801-808) before an interim or final rule takes effect, DoD, GSA, and NASA will send the rule and the “Submission of Federal Rules Under the Congressional Review Act” form to each House of the Congress and to the Comptroller General of the United States. A major rule cannot take effect until 60 days after it is published in the
Federal Register
. The Office of Information and Regulatory Affairs (OIRA) in the Office of Management and Budget has determined that this is not a major rule under 5 U.S.C. 804.
VI. Regulatory Flexibility Act
Because a notice of proposed rulemaking and an opportunity for public comment are not required to be given for this rule under 41 U.S.C. 1707(a)(1) (see section II. of this preamble), the analytical requirements of the Regulatory Flexibility Act (5 U.S.C. 601-612) are not applicable. Accordingly, no regulatory flexibility analysis is required, and none has been prepared.
VII. Paperwork Reduction Act
This rule does not contain any information collection requirements that require the approval of the Office of Management and Budget under the Paperwork Reduction Act (44 U.S.C. 3501-3521).