This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Notice of Intent To Conduct Restoration Planning for Discharge of Oil From the Amplify Energy Corp Pipeline P00547 Into the Pacific Ocean Near Huntington Beach, Orange County, California
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
296
as of
08/12/2026 at 10:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2023-12787 as it appeared on Public Inspection on
06/15/2023 at 8:45 am.
It was viewed
7
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2023-12787 (88 FR 39407)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
( printed page 39407)
AGENCY:
Office of Response and Restoration (ORR), National Ocean Service, National Oceanic and Atmospheric Administration (NOAA), Department of Commerce.
ACTION:
Notice of intent to conduct restoration planning activities.
SUMMARY:
Notice is hereby given of intent to proceed with restoration planning actions to address injuries to natural resources resulting from the discharge of oil from the Amplify Energy Corp Pipeline P00547 into the Pacific Ocean near Huntington Beach, Orange County, California (Incident). The purpose of this restoration planning effort is to further evaluate injuries to natural resources and services and to use that information to determine the need for, type of, and scale of restoration actions.
FOR FURTHER INFORMATION CONTACT:
For further information contact one or more of the following Trustee representatives: Troy Baker (NOAA) at
troy.baker@noaa.gov;
Mike Anderson (California Department of Fish and Wildlife) at
michael.anderson@wildlife.ca.gov;
Damian Higgins (U.S. Fish and Wildlife Service) at
damian_higgins@fws.gov.
SUPPLEMENTARY INFORMATION:
Background
On October 1, 2021, Pipeline P00547, an oil pipeline owned and operated by Amplify Energy Corp., Beta Operating Company, LLC, dba, “Beta Offshore”; and San Pedro Bay Pipeline Company (collectively, Amplify) ruptured. The underwater pipeline running from Platform Elly to Long Beach spilled a minimum of approximately 24,696 gallons of crude oil into San Pedro Bay. Product initially floated to the surface forming surface slicks and strands that extended from the source mainly south and southeast along prevailing ocean currents. Southern California beaches from at least Surfside Beach to potentially past the U.S./Mexico Border, including coastal marshes and lagoons, were either freshly oiled or received varying levels of tarballs in the weeks following the spill. This discharge affected natural resources in the area.
Pursuant to section 1006 of the Oil Pollution Act (OPA), 33 U.S.C. 2701et seq.,
Federal and State Trustees for natural resources are authorized to (1) assess natural resource injuries resulting from a discharge of oil or the substantial threat of a discharge and response activities, and (2) develop and implement a plan for restoration of such injured resources. The Federal Trustees are designated pursuant to the National Contingency Plan, 40 CFR 300.600 and Executive Order 12777. State trustees for California are designated pursuant to the National Contingency Plan, 40 CFR 300.605, and the Governor's Designation of State Natural Resource Trustees under the Comprehensive Environmental Response, Compensation and Liability Act of 1980, the Oil Pollution Act of 1990, and California Health and Safety Code section 25352(c), dated October 5, 2007, and the Delegation of Authority of Natural Resource Trustee, dated November 15, 2007. The natural resources trustees (Trustees) under OPA for this Incident are NOAA; the United States Department of the Interior, acting through the U.S. Fish and Wildlife Service, the National Park Service, and the Bureau of Land Management; the California Department of Fish and Wildlife; the California State Lands Commission; and the California Department of Parks and Recreation.
Amplify is the Responsible Party (RP) for this Incident. The Trustees have coordinated with representatives of the RP on Natural Resource Damage Assessment (NRDA) activities.
The Trustees began the Preassessment Phase of the NRDA in accordance with 15 CFR 990.40, to determine if they had jurisdiction to pursue restoration under OPA, and, if so, whether it was appropriate to do so. During the Preassessment Phase, the Trustees collected and analyzed the following: (1) data reasonably expected to be necessary to make a determination of jurisdiction or a determination to conduct restoration planning, (2) ephemeral data, and/or (3) information needed to design or implement anticipated emergency restoration and/or assessment activities as part of the Restoration Planning Phase.
The NRDA regulations under OPA, 15 CFR 990 (NRDA regulations), provide that the Trustees are to prepare a Notice of Intent to Conduct Restoration Planning (Notice) if they determine certain conditions have been met, and if they decide to quantify the injuries to natural resources and to develop a restoration plan.
This Notice is to announce, pursuant to 15 CFR 990.44, that the Trustees, having collected and analyzed data, intend to proceed with restoration planning actions to address injuries to natural resources resulting from the Incident. The purpose of this restoration planning effort is to further evaluate injuries to natural resources and services and to use that information to determine the need for, type of, and scale of restoration actions.
Determination of Jurisdiction
The Trustees have made the following findings pursuant to 15 CFR 990.41:
1. The rupture of Pipeline P00547 on October 1, 2021, resulted in a discharge of oil into and upon navigable waters of the United States, including the Pacific Ocean, as well as adjoining shorelines. Such occurrence constitutes an “Incident” within the meaning of 15 CFR 930.30.
2. The Incident was not permitted pursuant to Federal, State, or local law; was not from a public vessel; and was not from an onshore facility subject to the Trans-Alaska Pipeline Authority Act, 43 U.S.C. 1651et seq.
3. Natural resources under the trusteeship of the Trustees have been injured as a result of the Incident. The crude oil discharged from Pipeline P00547 is harmful to certain aquatic organisms, birds, wildlife, and vegetation that were exposed to the oil. Accordingly, the discharged oil and the response activities to address the discharge have had an adverse effect on the natural resources of the Pacific Ocean and its adjoining shorelines and impaired the services which those resources provide. Documents in the Administrative Record contain more information regarding the basis upon which the Trustees reached this determination.
As a result of the foregoing determinations, the Trustees have jurisdiction to pursue restoration under OPA.
Determination To Conduct Restoration Planning
The Trustees have determined, pursuant to 15 CFR 990.42(a), that:
1. Observations and data collected in accordance with 15 CFR 990.43 (including but not limited to dead and live oiled birds; oiling at beaches, rocky intertidal habitats, subtidal habitats, and other habitats; beach and fishery closures; and impacts from response activities) demonstrate that injuries to natural resources have resulted from the Incident. Immediately following the Incident, the Trustees, in cooperation with the RPs, identified several categories of impacted and potentially impacted natural resources, including
( printed page 39408)
birds, marine mammals, fish, and shoreline and subtidal habitats, as well as effects to human use resulting from impacts on these natural resources. The Trustees then began conducting activities, in cooperation with the RPs, to evaluate injuries and potential injuries within these categories. More information on these resource categories is available in the Administrative Record, including information gathered during the Preassessment.
2. Spill response actions did not address all injuries resulting from the Incident to the extent that restoration would not be necessary. Although response actions were initiated soon after the spill, the nature and location of the discharge prevented recovery of all of the oil and precluded prevention of injuries to some natural resources. In addition, certain response efforts, such as the removal of wrack from beaches and excavation of submerged oil, caused additional injuries to natural resources. It is anticipated that injured natural resources will eventually return to baseline levels (the condition they would have been in had it not been for the Incident), but interim losses have occurred or have likely occurred and will continue until a return to baseline is achieved. In addition, there were lost and diminished human uses of the resources resulting from the impacts to the natural resources and from spill response actions.
3. Feasible primary and compensatory restoration actions exist to address injuries to natural resources and lost human uses resulting from the Incident. The Trustees have compiled a list of restoration projects that could potentially be implemented to compensate for interim losses resulting from the Incident. The Trustees have also sought suggestions from the public on potential restoration projects to compensate for the services and functions provided by natural resources. In addition, assessment procedures such as Habitat Equivalency Analysis and Resource Equivalency Analysis are available to scale the appropriate amount of compensatory restoration required to offset ecological service losses resulting from this Incident. To quantify lost human uses resulting from the Incident, the Trustees, in cooperation with the RP, have collected and compiled data regarding visitor use of impacted sites and associated activities. To value those lost uses, the Trustees are investigating use of a Travel Cost Model and Benefits Transfer Method. To compensate for the lost and diminished human uses arising from the Incident, the Trustees intend to solicit project ideas from local, regional, State, and Federal managers of parks and other recreational areas, as well as from the general public. The final selection of projects will be informed by project costs, the value of lost use, distribution and character of impacts, and other criteria consistent with state and federal laws and practice.
During restoration planning, the Trustees evaluate potential restoration projects, determine the scale of restoration actions needed to make the environment and the public whole, and release a draft Damage Assessment and Restoration Plan for public review and comment.
Based upon the foregoing determinations and information in the Administrative Record, the Trustees intend to proceed with restoration planning for this Incident.
Administrative Record
The Trustees have opened an Administrative Record (Record) in accordance with 15 CFR 990.45. The Record will include documents considered by the Trustees during the preassessment, assessment, and restoration planning phases of the NRDA performed in connection with the Incident. The Record will be augmented with additional information over the course of the NRDA process.
Pursuant to 15 CFR 990.14(d), the Trustees seek public involvement in restoration planning for this Incident through public review of, and comment on, documents contained in the Record. The Trustees also intend to seek public comment on a draft Damage Assessment and Restoration Plan when it becomes available.
Scott Lundgren,
Director, Office of Response and Restoration, National Ocean Service, National Oceanic and Atmospheric Administration.