This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Comments are no longer being accepted.
See DATES for details.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
Coastal Virginia Offshore Wind (CVOW) Commercial Project Final Environmental Impact Statement (FEIS)
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
326
as of
07/12/2026 at 6:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2023-24295 as it appeared on Public Inspection on
11/02/2023 at 8:45 am.
It was viewed
20
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2023-24295 (88 FR 75624)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Bureau of Ocean Energy Management (BOEM), Interior; National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce.
ACTION:
Record of decision (ROD); notice of availability.
SUMMARY:
BOEM announces the availability of the joint ROD on the Final Environmental Impact Statement (EIS) for the construction and operations plan (COP) submitted by Virginia Electric and Power Company (dba Dominion Energy) for its proposed Coastal Virginia Offshore Wind Commercial Project (Project), offshore Virginia Beach, Virginia. The joint ROD includes the Department of the Interior's (DOI) decision regarding the COP and NMFS' plans for decision, pending completion of all statutory processes, regarding Dominion Energy's requested Incidental Take Regulations (ITR) and an associated Letter of Authorization (LOA) under the Marine Mammal Protection Act (MMPA). NMFS has adopted the final EIS to support its decision of whether or not to issue the requested ITR under the MMPA. The joint ROD concludes the National Environmental Policy Act process for each agency.
For information related to BOEM's action, contact Jessica Stromberg, BOEM Office of Renewable Energy Programs, 45600 Woodland Road, VAM-OREP, Sterling, Virginia 20166, (703) 787-1730, or
jessica.stromberg@boem.gov;
For information related to NMFS' action, contact Katherine Renshaw, NOAA Office of General Counsel, (302) 515-0324.
SUPPLEMENTARY INFORMATION:
Dominion Energy seeks approval to construct, operate, and maintain the Project: a wind energy facility and the associated export cables on the Outer Continental Shelf (OCS) offshore Virginia. The Project would be developed within the range of design parameters outlined in the COP, subject to applicable mitigation measures.
The Project as proposed in the COP would include up to 202 wind turbine generators (WTGs); 3 offshore, high voltage, alternating current substations; inter-array cables linking the individual turbines to the offshore substations; substation interconnector cables linking the substations to each other; offshore export cables; an onshore export cable system; an onshore switching station north of Harpers Road (Harpers Switching Station) or north of Princess Anne Road (Chicory Switching Station) in Virginia Beach, Virginia; and an overhead power line connection to the existing electrical grid at the Fentress Substation in Chesapeake, Virginia.
The WTGs, offshore substations, inter-array cables, and substation interconnector cables would be located on the OCS approximately 24 nautical miles (27 statute miles) east of Virginia Beach, Virginia, within the area defined by Renewable Energy Lease OCS-A-0483. The offshore export cables would be buried below the seabed surface on the OCS and Commonwealth of Virginia-owned submerged lands. The onshore export cables, substations, and grid connections would be located in Princess Anne County, Virginia.
After carefully considering public comments on the draft EIS and the alternatives described and analyzed in the final EIS, DOI selected Alternative B, “Revised Layout to Accommodate the Fish Haven and Navigation,” in combination with Alternative D-1, “Onshore Habitat Impact Minimization Alternative.” This combination of alternatives B and D-1 is the preferred alternative identified in the final EIS. The anticipated mitigation, monitoring, and reporting requirements, which will be included in BOEM's COP approval as terms and conditions, are included in the ROD, which is available at:
https://www.boem.gov/renewable-energy/state-activities/CVOW-C.
NMFS has adopted BOEM's final EIS to support its decision of whether or not to promulgate the requested ITR and issue the associated LOA to Dominion Energy. NMFS' final decision of whether or not to promulgate the requested ITR and issue the LOA will be documented in a separate Decision Memorandum prepared in accordance with internal NMFS policy and procedures. The final ITR and a notice of issuance of the LOA, if issued, will be published in the
Federal Register
. The LOA would authorize Dominion Energy to take small numbers of marine mammals incidental to Project construction and would set forth permissible methods of incidental
( printed page 75625)
taking; means of affecting the least practicable adverse impact on the species and their habitat; and requirements for monitoring and reporting. Pursuant to section 7 of the Endangered Species Act, NMFS issued a final Biological Opinion to BOEM on September 18, 2023, evaluating the effects of the proposed action on ESA-listed species. The proposed action in the Biological Opinion includes the associated permits, approvals, and authorizations that may be issued.