This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Comments are no longer being accepted.
See DATES for details.
Regulations.gov Data
Enhanced Content - Regulations.gov Data
FederalRegister.gov retrieves relevant information about this document
from Regulations.gov to provide users with additional context. This
information is not part of the official Federal Register document.
Notice of Availability of a Draft Environmental Impact Statement for Empire Wind, LLC's Proposed Wind Energy Facilities Offshore New York
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
393
as of
07/12/2026 at 10:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This PDF is FR Doc. 2023-26170 as it appeared on Public Inspection on
11/27/2023 at 8:45 am.
It was viewed
17
times while on Public Inspection.
If you are using public inspection listings for legal research, you
should verify the contents of the documents against a final, official
edition of the Federal Register. Only official editions of the
Federal Register provide legal notice of publication to the public and judicial notice
to the courts under 44 U.S.C. 1503 & 1507.
Learn more here.
Published Document: 2023-26170 (88 FR 83146)
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Bureau of Ocean Energy Management (BOEM), Interior; National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce.
ACTION:
Record of decision (ROD); notice of availability (NOA).
SUMMARY:
The BOEM announces the availability of the joint ROD for the construction and operations plan (COP) submitted by Empire Wind, LLC (Empire Wind) for its proposed Empire Wind Offshore Wind Farm Projects (Projects) offshore New York. The final environmental impact statement (EIS) analyzes the potential environmental
( printed page 83147)
impacts of the Projects as described in the COP (the proposed action) and the alternatives to the proposed action. The joint ROD includes the decision of the Department of the Interior (DOI) regarding the COP, and the decision of NMFS regarding Empire Wind's requested incidental take regulations (ITR) and an associated letter of authorization (LOA) under the Marine Mammal Protection Act (MMPA). NMFS has adopted the final EIS to support its decision of whether to issue the requested ITR. The joint ROD concludes the National Environmental Policy Act process for each agency.
For information related to BOEM's decision, please contact: Jessica Stromberg, BOEM Office of Renewable Energy Programs, 45600 Woodland Road, VAM-OREP, Sterling, Virginia 20166, (703) 787-1730 or
jessica.stromberg@boem.gov.
For information related to NMFS' action, contact Katherine Renshaw, NOAA Office of General Counsel, (302) 515-0324.
SUPPLEMENTARY INFORMATION:
Empire Wind seeks approval to construct, operate, and maintain the Projects: two wind energy facilities and their associated export cables on the Outer Continental Shelf (OCS) offshore New York. The Projects would be developed within the range of design parameters outlined in the Empire Wind COP, subject to applicable mitigation measures. Empire Wind proposes to develop the lease area in two wind farms, known as Empire Wind 1 (EW 1) and Empire Wind 2 (EW 2). EW 1 and EW 2 will be independent from each other. Including both EW 1 and EW 2, Empire Wind proposes constructing and operating up to 147 wind turbines and up to two offshore substations with two cable routes under the terms of Renewable Energy Lease OCS-A 0512 located 14 miles from Long Island, New York, and 19.5 miles from Long Branch, New Jersey. The onshore components of the Projects will include up to three export cable landfalls in New York (one for EW 1 and up to two for EW 2) and two onshore substations: EW 1 onshore substation in Brooklyn, New York; and EW 2 onshore substation A in Oceanside, New York, or EW 2 onshore substation C in Island Park, New York.
A notice of availability for the final EIS was published in the
Federal Register
on September 15, 2023. On November 15, 2023, BOEM published an errata on its website that included certain edits to the summary and comparison of impacts among those listed in the alternative table in chapter 2 of the final EIS to correct impact conclusions for marine mammals. The errata also provides corrections to chapter 3 to include identification of species-specific cumulative impacts of the proposed action. These corrections are neither substantive nor affect the analysis or conclusions in the final EIS.
After carefully considering public comments on the draft EIS and the alternatives described and analyzed in the final EIS, DOI selected the combination of Alternative C-1, “Gravesend Anchorage Area,” Alternative D, “EW 2 Submarine Export Cable Route Options to Minimize Impacts to the Sand Borrow Area,” Alternative F, “Wind Resource Optimization with Modifications for Environmental and Technical Considerations,” Alternative G, “Cable Bridge Crossing of Barnums Channel Adjacent to Long Island Railroad Bridge,” and Alternative H, “Dredging for EW 1 Export Cable Landfall.” This combination of alternatives is identified in the final EIS as the preferred alternative. The anticipated mitigation, monitoring, and reporting requirements are included in the ROD and will be included in BOEM's COP approval as terms and conditions. These requirements are available at:
https://www.boem.gov/renewable-energy/state-activities/empire-wind.
NMFS has adopted BOEM's final EIS to support its decision of whether to issue the requested ITR and associated LOA to Empire Wind. NMFS's final decision will be documented in a separate decision memorandum prepared in accordance with NMFS's internal policy and procedures. The final ITR and LOA, if issued, will be published in the
Federal Register
. The LOA would authorize Empire Wind to take small numbers of marine mammal incidental to the Projects' construction, would set forth permissible methods of incidental taking, would specify means to ensure the least practicable adverse impact on marine mammals and their habitat, and would include requirements for monitoring and reporting. Pursuant to section 7 of the Endangered Species Act, NMFS issued a final biological opinion to BOEM on September 8, 2023, evaluating the effects of the proposed action on ESA-listed species. The biological opinion includes the associated permits, approvals, and authorizations that may be issued.
Authority:
The National Environmental Policy Act of 1969, as amended, (42 U.S.C. 4321et seq.); 40 CFR 1505.2.
David Diamond,