Legal Status
This site displays a prototype of a “Web 2.0” version of the daily Federal Register. It is not an official legal edition of the Federal Register, and does not replace the official print version or the official electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal Register documents. Each document posted on the site includes a link to the corresponding official PDF file on govinfo.gov. This prototype edition of the daily Federal Register on FederalRegister.gov will remain an unofficial informational resource until the Administrative Committee of the Federal Register (ACFR) issues a regulation granting it official legal status. For complete information about, and access to, our official publications and services, go to About the Federal Register on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable regulatory information on FederalRegister.gov with the objective of establishing the XML-based Federal Register as an ACFR-sanctioned publication in the future. While every effort has been made to ensure that the material on FederalRegister.gov is accurately displayed, consistent with the official SGML-based PDF version on govinfo.gov, those relying on it for legal research should verify their results against an official edition of the Federal Register. Until the ACFR grants it official status, the XML rendition of the daily Federal Register on FederalRegister.gov does not provide legal notice to the public or judicial notice to the courts.
- Documents
- Public Inspection
-
Publication Date
-
Type
-
Section
-
Agency
-
National Wetland Plant List
The National Wetland Plant List (NWPL) provides plant species indicator status ratings, which are used in determining whether the hydrophytic vegetation factor is met when conducting wetland delineations under the Clean Water Act and wetland determinations under the Wetland Conservation Provisions of the Food Security Act. Other applications of...
-
Notice of Intent To Prepare a Draft Integrated Feasibility Report and Environmental Impact Statement for the Charleston Peninsula Coastal Flood Risk Management Study, Charleston County, South Carolina
Pursuant to the requirements of the National Environmental Policy Act (NEPA) of 1969, as implemented by the Council on Environmental Quality Regulations, the U.S. Army Corps of Engineers (USACE), Charleston District, announces its intent to conduct public scoping and solicit public comments to gather information to prepare a draft Integrated...
-
Water Resources Development Act of 2020 Comment Period and Stakeholder Sessions
The Assistant Secretary of the Army for Civil Works (ASA(CW)) is issuing this notice for a comment period for stakeholders and other interested parties to provide input and recommendations to the ASA(CW) on any provisions in the Water Resources Development Act (WRDA) of 2020. The Office of the ASA(CW) will consider all comments received before...
-
Submission for OMB Review; Comment Request
The Department of Defense has submitted to OMB for clearance the following proposal for collection of information under the provisions of the Paperwork Reduction Act.
-
Proposed Collection; Comment Request
In compliance with the Paperwork Reduction Act of 1995, the U.S. Army Corps of Engineers announces a proposed public information collection and seeks public comment on the provisions thereof. Comments are invited on: Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including...
-
Proposed Collection; Comment Request
In compliance with the Paperwork Reduction Act of 1995, the U.S. Corps of Engineers announces a proposed public information collection and seeks public comment on the provisions thereof. Comments are invited on: Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including...
-
Sabine Neches Navigation District User Fee Notice
The Water Resources Reform and Development Act (WRRDA) of 2014 authorizes a non-federal interest to levy port or harbor dues in the form of tonnage duties or fees in conjunction with a harbor navigation project whose usable increment of the project is complete to finance the cost, construction or maintenance of the project. The Sabine-Neches...
-
Inland Waterways Users Board Meeting Notice
The Department of the Army is publishing this notice to announce the Federal advisory committee online virtual meeting of the U.S. Army Corps of Engineers, Inland Waterways Users Board (Board). This meeting is open to the public. For additional information about the Board, please visit the committee's website at http://...
-
Notice of Availability of the Draft Integrated Disposition Report and Environmental Assessment for the Upper St. Anthony Falls Lock and Dam, Hennepin County, Minnesota
The St. Paul District, Army Corps of Engineers (Corps) is publishing this notice to announce that the draft Integrated Disposition Report and Environmental Assessment (DR/EA) for the Upper St. Anthony Falls Lock and Dam (USAF) is available for public review and comment in accordance with the National Environmental Policy Act (NEPA). The Corps...
-
Notification of Study Termination and Withdrawal of Notice of Intent To Prepare an Environmental Impact Statement for the San Francisco Bay to Stockton, California Navigation Study
The U.S. Army Corps of Engineers (USACE) is issuing this notice to advise Federal, State and local governmental agencies and the public that USACE is terminating the San Francisco Bay to Stockton, California Navigation Study and withdrawing its Notice of Intent (NOI) to prepare an Environmental Impact Statement (EIS) for said study.
-
Notice of Extension of Public Comment Period for the Interim Report for the Buffalo Bayou and Tributaries, Texas Resiliency Study
A notice of availability was published in the Federal Register by the U.S. Army Corps of Engineers (USACE) on October 2, 2020 for the Buffalo Bayou and Tributaries, Texas Resiliency Study (BBTRS) notifying the public an Interim Report was available for review and comment. The notice indicated the review period was to conclude on November 2,...
-
Inland Waterways Users Board; Request for Nominations
The Department of the Army is publishing this notice to request nominations to serve as representatives on the Inland Waterways Users Board, sponsored by the U.S. Army Corps of Engineers. Section 302 of Public Law 99-662 established the Inland Waterways Users Board. The Board is an independent Federal advisory committee. The Secretary of the...
-
Scoping Period Extension for Environmental Impact Statement for an Easement To Cross Under Lake Oahe, North Dakota for a Fuel-Carrying Pipeline Right-of-Way for a Portion of the Dakota Access Pipeline
The U.S. Army Corps of Engineers (USACE) is extending the scoping period through November 26, 2020. The scoping period was originally scheduled to end on October 26, 2020.
-
Notice of Availability of and Request for Comment on an Interim Report for the Buffalo Bayou and Tributaries, Texas Resiliency Study
The US Army Corps of Engineers (USACE) requests comments on the alternatives considered to date by the Buffalo Bayou and Tributaries, Texas Resiliency Study (BBTRS) to help inform the Study Team's recommendation to the Chief of Engineers on reducing the flood risk along Buffalo Bayou and its tributaries in Harris and Fort Bend counties, Texas....
-
Inland Waterways Users Board Meeting Notice
The Department of the Army is publishing this notice to announce the Federal advisory committee online virtual meeting of the U.S. Army Corps of Engineers, Inland Waterways Users Board (Board). This meeting is open to the public. For additional information about the Board, please visit the committee's website at http://...
-
Notice of Intent To Prepare an Environmental Impact Statement for the Nassau County Back Bays Coastal Storm Risk Management Feasibility Study
Pursuant to the requirements of the National Environmental Policy Act, the U.S. Army Corps of Engineers (Corps) plans to prepare an integrated Environmental Impact Statement (EIS) for the proposed Nassau County Back Bays (NCBB) Coastal Storm Risk Management (CSRM) Feasibility Study. The EIS will evaluate environmental impacts from reasonable...
-
Withdrawal of the Notice of Intent To Prepare an Environmental Impact Statement for the Upper Susquehanna River Basin, New York, Comprehensive Flood Damage Reduction Feasibility Study
The U.S. Army Corps of Engineers (USACE), Baltimore District, is notifying interested parties that it has withdrawn the notice of intent (NOI) to develop an EIS for the proposed Upper Susquehanna River Basin, New York, Comprehensive Flood Damage Reduction Feasibility Study.
-
Notice of Intent To Prepare an Environmental Impact Statement for an Easement to Cross Under Lake Oahe, North Dakota for a Fuel-Carrying Pipeline Right-Of-Way for a Portion of the Dakota Access Pipeline
This notice advises the public that the U.S. Army Corps of Engineers (Corps), as lead agency, will prepare an environmental impact statement (EIS) pursuant to court order to evaluate granting an easement to Dakota Access, LLC to cross federal land administered by Corps for the Oahe Dam and Reservoir Project on the Missouri River. This notice...
-
Table Rock Lake Oversight Committee; Meeting Notice
The Department of Defense (DoD) published a notice on July 6, 2020 that announced the third meeting of the Table Rock Lake Oversight Committee was to take place on July 16, 2020. In addition, Meeting 4 would also be rescheduled. DoD is publishing this notice to announce the revised schedule for Meeting 4 of the Federal advisory committee...